ROADWORKS SUMMARY
Blackbourne Chase, LITTLEHAMPTON, BN17 7FQ
Introduction

View current and future planned roadworks and road closures for Blackbourne Chase, BN17 7FQ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Blackbourne Chase, LITTLEHAMPTON, BN17 7FQ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Blackbourne Chase are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
3 Jan 2023 and 31 Aug 2026
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Beach Road, Littlehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2023 and could run through until 31 August 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 16 Mar 2023 at 14:49.
30 Mar 2025 and 12 Apr 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Arundel Road, Angmering.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 March 2025 and run through until 12 April 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 14:16.
21 Apr and 10 Oct 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Water Lane, Angmering.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Water on 27 Jun 2024 at 14:17.
21 Apr and 10 Oct 2025
Southern Water are proposing to carry out Utility repair and maintenance works on The Square, Angmering.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Water on 27 Jun 2024 at 14:17.
21 Apr and 10 Oct 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Station Road, Angmering.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Water on 27 Jun 2024 at 14:16.
19 May and 19 Dec 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Water Lane, Angmering.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 19 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Water on 18 Nov 2024 at 14:32.
19 Dec 2025
Southern Water are carrying out Utility repair and maintenance works on The Square, Angmering.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 May 2025 at 13:00 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 21 May 2025 at 13:01.
Tomorrow
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Pier Road, Littlehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 4 Jun 2025 at 11:51.
14 Nov 2025
West Sussex County Council are carrying out Highway improvement works on Shripney Road, Bognor Regis.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 20:00 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 6 Aug 2025 at 09:44.
18 Aug and 26 Sep 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Grevatts Lane, Yapton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 9 Jun 2025 at 15:03.
3 Oct 2025
West Sussex County Council are carrying out Highway repair and maintenance works on Grevatts Lane, Yapton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 August 2025 at 19:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 4 Sep 2025 at 14:37.
8 Oct 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Mill Lane, Littlehampton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 August 2025 at 12:20 and could run through until 8 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Sep 2025 at 10:23.
1 Sep and 3 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on St Floras Road, Littlehampton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 14:24.
8 Sep and 24 Oct 2025
West Sussex County Council are proposing to carry out Highway improvement works on New Road Eastbound, Angmering.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 13 Mar 2025 at 10:21.
24 Oct 2025
West Sussex County Council are carrying out Highway improvement works on New Road Westbound, Angmering.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 07:30 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 8 Sep 2025 at 08:37.
24 Oct 2025
West Sussex County Council are carrying out Highway improvement works on New Road Eastbound, Angmering.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 06:00 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 8 Sep 2025 at 07:43.
8 Sep and 24 Oct 2025
West Sussex County Council are proposing to carry out Highway improvement works on New Road Westbound, Angmering.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 13 Mar 2025 at 10:03.
24 Oct 2025
West Sussex County Council are carrying out Highway improvement works on Access To Superstores, Rustington.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 07:30 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 8 Sep 2025 at 08:35.
8 Sep and 24 Oct 2025
West Sussex County Council are proposing to carry out Highway improvement works on New Road Eastbound, Angmering.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 13 Mar 2025 at 10:24.
24 Oct 2025
West Sussex County Council are carrying out Highway improvement works on New Road Eastbound, Angmering.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 07:30 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 8 Sep 2025 at 08:37.
8 Sep and 24 Oct 2025
West Sussex County Council are proposing to carry out Highway improvement works on Access To Superstores, Rustington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 13 Mar 2025 at 10:25.
Tomorrow
Portsmouth Waterworks Company are carrying out Utility asset works on Climping Street, Climping.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 14:00 and could run through until 19 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Portsmouth Waterworks Company on 15 Sep 2025 at 10:07.
Tomorrow
Cityfibre Metro Networks were proposing to carry out Utility asset works on Arundel Road, Patching.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 19 September 2025. The works were due to impact the verge only.
This roadwork event was last updated by Cityfibre Metro Networks on 2 Jul 2025 at 11:25.
15 and 26 Sep 2025
West Sussex County Council were proposing to carry out Highway repair and maintenance works on North Drive, Angmering.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 29 Aug 2025 at 12:10.
27 Sep 2025
West Sussex County Council are carrying out Highway repair and maintenance works on North Drive, Angmering.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 09:30 and could run through until 27 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 15 Sep 2025 at 11:53.
Tuesday
Cityfibre Metro Networks were proposing to carry out Utility asset works on France Lane, Patching.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 September 2025 and run through until 23 September 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 30 Jun 2025 at 09:52.
18 Sep and 1 Oct 2025
Cityfibre Metro Networks were proposing to carry out Utility asset works on Long Furlong, Patching.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 September 2025 and run through until 1 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 25 Jun 2025 at 09:14.
18 Sep and 1 Oct 2025
Cityfibre Metro Networks were proposing to carry out Utility asset works on Long Furlong, Clapham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 September 2025 and run through until 1 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 25 Jun 2025 at 09:13.
19 Sep and 2 Oct 2025
Cityfibre Metro Networks were proposing to carry out Utility asset works on Long Furlong, Clapham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 September 2025 and run through until 2 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 2 Jul 2025 at 11:26.
19 and 25 Sep 2025
Trooli are proposing to carry out Utility asset works on Jays Close, Littlehampton.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 25 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Trooli on 8 Sep 2025 at 08:27.
19 Sep and 2 Oct 2025
Cityfibre Metro Networks were proposing to carry out Utility asset works on Long Furlong, Patching.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 September 2025 and run through until 2 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 2 Jul 2025 at 11:27.
Monday
Network Rail are proposing to carry out Works for Rail Purposes on Lidsey Road, Woodgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 6 May 2025 at 14:09.
Monday
Network Rail are proposing to carry out Works for Rail Purposes on Lidsey Road, Woodgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 8 Aug 2025 at 12:46.
22 Sep and 17 Oct 2025
Portsmouth Waterworks Company were proposing to carry out Utility asset works on Madehurst Road, Madehurst.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Portsmouth Waterworks Company on 2 Apr 2025 at 10:02.
22 Sep and 24 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Limmer Lane, Felpham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 15:18.
22 and 26 Sep 2025
Cityfibre Metro Networks were proposing to carry out Utility asset works on France Lane, Patching.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 25 Jun 2025 at 06:50.
22 Sep and 24 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southview Road, Felpham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 16:02.
24 and 30 Sep 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on France Lane, Patching.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 30 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 28 Jul 2025 at 07:36.
25 and 26 Sep 2025
West Sussex County Council are proposing to carry out Highway improvement works on Blue Star Roundabout, Angmering.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 16 Sep 2025 at 14:24.
25 and 27 Sep 2025
West Sussex County Council are proposing to carry out Highway improvement works on Lidsey Road, Woodgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 28 Aug 2025 at 10:17.
25 and 26 Sep 2025
West Sussex County Council are proposing to carry out Highway improvement works on Lidsey Road, Woodgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 4 Aug 2025 at 14:09.
25 and 27 Sep 2025
West Sussex County Council are proposing to carry out Highway improvement works on Lidsey Road, Woodgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 12 Sep 2025 at 10:01.
29 Sep and 24 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Western Road, Littlehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 08:26.
29 Sep and 24 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Augustine Road, Littlehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 08:25.
29 Sep and 24 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Irvine Road, Littlehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 10:22.
29 Sep and 24 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Irvine Road, Littlehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 08:27.
29 Sep and 24 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Western Road, Littlehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 11:31.
29 Sep and 24 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Augustine Road, Littlehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 11:34.
29 Sep and 3 Oct 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Kingston Lane, Kingston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 25 Jul 2025 at 10:58.
29 Sep and 3 Oct 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Kingston Lane, Kingston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Jul 2025 at 10:42.
1 and 3 Oct 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Church Lane, Eastergate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 20 Aug 2025 at 14:58.
1 and 3 Oct 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Arundel Road, Patching.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the verge only.
This roadwork event was last updated by Cityfibre Metro Networks on 28 Jul 2025 at 08:19.
1 and 3 Oct 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Church Lane, Eastergate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 13 Aug 2025 at 14:38.
1 Oct 2025
West Sussex County Council are proposing to carry out Highway improvement works on Guernsey Farm Lane, Felpham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 1 October 2025 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 30 Jul 2025 at 08:17.
2 Oct 2025
West Sussex County Council are proposing to carry out Highway improvement works on Eastergate Lane, Walberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 2 October 2025 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 22 Aug 2025 at 14:28.
6 and 17 Oct 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Long Furlong, Patching.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 28 Jul 2025 at 07:35.
6 Oct and 7 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southview Road, Felpham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 17 Mar 2025 at 11:29.
6 and 17 Oct 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Long Furlong, Clapham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 28 Jul 2025 at 07:35.
6 Oct and 19 Nov 2025
West Sussex County Council are proposing to carry out Highway improvement works on The Street, Houghton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 28 Apr 2025 at 11:51.
6 and 8 Oct 2025
National Highways are proposing to carry out Works for road purposes on Maltravers Street, Arundel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 5 Sep 2025 at 11:33.
6 Oct and 19 Nov 2025
West Sussex County Council are proposing to carry out Highway improvement works on The Street, Houghton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 30 May 2025 at 14:09.
6 and 8 Oct 2025
National Highways are proposing to carry out Works for road purposes on Maltravers Street, Arundel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 1 Sep 2025 at 09:32.
6 Oct and 7 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Limmer Lane, Felpham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Mar 2025 at 14:44.
6 and 17 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lansdowne Road, Littlehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 08:48.
6 and 17 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lansdowne Road, Littlehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 11:17.
7 and 10 Oct 2025
West Sussex County Council are proposing to carry out Highway improvement works on Eastergate Lane, Walberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 31 Jul 2025 at 12:24.
8 and 10 Oct 2025
National Highways are proposing to carry out Works for road purposes on Ford Road, Arundel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 1 Sep 2025 at 10:02.
8 and 10 Oct 2025
National Highways are proposing to carry out Works for road purposes on Ford Road, Arundel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 5 Sep 2025 at 11:33.
13 Oct and 21 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Walberton Lane, Walberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 15:31.
13 and 16 Oct 2025
West Sussex County Council are proposing to carry out Highway improvement works on Eastergate Lane, Walberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 15 Aug 2025 at 09:40.
13 and 30 Oct 2025
West Sussex County Council are proposing to carry out Highway improvement works on St Floras Road, Littlehampton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 30 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 22 Apr 2025 at 10:26.
13 and 30 Oct 2025
West Sussex County Council are proposing to carry out Highway improvement works on St Floras Road, Littlehampton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 30 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 24 Apr 2025 at 14:10.
13 Oct and 9 Nov 2025
West Sussex County Council are proposing to carry out roadworks on Lyminster Road, Lyminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 9 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Jun 2025 at 14:39.
13 Oct and 21 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Street, Walberton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 10:11.
20 and 31 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lansdowne Road, Littlehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 12:56.
20 and 31 Oct 2025
West Sussex County Council were proposing to carry out Section 50 on Eastergate Lane, Eastergate.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 7 Aug 2025 at 11:05.
21 and 23 Oct 2025
Southern Water are proposing to carry out Utility repair and maintenance works on Roundstone Lane, Angmering.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 22 Aug 2025 at 15:08.
27 Oct and 14 Nov 2025
West Sussex County Council are proposing to carry out Highway improvement works on Barnham Road, Eastergate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 16 Apr 2025 at 10:51.
27 Oct and 7 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lansdowne Road, Littlehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 13:34.
27 Oct and 14 Nov 2025
West Sussex County Council are proposing to carry out Highway improvement works on Barnham Road, Eastergate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 11 Apr 2025 at 09:08.
3 Nov and 24 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Yapton Road, Burndell, Ford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 24 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Aug 2025 at 15:42.
3 and 15 Nov 2025
West Sussex County Council were proposing to carry out Section 50 on Eastergate Lane, Eastergate.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 7 Aug 2025 at 11:03.
3 Nov and 24 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Yapton Road, Burndell, Ford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 24 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 14:53.
3 Nov and 5 Dec 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on St Winefrides Road, Littlehampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 5 December 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 14:24.
7 and 10 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Ferring Street, Ferring.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 27 Aug 2025 at 18:31.
10 and 14 Nov 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Manning Road, Littlehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 15 Aug 2025 at 11:26.
12 and 15 Nov 2025
West Sussex County Council are proposing to carry out Highway improvement works on Shripney Road, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 21 Aug 2025 at 10:28.
12 and 15 Nov 2025
West Sussex County Council are proposing to carry out Highway improvement works on Shripney Road, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 21 Aug 2025 at 10:36.
17 and 28 Nov 2025
West Sussex County Council are proposing to carry out Highway improvement works on Lyminster Road, Lyminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 21 Jul 2025 at 14:53.
17 and 28 Nov 2025
West Sussex County Council are proposing to carry out Highway improvement works on Lyminster Road, Lyminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 29 Jul 2025 at 10:09.
24 and 28 Nov 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Ferringham Lane, Ferring.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Sep 2025 at 15:23.
24 and 28 Nov 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Ferringham Lane, Ferring.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Sep 2025 at 17:31.
24 Nov and 5 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lansdowne Road, Littlehampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Sep 2025 at 14:19.
26 and 29 Nov 2025
West Sussex County Council are proposing to carry out Highway improvement works on Lyminster Road, Lyminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 29 Jul 2025 at 09:54.
26 and 29 Nov 2025
West Sussex County Council are proposing to carry out Highway improvement works on Lyminster Road, Lyminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 21 Jul 2025 at 14:04.
1 Dec 2025 and 16 Jan 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burndell Road, Yapton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 16 January 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Aug 2025 at 15:44.
2 and 5 Dec 2025
West Sussex County Council are proposing to carry out Highway improvement works on Eastergate Lane, Walberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 5 Sep 2025 at 13:30.
8 and 19 Dec 2025
West Sussex County Council are proposing to carry out Section 50 on Eastergate Lane, Eastergate.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 7 Aug 2025 at 11:25.
8 and 19 Dec 2025
West Sussex County Council are proposing to carry out Section 50 on Eastergate Lane, Eastergate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 19 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 7 Aug 2025 at 11:24.
Roadworks Map near to Blackbourne Chase, LITTLEHAMPTON, BN17 7FQ (29 Events)



























- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Blackbourne Chase, LITTLEHAMPTON, BN17 7FQ (29 Events)
(Scheduled Dates)
(miles)
(Scheduled: 2 Sep 2025 - 19 Sep 2025)
(Scheduled: 15 Sep 2025 - 26 Sep 2025)
(Scheduled: 2 Sep 2025 - 19 Sep 2025)
(Scheduled: 15 Sep 2025 - 18 Sep 2025)
Contains public sector information licensed under the Open Government Licence v3.0.