ROADWORKS SUMMARY
Highdown Drive, LITTLEHAMPTON, BN17 6HR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Highdown Drive, BN17 6HR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Highdown Drive, LITTLEHAMPTON, BN17 6HR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Highdown Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

West Sussex County Council logo
LONG TERM
Between
3 Jan 2023 and 31 Aug 2026
Details
View Map
Share
Follow
Beach Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Beach Road, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2023 and could run through until 31 August 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 16 Mar 2023 at 14:49.

Southern Gas Networks logo
LONG TERM
Between
30 Mar 2025 and 12 Apr 2026
Details
View Map
Share
Arundel Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Arundel Road, Angmering.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 March 2025 and run through until 12 April 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 14:16.

Southern Water logo
LONG TERM
Between
21 Apr and 10 Oct 2025
Details
View Map
Share
Follow
The Square

Southern Water are proposing to carry out Utility repair and maintenance works on The Square, Angmering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Water on 27 Jun 2024 at 14:17.

Southern Water logo
LONG TERM
Between
21 Apr and 10 Oct 2025
Details
View Map
Share
Follow
Water Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Water Lane, Angmering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Water on 27 Jun 2024 at 14:17.

Southern Water logo
LONG TERM
Between
21 Apr and 10 Oct 2025
Details
View Map
Share
Follow
Station Road

Southern Water are proposing to carry out Utility repair and maintenance works on Station Road, Angmering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Water on 27 Jun 2024 at 14:16.

Southern Water logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
The Square

Southern Water are carrying out Utility repair and maintenance works on The Square, Angmering.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 May 2025 at 13:00 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 21 May 2025 at 13:01.

Southern Gas Networks logo
LONG TERM
Until
14 Sep 2025
Details
View Map
Share
Follow
Lyminster Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Lyminster Road, Wick, Littlehampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 10:34 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 12:30.

Southern Water logo
LONG TERM
Between
19 May and 19 Dec 2025
Details
View Map
Share
Follow
Water Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Water Lane, Angmering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Water on 18 Nov 2024 at 14:32.

West Sussex County Council logo
LONG TERM
Between
21 Jul and 19 Sep 2025
Details
View Map
Share
Follow
Pier Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Pier Road, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 4 Jun 2025 at 11:51.

West Sussex County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
A259 Littlehampton Bypass

West Sussex County Council are proposing to carry out roadworks on A259 Littlehampton Bypass, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 7 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 9 Jul 2025 at 12:53.

West Sussex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
North End Road

West Sussex County Council are carrying out Highway improvement works on North End Road, Yapton.

These works are categorised as Major.

The works started on 6 August 2025 at 09:00 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 29 Aug 2025 at 15:16.

West Sussex County Council logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Grevatts Lane

West Sussex County Council are carrying out Highway repair and maintenance works on Grevatts Lane, Yapton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 19:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 21 Aug 2025 at 13:24.

West Sussex County Council logo
LONG TERM
Between
18 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Grevatts Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Grevatts Lane, Yapton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 9 Jun 2025 at 15:03.

Southern Gas Networks logo
Between
18 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Goring Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Goring Street, Castle, Worthing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 Jun 2025 at 09:54.

Southern Gas Networks logo
Between
18 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Goring Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Goring Way, Goring, Worthing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 Jun 2025 at 10:00.

Southern Gas Networks logo
Until
19 Sep 2025
Details
View Map
Share
Follow
Goring Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Goring Way, Goring, Worthing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 08:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 08:10.

Southern Gas Networks logo
Until
19 Sep 2025
Details
View Map
Share
Follow
Goring Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Goring Street, Castle, Worthing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 08:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 08:08.

Trooli logo
Between
1 and 12 Sep 2025
Details
View Map
Share
Jays Close

Trooli were proposing to carry out Utility asset works on Jays Close, Littlehampton.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 12 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Trooli on 5 Aug 2025 at 10:49.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 3 Oct 2025
Details
View Map
Share
St Floras Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on St Floras Road, Littlehampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 14:24.

West Sussex County Council logo
Between
1 and 15 Sep 2025
Details
View Map
Share
St Floras Road

West Sussex County Council were proposing to carry out Highway improvement works on St Floras Road, Littlehampton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 15 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 17 Apr 2025 at 15:51.

Trooli logo
Between
1 and 12 Sep 2025
Details
View Map
Share
Follow
Jays Close

Trooli are proposing to carry out Utility asset works on Jays Close, Littlehampton.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Trooli on 6 Aug 2025 at 09:08.

Network Rail logo
Finishing
Today
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Rustington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Jun 2025 at 11:35.

Network Rail logo
Today
Details
View Map
Share
Station Road

Network Rail carried out Works for Rail Purposes on Station Road, Rustington.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 1 Sep 2025 and 3 Sep 2025 and were actually completed between 1 Sep 2025 (23:00) and 3 Sep 2025 (06:00). The works impacted the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Sep 2025 at 07:57.

West Sussex County Council logo
Between
1 and 12 Sep 2025
Details
View Map
Share
Follow
North Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on North Drive, Angmering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 8 Jul 2025 at 12:10.

West Sussex County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Marshall Close

West Sussex County Council are proposing to carry out Highway improvement works on Marshall Close, Barnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 6 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 27 Aug 2025 at 12:53.

West Sussex County Council logo
LONG TERM
Between
8 Sep and 24 Oct 2025
Details
View Map
Share
Follow
New Road Westbound

West Sussex County Council are proposing to carry out Highway improvement works on New Road Westbound, Angmering.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 13 Mar 2025 at 10:03.

West Sussex County Council logo
LONG TERM
Between
8 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Access To Superstores

West Sussex County Council are proposing to carry out Highway improvement works on Access To Superstores, Rustington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 13 Mar 2025 at 10:25.

West Sussex County Council logo
LONG TERM
Between
8 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Access To Superstores

West Sussex County Council are proposing to carry out Highway improvement works on Access To Superstores, Rustington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 24 Mar 2025 at 09:23.

West Sussex County Council logo
LONG TERM
Between
8 Sep and 24 Oct 2025
Details
View Map
Share
Follow
New Road Westbound

West Sussex County Council are proposing to carry out Highway improvement works on New Road Westbound, Angmering.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 24 Mar 2025 at 09:49.

Portsmouth Waterworks Company logo
Between
8 and 12 Sep 2025
Details
View Map
Share
Follow
Climping Street

Portsmouth Waterworks Company are proposing to carry out Utility asset works on Climping Street, Climping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Portsmouth Waterworks Company on 1 Jul 2025 at 10:41.

Portsmouth Waterworks Company logo
Between
8 and 12 Sep 2025
Details
View Map
Share
Follow
Climping Street

Portsmouth Waterworks Company are proposing to carry out Utility asset works on Climping Street, Climping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Portsmouth Waterworks Company on 16 Jun 2025 at 12:11.

West Sussex County Council logo
LONG TERM
Between
8 Sep and 24 Oct 2025
Details
View Map
Share
Follow
New Road Eastbound

West Sussex County Council are proposing to carry out Highway improvement works on New Road Eastbound, Angmering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 13 Mar 2025 at 10:21.

West Sussex County Council logo
LONG TERM
Between
8 Sep and 24 Oct 2025
Details
View Map
Share
Follow
New Road Eastbound

West Sussex County Council are proposing to carry out Highway improvement works on New Road Eastbound, Angmering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 17 Mar 2025 at 13:21.

West Sussex County Council logo
LONG TERM
Between
8 Sep and 24 Oct 2025
Details
View Map
Share
Follow
New Road Eastbound

West Sussex County Council are proposing to carry out Highway improvement works on New Road Eastbound, Angmering.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 13 Mar 2025 at 10:24.

West Sussex County Council logo
LONG TERM
Between
8 Sep and 24 Oct 2025
Details
View Map
Share
Follow
New Road Eastbound

West Sussex County Council are proposing to carry out Highway improvement works on New Road Eastbound, Angmering.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 24 Mar 2025 at 09:58.

West Sussex County Council logo
Between
8 and 12 Sep 2025
Details
View Map
Share
Follow
Main Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Main Road, Yapton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Aug 2025 at 15:09.

West Sussex County Council logo
Between
15 and 26 Sep 2025
Details
View Map
Share
North Drive

West Sussex County Council were proposing to carry out Highway repair and maintenance works on North Drive, Angmering.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Aug 2025 at 12:10.

West Sussex County Council logo
On
15 Sep 2025
Details
View Map
Share
Follow
Church Street

West Sussex County Council are proposing to carry out Highway improvement works on Church Street, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 15 September 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 2 Sep 2025 at 10:15.

West Sussex County Council logo
On
15 Sep 2025
Details
View Map
Share
Follow
Church Street

West Sussex County Council are proposing to carry out Highway improvement works on Church Street, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 15 September 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 22 Jul 2025 at 19:02.

Cityfibre Metro Networks logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Arundel Road

Cityfibre Metro Networks were proposing to carry out Utility asset works on Arundel Road, Patching.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 19 September 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Jul 2025 at 11:25.

West Sussex County Council logo
On
15 Sep 2025
Details
View Map
Share
Follow
Clun Road

West Sussex County Council are proposing to carry out Highway improvement works on Clun Road, Wick, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 15 September 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 18 Jul 2025 at 10:16.

West Sussex County Council logo
On
15 Sep 2025
Details
View Map
Share
Follow
Clun Road

West Sussex County Council are proposing to carry out Highway improvement works on Clun Road, Wick, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 15 September 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 2 Sep 2025 at 10:11.

West Sussex County Council logo
Between
15 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Littlehampton Road

West Sussex County Council are proposing to carry out roadworks on Littlehampton Road, Salvington, Worthing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 28 Apr 2025 at 13:28.

West Sussex County Council logo
On
16 Sep 2025
Details
View Map
Share
Follow
Carisbrooke Drive

West Sussex County Council are proposing to carry out Highway improvement works on Carisbrooke Drive, Northbrook, Worthing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 16 September 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 30 Jul 2025 at 09:33.

West Sussex County Council logo
On
16 Sep 2025
Details
View Map
Share
Follow
Carisbrooke Drive

West Sussex County Council are proposing to carry out Highway improvement works on Carisbrooke Drive, Northbrook, Worthing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 16 September 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 3 Sep 2025 at 08:15.

Cityfibre Metro Networks logo
Between
17 and 23 Sep 2025
Details
View Map
Share
France Lane

Cityfibre Metro Networks were proposing to carry out Utility asset works on France Lane, Patching.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 September 2025 and run through until 23 September 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Jun 2025 at 09:52.

Cityfibre Metro Networks logo
Between
18 Sep and 1 Oct 2025
Details
View Map
Share
Long Furlong

Cityfibre Metro Networks were proposing to carry out Utility asset works on Long Furlong, Patching.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 September 2025 and run through until 1 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 25 Jun 2025 at 09:14.

Cityfibre Metro Networks logo
Between
18 Sep and 1 Oct 2025
Details
View Map
Share
Long Furlong

Cityfibre Metro Networks were proposing to carry out Utility asset works on Long Furlong, Clapham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 September 2025 and run through until 1 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 25 Jun 2025 at 09:13.

Cityfibre Metro Networks logo
Between
19 Sep and 2 Oct 2025
Details
View Map
Share
Long Furlong

Cityfibre Metro Networks were proposing to carry out Utility asset works on Long Furlong, Patching.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 September 2025 and run through until 2 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Jul 2025 at 11:27.

Cityfibre Metro Networks logo
Between
19 Sep and 2 Oct 2025
Details
View Map
Share
Long Furlong

Cityfibre Metro Networks were proposing to carry out Utility asset works on Long Furlong, Clapham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 September 2025 and run through until 2 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Jul 2025 at 11:26.

Portsmouth Waterworks Company logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Madehurst Road

Portsmouth Waterworks Company were proposing to carry out Utility asset works on Madehurst Road, Madehurst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Portsmouth Waterworks Company on 2 Apr 2025 at 10:02.

Cityfibre Metro Networks logo
Between
22 and 26 Sep 2025
Details
View Map
Share
France Lane

Cityfibre Metro Networks were proposing to carry out Utility asset works on France Lane, Patching.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 25 Jun 2025 at 06:50.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Southview Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southview Road, Felpham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 16:02.

West Sussex County Council logo
On
22 Sep 2025
Details
View Map
Share
Follow
Goring Way

West Sussex County Council are proposing to carry out Highway improvement works on Goring Way, Goring, Worthing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 22 September 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Jul 2025 at 12:18.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Limmer Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Limmer Lane, Felpham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 15:18.

Cityfibre Metro Networks logo
Between
24 and 30 Sep 2025
Details
View Map
Share
Follow
France Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on France Lane, Patching.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 30 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Jul 2025 at 07:36.

Southern Gas Networks logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Western Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Western Road, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 11:31.

Southern Gas Networks logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
St Augustine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Augustine Road, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 08:25.

Southern Gas Networks logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Western Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Western Road, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 08:26.

Southern Gas Networks logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
St Augustine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Augustine Road, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 11:34.

Southern Gas Networks logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Irvine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Irvine Road, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 10:22.

UK Power Networks South Eastern logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Kingston Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Kingston Lane, Kingston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Jul 2025 at 10:58.

UK Power Networks South Eastern logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Kingston Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Kingston Lane, Kingston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Jul 2025 at 10:42.

Southern Gas Networks logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Irvine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Irvine Road, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 08:27.

West Sussex County Council logo
On
1 Oct 2025
Details
View Map
Share
Follow
Guernsey Farm Lane

West Sussex County Council are proposing to carry out Highway improvement works on Guernsey Farm Lane, Felpham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 1 October 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 30 Jul 2025 at 08:17.

Cityfibre Metro Networks logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Arundel Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Arundel Road, Patching.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the verge only.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Jul 2025 at 08:19.

West Sussex County Council logo
On
2 Oct 2025
Details
View Map
Share
Follow
Eastergate Lane

West Sussex County Council are proposing to carry out Highway improvement works on Eastergate Lane, Walberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 2 October 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 22 Aug 2025 at 14:28.

Cityfibre Metro Networks logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Long Furlong

Cityfibre Metro Networks are proposing to carry out Utility asset works on Long Furlong, Patching.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Jul 2025 at 07:35.

Southern Gas Networks logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Lansdowne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lansdowne Road, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 11:17.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Limmer Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Limmer Lane, Felpham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Mar 2025 at 14:44.

Cityfibre Metro Networks logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Long Furlong

Cityfibre Metro Networks are proposing to carry out Utility asset works on Long Furlong, Clapham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Jul 2025 at 07:35.

National Highways logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Maltravers Street

National Highways are proposing to carry out Works for road purposes on Maltravers Street, Arundel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 1 Sep 2025 at 09:32.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Southview Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southview Road, Felpham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Mar 2025 at 11:29.

Southern Gas Networks logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Lansdowne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lansdowne Road, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 08:48.

West Sussex County Council logo
Between
7 and 10 Oct 2025
Details
View Map
Share
Follow
Eastergate Lane

West Sussex County Council are proposing to carry out Highway improvement works on Eastergate Lane, Walberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Jul 2025 at 12:24.

National Highways logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Ford Road

National Highways are proposing to carry out Works for road purposes on Ford Road, Arundel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 1 Sep 2025 at 10:02.

West Sussex County Council logo
Between
13 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Lyminster Road

West Sussex County Council are proposing to carry out roadworks on Lyminster Road, Lyminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 10 Jun 2025 at 14:39.

Southern Gas Networks logo
LONG TERM
Between
13 Oct and 21 Nov 2025
Details
View Map
Share
Follow
West Walberton Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Walberton Lane, Walberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 15:31.

West Sussex County Council logo
Between
13 and 16 Oct 2025
Details
View Map
Share
Follow
Eastergate Lane

West Sussex County Council are proposing to carry out Highway improvement works on Eastergate Lane, Walberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Aug 2025 at 09:40.

Southern Gas Networks logo
LONG TERM
Between
13 Oct and 21 Nov 2025
Details
View Map
Share
Follow
The Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Street, Walberton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 10:11.

West Sussex County Council logo
Between
13 and 30 Oct 2025
Details
View Map
Share
Follow
St Floras Road

West Sussex County Council are proposing to carry out Highway improvement works on St Floras Road, Littlehampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 30 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 22 Apr 2025 at 10:26.

West Sussex County Council logo
Between
13 and 30 Oct 2025
Details
View Map
Share
Follow
St Floras Road

West Sussex County Council are proposing to carry out Highway improvement works on St Floras Road, Littlehampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 30 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 24 Apr 2025 at 14:10.

Southern Gas Networks logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Lansdowne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lansdowne Road, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 12:56.

Southern Water logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Roundstone Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Roundstone Lane, Angmering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 22 Aug 2025 at 15:08.

West Sussex County Council logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Barnham Road

West Sussex County Council are proposing to carry out Highway improvement works on Barnham Road, Eastergate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 11 Apr 2025 at 09:08.

Southern Gas Networks logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Lansdowne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lansdowne Road, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 11:40.

West Sussex County Council logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Barnham Road

West Sussex County Council are proposing to carry out Highway improvement works on Barnham Road, Eastergate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 16 Apr 2025 at 10:51.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 24 Dec 2025
Details
View Map
Share
Follow
Yapton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Yapton Road, Burndell, Ford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2025 at 15:42.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 5 Dec 2025
Details
View Map
Share
St Winefrides Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on St Winefrides Road, Littlehampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 5 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 14:24.

Network Rail logo
Between
7 and 10 Nov 2025
Details
View Map
Share
Follow
Ferring Street

Network Rail are proposing to carry out Works for Rail Purposes on Ferring Street, Ferring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 27 Aug 2025 at 18:31.

UK Power Networks South Eastern logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Manning Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Manning Road, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Aug 2025 at 11:26.

West Sussex County Council logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Lyminster Road

West Sussex County Council are proposing to carry out Highway improvement works on Lyminster Road, Lyminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Jul 2025 at 14:53.

West Sussex County Council logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Lyminster Road

West Sussex County Council are proposing to carry out Highway improvement works on Lyminster Road, Lyminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Jul 2025 at 10:09.

UK Power Networks South Eastern logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Ferringham Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Ferringham Lane, Ferring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Aug 2025 at 10:19.

West Sussex County Council logo
Between
26 and 29 Nov 2025
Details
View Map
Share
Follow
Lyminster Road

West Sussex County Council are proposing to carry out Highway improvement works on Lyminster Road, Lyminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Jul 2025 at 09:54.

West Sussex County Council logo
Between
26 and 29 Nov 2025
Details
View Map
Share
Follow
Lyminster Road

West Sussex County Council are proposing to carry out Highway improvement works on Lyminster Road, Lyminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Jul 2025 at 14:04.

Southern Gas Networks logo
LONG TERM
Between
1 Dec 2025 and 16 Jan 2026
Details
View Map
Share
Follow
Burndell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burndell Road, Yapton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 16 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2025 at 15:44.


Roadworks Map near to Highdown Drive, LITTLEHAMPTON, BN17 6HR (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Highdown Drive, LITTLEHAMPTON, BN17 6HR (37 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
HIGHDOWN DRIVE 
(0.0 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 1 Sep 2025 - 3 Sep 2025
0.0
Details
Share
Follow
2
Trooli logo
MADEHURST WAY 
(0.2 miles)
Trooli
Utility asset works - Footway, Carriageway, Verge - Multi-way signals
Planned
Scheduled: 1 Sep 2025 - 12 Sep 2025
0.2
Details
Share
Follow
3
Trooli logo
MADEHURST WAY 
(0.2 miles)
Trooli
Utility asset works - Footway, Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 1 Sep 2025 - 12 Sep 2025)
0.2
Details
Share
4
Trooli logo
JAYS CLOSE 
(0.2 miles)
Trooli
Utility asset works - Footway, Carriageway, Verge - Multi-way signals
Planned
Scheduled: 1 Sep 2025 - 12 Sep 2025
0.2
Details
Share
Follow
5
Trooli logo
JAYS CLOSE 
(0.2 miles)
Trooli
Utility asset works - Footway, Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 1 Sep 2025 - 12 Sep 2025)
0.2
Details
Share
6
Nexfibre Networks Limited logo
CORNWALL ROAD 
(0.3 miles)
Nexfibre Networks Limited
New service connection - Footway, Verge - Give and take
In Progress
Since: 2 Sep 2025 10:22
(Scheduled: 2 Sep 2025 - 15 Sep 2025)
0.3
Details
Share
Follow
7
Trooli logo
COLEBROOK ROAD 
(0.4 miles)
Trooli
Utility asset works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 2 Sep 2025 10:49
(Scheduled: 1 Sep 2025 - 8 Sep 2025)
0.4
Details
Share
Follow
8
Southern Gas Networks logo
MAJOR
  
LYMINSTER ROAD, WICK 
(0.4 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
In Progress
Since: 19 May 2025 10:34
(Scheduled: 19 May 2025 - 14 Sep 2025)
0.4
Details
Share
Follow
9
West Sussex County Council logo
MAJOR
  
HILL ROAD 
(0.4 miles)
West Sussex County Council
Works for road purposes - Footway, Carriageway, Verge - No carriageway incursion
Planned
Scheduled: 8 May 2025 - 5 Nov 2025
0.4
Details
Share
Follow
10
Southern Water logo
URGENT
  
GROVE CRESCENT 
(0.4 miles)
Southern Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
30 Aug 2025 09:09 - 3 Sep 2025 09:16
0.4
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.