View current and future planned roadworks and road closures for Surrey Street, BN17 5DT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Surrey Street, LITTLEHAMPTON, BN17 5DT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Surrey Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

West Sussex County Council logo
LONG TERM
Between
3 Jan 2023 and 31 Aug 2026
Details
View Map
Share
Follow
Beach Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Beach Road, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2023 and could run through until 31 August 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 16 Mar 2023 at 14:49.

West Sussex County Council logo
LONG TERM
Between
2 Sep 2024 and 16 May 2025
Details
View Map
Share
Follow
Angmering Bypass Northbound

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Angmering Bypass Northbound, Angmering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 16 May 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 30 Oct 2024 at 09:15.

West Sussex County Council logo
LONG TERM
Between
2 Sep 2024 and 16 May 2025
Details
View Map
Share
Angmering Bypass Northbound

West Sussex County Council were proposing to carry out Highway repair and maintenance works on Angmering Bypass Northbound, Angmering.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 16 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 2 Sep 2024 at 11:44.

West Sussex County Council logo
LONG TERM
Between
8 Sep 2024 and 9 Mar 2025
Details
View Map
Share
Follow
Daltons Place

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Daltons Place, Arundel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2024 and could run through until 9 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 8 May 2024 at 10:12.

West Sussex County Council logo
LONG TERM
Between
9 Sep 2024 and 10 Mar 2025
Details
View Map
Share
Follow
Fitzalan Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Fitzalan Road, Arundel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 10 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 8 May 2024 at 10:23.

West Sussex County Council logo
LONG TERM
Between
9 Sep 2024 and 9 Mar 2025
Details
View Map
Share
Follow
Malthouse Close

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Malthouse Close, Arundel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 9 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 8 May 2024 at 11:15.

Southern Gas Networks logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Bilsham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Bilsham Road, Yapton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 09:00 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 09:19.

West Sussex County Council logo
LONG TERM
Between
27 Sep 2024 and 27 Mar 2025
Details
View Map
Share
Follow
Dukes Close

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Dukes Close, Arundel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 27 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 14 Aug 2024 at 09:12.

West Sussex County Council logo
LONG TERM
Between
27 Sep 2024 and 27 Mar 2025
Details
View Map
Share
Follow
Hill Terrace

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Hill Terrace, Arundel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 27 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 14 Aug 2024 at 09:32.

West Sussex County Council logo
LONG TERM
Between
29 Sep 2024 and 29 Mar 2025
Details
View Map
Share
Follow
Torton Hill Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Torton Hill Road, Arundel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2024 and could run through until 29 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 2 Aug 2024 at 09:04.

Southern Gas Networks logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Goring Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Goring Street, Castle, Worthing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 13:52.

Cityfibre Metro Networks logo
LONG TERM
Between
14 Oct and 6 Dec 2024
Details
View Map
Share
Flansham Park

Cityfibre Metro Networks were proposing to carry out Utility asset works on Flansham Park, Felpham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 31 Oct 2024 at 11:43.

Cityfibre Metro Networks logo
LONG TERM
Between
14 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Flansham Park

Cityfibre Metro Networks are proposing to carry out Utility asset works on Flansham Park, Felpham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Oct 2024 at 14:38.

Southern Gas Networks logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Limmer Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Limmer Lane, Felpham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 11:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 11:33.

Southern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Ferringham Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Ferringham Lane, Ferring.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 October 2024 at 15:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 11:18.

West Sussex County Council logo
LONG TERM
Between
27 Oct 2024 and 27 Apr 2025
Details
View Map
Share
Follow
Canada Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Canada Road, Arundel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2024 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 9 Oct 2024 at 16:30.

West Sussex County Council logo
LONG TERM
Between
27 Oct 2024 and 27 Apr 2025
Details
View Map
Share
Follow
Green Lane Close

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Green Lane Close, Arundel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2024 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 9 Oct 2024 at 16:30.

Cityfibre Metro Networks logo
LONG TERM
Until
2 Dec 2024
Details
View Map
Share
Follow
Westmorland Drive

Cityfibre Metro Networks are carrying out Utility asset works on Westmorland Drive, Felpham.

These works are categorised as Major.

The works started on 28 October 2024 at 13:52 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 31 Oct 2024 at 11:43.

Cityfibre Metro Networks logo
LONG TERM
Between
30 Oct and 4 Dec 2024
Details
View Map
Share
Follow
Westmorland Drive

Cityfibre Metro Networks are proposing to carry out Utility asset works on Westmorland Drive, Felpham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Jul 2024 at 13:49.

West Sussex County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Tye Lane

West Sussex County Council are carrying out Highway repair and maintenance works on Tye Lane, Walberton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 14:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 14:52.

Southern Water logo
Finishing
Today
Details
View Map
Share
Follow
Dappers Lane

Southern Water are carrying out Utility repair and maintenance works on Dappers Lane, Angmering.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 07:18 and could run through until 22 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 18 Nov 2024 at 09:30.

Southern Water logo
Finishing
Today
Details
View Map
Share
Follow
Dappers Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Dappers Lane, Angmering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 4 Oct 2024 at 09:53.

Southern Water logo
Finishing
Today
Details
View Map
Share
Follow
Dappers Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Dappers Lane, Angmering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 1 Oct 2024 at 16:32.

West Sussex County Council logo
Finishing
Today
Details
View Map
Share
Follow
Bilsham Road

West Sussex County Council are carrying out Highway improvement works on Bilsham Road, Yapton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 10:09 and could run through until 22 November 2024. The works will impact the verge and footpath.

This roadwork event was last updated by West Sussex County Council on 19 Nov 2024 at 14:48.

Nexfibre Networks Limited logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Wroxham Way

Nexfibre Networks Limited are proposing to carry out New service connection on Wroxham Way, Felpham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 25 Sep 2024 at 10:43.

West Sussex County Council logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Water Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Water Lane, Angmering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 15:13.

West Sussex County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Water Lane

West Sussex County Council are carrying out Highway repair and maintenance works on Water Lane, Angmering.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 18 Nov 2024 at 15:23.

Cityfibre Metro Networks logo
LONG TERM
Between
19 Nov 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Flansham Park

Cityfibre Metro Networks are proposing to carry out Utility asset works on Flansham Park, Felpham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 6 Sep 2024 at 10:55.

West Sussex County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
The Causeway

West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Causeway, Arundel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 12:37.

West Sussex County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Fitzalan Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Fitzalan Road, Arundel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 10:09.

Nexfibre Networks Limited logo
Between
25 Nov and 21 Dec 2024
Details
View Map
Share
Follow
The Estuary

Nexfibre Networks Limited are proposing to carry out New service connection on The Estuary, Littlehampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 21 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 8 Oct 2024 at 12:36.

Nexfibre Networks Limited logo
Between
25 Nov and 21 Dec 2024
Details
View Map
Share
Follow
The Estuary

Nexfibre Networks Limited are proposing to carry out New service connection on The Estuary, Littlehampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 21 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Nov 2024 at 11:24.

Nexfibre Networks Limited logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Holmes Lane

Nexfibre Networks Limited are proposing to carry out New service connection on Holmes Lane, Rustington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Oct 2024 at 15:17.

Nexfibre Networks Limited logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Holmes Lane

Nexfibre Networks Limited are proposing to carry out New service connection on Holmes Lane, Rustington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Oct 2024 at 15:50.

BT logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Yapton Road

BT are proposing to carry out Utility asset works on Yapton Road, Middleton-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 Nov 2024 at 13:50.

BT logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Yapton Road

BT are proposing to carry out Utility asset works on Yapton Road, Middleton-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Jun 2024 at 10:29.

West Sussex County Council logo
Between
6 and 10 Dec 2024
Details
View Map
Share
Follow
Lake Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Yapton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 12:45.

West Sussex County Council logo
Between
6 and 10 Dec 2024
Details
View Map
Share
Follow
Lake Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Yapton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 09:46.

West Sussex County Council logo
Between
6 and 10 Dec 2024
Details
View Map
Share
Follow
Lake Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Walberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 12:16.

West Sussex County Council logo
Between
6 and 10 Dec 2024
Details
View Map
Share
Follow
Lake Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Walberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 09:45.

West Sussex County Council logo
Between
6 and 10 Dec 2024
Details
View Map
Share
Follow
Lake Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Barnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 12:09.

West Sussex County Council logo
Between
6 and 10 Dec 2024
Details
View Map
Share
Follow
Lake Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Barnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 09:45.

West Sussex County Council logo
Between
6 and 9 Dec 2024
Details
View Map
Share
Follow
Water Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Water Lane, Angmering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 30 Aug 2024 at 13:16.

West Sussex County Council logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Lake Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Barnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 10:34.

West Sussex County Council logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Lake Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Yapton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 10:38.

West Sussex County Council logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Lake Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Walberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 10:35.

Southern Water logo
On
2 Jan 2025
Details
View Map
Share
Ferringham Lane

Southern Water were proposing to carry out Utility repair and maintenance works on Ferringham Lane, Ferring.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 2 January 2025 The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 7 Oct 2024 at 15:41.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lyminster Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lyminster Road, Wick, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Mar 2024 at 10:17.

BT logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Grevatts Lane West

BT are proposing to carry out Utility asset works on Grevatts Lane West, Yapton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 24 May 2024 at 05:48.

West Sussex County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Limmer Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Limmer Lane, Felpham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 6 Sep 2024 at 13:32.

West Sussex County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Water Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Water Lane, Angmering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 12 Nov 2024 at 14:26.

West Sussex County Council logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Felpham Way

West Sussex County Council are proposing to carry out Highway improvement works on Felpham Way, Felpham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 16:08.

West Sussex County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Limmer Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Limmer Lane, Felpham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 23 Aug 2024 at 11:25.

West Sussex County Council logo
Between
16 and 21 Jan 2025
Details
View Map
Share
Follow
Arndale Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Arndale Road, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 13:52.

West Sussex County Council logo
Between
16 and 21 Jan 2025
Details
View Map
Share
Follow
Arndale Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Arndale Road, Littlehampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 4 Nov 2024 at 10:52.

Scottish Hydro Electric Power Dis logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Mill Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Mill Road, Slindon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Nov 2024 at 10:04.

Scottish Hydro Electric Power Dis logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Mill Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Mill Road, Slindon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Nov 2024 at 15:26.

Scottish Hydro Electric Power Dis logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Church Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Church Lane, Barnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Oct 2024 at 10:19.

Scottish Hydro Electric Power Dis logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Church Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Church Lane, Barnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Oct 2024 at 13:39.

West Sussex County Council logo
Between
29 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Felpham Gardens

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Felpham Gardens, Felpham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 13 Nov 2024 at 12:34.

West Sussex County Council logo
Between
29 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Felpham Gardens

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Felpham Gardens, Felpham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 12 Nov 2024 at 12:54.

West Sussex County Council logo
Between
30 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Felpham Way

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Felpham Way, Felpham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 24 Oct 2024 at 21:13.

West Sussex County Council logo
Between
30 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Felpham Gardens

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Felpham Gardens, Felpham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 11:44.

BT logo
Between
1 and 8 Feb 2025
Details
View Map
Share
The Street

BT were proposing to carry out Utility asset works on The Street, Walberton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 24 Sep 2024 at 10:54.

BT logo
Between
1 and 8 Feb 2025
Details
View Map
Share
Tye Lane

BT were proposing to carry out Utility asset works on Tye Lane, Walberton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 24 Sep 2024 at 10:53.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Tye Lane

BT were proposing to carry out Utility asset works on Tye Lane, Walberton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 23 Sep 2024 at 15:28.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
The Street

BT were proposing to carry out Utility asset works on The Street, Walberton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 23 Sep 2024 at 15:28.

UK Power Networks South Eastern logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Sea Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Sea Lane, Ferring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Nov 2024 at 15:43.

UK Power Networks South Eastern logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Sea Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Sea Lane, Ferring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Nov 2024 at 09:43.

UK Power Networks South Eastern logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Sea Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Sea Lane, Ferring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Nov 2024 at 14:13.

West Sussex County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Sea Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Sea Lane, Ferring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 09:40.

West Sussex County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Sea Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Sea Lane, Ferring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 12 Nov 2024 at 11:03.


Roadworks Map near to Surrey Street, LITTLEHAMPTON, BN17 5DT

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 22 Nov 2024 04:55
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Surrey Street, LITTLEHAMPTON, BN17 5DT (30 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
West Sussex County Council logo
SURREY STREET 
(0.0 miles)
West Sussex County Council
Section 50 - Footway, Carriageway, Verge - Priority working
Cancelled
(Scheduled: 18 Nov 2024 - 22 Nov 2024)
0.0
Details
Share
2
West Sussex County Council logo
HIGH STREET 
(0.1 miles)
West Sussex County Council
Highway repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 22 Nov 2024
0.1
Details
Share
Follow
3
Southern Gas Networks logo
PIER ROAD 
(0.1 miles)
Southern Gas Networks
Disconnection or alteration of supply - Footway - No carriageway incursion
In Progress
Since: 21 Nov 2024 10:10
(Scheduled: 21 Nov 2024 - 27 Nov 2024)
0.1
Details
Share
Follow
4
Trooli logo
HOWARD ROAD 
(0.2 miles)
Trooli
Utility asset works - Footway - Some carriageway incursion
Complete
20 Nov 2024 15:15 - 21 Nov 2024 13:19
0.2
Details
Share
5
West Sussex County Council logo
MAJOR
  
BEACH ROAD 
(0.2 miles)
West Sussex County Council
Highway repair and maintenance works - Footway, Carriageway - Road closure
Planned
Scheduled: 3 Jan 2023 - 31 Aug 2026
0.2
Details
Share
Follow
6
West Sussex County Council logo
MAJOR
  
FITZALAN ROAD 
(0.4 miles)
West Sussex County Council
Highway repair and maintenance works - Footway, Carriageway - No carriageway incursion
Planned
Scheduled: 24 Feb 2023 - 24 Feb 2026
0.4
Details
Share
Follow
7
Trooli logo
HARWOOD ROAD 
(0.4 miles)
Trooli
Utility asset works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 20 Nov 2024 - 22 Nov 2024)
0.4
Details
Share
8
Nexfibre Networks Limited logo
SELBORNE ROAD 
(0.4 miles)
Nexfibre Networks Limited
New service connection - Footway, Verge - Some carriageway incursion
In Progress
Since: 21 Nov 2024 12:45
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
0.4
Details
Share
Follow
9
Trooli logo
WICK FARM ROAD 
(0.5 miles)
Trooli
Utility asset works - Footway, Verge - Some carriageway incursion
Planned
Scheduled: 21 Nov 2024 - 22 Nov 2024
0.5
Details
Share
Follow
10
Trooli logo
ARUNDEL ROAD 
(0.5 miles)
Trooli
Utility asset works - Footway, Carriageway, Verge - Multi-way signals
In Progress
Since: 21 Nov 2024 11:55
(Scheduled: 21 Nov 2024 - 22 Nov 2024)
0.5
Details
Share
Follow
  • ...