ROADWORKS SUMMARY
Slater Avenue, BOLTON, BL6 7BJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Slater Avenue, BL6 7BJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Slater Avenue, BOLTON, BL6 7BJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Slater Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

United Utilities Water (formerly North West Water) logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Moor Road

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Moor Road, Anglezarke.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:45 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Dec 2024 at 09:09.

Bolton Metropolitan Borough Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Deansgate

Bolton Metropolitan Borough Council are carrying out Section 50 on Deansgate, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 09:30 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 7 Jan 2025 at 02:27.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 13:48.

Bolton Metropolitan Borough Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Deansgate

Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Deansgate, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 27 Dec 2024 at 12:30.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Deansgate

Bolton Metropolitan Borough Council were proposing to carry out Section 50 on Deansgate, Bolton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 27 Dec 2024 at 12:16.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Deansgate

Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Deansgate, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 27 Dec 2024 at 12:15.

Bolton Metropolitan Borough Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Chorley Road

Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Chorley Road, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 9 Dec 2024 at 15:31.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Chorley Road

Bolton Metropolitan Borough Council are carrying out Section 50 on Chorley Road, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 January 2025 at 09:30 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 12 Feb 2025 at 14:24.

Cadent Gas logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Crown Lane

Cadent Gas are carrying out Utility asset works on Crown Lane, Horwich, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 January 2025 at 14:30 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 12:23.

Cadent Gas logo
LONG TERM
Until
5 Mar 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are carrying out Utility asset works on Manchester Road, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 12:55 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 12:57.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
25 Jan and 25 Jul 2025
Details
View Map
Share
Follow
Moor Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Moor Road, Anglezarke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Oct 2024 at 12:56.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
James Street

Cadent Gas are carrying out Utility asset works on James Street, Horwich, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 January 2025 at 08:40 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 08:44.

Cadent Gas logo
LONG TERM
Until
21 May 2025
Details
View Map
Share
Follow
Wigan Road

Cadent Gas are carrying out Utility asset works on Wigan Road, Standish.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 February 2025 at 12:00 and could run through until 21 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 13:27.

Cadent Gas logo
Until
26 Feb 2025
Details
View Map
Share
Follow
Gaskell Street

Cadent Gas are carrying out Utility asset works on Gaskell Street, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 February 2025 at 09:00 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Feb 2025 at 09:40.

United Utilities Water (formerly North West Water) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Babylon Lane

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Babylon Lane, Adlington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Dec 2024 at 11:07.

Cadent Gas logo
Between
17 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Vicarage Road

Cadent Gas are proposing to carry out Utility asset works on Vicarage Road, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 12:28.

United Utilities Water (formerly North West Water) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Babylon Lane

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Babylon Lane, Adlington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Dec 2024 at 13:40.

Network Rail logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Friday Street

Network Rail are proposing to carry out Works for Rail Purposes on Friday Street, Chorley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Nov 2024 at 10:58.

Network Rail logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Friday Street

Network Rail were proposing to carry out Works for Rail Purposes on Friday Street, Chorley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 22 Jan 2025 at 10:05.

Network Rail logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Steeley Lane

Network Rail are proposing to carry out Works for Rail Purposes on Steeley Lane, Chorley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Nov 2024 at 10:40.

Network Rail logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Steeley Lane

Network Rail were proposing to carry out Works for Rail Purposes on Steeley Lane, Chorley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 22 Jan 2025 at 10:04.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Back Bertrand Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Bertrand Road, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Feb 2025 at 09:38.

United Utilities Water (formerly North West Water) logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Back Higher Swan Lane

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Back Higher Swan Lane, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 25 Nov 2024 at 15:46.

United Utilities Water (formerly North West Water) logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Back Higher Swan Lane

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Back Higher Swan Lane, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Feb 2025 at 14:53.

United Utilities Water (formerly North West Water) logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Back St Helens Road South

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back St Helens Road South, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Dec 2024 at 08:48.

United Utilities Water (formerly North West Water) logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Back St Helens Road South

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back St Helens Road South, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Feb 2025 at 08:55.

Electricity North West (NorWeb) logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Coronation Street

Electricity North West (NorWeb) were proposing to carry out New service connection on Coronation Street, Bolton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 8 Dec 2024 at 13:23.

Cadent Gas logo
Between
3 and 26 Mar 2025
Details
View Map
Share
Vicarage Road

Cadent Gas were proposing to carry out Utility asset works on Vicarage Road, Blackrod, Bolton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 26 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:28.

United Utilities Water (formerly North West Water) logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Bridgewater Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Bridgewater Street, Hindley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Feb 2025 at 09:14.

United Utilities Water (formerly North West Water) logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Bridgewater Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Bridgewater Street, Hindley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Dec 2024 at 10:37.

Bolton Metropolitan Borough Council logo
Between
31 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Singleton Avenue

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Singleton Avenue, Horwich, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 12 Feb 2025 at 11:41.

Bolton Metropolitan Borough Council logo
Between
31 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Castle Crescent

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Castle Crescent, Horwich, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 12 Feb 2025 at 11:46.

Bolton Metropolitan Borough Council logo
Between
31 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Ormston Avenue

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ormston Avenue, Horwich, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 12 Feb 2025 at 12:02.

Cadent Gas logo
LONG TERM
Between
31 Mar and 2 May 2025
Details
View Map
Share
Follow
Bridgeman Street

Cadent Gas are proposing to carry out Utility asset works on Bridgeman Street, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 14:57.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
4 Apr and 2 Sep 2025
Details
View Map
Share
Follow
Rectory Lane

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Rectory Lane, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 4 Feb 2025 at 11:34.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
7 Apr and 16 May 2025
Details
View Map
Share
Follow
Church Street

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Street, Blackrod, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 3 Sep 2024 at 10:56.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
7 Apr and 16 May 2025
Details
View Map
Share
Follow
Manchester Road

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Manchester Road, Blackrod, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Aug 2024 at 14:27.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
7 Apr and 16 May 2025
Details
View Map
Share
Follow
Manchester Road

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Manchester Road, Blackrod, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 3 Sep 2024 at 11:13.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
7 Apr and 16 May 2025
Details
View Map
Share
Follow
Blackhorse Street

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Blackhorse Street, Blackrod, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 3 Sep 2024 at 10:56.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
7 Apr and 16 May 2025
Details
View Map
Share
Follow
Blackhorse Street

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Blackhorse Street, Blackrod, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Aug 2024 at 14:25.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
7 Apr and 16 May 2025
Details
View Map
Share
Follow
Church Street

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Street, Blackrod, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Aug 2024 at 14:25.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
7 Apr and 16 May 2025
Details
View Map
Share
Follow
New Street

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on New Street, Blackrod, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 3 Sep 2024 at 11:14.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
7 Apr and 16 May 2025
Details
View Map
Share
Follow
New Street

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on New Street, Blackrod, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Aug 2024 at 14:27.

Cadent Gas logo
Between
8 and 22 Apr 2025
Details
View Map
Share
Follow
New Hall Lane

Cadent Gas are proposing to carry out Utility asset works on New Hall Lane, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 13:54.

Cadent Gas logo
Between
14 Apr and 12 May 2025
Details
View Map
Share
Follow
Vicarage Road

Cadent Gas are proposing to carry out Utility asset works on Vicarage Road, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 10:32.

Cadent Gas logo
Between
14 Apr and 14 May 2025
Details
View Map
Share
Follow
Mansell Way

Cadent Gas are proposing to carry out Utility asset works on Mansell Way, Horwich, Bolton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 14:08.

Cadent Gas logo
LONG TERM
Between
21 Apr and 6 Aug 2025
Details
View Map
Share
Follow
Wigan Road

Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Standish.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jan 2025 at 12:45.

United Utilities Water (formerly North West Water) logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Back Chorley Old Road North

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Chorley Old Road North, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Jan 2025 at 15:38.

United Utilities Water (formerly North West Water) logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Back Bertrand Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Bertrand Road, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Jan 2025 at 07:45.

United Utilities Water (formerly North West Water) logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Back Cardwell Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Cardwell Street, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Jan 2025 at 07:44.

Cadent Gas logo
Between
28 Apr and 12 May 2025
Details
View Map
Share
Follow
Thirlmere Avenue

Cadent Gas are proposing to carry out Utility asset works on Thirlmere Avenue, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 12:10.

Cadent Gas logo
Between
5 and 30 May 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 14:30.

Cadent Gas logo
Between
5 and 22 May 2025
Details
View Map
Share
Follow
Roundmoor Road

Cadent Gas are proposing to carry out Utility asset works on Roundmoor Road, Standish.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 22 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 14:38.

Cadent Gas logo
Between
5 and 30 May 2025
Details
View Map
Share
Follow
Bridgeman Street

Cadent Gas are proposing to carry out Utility asset works on Bridgeman Street, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 14:26.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
6 May and 8 Aug 2025
Details
View Map
Share
Follow
De Havilland Way

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on De Havilland Way, Horwich, Bolton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 21 Jan 2025 at 14:40.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
6 May and 8 Aug 2025
Details
View Map
Share
Follow
Chorley New Road

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chorley New Road, Horwich, Bolton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 22 Jan 2025 at 14:05.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
6 May and 8 Aug 2025
Details
View Map
Share
Follow
Chorley New Road

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chorley New Road, Horwich, Bolton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 21 Jan 2025 at 14:38.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
6 May and 8 Aug 2025
Details
View Map
Share
Follow
De Havilland Way

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on De Havilland Way, Horwich, Bolton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 22 Jan 2025 at 11:55.

Cadent Gas logo
LONG TERM
Between
7 May and 11 Jun 2025
Details
View Map
Share
Follow
Belmont Road

Cadent Gas are proposing to carry out Utility asset works on Belmont Road, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 17:00.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
12 May and 3 Aug 2025
Details
View Map
Share
Follow
Atherton Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Atherton Road, Hindley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Nov 2024 at 15:41.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
12 May and 3 Aug 2025
Details
View Map
Share
Follow
Wigan Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Wigan Road, Hindley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 3 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Nov 2024 at 15:40.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
12 May and 3 Aug 2025
Details
View Map
Share
Follow
Market Street

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Market Street, Hindley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Nov 2024 at 15:40.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
12 May and 3 Aug 2025
Details
View Map
Share
Follow
Liverpool Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Liverpool Road, Hindley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Nov 2024 at 15:42.


Roadworks Map near to Slater Avenue, BOLTON, BL6 7BJ (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 13 Feb 2025 02:16
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Slater Avenue, BOLTON, BL6 7BJ (20 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Bolton Metropolitan Borough Council logo
HILLSIDE AVENUE, HORWICH 
(0.1 miles)
Bolton Metropolitan Borough Council
Highway repair and maintenance works - Carriageway - Give and take
Planned
Scheduled: 12 Feb 2025 - 14 Feb 2025
0.1
Details
Share
Follow
2
Bolton Metropolitan Borough Council logo
DUNCAN STREET, HORWICH 
(0.2 miles)
Bolton Metropolitan Borough Council
Highway repair and maintenance works - Footway - Give and take
In Progress
Since: 11 Feb 2025 12:13
(Scheduled: 11 Feb 2025 - 13 Feb 2025)
0.2
Details
Share
Follow
3
Bolton Metropolitan Borough Council logo
DUNCAN STREET, HORWICH 
(0.2 miles)
Bolton Metropolitan Borough Council
Highway repair and maintenance works - Carriageway - Give and take
Planned
Scheduled: 12 Feb 2025 - 14 Feb 2025
0.2
Details
Share
Follow
4
Bolton Metropolitan Borough Council logo
SINGLETON AVENUE, HORWICH 
(0.2 miles)
Bolton Metropolitan Borough Council
Highway repair and maintenance works - Footway - Give and take
In Progress
Since: 11 Feb 2025 12:14
(Scheduled: 11 Feb 2025 - 13 Feb 2025)
0.2
Details
Share
Follow
5
Virgin Media logo
JONES STREET, HORWICH 
(0.3 miles)
Virgin Media
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 13 Feb 2025 - 17 Feb 2025
0.3
Details
Share
Follow
6
Bolton Metropolitan Borough Council logo
COTSWOLD DRIVE, HORWICH 
(0.4 miles)
Bolton Metropolitan Borough Council
Highway repair and maintenance works - Carriageway - Give and take
Planned
Scheduled: 12 Feb 2025 - 14 Feb 2025
0.4
Details
Share
Follow
7
Bolton Metropolitan Borough Council logo
COTSWOLD DRIVE, HORWICH 
(0.4 miles)
Bolton Metropolitan Borough Council
Highway repair and maintenance works - Carriageway - Give and take
Planned
Scheduled: 12 Feb 2025 - 14 Feb 2025
0.4
Details
Share
Follow
8
Electricity North West (NorWeb) logo
PENNINE ROAD, HORWICH 
(0.4 miles)
Electricity North West (NorWeb)
Remedial works - Footway - Some carriageway incursion
Planned
Scheduled: 13 Feb 2025 - 14 Feb 2025
0.4
Details
Share
Follow
9
Bolton Metropolitan Borough Council logo
COTSWOLD DRIVE, HORWICH 
(0.4 miles)
Bolton Metropolitan Borough Council
Highway repair and maintenance works - Carriageway - Give and take
Planned
Scheduled: 12 Feb 2025 - 14 Feb 2025
0.4
Details
Share
Follow
10
Bolton Metropolitan Borough Council logo
COTSWOLD DRIVE, HORWICH 
(0.4 miles)
Bolton Metropolitan Borough Council
Highway repair and maintenance works - Carriageway - Give and take
Planned
Scheduled: 12 Feb 2025 - 14 Feb 2025
0.4
Details
Share
Follow