ROADWORKS SUMMARY
A6 Blackrod Bypass, BOLTON, BL6 5HX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for A6 Blackrod Bypass, BL6 5HX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to A6 Blackrod Bypass, BOLTON, BL6 5HX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for A6 Blackrod Bypass are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wigan Metropolitan Borough Council logo
LONG TERM
Between
22 Apr and 24 Nov 2024
Details
View Map
Share
Follow
Ince Green Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ince Green Lane, Ince.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 30 Jan 2024 at 10:35.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Jun and 30 Sep 2024
Details
View Map
Share
Follow
Fourteen Meadows Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Fourteen Meadows Road, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 30 September 2024. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 13 Jun 2024 at 10:13.

Network Rail logo
LONG TERM
Until
27 Nov 2024
Details
View Map
Share
Follow
Ince Green Lane

Network Rail are carrying out Works for Rail Purposes on Ince Green Lane, Ince.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 07:00 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Jul 2024 at 08:02.

United Utilities Water (formerly North West Water) logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Butterworth Brow

United Utilities Water (formerly North West Water) are carrying out Utility asset works on Butterworth Brow, Chorley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 09:00 and could run through until 17 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Aug 2024 at 14:12.

Lancashire County Council logo
LONG TERM
Between
2 Aug and 2 Oct 2024
Details
View Map
Share
Follow
Bolton Road

Lancashire County Council are proposing to carry out Section 50 on Bolton Road, Chorley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2024 and could run through until 2 October 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 30 Aug 2024 at 08:53.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Moss Bank Way

Cadent Gas are proposing to carry out Utility asset works on Moss Bank Way, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2024 and could run through until 18 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2024 at 13:11.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
26 Aug and 29 Sep 2024
Details
View Map
Share
Follow
Scot Lane

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Scot Lane, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 29 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 25 Jul 2024 at 14:08.

Network Rail logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Canal Street

Network Rail are proposing to carry out Works for Rail Purposes on Canal Street, Ince.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 13 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Jun 2024 at 12:57.

Network Rail logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Canal Street

Network Rail are carrying out Works for Rail Purposes on Canal Street, Ince.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2024 at 06:00 and could run through until 13 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 27 Aug 2024 at 09:03.

Wigan Metropolitan Borough Council logo
Between
8 and 29 Sep 2024
Details
View Map
Share
Follow
Whelley

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Whelley, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2024 and could run through until 29 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 4 Jul 2024 at 11:05.

Wigan Metropolitan Borough Council logo
Until
20 Sep 2024
Details
View Map
Share
Follow
Sephton Street

Wigan Metropolitan Borough Council are carrying out Highway repair and maintenance works on Sephton Street, Ince.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 07:30 and could run through until 20 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 9 Sep 2024 at 09:22.

Wigan Metropolitan Borough Council logo
Between
9 and 20 Sep 2024
Details
View Map
Share
Follow
Sephton Street

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Sephton Street, Ince.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 20 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 19 Aug 2024 at 12:34.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
11 Oct 2024
Details
View Map
Share
Follow
Scot Lane

Wigan Metropolitan Borough Council are carrying out Section 50 on Scot Lane, Wigan.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 11 Sep 2024 at 09:10.

Cadent Gas logo
Until
26 Sep 2024
Details
View Map
Share
Follow
Marnland Grove

Cadent Gas are carrying out Utility asset works on Marnland Grove, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2024 at 12:30 and could run through until 26 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 12:43.

Wigan Metropolitan Borough Council logo
Between
15 Sep and 6 Oct 2024
Details
View Map
Share
Follow
Whelley

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Whelley, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2024 and could run through until 6 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 27 Aug 2024 at 12:16.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
16 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Belmont Road

Blackburn With Darwen Borough Council are proposing to carry out Highway repair and maintenance works on Belmont Road, Belmont.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 28 Aug 2024 at 09:33.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
The Fields

BT are proposing to carry out Utility repair and maintenance works on The Fields, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 18 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Jun 2024 at 09:55.

Cadent Gas logo
Between
16 Sep and 2 Oct 2024
Details
View Map
Share
Follow
Blairmore Drive

Cadent Gas are proposing to carry out Utility asset works on Blairmore Drive, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 2 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 09:44.

Wigan Metropolitan Borough Council logo
Between
17 and 20 Sep 2024
Details
View Map
Share
Follow
Ascroft Avenue

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ascroft Avenue, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 20 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 10 Sep 2024 at 08:48.

Wigan Metropolitan Borough Council logo
Between
17 and 20 Sep 2024
Details
View Map
Share
Follow
Ascroft Avenue

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ascroft Avenue, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 20 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 19 Aug 2024 at 12:55.

Wigan Metropolitan Borough Council logo
Between
18 and 20 Sep 2024
Details
View Map
Share
Follow
Penny Gate Close

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Penny Gate Close, Hindley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2024 and could run through until 20 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 19 Aug 2024 at 12:41.

Wigan Metropolitan Borough Council logo
Between
18 and 20 Sep 2024
Details
View Map
Share
Follow
Penny Gate Close

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Penny Gate Close, Hindley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2024 and could run through until 20 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 10 Sep 2024 at 08:48.

Wigan Metropolitan Borough Council logo
Between
22 and 29 Sep 2024
Details
View Map
Share
Follow
Pepper Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Pepper Lane, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2024 and could run through until 29 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 20 Aug 2024 at 16:37.

Network Rail logo
Between
30 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 31 Jul 2024 at 09:57.

Network Rail logo
Between
30 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 11 Sep 2024 at 10:25.

Between
30 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Arcade Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Arcade Street, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 27 Aug 2024 at 11:20.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Oct and 30 Nov 2024
Details
View Map
Share
Follow
Market Street

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Market Street, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Sep 2024 at 11:40.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Oct and 30 Nov 2024
Details
View Map
Share
Follow
Market Street

Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Market Street, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Sep 2024 at 11:41.

Lancashire County Council logo
Between
1 and 3 Oct 2024
Details
View Map
Share
Follow
Stump Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Stump Lane, Chorley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 3 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 10 Aug 2024 at 12:59.

Wigan Metropolitan Borough Council logo
Between
7 and 9 Oct 2024
Details
View Map
Share
Follow
Stadium Way

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stadium Way, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 9 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 27 Aug 2024 at 09:01.

Wigan Metropolitan Borough Council logo
Between
13 and 20 Oct 2024
Details
View Map
Share
Follow
Wigan Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Wigan Lane, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 20 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 19 Aug 2024 at 15:03.

Wigan Metropolitan Borough Council logo
Between
13 and 20 Oct 2024
Details
View Map
Share
Follow
Wigan Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Wigan Lane, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 20 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 1 Jul 2024 at 15:07.

Wigan Metropolitan Borough Council logo
Between
13 and 20 Oct 2024
Details
View Map
Share
Follow
Pepper Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Pepper Lane, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 20 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 5 Sep 2024 at 11:06.

Cadent Gas logo
Between
14 and 30 Oct 2024
Details
View Map
Share
Follow
Lock Lane

Cadent Gas are proposing to carry out Utility asset works on Lock Lane, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2024 at 11:30.

Cadent Gas logo
Between
14 Oct and 6 Nov 2024
Details
View Map
Share
Follow
Tempest Road

Cadent Gas are proposing to carry out Utility asset works on Tempest Road, Lostock, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2024 at 11:26.

Cadent Gas logo
Between
14 and 29 Oct 2024
Details
View Map
Share
Follow
The Pewfist

Cadent Gas are proposing to carry out Utility asset works on The Pewfist, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 29 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 08:39.

Cadent Gas logo
Between
14 Oct and 6 Nov 2024
Details
View Map
Share
Follow
Blackrod Footpath 24

Cadent Gas are proposing to carry out Utility asset works on Blackrod Footpath 24, Blackrod.

These works are categorised as Major.

The works will start on or after 14 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 16:30.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2024 at 07:50.

Lancashire County Council logo
Between
17 and 21 Oct 2024
Details
View Map
Share
Follow
Stump Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Stump Lane, Chorley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2024 and could run through until 21 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 19 Jul 2024 at 09:32.

Electricity North West (NorWeb) logo
Between
18 Oct and 13 Nov 2024
Details
View Map
Share
Follow
Preston Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Preston Road, Chorley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2024 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 26 Jul 2024 at 10:49.

Electricity North West (NorWeb) logo
Between
18 Oct and 13 Nov 2024
Details
View Map
Share
Follow
Preston Road

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Preston Road, Chorley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2024 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 26 Jul 2024 at 10:47.

Cadent Gas logo
Between
21 Oct and 5 Nov 2024
Details
View Map
Share
Follow
St Georges Avenue

Cadent Gas are proposing to carry out Utility asset works on St Georges Avenue, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 08:38.

Cadent Gas logo
LONG TERM
Between
21 Oct 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Aug 2024 at 09:05.

Electricity North West (NorWeb) logo
Between
21 and 28 Oct 2024
Details
View Map
Share
Follow
Devonshire Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Devonshire Road, Chorley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Aug 2024 at 14:20.

Electricity North West (NorWeb) logo
Between
21 and 28 Oct 2024
Details
View Map
Share
Follow
Devonshire Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Devonshire Road, Chorley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Aug 2024 at 09:32.

Wigan Metropolitan Borough Council logo
Between
27 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Bridge Street

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bridge Street, Hindley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 1 Jul 2024 at 14:52.

Cadent Gas logo
LONG TERM
Between
4 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Pepper Lane

Cadent Gas are proposing to carry out Utility asset works on Pepper Lane, Standish.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 10:53.

Cadent Gas logo
Between
4 and 27 Nov 2024
Details
View Map
Share
Follow
St Georges Avenue

Cadent Gas are proposing to carry out Utility asset works on St Georges Avenue, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Aug 2024 at 09:15.

Cadent Gas logo
Between
4 Nov and 3 Dec 2024
Details
View Map
Share
Follow
The Pewfist

Cadent Gas are proposing to carry out Utility asset works on The Pewfist, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Aug 2024 at 09:14.

Between
7 and 13 Nov 2024
Details
View Map
Share
Follow
Arcade Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Arcade Street, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Aug 2024 at 12:02.

Wigan Metropolitan Borough Council logo
Between
17 and 24 Nov 2024
Details
View Map
Share
Follow
Almond Brook Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Almond Brook Road, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 28 Aug 2024 at 14:33.

Cadent Gas logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Regent Road

Cadent Gas are proposing to carry out Utility asset works on Regent Road, Lostock, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:19.

Cadent Gas logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Overdene Close

Cadent Gas are proposing to carry out Utility asset works on Overdene Close, Lostock, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:19.

Cadent Gas logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Morris Fold Drive

Cadent Gas are proposing to carry out Utility asset works on Morris Fold Drive, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:20.


Roadworks Map near to A6 Blackrod Bypass, BOLTON, BL6 5HX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 12 Sep 2024 15:55
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to A6 Blackrod Bypass, BOLTON, BL6 5HX (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Electricity North West (NorWeb) logo
URGENT
  
VICARAGE ROAD WEST, BLACKROD 
(0.6 miles)
Electricity North West (NorWeb)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 11 Sep 2024 14:00
(Scheduled: 11 Sep 2024 - 17 Sep 2024)
0.6
Details
Share
Follow
2
United Utilities Water (formerly North West Water) logo
URGENT
  
EPSOM CROFT 
(0.9 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 12 Sep 2024 15:15
(Scheduled: 12 Sep 2024)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.