ROADWORKS SUMMARY
Bent Spur Road, BOLTON, BL4 8SJ
Introduction

View current and future planned roadworks and road closures for Bent Spur Road, BL4 8SJ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Bent Spur Road, BOLTON, BL4 8SJ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bent Spur Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
Friday
Salford City Council are carrying out Highway improvement works on Goulden Street, Salford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 September 2021 at 00:00 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 21 May 2025 at 14:47.
28 Aug 2025
Salford City Council are carrying out Highway improvement works on Mather Road, Eccles.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 July 2022 at 00:00 and could run through until 28 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 29 May 2025 at 16:37.
31 Oct 2025
Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Manchester Road, Bolton.
These works are categorised as Major.
The works started on 20 September 2022 at 09:30 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 10 Oct 2024 at 10:27.
11 Apr 2026
Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Higher Market Street, Farnworth, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 June 2024 at 09:30 and could run through until 11 April 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 11 Apr 2025 at 11:26.
11 Apr 2026
Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Market Street, Farnworth, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 June 2024 at 09:30 and could run through until 11 April 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 11 Apr 2025 at 11:20.
20 Oct 2024 and 17 Oct 2025
Bury Metropolitan Borough Council are proposing to carry out Section 58 on Spring Lane, Radcliffe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2024 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bury Metropolitan Borough Council on 31 Jul 2024 at 14:06.
Monday
Salford City Council are proposing to carry out Works for road purposes on Harriet Street, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Salford City Council on 6 Dec 2024 at 08:02.
9 Jun 2026
Salford City Council are carrying out Works for road purposes on Harriet Street, Worsley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 08:00 and could run through until 9 June 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 6 Jan 2025 at 13:29.
Monday
Salford City Council are proposing to carry out Highway improvement works on Mossfield Road, Swinton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 9 June 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Salford City Council on 19 Feb 2025 at 14:46.
10 Jun 2025
Salford City Council are carrying out Highway improvement works on Mossfield Road, Swinton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 March 2025 at 13:30 and could run through until 10 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Salford City Council on 23 Apr 2025 at 08:42.
13 Mar 2026
Bury Metropolitan Borough Council are carrying out Section 58 on Spring Lane, Radcliffe.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 April 2025 at 08:30 and could run through until 13 March 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Bury Metropolitan Borough Council on 17 Apr 2025 at 08:48.
1 Apr and 1 Jul 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on East Lancashire Road, Worsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 23 Dec 2024 at 15:51.
1 Apr and 1 Jul 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Mosley Common Road, Worsley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 July 2025. The works will impact the carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Feb 2025 at 11:16.
1 Apr and 1 Jul 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Mosley Common Road, Worsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 10 Dec 2024 at 14:45.
6 Apr 2025 and 30 Jan 2026
Salford City Council are proposing to carry out Highway improvement works on Liverpool Road, Winton Ward, Eccles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 April 2025 and could run through until 30 January 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Salford City Council on 26 Jul 2024 at 12:32.
20 Jun 2025
Cadent Gas are carrying out Utility asset works on Crescent Road, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 April 2025 at 10:42 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 11:34.
14 Apr and 16 Jul 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on East Lancashire Road, Worsley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 July 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 17 Mar 2025 at 08:36.
22 Jul 2025
Wigan Metropolitan Borough Council are carrying out Highway improvement works on East Lancashire Road, Worsley.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 09:00 and could run through until 22 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 2 May 2025 at 10:28.
22 Jul 2025
Wigan Metropolitan Borough Council are carrying out Highway improvement works on Mosley Common Road, Worsley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 09:00 and could run through until 22 July 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Apr 2025 at 13:49.
19 Apr and 21 Sep 2025
Salford City Council were proposing to carry out Highway improvement works on Liverpool Street, Salford Six, Salford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 April 2025 and run through until 21 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 13 Jan 2025 at 13:01.
19 Apr and 21 Sep 2025
Salford City Council were proposing to carry out Highway improvement works on Weaste Lane, Salford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 April 2025 and run through until 21 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 13 Jan 2025 at 13:00.
Friday
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Parkhills Road, Bury.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bury Metropolitan Borough Council on 9 Dec 2024 at 14:12.
1 May 2025 and 1 May 2026
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bolton Road, Farnworth, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 1 May 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 11 Apr 2025 at 12:22.
1 May 2026
Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Bolton Road, Farnworth, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 May 2025 at 08:00 and could run through until 1 May 2026. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 8 May 2025 at 08:15.
15 Jun 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Broughton Road, Salford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 May 2025 at 19:50 and could run through until 15 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 23 May 2025 at 15:09.
5 May and 17 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Trafford Park Road, Trafford Park.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 14:11.
5 May and 17 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Trafford Park Road, Trafford Park.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 07:06.
5 May and 10 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Kennedy Road, Tyldesley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 14:51.
5 May and 27 Jun 2025
Transport For Greater Manchester are proposing to carry out Works for Rail Purposes on Church Lane, Whitefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport For Greater Manchester on 20 Feb 2025 at 15:23.
27 Jun 2025
Transport For Greater Manchester are carrying out Works for Rail Purposes on Church Lane, Whitefield.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 May 2025 at 06:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport For Greater Manchester on 30 May 2025 at 11:38.
5 May and 27 Jun 2025
Transport For Greater Manchester are proposing to carry out Works for Rail Purposes on Bury New Road, Whitefield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport For Greater Manchester on 20 Feb 2025 at 15:25.
5 May and 27 Jun 2025
Transport For Greater Manchester are proposing to carry out Works for Rail Purposes on Bury New Road, Whitefield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport For Greater Manchester on 31 Mar 2025 at 11:35.
5 May and 25 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Crescent Road, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 09:42.
5 May and 20 Jun 2025
Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Bowstone Rise, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 11 Mar 2025 at 11:13.
10 Jun 2025
United Utilities Water (formerly North West Water) are carrying out New service connection on Spring Lane, Radcliffe.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 09:41 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 May 2025 at 11:38.
6 May and 16 Jun 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Nelson Street, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 4 Feb 2025 at 14:22.
16 Jun 2025
Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Nelson Street, Bolton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 09:30 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 6 May 2025 at 10:40.
6 May and 16 Jun 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Thynne Street, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 4 Feb 2025 at 14:24.
16 Jun 2025
Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Thynne Street, Bolton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 09:30 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 6 May 2025 at 10:41.
Monday
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Ringley Road, Radcliffe.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 May 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 May 2025 at 14:19.
27 Jun 2025
Cadent Gas are carrying out Utility asset works on Shakerley Road, Tyldesley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 May 2025 at 18:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 12:27.
12 May and 26 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Gigg Lane, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 26 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 12 Mar 2025 at 11:46.
12 May and 26 Aug 2025
Bury Metropolitan Borough Council were proposing to carry out Highway improvement works on Manchester Road, Bury.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 26 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Bury Metropolitan Borough Council on 24 Mar 2025 at 12:40.
12 May and 26 Aug 2025
Bury Metropolitan Borough Council were proposing to carry out Highway improvement works on Manchester Road, Bury.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 26 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Bury Metropolitan Borough Council on 24 Mar 2025 at 12:24.
12 May and 22 Jul 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Market Street, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bury Metropolitan Borough Council on 12 Mar 2025 at 11:50.
12 May and 26 Aug 2025
Bury Metropolitan Borough Council were proposing to carry out Highway improvement works on Radcliffe Road, Bury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 26 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 24 Mar 2025 at 12:01.
12 May and 26 Aug 2025
Bury Metropolitan Borough Council were proposing to carry out Highway improvement works on Manchester Road, Bury.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 26 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Bury Metropolitan Borough Council on 24 Mar 2025 at 12:16.
12 May 2025 and 17 Dec 2026
Bury Metropolitan Borough Council were proposing to carry out Highway improvement works on Manchester Road, Bury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 17 December 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Bury Metropolitan Borough Council on 24 Mar 2025 at 13:10.
12 May and 26 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Parkhills Road, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 26 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 12 Mar 2025 at 12:07.
12 May and 22 Jul 2025
Bury Metropolitan Borough Council were proposing to carry out Highway improvement works on Wellington Road, Bury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 22 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Bury Metropolitan Borough Council on 24 Mar 2025 at 13:03.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Broad Street, Salford.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 11:35 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 11:52.
16 May and 15 Jun 2025
Electricity North West (NorWeb) are proposing to carry out Utility asset works on Lissadel Street, Salford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 16 May 2025 at 09:58.
18 May 2025 and 24 May 2026
Bury Metropolitan Borough Council were proposing to carry out Highway improvement works on Redvales Road, Bury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 May 2025 and run through until 24 May 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 24 Mar 2025 at 13:15.
18 May 2025 and 24 May 2026
Bury Metropolitan Borough Council were proposing to carry out Highway improvement works on Gigg Lane, Bury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 May 2025 and run through until 24 May 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 24 Mar 2025 at 13:14.
18 May 2025 and 24 May 2026
Bury Metropolitan Borough Council were proposing to carry out Highway improvement works on Gigg Lane, Bury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 May 2025 and run through until 24 May 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 24 Mar 2025 at 13:19.
18 May 2025 and 24 May 2026
Bury Metropolitan Borough Council were proposing to carry out Highway improvement works on Market Street, Bury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 May 2025 and run through until 24 May 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 24 Mar 2025 at 13:18.
18 May 2025 and 24 May 2026
Bury Metropolitan Borough Council were proposing to carry out Highway improvement works on Parkhills Road, Bury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 May 2025 and run through until 24 May 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 24 Mar 2025 at 13:19.
18 May 2025 and 24 May 2026
Bury Metropolitan Borough Council were proposing to carry out Highway improvement works on Wellington Road, Bury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 May 2025 and run through until 24 May 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 24 Mar 2025 at 13:15.
18 May 2025 and 24 May 2026
Bury Metropolitan Borough Council were proposing to carry out Highway improvement works on Manchester Road, Bury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 May 2025 and run through until 24 May 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 24 Mar 2025 at 13:17.
18 May 2025 and 24 May 2026
Bury Metropolitan Borough Council were proposing to carry out Highway improvement works on Back Wellington Road South, Bury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 May 2025 and run through until 24 May 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 24 Mar 2025 at 13:15.
18 May 2025 and 24 May 2026
Bury Metropolitan Borough Council were proposing to carry out Highway improvement works on Wellington Road, Bury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 May 2025 and run through until 24 May 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 24 Mar 2025 at 13:17.
19 May and 20 Sep 2025
Salford City Council are proposing to carry out Highway improvement works on Weaste Road, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 30 Apr 2025 at 14:00.
20 Sep 2025
Salford City Council are carrying out Highway improvement works on Weaste Road, Salford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 07:00 and could run through until 20 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 19 May 2025 at 08:54.
19 May and 20 Sep 2025
Transport For Greater Manchester were proposing to carry out Highway improvement works on Weaste Road, Salford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 20 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport For Greater Manchester on 1 May 2025 at 14:32.
19 May and 21 Sep 2025
Salford City Council are proposing to carry out Highway improvement works on Weaste Road, Salford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 30 Jan 2025 at 14:49.
19 May and 20 Sep 2025
Transport For Greater Manchester were proposing to carry out Highway improvement works on Weaste Lane, Salford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 20 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport For Greater Manchester on 1 May 2025 at 14:33.
19 May and 20 Sep 2025
Salford City Council are proposing to carry out Highway improvement works on Weaste Lane, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 30 Apr 2025 at 13:59.
20 Sep 2025
Salford City Council are carrying out Highway improvement works on Weaste Lane, Salford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 07:00 and could run through until 20 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 19 May 2025 at 08:53.
19 May and 20 Sep 2025
Transport For Greater Manchester were proposing to carry out Highway improvement works on Liverpool Street, Salford Six, Salford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 20 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport For Greater Manchester on 1 May 2025 at 14:33.
19 May and 20 Sep 2025
Salford City Council are proposing to carry out Highway improvement works on Liverpool Street, Salford Six, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 30 Apr 2025 at 14:01.
20 Sep 2025
Salford City Council are carrying out Highway improvement works on Liverpool Street, Salford Six, Salford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 07:00 and could run through until 20 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 19 May 2025 at 08:53.
19 May and 21 Sep 2025
Salford City Council are proposing to carry out Highway improvement works on Liverpool Street, Salford Six, Salford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 30 Jan 2025 at 14:50.
19 May and 21 Sep 2025
Salford City Council were proposing to carry out Highway improvement works on Liverpool Street, Salford Six, Salford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 21 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 13 Jan 2025 at 13:12.
19 May and 21 Sep 2025
Salford City Council are proposing to carry out Highway improvement works on Weaste Lane, Salford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 30 Jan 2025 at 14:49.
19 May and 21 Sep 2025
Salford City Council are proposing to carry out Highway improvement works on Tootal Road, Salford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 30 Jan 2025 at 14:48.
19 May and 21 Sep 2025
Salford City Council were proposing to carry out Highway improvement works on Tootal Road, Salford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 21 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 13 Jan 2025 at 13:53.
19 May and 20 Sep 2025
Salford City Council are proposing to carry out Highway improvement works on Tootal Road, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 30 Apr 2025 at 13:57.
20 Sep 2025
Salford City Council are carrying out Highway improvement works on Tootal Road, Salford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 07:00 and could run through until 20 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 19 May 2025 at 08:54.
19 May and 20 Sep 2025
Transport For Greater Manchester were proposing to carry out Highway improvement works on Tootal Road, Salford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 20 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport For Greater Manchester on 1 May 2025 at 14:32.
Sunday
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Greenwood Street, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 14 Mar 2025 at 09:36.
Sunday
Electricity North West (NorWeb) are carrying out Diversionary works on Greenwood Street, Salford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 08:00 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 19 May 2025 at 08:27.
Friday
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Pole Lane, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 18 Feb 2025 at 13:55.
Friday
Bury Metropolitan Borough Council are carrying out Highway improvement works on Pole Lane, Bury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 08:30 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 19 May 2025 at 08:34.
19 May and 30 Jun 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tong Road, Little Lever, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 14 Feb 2025 at 14:24.
23 May and 15 Jun 2025
Electricity North West (NorWeb) are proposing to carry out Utility asset works on Lissadel Street, Salford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 22 May 2025 at 13:23.
15 Jun 2025
Electricity North West (NorWeb) are carrying out Utility asset works on Lissadel Street, Salford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 May 2025 at 10:00 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 24 May 2025 at 11:25.
Monday
Cadent Gas are proposing to carry out Utility asset works on Park Street Icw Swinton Hall Road, Swinton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Feb 2025 at 12:00.
26 May and 19 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Bridge Street, Swinton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Feb 2025 at 11:54.
Sunday
Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Falkland Road, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 9 May 2025 at 09:20.
Sunday
Bolton Metropolitan Borough Council are carrying out Section 50 on Falkland Road, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 May 2025 at 09:30 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 27 May 2025 at 08:09.
26 May and 14 Jun 2025
Bury Metropolitan Borough Council are proposing to carry out Section 50 on Lowercroft Road, Bury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bury Metropolitan Borough Council on 20 May 2025 at 15:12.
14 Jun 2025
Bury Metropolitan Borough Council are carrying out Section 50 on Lowercroft Road, Bury.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 10:00 and could run through until 14 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bury Metropolitan Borough Council on 30 May 2025 at 11:20.
27 May and 20 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Victoria Street, Radcliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Mar 2025 at 09:37.
27 May and 23 Jun 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Dumers Lane, Radcliffe.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 23 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 22 May 2025 at 09:27.
27 May and 15 Jun 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Tennyson Avenue, Bury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 23 May 2025 at 14:48.
15 Jun 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Tennyson Avenue, Bury.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 09:55 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 27 May 2025 at 11:51.
27 May and 15 Jun 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Bridges Avenue, Bury.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 23 May 2025 at 14:48.
16 Jun 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Bridges Avenue, Bury.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 May 2025 at 10:28 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 28 May 2025 at 11:10.
2 and 13 Jun 2025
Salford City Council are proposing to carry out Works for road purposes on Broad Street, Salford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 14:00.
2 and 13 Jun 2025
Salford City Council are proposing to carry out Works for road purposes on Broad Street, Salford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 29 May 2025 at 13:22.
2 and 13 Jun 2025
Salford City Council are proposing to carry out Works for road purposes on Bolton Road, Salford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 14:01.
2 and 13 Jun 2025
Salford City Council are proposing to carry out Works for road purposes on Bolton Road, Salford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 29 May 2025 at 14:14.
2 and 13 Jun 2025
Salford City Council are proposing to carry out Works for road purposes on Broad Street, Salford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 14:01.
2 and 13 Jun 2025
Salford City Council are proposing to carry out Works for road purposes on Broad Street, Salford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 29 May 2025 at 13:36.
Monday
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Cholmondeley Road, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 May 2025 at 15:45.
Monday
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Cholmondeley Road, Salford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:36 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Jun 2025 at 10:18.
2 and 13 Jun 2025
Salford City Council are proposing to carry out Works for road purposes on Broad Street, Salford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 14:01.
2 and 13 Jun 2025
Salford City Council were proposing to carry out Works for road purposes on Broad Street, Salford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Salford City Council on 30 May 2025 at 12:33.
2 and 13 Jun 2025
Salford City Council are proposing to carry out Works for road purposes on Broad Street, Salford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 14:01.
2 and 13 Jun 2025
Salford City Council are proposing to carry out Works for road purposes on Broad Street, Salford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 29 May 2025 at 13:24.
2 and 30 Jun 2025
Salford City Council are proposing to carry out Highway improvement works on Greenleach Lane, Worsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 13 Mar 2025 at 10:05.
2 and 30 Jun 2025
Salford City Council are proposing to carry out Highway improvement works on Lumber Lane, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Salford City Council on 27 Feb 2025 at 10:18.
2 Jun and 16 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Shakerley Road, Tyldesley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 11:16.
2 and 18 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on York Avenue, Tyldesley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 15:30.
Thursday
Salford City Council are carrying out Highway repair and maintenance works on Coniston Avenue, Worsley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 10:10 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 2 Jun 2025 at 10:26.
5 Jul 2025
Bolton Metropolitan Borough Council are carrying out Section 50 on Bowstone Rise, Bolton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 10:10 and could run through until 5 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 2 Jun 2025 at 12:08.
2 and 27 Jun 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Heaton Road, Radcliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 15 May 2025 at 10:35.
2 and 27 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Bury And Bolton Road, Radcliffe.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 09:57.
2 and 20 Jun 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Arden Close, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 18 Feb 2025 at 13:47.
20 Jun 2025
Bury Metropolitan Borough Council are carrying out Highway improvement works on Arden Close, Bury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 08:19 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 29 May 2025 at 08:19.
2 and 13 Jun 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Withins Lane, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Mar 2025 at 15:34.
2 and 13 Jun 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Withins Lane, Bolton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 May 2025 at 12:32.
Monday
Salford City Council were proposing to carry out Works for road purposes on Broad Street, Salford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 June 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Salford City Council on 29 May 2025 at 09:40.
Monday
Salford City Council are proposing to carry out Highway repair and maintenance works on Eastham Way, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 28 Apr 2025 at 15:18.
4 Jun and 4 Jul 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Seaford Road, Salford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 23 May 2025 at 10:03.
4 and 25 Jun 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Seaford Road, Salford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 23 May 2025 at 11:30.
4 and 23 Jun 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Seaford Road, Salford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 27 May 2025 at 12:10.
4 and 10 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Pemberton Street, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 28 Apr 2025 at 15:19.
4 Jun and 25 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Higher Ainsworth Road, Radcliffe.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 10:15.
8 Jun 2025 and 8 Jun 2028
Salford City Council are proposing to carry out Highway repair and maintenance works on Cleggs Lane, Worsley.
These works are categorised as Major.
The works will start on or after 8 June 2025 and could run through until 8 June 2028. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 14 May 2025 at 20:08.
8 Jun 2025 and 8 Jun 2028
Salford City Council were proposing to carry out Highway repair and maintenance works on Cleggs Lane, Worsley.
These works were categorised as Major.
The works were originally planned to start 8 June 2025 and run through until 8 June 2028. The works were due to impact the carriageway only.
This roadwork event was last updated by Salford City Council on 21 May 2025 at 10:10.
9 and 29 Jun 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Lyons Road, Trafford Park.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 29 May 2025 at 10:12.
9 and 29 Jun 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Lyons Road, Trafford Park.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 2 Jun 2025 at 17:49.
9 and 23 Jun 2025
Electricity North West (NorWeb) are proposing to carry out Utility asset works on Cobden Street, Salford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 29 May 2025 at 15:26.
9 and 27 Jun 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Littleton Road, Salford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Jun 2025 at 10:50.
9 Jun and 28 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Littleton Road, Salford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 30 Apr 2025 at 11:04.
9 Jun and 28 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Littleton Road, Salford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 23 May 2025 at 10:01.
9 and 13 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Eastwood Avenue, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 Apr 2025 at 14:43.
9 and 13 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Fleetwood Road, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 Apr 2025 at 14:44.
9 and 13 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Westwood Avenue, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 Apr 2025 at 14:45.
9 and 25 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Coomassie Street, Radcliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 14:39.
9 and 29 Jun 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Tennyson Avenue, Bury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 29 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 May 2025 at 12:32.
9 and 29 Jun 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Tennyson Avenue, Bury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 29 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 22 May 2025 at 08:58.
9 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Bury And Bolton Road, Radcliffe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 16:24.
10 and 16 Jun 2025
Salford City Council were proposing to carry out Works for road purposes on Broad Street, Salford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 June 2025 and run through until 16 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Salford City Council on 29 May 2025 at 09:40.
10 and 13 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Barry Crescent, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 Apr 2025 at 14:42.
11 and 30 Jun 2025
Electricity North West (NorWeb) were proposing to carry out Utility repair and maintenance works on Seaford Road, Salford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Jun 2025 at 11:59.
12 and 14 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Eastwood Avenue, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 11:23.
12 and 14 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Barry Crescent, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 11:20.
13 and 17 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Auckland Drive, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 24 Apr 2025 at 09:11.
13 and 16 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Worsley Avenue, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 11:45.
13 and 16 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Wardley Avenue, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 24 Apr 2025 at 09:41.
13 and 16 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Hulton Avenue, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 24 Apr 2025 at 09:23.
15 and 18 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Whit Lane, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 24 Apr 2025 at 09:43.
15 and 17 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Whit Lane, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 2 May 2025 at 11:04.
15 and 17 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Wardley Avenue, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 11:42.
15 and 17 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Hulton Avenue, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 11:36.
16 and 24 Jun 2025
Electricity North West (NorWeb) were proposing to carry out Utility repair and maintenance works on Derby Road, Salford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 24 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 27 Mar 2025 at 12:10.
16 Jun and 11 Jul 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Gerald Road, Salford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 23 May 2025 at 10:03.
16 and 19 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Auckland Drive, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 11:18.
16 Jun and 11 Jul 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Bury New Road, Prestwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 20 Feb 2025 at 09:23.
16 Jun and 11 Jul 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Bury New Road, Prestwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 3 Mar 2025 at 13:28.
16 Jun and 11 Jul 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Bury New Road, Whitefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 20 Feb 2025 at 09:25.
16 Jun and 11 Jul 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Bury New Road, Whitefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 3 Mar 2025 at 13:28.
16 and 27 Jun 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Heaton Road, Radcliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 18 Feb 2025 at 14:03.
16 Jun and 18 Jul 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Tennyson Avenue, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 22 May 2025 at 12:52.
16 Jun and 4 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Higher Ainsworth Road, Radcliffe.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 09:29.
17 and 23 Jun 2025
Salford City Council were proposing to carry out Works for road purposes on Manchester Road, Pendlebury, Swinton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 June 2025 and run through until 23 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Salford City Council on 29 May 2025 at 09:53.
17 Jun and 30 Sep 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Manchester Road, Bury.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 9 Apr 2025 at 11:11.
17 Jun and 30 Sep 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Manchester Road, Bury.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 9 Apr 2025 at 11:09.
17 Jun and 30 Sep 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Radcliffe Road, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 9 Apr 2025 at 11:14.
17 Jun and 30 Sep 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Manchester Road, Bury.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 9 Apr 2025 at 11:07.
17 Jun and 30 Sep 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Wellington Road, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 9 Apr 2025 at 11:16.
18 and 25 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Gore Crescent, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 24 Apr 2025 at 09:22.
18 and 24 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Gore Crescent, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 2 May 2025 at 12:07.
18 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Coomassie Street, Radcliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Mar 2025 at 09:33.
23 and 25 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Derby Road, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 Apr 2025 at 13:28.
23 and 27 Jun 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Lingards Lane, Tyldesley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Jun 2025 at 10:41.
23 and 26 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Bridge Street, Swinton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 2 May 2025 at 14:21.
23 Jun and 16 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Victoria Street, Radcliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 May 2025 at 08:50.
23 Jun and 6 Jul 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Bridges Avenue, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 29 May 2025 at 13:45.
23 Jun and 17 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Middleton Close, Radcliffe.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 23 June 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 May 2025 at 12:58.
23 and 27 Jun 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Mornington Road, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 24 Mar 2025 at 13:57.
23 and 25 Jun 2025
BT are proposing to carry out New service connection on Firwood Lane, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 18 Mar 2025 at 11:27.
24 and 27 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Oxford Road, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 Apr 2025 at 13:39.
30 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Jubilee Street, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 13:25.
30 Jun and 4 Jul 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Lingards Lane, Tyldesley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 Apr 2025 at 11:42.
30 Jun and 25 Jul 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Broad Street, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 29 May 2025 at 16:19.
30 Jun and 5 Aug 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Agecroft Road, Swinton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Jun 2025 at 10:51.
30 Jun and 29 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Grindsbrook Road, Radcliffe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 29 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 15:33.
1 Jul and 24 Oct 2025
Transport For Greater Manchester are proposing to carry out Highway improvement works on Higher Lane, Whitefield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport For Greater Manchester on 20 May 2025 at 09:35.
1 and 3 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Vincent Street, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 Apr 2025 at 15:33.
7 Jul and 22 Aug 2025
Electricity North West (NorWeb) were proposing to carry out Utility repair and maintenance works on Agecroft Road, Swinton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 July 2025 and run through until 22 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 20 May 2025 at 11:48.
7 and 30 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Birch Road, Worsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Mar 2025 at 08:38.
7 and 30 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Birch Road, Worsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 14:38.
7 Jul and 8 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Bridgeman Street, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Mar 2025 at 12:25.
8 and 25 Jul 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tong Road, Little Lever, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Apr 2025 at 11:56.
14 Jul and 25 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Portland Road, Eccles.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 May 2025 at 10:54.
14 Jul and 26 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Westminster Road, Eccles.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 May 2025 at 10:55.
14 Jul and 1 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Chatsworth Road, Eccles.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 May 2025 at 09:41.
14 and 28 Jul 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Bridge Street, Swinton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 17 Apr 2025 at 15:45.
14 Jul 2025 and 23 Feb 2026
Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Well Street, Tyldesley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 2 Apr 2025 at 13:19.
14 Jul 2025 and 23 Feb 2026
Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on Elliott Street, Tyldesley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 23 February 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 25 Mar 2025 at 13:11.
14 Jul 2025 and 23 Feb 2026
Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Elliott Street, Tyldesley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 25 Mar 2025 at 16:26.
14 Jul 2025 and 23 Feb 2026
Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Shuttle Street, Tyldesley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 2 Apr 2025 at 13:19.
14 Jul 2025 and 23 Feb 2026
Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Bolton Road, Atherton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 2 Apr 2025 at 14:07.
14 Jul and 1 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Derwent Avenue, Whitefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 30 Apr 2025 at 16:07.
14 Jul and 1 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Derwent Avenue, Whitefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 7 May 2025 at 15:20.
14 Jul and 1 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Mode Hill Lane, Whitefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 30 Apr 2025 at 16:11.
14 Jul and 1 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Mode Hill Lane, Whitefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 7 May 2025 at 15:47.
14 and 31 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 08:43.
17 Jul and 2 Sep 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Tyldesley Road, Atherton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 May 2025 at 09:36.
17 Jul and 2 Sep 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Hamilton Street, Atherton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 2 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 May 2025 at 09:34.
18 Jul and 3 Aug 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Tenax Road, Trafford Park.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 2 Jun 2025 at 12:34.
20 Jul and 29 Aug 2025
Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Hamilton Street, Atherton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 25 Feb 2025 at 13:10.
20 Jul and 29 Aug 2025
Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Hamilton Street, Atherton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 25 Feb 2025 at 13:10.
21 Jul and 13 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Leigh Road, Worsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 12:00.
21 Jul and 13 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Ellenbrook Road, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 May 2025 at 10:33.
21 Jul and 3 Aug 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Back Dumers Lane South, Radcliffe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 3 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 20 May 2025 at 13:52.
21 Jul and 3 Aug 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Hassall Street, Radcliffe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 3 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 20 May 2025 at 13:45.
21 Jul and 15 Aug 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Dumers Lane, Radcliffe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 29 Apr 2025 at 15:47.
21 Jul and 7 Aug 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Dumers Lane, Radcliffe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 29 Apr 2025 at 15:09.
21 Jul and 14 Aug 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Dumers Lane, Bury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 28 Apr 2025 at 16:52.
21 Jul and 13 Aug 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Manchester Road, Bury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 13 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 29 Apr 2025 at 11:13.
21 Jul and 8 Aug 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Tennyson Avenue, Bury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 29 Apr 2025 at 11:39.
21 Jul and 15 Aug 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Tennyson Avenue, Bury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 May 2025 at 12:34.
21 Jul and 1 Aug 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Bridges Avenue, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 May 2025 at 14:40.
28 Jul and 4 Sep 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Broad Street, Salford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 23 Dec 2024 at 10:04.
28 Jul and 22 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Carden Avenue, Swinton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 14:48.
28 Jul and 27 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Old Clough Lane, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:15.
28 Jul and 20 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Worsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 May 2025 at 11:15.
28 Jul and 15 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Heys Road, Prestwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 29 Apr 2025 at 10:43.
28 Jul and 15 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Heys Road, Prestwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 7 May 2025 at 15:28.
28 Jul and 15 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Heywood Road, Prestwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 28 May 2025 at 09:49.
28 Jul and 15 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Water Street, Radcliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 18 Feb 2025 at 14:15.
28 Jul and 15 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Water Street, Radcliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 3 Mar 2025 at 15:58.
28 Jul and 15 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Spring Lane, Radcliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 18 Feb 2025 at 14:14.
28 Jul and 15 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Spring Lane, Radcliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 3 Mar 2025 at 15:54.
29 Jul and 6 Aug 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Bailey Lane, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 May 2025 at 09:49.
31 Jul and 14 Aug 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Hallsworth Road, Eccles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2025 and could run through until 14 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 8 May 2025 at 14:20.
31 Jul and 14 Aug 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Barton Hall Avenue, Eccles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2025 and could run through until 14 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 8 May 2025 at 14:18.
31 Jul and 14 Aug 2025
Salford City Council were proposing to carry out Highway repair and maintenance works on Ellesmere Street, Eccles.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 July 2025 and run through until 14 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 13:40.
31 Jul and 14 Aug 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Renshaw Street, Eccles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2025 and could run through until 14 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 8 May 2025 at 14:27.
31 Jul and 14 Aug 2025
Salford City Council were proposing to carry out Highway repair and maintenance works on Kingswood Road, Eccles.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 July 2025 and run through until 14 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 13:42.
31 Jul and 14 Aug 2025
Salford City Council were proposing to carry out Highway repair and maintenance works on Mount Skip Lane, Worsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 July 2025 and run through until 14 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 13:44.
31 Jul and 4 Sep 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Tennyson Avenue, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2025 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 May 2025 at 14:52.
31 Jul and 4 Sep 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Tennyson Avenue, Bury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 July 2025 and run through until 4 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 May 2025 at 12:36.
1 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Parkstone Avenue, Whitefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 10:05.
1 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Lindrick Avenue, Whitefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 09:10.
1 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Woodhall Avenue, Whitefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 2 Jun 2025 at 12:40.
1 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Ferndale Avenue, Whitefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 10:08.
1 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Hillingdon Road, Whitefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 10:10.
1 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Hawkstone Avenue, Whitefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 10:11.
1 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Wentworth Avenue, Whitefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 10:11.
1 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Fairhaven Avenue, Whitefield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 10:07.
1 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Redvales Road, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 09:12.
1 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Cardigan Drive, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 09:08.
1 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Pembroke Drive, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 09:11.
4 and 18 Aug 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Graham Road, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 14:19.
4 and 18 Aug 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Cholmondeley Road, Salford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 14:23.
4 and 30 Aug 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Broad Street, Salford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 19 Feb 2025 at 14:31.
4 Aug and 5 Sep 2025
Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Chaddock Lane, Worsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 31 Mar 2025 at 15:02.
4 Aug and 5 Sep 2025
Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Chaddock Lane, Worsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 31 Mar 2025 at 15:03.
4 and 10 Aug 2025
Wigan Metropolitan Borough Council are proposing to carry out Section 50 on East Lancashire Road, Tyldesley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 31 Mar 2025 at 15:07.
4 and 10 Aug 2025
Wigan Metropolitan Borough Council are proposing to carry out Section 50 on East Lancashire Road, Tyldesley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 31 Mar 2025 at 15:08.
4 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Ullswater Drive, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 09:13.
4 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Windermere Drive, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 09:19.
4 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Patterdale Drive, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 09:10.
4 and 28 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Brecon Drive, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 09:06.
5 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Lakeland Crescent, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 09:30.
5 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Tarn Drive, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 09:37.
5 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Thirlmere Drive, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 09:38.
5 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Keswick Drive, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 09:29.
5 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Kendal Drive, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 09:28.
5 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Sussex Drive, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 09:37.
5 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Surrey Drive, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 09:35.
5 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Essex Drive, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 09:27.
5 and 7 Aug 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Tonge Moor Road, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 May 2025 at 08:30.
6 and 26 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Dryden Avenue, Swinton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 14:48.
6 and 15 Aug 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Mornington Road, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 May 2025 at 11:07.
11 and 29 Aug 2025
BT are proposing to carry out Utility repair and maintenance works on Brookhouse Avenue, Eccles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 29 Jan 2025 at 16:57.
11 and 29 Aug 2025
BT are proposing to carry out Utility repair and maintenance works on Brookhouse Avenue, Eccles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 3 Feb 2025 at 14:58.
11 and 29 Aug 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Kersal Vale Road, Salford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 23 May 2025 at 10:03.
11 Aug and 5 Sep 2025
Electricity North West (NorWeb) were proposing to carry out Utility repair and maintenance works on Kersal Vale Road, Prestwich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 20 May 2025 at 12:03.
11 Aug and 5 Sep 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Perrymead, Prestwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 13 May 2025 at 11:56.
11 Aug and 5 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Middleton Close, Radcliffe.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 11 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 May 2025 at 16:10.
11 Aug and 30 Nov 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Richmond Street, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 12 Mar 2025 at 15:25.
11 Aug and 30 Nov 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Wellington Road, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 12 Mar 2025 at 15:31.
11 Aug and 30 Nov 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Olivant Street, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 12 Mar 2025 at 11:54.
11 Aug and 30 Nov 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Olivant Street, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 13 May 2025 at 11:54.
11 Aug and 30 Nov 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Parliament Street, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 12 Mar 2025 at 15:17.
11 Aug and 30 Nov 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Manchester Road, Bury.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 27 Feb 2025 at 15:29.
13 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Rhiwlas Drive, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 22 May 2025 at 09:51.
14 Aug and 15 Sep 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Wellington Road, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 13 May 2025 at 12:28.
16 Aug and 28 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Ellesmere Street, Swinton North Ward, Swinton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 August 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 14:25.
18 Aug and 5 Sep 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Kersal Vale Road, Prestwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 20 May 2025 at 12:09.
18 Aug and 16 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Grindsbrook Road, Radcliffe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 16 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 May 2025 at 15:15.
18 Aug and 6 Dec 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Gigg Lane, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 6 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 13 May 2025 at 11:37.
18 Aug and 6 Dec 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Manchester Road, Bury.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 6 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 16 May 2025 at 10:41.
18 Aug and 6 Dec 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Manchester Road, Bury.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 6 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 16 May 2025 at 10:38.
18 Aug and 6 Dec 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Radcliffe Road, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 6 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 16 May 2025 at 10:41.
18 Aug and 6 Dec 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Manchester Road, Bury.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 6 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 16 May 2025 at 10:37.
18 Aug and 6 Dec 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Parkhills Road, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 6 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 14 May 2025 at 09:52.
18 Aug and 6 Dec 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Richmond Street, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 6 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 16 May 2025 at 10:42.
18 Aug and 6 Dec 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Wellington Road, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 6 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 16 May 2025 at 10:42.
18 Aug and 6 Dec 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Parliament Street, Bury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 6 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 13 May 2025 at 11:56.
18 Aug and 6 Dec 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Manchester Road, Bury.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 6 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 13 May 2025 at 11:40.
22 and 25 Aug 2025
BT are proposing to carry out Utility repair and maintenance works on Verdant Lane, Eccles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 29 Jan 2025 at 16:57.
22 and 25 Aug 2025
BT are proposing to carry out Utility repair and maintenance works on Verdant Lane, Eccles.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 3 Feb 2025 at 14:59.
25 Aug and 10 Oct 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Broad Street, Salford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 14:56.
25 Aug and 10 Oct 2025
Salford City Council were proposing to carry out Highway repair and maintenance works on Broad Street, Salford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 10 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Salford City Council on 19 May 2025 at 08:45.
26 Aug and 19 Sep 2025
Electricity North West (NorWeb) were proposing to carry out Utility repair and maintenance works on Gerald Road, Salford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 20 May 2025 at 14:52.
26 Aug and 22 Sep 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Dumers Lane, Radcliffe.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Jun 2025 at 10:11.
26 Aug and 22 Sep 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Dumers Lane, Bury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Jun 2025 at 10:06.
Roadworks Map near to Bent Spur Road, BOLTON, BL4 8SJ (15 Events)































- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Bent Spur Road, BOLTON, BL4 8SJ (15 Events)
(Scheduled Dates)
(miles)
(Scheduled: 3 Jun 2025 - 6 Jun 2025)
(Scheduled: 30 May 2025 - 3 Jun 2025)
(Scheduled: 1 Jun 2025 - 6 Jun 2025)
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
(Scheduled: 29 May 2025 - 18 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.