ROADWORKS SUMMARY
Haslam Hall Mews, BOLTON, BL1 5EX
Introduction

View current and future planned roadworks and road closures for Haslam Hall Mews, BL1 5EX and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Haslam Hall Mews, BOLTON, BL1 5EX
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Haslam Hall Mews are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
31 Oct 2025
Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Manchester Road, Bolton.
These works are categorised as Major.
The works started on 20 September 2022 at 09:30 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 10 Oct 2024 at 10:27.
11 Apr 2026
Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Higher Market Street, Farnworth, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 June 2024 at 09:30 and could run through until 11 April 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 11 Apr 2025 at 11:26.
11 Apr 2026
Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Market Street, Farnworth, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 June 2024 at 09:30 and could run through until 11 April 2026. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 11 Apr 2025 at 11:20.
26 Mar and 30 Jun 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Temple Road, Bolton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 27 Mar 2025 at 08:18.
30 Jun 2025
Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Temple Road, Bolton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 March 2025 at 15:30 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 27 Mar 2025 at 09:33.
20 Jun 2025
Cadent Gas are carrying out Utility asset works on Crescent Road, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 April 2025 at 10:42 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2025 at 11:34.
23 Apr and 18 Jul 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Manchester Road, Blackrod, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Apr 2025 at 10:32.
23 Apr and 18 Jul 2025
Bolton Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Manchester Road, Blackrod, Bolton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 April 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 8 May 2025 at 09:19.
1 May 2025 and 1 May 2026
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bolton Road, Farnworth, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 1 May 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 11 Apr 2025 at 12:22.
1 May 2026
Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Bolton Road, Farnworth, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 May 2025 at 08:00 and could run through until 1 May 2026. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 8 May 2025 at 08:15.
5 May and 25 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Crescent Road, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 09:42.
5 May and 20 Jun 2025
Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Bowstone Rise, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 11 Mar 2025 at 11:13.
Today
Cadent Gas are proposing to carry out Utility asset works on Mansell Way, Horwich, Bolton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 10:33.
6 May and 16 Jun 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Nelson Street, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 4 Feb 2025 at 14:22.
16 Jun 2025
Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Nelson Street, Bolton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 09:30 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 6 May 2025 at 10:40.
6 May and 16 Jun 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Thynne Street, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 4 Feb 2025 at 14:24.
16 Jun 2025
Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Thynne Street, Bolton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 09:30 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 6 May 2025 at 10:41.
6 May and 8 Aug 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on De Havilland Way, Horwich, Bolton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 21 Jan 2025 at 14:40.
6 May and 8 Aug 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chorley New Road, Horwich, Bolton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 21 Jan 2025 at 14:38.
7 May and 11 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Belmont Road, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Feb 2025 at 12:37.
27 Jun 2025
Cadent Gas are carrying out Utility asset works on Shakerley Road, Tyldesley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 May 2025 at 18:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 12:27.
19 Jun 2025
Cadent Gas are carrying out Utility asset works on France Street, Westhoughton, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 May 2025 at 18:00 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 08:44.
Monday
Blackburn With Darwen Borough Council are proposing to carry out Highway repair and maintenance works on Stones Bank Road, Turton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Blackburn With Darwen Borough Council on 14 Apr 2025 at 14:56.
19 May and 30 Jun 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lower Leigh Road, Westhoughton, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 14 Feb 2025 at 14:23.
19 May and 30 Jun 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tong Road, Little Lever, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 14 Feb 2025 at 14:24.
15 Jun 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Crown Lane, Horwich, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 May 2025 at 11:03 and could run through until 15 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 21 May 2025 at 08:56.
11 Jun 2025
Cadent Gas are carrying out Utility asset works on Chorley Road, Blackrod, Bolton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 May 2025 at 11:00 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 May 2025 at 11:13.
13 Jun 2025
Bolton Metropolitan Borough Council are carrying out Section 50 on Chorley Road, Westhoughton, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 May 2025 at 09:15 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 22 May 2025 at 09:16.
26 May and 26 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on France Street, Westhoughton, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 14:27.
26 May and 12 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on St Georges Avenue, Westhoughton, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 14:29.
Sunday
Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Falkland Road, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 9 May 2025 at 09:20.
Sunday
Bolton Metropolitan Borough Council are carrying out Section 50 on Falkland Road, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 May 2025 at 09:30 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 27 May 2025 at 08:09.
8 Aug 2025
Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on De Havilland Way, Horwich, Bolton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:00 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 27 May 2025 at 09:18.
8 Aug 2025
Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Chorley New Road, Horwich, Bolton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:00 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 27 May 2025 at 09:18.
2 Jun and 16 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Shakerley Road, Tyldesley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 11:16.
2 and 18 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on York Avenue, Tyldesley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 15:30.
Thursday
Salford City Council are carrying out Highway repair and maintenance works on Coniston Avenue, Worsley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 10:10 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 2 Jun 2025 at 10:26.
5 Jul 2025
Bolton Metropolitan Borough Council are carrying out Section 50 on Bowstone Rise, Bolton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 10:10 and could run through until 5 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 2 Jun 2025 at 12:08.
2 and 27 Jun 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Heaton Road, Radcliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 15 May 2025 at 10:35.
2 and 13 Jun 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Withins Lane, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Mar 2025 at 15:34.
2 and 13 Jun 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Withins Lane, Bolton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 May 2025 at 12:32.
2 Jun and 11 Jul 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Station Road, Blackrod, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 6 Nov 2024 at 14:41.
2 Jun and 11 Jul 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Crown Lane, Horwich, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 6 Nov 2024 at 14:41.
2 and 25 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Chorley Road, Blackrod, Bolton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 08:33.
Monday
Salford City Council are proposing to carry out Highway repair and maintenance works on Eastham Way, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 28 Apr 2025 at 15:18.
4 and 10 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Pemberton Street, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 28 Apr 2025 at 15:19.
8 Jun 2025 and 8 Jun 2028
Salford City Council are proposing to carry out Highway repair and maintenance works on Cleggs Lane, Worsley.
These works are categorised as Major.
The works will start on or after 8 June 2025 and could run through until 8 June 2028. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 14 May 2025 at 20:08.
8 Jun 2025 and 8 Jun 2028
Salford City Council were proposing to carry out Highway repair and maintenance works on Cleggs Lane, Worsley.
These works were categorised as Major.
The works were originally planned to start 8 June 2025 and run through until 8 June 2028. The works were due to impact the carriageway only.
This roadwork event was last updated by Salford City Council on 21 May 2025 at 10:10.
9 and 13 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Eastwood Avenue, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 Apr 2025 at 14:43.
9 and 13 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Fleetwood Road, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 Apr 2025 at 14:44.
9 and 13 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Westwood Avenue, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 Apr 2025 at 14:45.
10 and 13 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Barry Crescent, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 Apr 2025 at 14:42.
12 and 14 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Eastwood Avenue, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 11:23.
12 and 14 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Barry Crescent, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 11:20.
13 and 16 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Worsley Avenue, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 11:45.
13 and 16 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Wardley Avenue, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 24 Apr 2025 at 09:41.
13 and 16 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Hulton Avenue, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 24 Apr 2025 at 09:23.
15 and 17 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Wardley Avenue, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 11:42.
15 and 17 Jun 2025
Salford City Council are proposing to carry out Highway repair and maintenance works on Hulton Avenue, Worsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 11:36.
16 and 27 Jun 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Heaton Road, Radcliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 18 Feb 2025 at 14:03.
16 Jun and 27 Jul 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Vale Avenue, Horwich, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 30 May 2025 at 08:09.
16 Jun and 11 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Chorley Old Road, Horwich, Bolton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Mar 2025 at 14:59.
16 Jun and 11 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Chorley Old Road, Horwich, Bolton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 May 2025 at 09:56.
23 Jun and 23 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Market Street, Hindley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 11:55.
23 Jun and 23 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Market Street, Hindley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 09:12.
23 Jun and 23 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Market Street, Hindley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Apr 2025 at 10:23.
23 Jun and 18 Jul 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Manchester Road, Blackrod, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 6 May 2025 at 11:22.
23 and 27 Jun 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Mornington Road, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 24 Mar 2025 at 13:57.
23 Jun and 18 Jul 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on New Street, Blackrod, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Apr 2025 at 11:58.
23 Jun and 18 Jul 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Street, Blackrod, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Apr 2025 at 11:57.
23 Jun and 18 Jul 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Blackhorse Street, Blackrod, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Apr 2025 at 11:56.
23 and 25 Jun 2025
BT are proposing to carry out New service connection on Firwood Lane, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 18 Mar 2025 at 11:27.
1 and 3 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Vincent Street, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 Apr 2025 at 15:33.
7 Jul and 8 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Bridgeman Street, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Mar 2025 at 12:25.
7 Jul and 3 Aug 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Mason Street, Horwich, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 30 May 2025 at 08:09.
8 and 25 Jul 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tong Road, Little Lever, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Apr 2025 at 11:56.
14 Jul 2025 and 23 Feb 2026
Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Well Street, Tyldesley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 2 Apr 2025 at 13:19.
14 Jul 2025 and 23 Feb 2026
Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on Elliott Street, Tyldesley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 23 February 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 25 Mar 2025 at 13:11.
14 Jul 2025 and 23 Feb 2026
Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Elliott Street, Tyldesley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 25 Mar 2025 at 16:26.
14 Jul 2025 and 23 Feb 2026
Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Shuttle Street, Tyldesley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 2 Apr 2025 at 13:19.
14 and 30 Jul 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lower Leigh Road, Westhoughton, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Apr 2025 at 11:54.
14 Jul 2025 and 23 Feb 2026
Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Bolton Road, Atherton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 23 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 2 Apr 2025 at 14:07.
14 and 31 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 08:43.
17 Jul and 2 Sep 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Tyldesley Road, Atherton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 May 2025 at 09:36.
17 Jul and 2 Sep 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Hamilton Street, Atherton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 2 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 May 2025 at 09:34.
20 Jul and 29 Aug 2025
Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Hamilton Street, Atherton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 25 Feb 2025 at 13:10.
20 Jul and 29 Aug 2025
Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Hamilton Street, Atherton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 25 Feb 2025 at 13:10.
21 Jul and 7 Aug 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Station Road, Blackrod, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 7 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Apr 2025 at 11:55.
21 Jul and 7 Aug 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Crown Lane, Horwich, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 7 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Apr 2025 at 11:54.
25 Jul and 20 Aug 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Crown Lane, Horwich, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 May 2025 at 08:37.
29 Jul and 6 Aug 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Bailey Lane, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 May 2025 at 09:49.
29 Jul and 9 Sep 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Vale Avenue, Horwich, Bolton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 July 2025 and run through until 9 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 6 May 2025 at 14:22.
29 Jul and 9 Sep 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Vale Avenue, Horwich, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 12 May 2025 at 14:31.
29 Jul and 26 Aug 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Mason Street, Horwich, Bolton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 July 2025 and run through until 26 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 6 May 2025 at 14:35.
29 Jul and 26 Aug 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Mason Street, Horwich, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 12 May 2025 at 14:31.
31 Jul and 14 Aug 2025
Salford City Council were proposing to carry out Highway repair and maintenance works on Mount Skip Lane, Worsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 July 2025 and run through until 14 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Salford City Council on 22 May 2025 at 13:44.
4 Aug and 15 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Regent Road, Lostock, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 May 2025 at 15:36.
5 and 7 Aug 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Tonge Moor Road, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 May 2025 at 08:30.
6 and 15 Aug 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Mornington Road, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 May 2025 at 11:07.
18 and 20 Aug 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Olga Street, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 May 2025 at 08:54.
25 Aug and 15 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Atherton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 May 2025 at 14:31.
25 Aug and 15 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Atherton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 May 2025 at 13:08.
26 Aug and 15 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Seymour Road, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 15:19.
26 Aug and 15 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Crompton Way, Bolton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 15:00.
Roadworks Map near to Haslam Hall Mews, BOLTON, BL1 5EX (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Haslam Hall Mews, BOLTON, BL1 5EX (17 Events)
(Scheduled Dates)
(miles)
(Scheduled: 30 May 2025 - 4 Jun 2025)
(Scheduled: 30 May 2025 - 4 Jun 2025)
(Scheduled: 3 Jun 2025 - 5 Jun 2025)
(Scheduled: 2 Jun 2025 - 5 Jun 2025)
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
(Scheduled: 3 Jun 2025 - 6 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.