ROADWORKS SUMMARY
Halliwell Road, BOLTON, BL1 3NW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Halliwell Road, BL1 3NW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Halliwell Road, BOLTON, BL1 3NW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Halliwell Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Bolton Metropolitan Borough Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Manchester Road

Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Manchester Road, Bolton.

These works are categorised as Major.

The works started on 20 September 2022 at 09:30 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 10 Oct 2024 at 10:27.

Bolton Metropolitan Borough Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Cheadle Square

Bolton Metropolitan Borough Council are carrying out Section 50 on Cheadle Square, Bolton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2024 at 08:30 and could run through until 26 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 13 Jun 2024 at 13:19.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
11 Apr 2025
Details
View Map
Share
Follow
Higher Market Street

Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Higher Market Street, Farnworth, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 June 2024 at 09:30 and could run through until 11 April 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 24 Jun 2024 at 09:02.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
11 Apr 2025
Details
View Map
Share
Follow
Market Street

Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Market Street, Farnworth, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 June 2024 at 09:30 and could run through until 11 April 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 24 Jun 2024 at 09:02.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
18 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Church Road

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Road, Kearsley, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 25 Jun 2024 at 10:56.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
18 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Bridgewater Street

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bridgewater Street, Farnworth, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 25 Jun 2024 at 10:57.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
18 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Chapel Street

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chapel Street, Farnworth, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 25 Jun 2024 at 10:55.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
18 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Brackley Street

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Brackley Street, Farnworth, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 25 Jun 2024 at 10:53.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
18 Jul 2024 and 31 Mar 2025
Details
View Map
Share
Follow
King Street

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on King Street, Farnworth, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 25 Jun 2024 at 10:54.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Frederick Street

Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Frederick Street, Farnworth, Bolton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 August 2024 at 08:00 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 2 Aug 2024 at 08:25.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
1 Apr 2025
Details
View Map
Share
Follow
Church Street

Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Church Street, Farnworth, Bolton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 August 2024 at 08:00 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 9 Aug 2024 at 08:22.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Russell Street

Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Russell Street, Farnworth, Bolton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 08:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 5 Sep 2024 at 08:18.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
16 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Belmont Road

Blackburn With Darwen Borough Council are proposing to carry out Highway repair and maintenance works on Belmont Road, Belmont.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 24 Sep 2024 at 12:05.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Brook Street

Bolton Metropolitan Borough Council are carrying out Section 50 on Brook Street, Bolton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 4 Oct 2024 at 11:28.

Bolton Metropolitan Borough Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Prince Street

Bolton Metropolitan Borough Council are carrying out Section 50 on Prince Street, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 15:00 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 13 Nov 2024 at 14:42.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
30 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Brook Street

Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Brook Street, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 4 Oct 2024 at 11:22.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Ridgway Gates

Bolton Metropolitan Borough Council are carrying out Section 50 on Ridgway Gates, Bolton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 4 Oct 2024 at 11:28.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
30 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Ridgway Gates

Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Ridgway Gates, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 4 Oct 2024 at 11:24.

Bolton Metropolitan Borough Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Wardle Street

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Wardle Street, Bolton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 7 Oct 2024 at 12:45.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Kirkwall Drive

Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Kirkwall Drive, Bolton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 17:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 18 Oct 2024 at 10:50.

Bolton Metropolitan Borough Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Kirkwall Drive

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Kirkwall Drive, Bolton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 7 Oct 2024 at 12:56.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Wardle Street

Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Wardle Street, Bolton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 17:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 18 Oct 2024 at 10:51.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Wheatfield Street

Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Wheatfield Street, Bolton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 17:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 18 Oct 2024 at 10:51.

Bolton Metropolitan Borough Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Wheatfield Street

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Wheatfield Street, Bolton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 7 Oct 2024 at 12:48.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Bromwich Street

Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Bromwich Street, Bolton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 17:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 18 Oct 2024 at 10:44.

Bolton Metropolitan Borough Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Bromwich Street

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bromwich Street, Bolton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 7 Oct 2024 at 12:42.

Electricity North West (NorWeb) logo
LONG TERM
Between
9 Oct and 2 Dec 2024
Details
View Map
Share
Follow
Kearsley Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Kearsley Road, Radcliffe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity North West (NorWeb) on 31 Jul 2024 at 13:48.

Bolton Metropolitan Borough Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Marsden Road

Bolton Metropolitan Borough Council are carrying out Section 50 on Marsden Road, Bolton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 09:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 13 Nov 2024 at 11:30.

Cadent Gas logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Bury New Road

Cadent Gas are proposing to carry out Utility asset works on Bury New Road, Radcliffe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 31 Jul 2024 at 15:12.

Bury Metropolitan Borough Council logo
LONG TERM
Between
20 Oct 2024 and 17 Oct 2025
Details
View Map
Share
Follow
Spring Lane

Bury Metropolitan Borough Council are proposing to carry out Section 58 on Spring Lane, Radcliffe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2024 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bury Metropolitan Borough Council on 31 Jul 2024 at 14:06.

Cadent Gas logo
LONG TERM
Between
28 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Belmont Road

Cadent Gas are proposing to carry out Utility asset works on Belmont Road, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2024 at 14:49.

Cadent Gas logo
LONG TERM
Between
28 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Belmont Road

Cadent Gas are proposing to carry out Utility asset works on Belmont Road, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 14:05.

Bolton Metropolitan Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Bradshaw Road

Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Bradshaw Road, Bolton.

These works are categorised as Major.

The works started on 30 October 2024 at 10:30 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 13 Nov 2024 at 08:49.

Bolton Metropolitan Borough Council logo
Between
30 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Church Street

Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Street, Horwich, Bolton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 22 Oct 2024 at 12:59.

Bolton Metropolitan Borough Council logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Church Street

Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Church Street, Horwich, Bolton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 08:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Oct 2024 at 08:31.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Deansgate

Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Deansgate, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 25 Oct 2024 at 13:37.

Cadent Gas logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Belmont Road

Cadent Gas are carrying out Utility asset works on Belmont Road, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 08:15 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:19.

Cadent Gas logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Tennyson Street

Cadent Gas are carrying out Utility asset works on Tennyson Street, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 14:50 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 14:55.

Cadent Gas logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Tennyson Street

Cadent Gas are proposing to carry out Utility asset works on Tennyson Street, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 05:31.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Deansgate

Bolton Metropolitan Borough Council are carrying out Section 50 on Deansgate, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 18 Nov 2024 at 15:35.

Electricity North West (NorWeb) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Waverley Avenue

Electricity North West (NorWeb) are proposing to carry out New service connection on Waverley Avenue, Kearsley, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Sep 2024 at 12:11.

Cadent Gas logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Morris Fold Drive

Cadent Gas are proposing to carry out Utility asset works on Morris Fold Drive, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:20.

Cadent Gas logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Regent Road

Cadent Gas are proposing to carry out Utility asset works on Regent Road, Lostock, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:19.

Cadent Gas logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Overdene Close

Cadent Gas are proposing to carry out Utility asset works on Overdene Close, Lostock, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:19.

United Utilities Water (formerly North West Water) logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Horseshoe Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Horseshoe Lane, Bromley Cross, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Nov 2024 at 15:01.

United Utilities Water (formerly North West Water) logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Horseshoe Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Horseshoe Lane, Bromley Cross, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Oct 2024 at 12:13.

United Utilities Water (formerly North West Water) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Walley Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Walley Street, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Nov 2024 at 09:10.

United Utilities Water (formerly North West Water) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Walley Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Walley Street, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 16 Sep 2024 at 12:08.

United Utilities Water (formerly North West Water) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Back Hughes Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Hughes Street, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Nov 2024 at 09:17.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Ainsworth Road

BT are proposing to carry out Utility repair and maintenance works on Ainsworth Road, Radcliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 2 Oct 2024 at 12:15.

Electricity North West (NorWeb) logo
Between
13 and 19 Dec 2024
Details
View Map
Share
Follow
Firwood Grove

Electricity North West (NorWeb) are proposing to carry out New service connection on Firwood Grove, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Sep 2024 at 15:13.

Cadent Gas logo
Between
16 and 26 Dec 2024
Details
View Map
Share
Follow
Mile Lane

Cadent Gas are proposing to carry out Utility asset works on Mile Lane, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 26 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 11:33.

Cadent Gas logo
Between
16 and 26 Dec 2024
Details
View Map
Share
Follow
Mile Lane

Cadent Gas are proposing to carry out Utility asset works on Mile Lane, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 26 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 08:29.

Cadent Gas logo
Between
16 and 27 Dec 2024
Details
View Map
Share
Follow
Mile Lane

Cadent Gas are proposing to carry out Utility asset works on Mile Lane, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 10:38.

Cadent Gas logo
Between
16 and 27 Dec 2024
Details
View Map
Share
Follow
Mile Lane

Cadent Gas are proposing to carry out Utility asset works on Mile Lane, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 12:00.

Cadent Gas logo
Between
3 and 17 Jan 2025
Details
View Map
Share
Gaskell Street

Cadent Gas were proposing to carry out Utility asset works on Gaskell Street, Bolton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:12.

Cadent Gas logo
Between
3 and 17 Jan 2025
Details
View Map
Share
Follow
Gaskell Street

Cadent Gas are proposing to carry out Utility asset works on Gaskell Street, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 08:22.

Cadent Gas logo
Between
3 and 17 Jan 2025
Details
View Map
Share
Follow
Gaskell Street

Cadent Gas are proposing to carry out Utility asset works on Gaskell Street, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 09:56.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Back Morris Green Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Morris Green Lane, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Oct 2024 at 11:45.

Cadent Gas logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Parkfield Road

Cadent Gas are proposing to carry out Utility asset works on Parkfield Road, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 08:55.

Cadent Gas logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Follow
Fairfields

Cadent Gas are proposing to carry out Utility asset works on Fairfields, Egerton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:39.

Cadent Gas logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Fairfields

Cadent Gas were proposing to carry out Utility asset works on Fairfields, Egerton, Bolton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:30.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Back Bertrand Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Bertrand Road, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 1 Oct 2024 at 08:34.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Overdene Close

Cadent Gas are proposing to carry out Utility asset works on Overdene Close, Lostock, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:00.

Cadent Gas logo
Between
6 and 29 Jan 2025
Details
View Map
Share
Follow
Regent Road

Cadent Gas are proposing to carry out Utility asset works on Regent Road, Lostock, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:01.

Bury Metropolitan Borough Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Radcliffe Moor Road

Bury Metropolitan Borough Council are proposing to carry out Section 50 on Radcliffe Moor Road, Radcliffe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bury Metropolitan Borough Council on 19 Nov 2024 at 15:04.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Morris Fold Drive

Cadent Gas are proposing to carry out Utility asset works on Morris Fold Drive, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 13:59.

United Utilities Water (formerly North West Water) logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Back Campbell Street North

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Campbell Street North, Farnworth, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 25 Oct 2024 at 09:31.

United Utilities Water (formerly North West Water) logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Back Hughes Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Hughes Street, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 24 Oct 2024 at 14:04.

United Utilities Water (formerly North West Water) logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Back Hulton Lane West

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Hulton Lane West, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 Nov 2024 at 14:54.

United Utilities Water (formerly North West Water) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Back St Georges Road Central

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Back St Georges Road Central, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 7 Nov 2024 at 07:42.

United Utilities Water (formerly North West Water) logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Lever Street

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Lever Street, Little Lever, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 12 Nov 2024 at 12:56.


Roadworks Map near to Halliwell Road, BOLTON, BL1 3NW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 20:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Halliwell Road, BOLTON, BL1 3NW (92 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
MAJOR
  
TENNYSON STREET 
(0.1 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 15 Nov 2024 14:50
(Scheduled: 15 Nov 2024 - 29 Nov 2024)
0.1
Details
Share
Follow
2
Cadent Gas logo
MAJOR
  
TENNYSON STREET 
(0.1 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 18 Nov 2024 - 2 Dec 2024
0.1
Details
Share
Follow
3
Cityfibre Metro Networks logo
DICKINSON STREET 
(0.1 miles)
Cityfibre Metro Networks
Remedial works - Footway - Give and take
In Progress
Since: 21 Nov 2024 14:30
(Scheduled: 20 Nov 2024 - 27 Nov 2024)
0.1
Details
Share
Follow
4
BT logo
BACK CLYDE STREET 
(0.1 miles)
BT
Utility repair and maintenance works - Footway - Give and take
Complete
21 Nov 2024 09:22 - 10:50
0.1
Details
Share
5
Bolton Metropolitan Borough Council logo
MADELEY GARDENS 
(0.1 miles)
Bolton Metropolitan Borough Council
Highway repair and maintenance works - Footway - Give and take
In Progress
Since: 20 Nov 2024 13:09
(Scheduled: 20 Nov 2024 - 22 Nov 2024)
0.1
Details
Share
Follow
6
BT logo
ST MATTHEWS WALK 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 19 Nov 2024 17:00
(Scheduled: 18 Nov 2024 - 21 Nov 2024)
0.2
Details
Share
Follow
7
Cadent Gas logo
BROWNLOW WAY 
(0.2 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 18 Nov 2024 - 22 Nov 2024
0.2
Details
Share
Follow
8
Bolton Metropolitan Borough Council logo
DARWIN STREET 
(0.2 miles)
Bolton Metropolitan Borough Council
Highway repair and maintenance works - Footway - Give and take
Planned
Scheduled: 21 Nov 2024 - 25 Nov 2024
0.2
Details
Share
Follow
9
Bolton Metropolitan Borough Council logo
DARWIN STREET 
(0.2 miles)
Bolton Metropolitan Borough Council
Highway repair and maintenance works - Carriageway - Give and take
Planned
Scheduled: 21 Nov 2024 - 25 Nov 2024
0.2
Details
Share
Follow
10
Bolton Metropolitan Borough Council logo
DARWIN STREET 
(0.2 miles)
Bolton Metropolitan Borough Council
Highway repair and maintenance works - Carriageway - Give and take
Planned
Scheduled: 21 Nov 2024 - 25 Nov 2024
0.2
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.