ROADWORKS SUMMARY
Charminster Road, BOURNEMOUTH, BH8 9SQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Charminster Road, BH8 9SQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Charminster Road, BOURNEMOUTH, BH8 9SQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Charminster Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
18 Mar 2024 and 13 Jun 2025
Details
View Map
Share
Follow
Castle Lane West - Side Section 169 To 219

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Castle Lane West - Side Section 169 To 219, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2024 and could run through until 13 June 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 21 Dec 2023 at 14:48.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
26 Aug 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Dolbery Road North

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Dolbery Road North, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 21 Jun 2024 at 12:59.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Hilton Close

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Hilton Close, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:36.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Ringwood Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ringwood Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 30 Aug 2024 at 15:15.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Broom Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Broom Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 30 Aug 2024 at 15:10.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Ringwood Road To Alderney Hospital Access Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ringwood Road To Alderney Hospital Access Road, Alderney, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:38.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Alderney Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Alderney Avenue, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:38.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Bedford Road South

Bournemouth, Christchurch And Poole Council were proposing to carry out Highway improvement works on Bedford Road South, Poole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 23 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 23 Aug 2024 at 12:03.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Portelet Close

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Portelet Close, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:38.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Canford Way

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Canford Way, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:37.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Loewy Crescent

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Loewy Crescent, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:37.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Belben Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Belben Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:37.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
9 Sep 2024 and 12 Jun 2025
Details
View Map
Share
Follow
Ringwood Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ringwood Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 12 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 30 Aug 2024 at 13:59.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Until
12 Jun 2025
Details
View Map
Share
Follow
Ringwood Road

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Ringwood Road, Poole.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 07:30 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 29 Apr 2025 at 09:55.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
9 Sep 2024 and 5 Sep 2025
Details
View Map
Share
Follow
Castle Lane West

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Castle Lane West, Bournemouth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 5 September 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 Jul 2024 at 15:22.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
30 Sep 2024 and 25 Oct 2025
Details
View Map
Share
Follow
Seafield Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Seafield Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 25 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Aug 2024 at 09:51.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
30 Sep 2024 and 19 Oct 2025
Details
View Map
Share
Seafield Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Seafield Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 19 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Sep 2024 at 10:32.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
26 Oct 2024 and 22 Nov 2025
Details
View Map
Share
Gloucester Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Gloucester Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2024 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Aug 2024 at 11:18.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
7 Nov 2024 and 5 Dec 2025
Details
View Map
Share
Southbourne Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Southbourne Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 November 2024 and run through until 5 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Aug 2024 at 12:25.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
20 Jan and 29 Aug 2025
Details
View Map
Share
Follow
Redhill Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Redhill Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 Jul 2024 at 15:30.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
20 Jan and 29 Aug 2025
Details
View Map
Share
Follow
Redhill Drive

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Redhill Drive, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 Jul 2024 at 15:46.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
20 Jan and 29 Aug 2025
Details
View Map
Share
Follow
Whitelegg Way

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Whitelegg Way, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 Jul 2024 at 15:38.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
10 Feb and 23 Jun 2025
Details
View Map
Share
Follow
Ringwood Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ringwood Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 18 Dec 2024 at 16:42.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
17 Feb and 18 Jun 2025
Details
View Map
Share
Harewood Crescent

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Harewood Crescent, Bournemouth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 18 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Jan 2025 at 16:25.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
10 Mar and 18 Jun 2025
Details
View Map
Share
Walsingham Dene

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Walsingham Dene, Bournemouth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 18 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Jan 2025 at 16:32.

Southern Gas Networks logo
LONG TERM
Between
31 Mar and 19 Dec 2025
Details
View Map
Share
Poole Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Poole Road, Poole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 19 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Feb 2025 at 09:42.

Southern Gas Networks logo
LONG TERM
Until
5 Sep 2025
Details
View Map
Share
Follow
Cranbrook Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Cranbrook Road, Poole.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 09:43 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 09:51.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
7 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Castle Lane West

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Castle Lane West, Bournemouth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 9 May 2025 at 12:41.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Castle Lane West

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Castle Lane West, Bournemouth.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 08:00 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 12 May 2025 at 10:57.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
7 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Muscliffe Lane

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Muscliffe Lane, Bournemouth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 9 May 2025 at 13:48.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Muscliffe Lane

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Muscliffe Lane, Bournemouth.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 12 May 2025 at 10:58.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
7 Apr and 22 Aug 2025
Details
View Map
Share
Follow
Redhill Roundabout

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Redhill Roundabout, Bournemouth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 9 May 2025 at 14:05.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Redhill Roundabout

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Redhill Roundabout, Bournemouth.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 08:00 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 16 May 2025 at 14:05.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
7 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Wimborne Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Wimborne Road, Bournemouth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 9 May 2025 at 07:55.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Wimborne Road

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Wimborne Road, Bournemouth.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 08:00 and could run through until 4 July 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 9 May 2025 at 11:47.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Whitelegg Way

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Whitelegg Way, Bournemouth.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 08:00 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 12 May 2025 at 10:56.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
14 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Ringwood Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ringwood Road, Poole.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 9 Apr 2025 at 16:18.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Ringwood Road

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Ringwood Road, Poole.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 07:30 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 20 May 2025 at 09:28.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
21 Apr and 11 Jul 2025
Details
View Map
Share
Follow
Ashley Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ashley Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Apr 2025 at 17:26.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
28 Apr and 13 Nov 2025
Details
View Map
Share
Madeira Road

Bournemouth, Christchurch And Poole Council were proposing to carry out Works for Rail Purposes on Madeira Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 13 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 24 Apr 2025 at 10:04.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
28 Apr and 11 Nov 2025
Details
View Map
Share
Madeira Road

Bournemouth, Christchurch And Poole Council were proposing to carry out Highway improvement works on Madeira Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 11 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 24 Apr 2025 at 10:18.

Southern Gas Networks logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Western Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Western Road, Poole.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 May 2025 at 09:47 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 08:17.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Ringwood Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ringwood Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 30 Aug 2024 at 15:03.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Haskells Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Haskells Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:43.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Albion Close

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Albion Close, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:44.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Cynthia Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Cynthia Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:43.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Rosemary Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Rosemary Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:44.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Old Wareham Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Old Wareham Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:42.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 30 Apr 2026
Details
View Map
Share
Follow
St Georges Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on St Georges Avenue, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:40.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Rossmore Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Rossmore Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:41.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 23 Apr 2026
Details
View Map
Share
Follow
Herbert Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Herbert Avenue, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 23 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:39.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Mannings Heath Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Mannings Heath Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:42.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
5 May and 28 Nov 2025
Details
View Map
Share
Follow
Exeter Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Exeter Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 9 Jan 2025 at 16:19.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
5 May and 28 Nov 2025
Details
View Map
Share
Follow
Gervis Place

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Gervis Place, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 17 Feb 2025 at 11:09.

Southern Gas Networks logo
LONG TERM
Between
6 May and 18 Jul 2025
Details
View Map
Share
Follow
Western Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Western Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Feb 2025 at 15:09.

Southern Gas Networks logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Western Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Western Road, Poole.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 14:33 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 14:46.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
6 May and 4 Jul 2025
Details
View Map
Share
Follow
Whitelegg Way

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Whitelegg Way, Bournemouth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 8 May 2025 at 17:22.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
12 May and 23 Jun 2025
Details
View Map
Share
Knyveton Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Knyveton Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 23 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 May 2025 at 08:30.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Knyveton Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Knyveton Road, Bournemouth.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 May 2025 at 10:41.

Wessex Water logo
LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Fishermans Walk Gardens

Wessex Water are carrying out Utility repair and maintenance works on Fishermans Walk Gardens, Bournemouth.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 12 May 2025 at 09:15 and could run through until 27 June 2025. The works will impact the verge only.

This roadwork event was last updated by Wessex Water on 2 Jun 2025 at 08:32.

Southern Gas Networks logo
LONG TERM
Between
12 May and 4 Jul 2025
Details
View Map
Share
Follow
Fernside Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fernside Road, Bournemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Feb 2025 at 16:52.

Southern Gas Networks logo
LONG TERM
Between
19 May and 4 Jul 2025
Details
View Map
Share
Follow
Western Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Western Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Feb 2025 at 16:36.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Watkin Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Watkin Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 29 Jan 2025 at 14:33.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Watkin Road

Wessex Water are carrying out Utility repair and maintenance works on Watkin Road, Bournemouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 09:45 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 19 May 2025 at 15:36.

Scottish Hydro Electric Power Dis logo
Between
19 May and 17 Jun 2025
Details
View Map
Share
Wynter Close

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wynter Close, Bournemouth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 17 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Jan 2025 at 16:34.

Southern Gas Networks logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Redhill Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Redhill Drive, Bournemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 13:39.

Southern Gas Networks logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Redhill Drive

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Redhill Drive, Bournemouth.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Mar 2025 at 16:10.

Southern Gas Networks logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Pine Vale Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Vale Crescent, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 12:28.

Southern Gas Networks logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Pine Vale Crescent

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Pine Vale Crescent, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 13 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 09:14.

Southern Gas Networks logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Headswell Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Headswell Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 13:32.

Southern Gas Networks logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Headswell Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Headswell Avenue, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 13 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 08:00.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
21 May and 20 Jun 2025
Details
View Map
Share
Follow
Ashley Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ashley Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Apr 2025 at 17:29.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Ashley Road

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Ashley Road, Bournemouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 May 2025 at 11:05 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 21 May 2025 at 11:44.

Bournemouth, Christchurch And Poole Council logo
Finishing
Friday
Details
View Map
Share
Follow
Shelley Road East

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Shelley Road East, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Apr 2025 at 17:21.

Bournemouth, Christchurch And Poole Council logo
Finishing
Friday
Details
View Map
Share
Follow
Shelley Road East

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Shelley Road East, Bournemouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 11:05 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 21 May 2025 at 13:35.

Bournemouth, Christchurch And Poole Council logo
Finishing
Friday
Details
View Map
Share
Follow
North Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on North Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Apr 2025 at 17:04.

Bournemouth, Christchurch And Poole Council logo
Finishing
Friday
Details
View Map
Share
Follow
North Road

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on North Road, Bournemouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 11:05 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 21 May 2025 at 13:35.

Bournemouth, Christchurch And Poole Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Castle Lane West

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Castle Lane West, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 28 Feb 2025 at 11:24.

Bournemouth, Christchurch And Poole Council logo
Finishing
Tomorrow
Details
View Map
Share
Castle Lane West

Bournemouth, Christchurch And Poole Council were proposing to carry out Highway repair and maintenance works on Castle Lane West, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 May 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 12 May 2025 at 12:16.

Bournemouth, Christchurch And Poole Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Castle Lane West

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Castle Lane West, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 12 May 2025 at 12:05.

Bournemouth, Christchurch And Poole Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Castle Lane West

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Castle Lane West, Bournemouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 May 2025 at 08:00 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 23 May 2025 at 13:06.

Bournemouth, Christchurch And Poole Council logo
Finishing
Tomorrow
Details
View Map
Share
Muscliffe Lane

Bournemouth, Christchurch And Poole Council were proposing to carry out Highway improvement works on Muscliffe Lane, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 May 2025 and run through until 4 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 14 May 2025 at 16:10.

Bournemouth, Christchurch And Poole Council logo
Finishing
Friday
Details
View Map
Share
Follow
Muscliffe Lane

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Muscliffe Lane, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 12 May 2025 at 11:59.

Dorset Council logo
Finishing
Thursday
Details
View Map
Share
Bracken Road

Dorset Council were proposing to carry out Highway improvement works on Bracken Road, Ferndown.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 May 2025 and run through until 5 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Dorset Council on 19 Feb 2025 at 15:30.

Dorset Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Bracken Road

Dorset Council are proposing to carry out Highway improvement works on Bracken Road, Ferndown.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 7 Mar 2025 at 11:10.

Dorset Council logo
Finishing
Friday
Details
View Map
Share
Follow
Bracken Road

Dorset Council are carrying out Highway improvement works on Bracken Road, Ferndown.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 May 2025 at 10:30 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 27 May 2025 at 09:20.

Dorset Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Leeson Drive

Dorset Council are proposing to carry out Highway improvement works on Leeson Drive, Ferndown.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 7 Mar 2025 at 11:10.

Bournemouth, Christchurch And Poole Council logo
Finishing
Today
Details
View Map
Share
Follow
Wimborne Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Wimborne Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 9 Oct 2024 at 10:51.

Bournemouth, Christchurch And Poole Council logo
Finishing
Today
Details
View Map
Share
Follow
Wimborne Road - Side Section Redhill Roundabout To Castle Lane West

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Wimborne Road - Side Section Redhill Roundabout To Castle Lane West, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 9 Oct 2024 at 11:29.

Scottish Hydro Electric Power Dis logo
Finishing
Tomorrow
Details
View Map
Share
Cobham Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Cobham Road, Ferndown.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Jun 2025 at 11:04.

Southern Gas Networks logo
Until
20 Jun 2025
Details
View Map
Share
Follow
Wayne Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Wayne Road, Poole.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 09:21.

Bournemouth, Christchurch And Poole Council logo
Finishing
Tomorrow
Details
View Map
Share
Castle Lane West

Bournemouth, Christchurch And Poole Council were proposing to carry out Highway improvement works on Castle Lane West, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 4 June 2025. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 14 May 2025 at 16:12.

Bournemouth, Christchurch And Poole Council logo
Finishing
Tomorrow
Details
View Map
Share
Wimborne Road

Bournemouth, Christchurch And Poole Council were proposing to carry out Highway repair and maintenance works on Wimborne Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 14 May 2025 at 14:17.

Bournemouth, Christchurch And Poole Council logo
Finishing
Tomorrow
Details
View Map
Share
Wimborne Road

Bournemouth, Christchurch And Poole Council were proposing to carry out Highway improvement works on Wimborne Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 4 June 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 14 May 2025 at 14:54.

Bournemouth, Christchurch And Poole Council logo
Finishing
Tomorrow
Details
View Map
Share
Wimborne Road - Side Section Redhill Roundabout To Castle Lane West

Bournemouth, Christchurch And Poole Council were proposing to carry out Highway repair and maintenance works on Wimborne Road - Side Section Redhill Roundabout To Castle Lane West, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 14 May 2025 at 15:21.

Bournemouth, Christchurch And Poole Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Whitelegg Way

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Whitelegg Way, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 26 Feb 2025 at 17:26.

Bournemouth, Christchurch And Poole Council logo
Finishing
Tomorrow
Details
View Map
Share
Whitelegg Way

Bournemouth, Christchurch And Poole Council were proposing to carry out Highway repair and maintenance works on Whitelegg Way, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 20 May 2025 at 14:15.

Dorset Council logo
Between
28 May and 10 Jun 2025
Details
View Map
Share
Follow
Linden Road

Dorset Council are proposing to carry out Highway improvement works on Linden Road, West Parley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 7 Mar 2025 at 11:15.

Dorset Council logo
Until
11 Jun 2025
Details
View Map
Share
Follow
Linden Road

Dorset Council are carrying out Highway improvement works on Linden Road, West Parley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 11:49 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 29 May 2025 at 11:50.

Dorset Council logo
Between
28 May and 10 Jun 2025
Details
View Map
Share
Follow
Linden Close

Dorset Council are proposing to carry out Highway improvement works on Linden Close, West Parley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 7 Mar 2025 at 11:15.

Dorset Council logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Linden Close

Dorset Council are carrying out Highway improvement works on Linden Close, West Parley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 11:49 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 29 May 2025 at 12:05.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
West Cliff Road

Southern Gas Networks are carrying out Utility repair and maintenance works on West Cliff Road, Bournemouth.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 12:00 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 12:38.

South West Water logo
Finishing
Friday
Details
View Map
Share
Follow
Braidley Road

South West Water are carrying out Utility repair and maintenance works on Braidley Road, Bournemouth.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 May 2025 at 14:53 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 2 Jun 2025 at 08:48.

Bournemouth, Christchurch And Poole Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Castle Lane West

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Castle Lane West, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 14 May 2025 at 15:50.

Bournemouth, Christchurch And Poole Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Castle Lane West

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Castle Lane West, Bournemouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 June 2025 at 08:00 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 1 Jun 2025 at 09:12.

Bournemouth, Christchurch And Poole Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Wimborne Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Wimborne Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 14 May 2025 at 16:31.

Bournemouth, Christchurch And Poole Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Wimborne Road

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Wimborne Road, Bournemouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 June 2025 at 08:00 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 2 Jun 2025 at 10:34.

Bournemouth, Christchurch And Poole Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Portswood Drive

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Portswood Drive, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 14 May 2025 at 16:38.

Bournemouth, Christchurch And Poole Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Portswood Drive

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Portswood Drive, Bournemouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 June 2025 at 08:00 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 2 Jun 2025 at 13:56.

Scottish Hydro Electric Power Dis logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Owls Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Owls Road, Bournemouth.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 07:57 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Jun 2025 at 11:17.

Bournemouth, Christchurch And Poole Council logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Derby Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Derby Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 15 May 2025 at 09:20.

Scottish Hydro Electric Power Dis logo
Until
2 Jul 2025
Details
View Map
Share
Follow
Nelson Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Nelson Road, Poole.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Jun 2025 at 11:45.

Scottish Hydro Electric Power Dis logo
Until
17 Jun 2025
Details
View Map
Share
Follow
Parkwood Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Parkwood Road, Bournemouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 07:00 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Jun 2025 at 08:00.

Scottish Hydro Electric Power Dis logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Gloucester Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Gloucester Road, Bournemouth.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Dec 2024 at 13:01.

Scottish Hydro Electric Power Dis logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Gloucester Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Gloucester Road, Bournemouth.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Dec 2024 at 11:43.

Scottish Hydro Electric Power Dis logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Gloucester Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Gloucester Road, Bournemouth.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Jan 2025 at 11:56.

Scottish Hydro Electric Power Dis logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Gloucester Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Gloucester Road, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Jan 2025 at 13:04.

Scottish Hydro Electric Power Dis logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Gloucester Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Gloucester Road, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Jan 2025 at 14:33.

Scottish Hydro Electric Power Dis logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Gloucester Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Gloucester Road, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Jan 2025 at 13:13.

Scottish Hydro Electric Power Dis logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Gloucester Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Gloucester Road, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Mar 2025 at 15:10.

Wessex Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Fountain Way

Wessex Water are proposing to carry out Utility repair and maintenance works on Fountain Way, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 16 Jan 2025 at 15:06.

Bournemouth, Christchurch And Poole Council logo
Until
20 Jun 2025
Details
View Map
Share
Follow
Warnford Road

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Warnford Road, Bournemouth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Jun 2025 at 10:15.

South West Water logo
Finishing
Friday
Details
View Map
Share
Follow
Arne Avenue

South West Water are proposing to carry out Utility repair and maintenance works on Arne Avenue, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 13 Feb 2025 at 13:02.

South West Water logo
Finishing
Friday
Details
View Map
Share
Follow
Arne Avenue

South West Water are carrying out Utility repair and maintenance works on Arne Avenue, Poole.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:03 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 2 Jun 2025 at 09:21.

Scottish Hydro Electric Power Dis logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Wycliffe Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Wycliffe Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Mar 2025 at 11:58.

Scottish Hydro Electric Power Dis logo
Until
20 Jun 2025
Details
View Map
Share
Follow
Wycliffe Road

Scottish Hydro Electric Power Dis are carrying out New service connection on Wycliffe Road, Bournemouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Jun 2025 at 08:08.

Scottish Hydro Electric Power Dis logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Wimborne Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Wimborne Road, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Mar 2025 at 11:58.

Scottish Hydro Electric Power Dis logo
Until
20 Jun 2025
Details
View Map
Share
Follow
Wimborne Road

Scottish Hydro Electric Power Dis are carrying out New service connection on Wimborne Road, Bournemouth.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:33 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Jun 2025 at 09:34.

Southern Gas Networks logo
LONG TERM
Between
2 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Sunnymoor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sunnymoor Road, Bournemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 14:57.

Southern Gas Networks logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Sunnymoor Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Sunnymoor Road, Bournemouth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 13:10 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 13:15.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Jun and 8 Jul 2025
Details
View Map
Share
Redhill Avenue

Bournemouth, Christchurch And Poole Council were proposing to carry out Highway improvement works on Redhill Avenue, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 8 July 2025. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 14 May 2025 at 16:45.

Bournemouth, Christchurch And Poole Council logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Follow
Redhill Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Redhill Avenue, Bournemouth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 14 May 2025 at 16:55.

Bournemouth, Christchurch And Poole Council logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Redhill Avenue

Bournemouth, Christchurch And Poole Council were proposing to carry out Highway improvement works on Redhill Avenue, Bournemouth.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 23 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Jun 2025 at 08:47.

Bournemouth, Christchurch And Poole Council logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Redhill Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Redhill Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 16 May 2025 at 10:40.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Cardigan Road

BT are proposing to carry out Utility asset works on Cardigan Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Mar 2025 at 11:43.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Cardigan Road

BT are proposing to carry out Utility asset works on Cardigan Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Jun 2025 at 11:46.

Bournemouth, Christchurch And Poole Council logo
Between
5 and 19 Jun 2025
Details
View Map
Share
Follow
Gladstone Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Gladstone Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Apr 2025 at 17:24.

Bournemouth, Christchurch And Poole Council logo
Between
5 and 19 Jun 2025
Details
View Map
Share
Follow
Gladstone Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Gladstone Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 20 May 2025 at 15:25.

Wessex Water logo
Between
6 and 30 Jun 2025
Details
View Map
Share
Follow
Bargates

Wessex Water are proposing to carry out Utility repair and maintenance works on Bargates, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 30 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 16 Jan 2025 at 15:04.

Cityfibre Metro Networks logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Prince Of Wales Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Prince Of Wales Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 8 Apr 2025 at 10:25.

Wessex Water logo
Between
9 and 30 Jun 2025
Details
View Map
Share
Follow
Barrack Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Barrack Road, Christchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 2 Jun 2025 at 12:53.

Wessex Water logo
Between
9 and 30 Jun 2025
Details
View Map
Share
Follow
Fountain Way

Wessex Water are proposing to carry out Utility repair and maintenance works on Fountain Way, Christchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 2 Jun 2025 at 12:56.

Wessex Water logo
Between
9 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Bargates

Wessex Water are proposing to carry out Utility repair and maintenance works on Bargates, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 2 Jun 2025 at 15:41.

Scottish Hydro Electric Power Dis logo
Between
16 and 27 Jun 2025
Details
View Map
Share
Follow
Harewood Crescent

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Harewood Crescent, Bournemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Jun 2025 at 11:43.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Castle Lane West

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Castle Lane West, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 Jul 2024 at 15:54.

Bournemouth, Christchurch And Poole Council logo
Between
16 and 27 Jun 2025
Details
View Map
Share
Wimborne Road

Bournemouth, Christchurch And Poole Council were proposing to carry out Highway repair and maintenance works on Wimborne Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 20 May 2025 at 14:14.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Wimborne Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Wimborne Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 Jul 2024 at 15:53.

Bournemouth, Christchurch And Poole Council logo
Between
20 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Ashley Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ashley Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Apr 2025 at 17:36.

Bournemouth, Christchurch And Poole Council logo
Between
20 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Ashley Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ashley Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 20 May 2025 at 15:16.

Scottish Hydro Electric Power Dis logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Seafield Road

Scottish Hydro Electric Power Dis are proposing to carry out Highway repair and maintenance works on Seafield Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 May 2025 at 12:40.

Southern Gas Networks logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 14:23.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
23 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Muscliffe Lane

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Muscliffe Lane, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 Jul 2024 at 16:09.

Bournemouth, Christchurch And Poole Council logo
Between
24 and 29 Jun 2025
Details
View Map
Share
Follow
Redhill Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Redhill Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Jun 2025 at 08:35.

Bournemouth, Christchurch And Poole Council logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Wessex Way

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Wessex Way, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 23 Apr 2025 at 13:01.

Wessex Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Whitecliff Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Whitecliff Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 30 Apr 2025 at 12:43.

Wessex Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Whitecliff Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Whitecliff Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 2 May 2025 at 10:30.

South West Water logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Christchurch Road - Lansdowne To St Swithins South Side Sections

South West Water are proposing to carry out Utility repair and maintenance works on Christchurch Road - Lansdowne To St Swithins South Side Sections, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 4 Apr 2025 at 09:30.

South West Water logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Christchurch Road - Lansdowne To St Swithins South Side Sections

South West Water are proposing to carry out Utility repair and maintenance works on Christchurch Road - Lansdowne To St Swithins South Side Sections, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 29 May 2025 at 13:00.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
30 Jun 2025 and 11 Feb 2026
Details
View Map
Share
Follow
Madeira Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Works for Rail Purposes on Madeira Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 6 May 2025 at 11:33.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
30 Jun 2025 and 11 Feb 2026
Details
View Map
Share
Follow
Madeira Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Madeira Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 6 May 2025 at 11:32.

Bournemouth, Christchurch And Poole Council logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Oxford Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Oxford Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 8 May 2025 at 13:37.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 29 Aug 2025
Details
View Map
Share
Follow
Constitution Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Constitution Hill Road, Poole.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2025 at 15:57.

Scottish Hydro Electric Power Dis logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
The Meridians

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on The Meridians, Christchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Aug 2024 at 11:20.

Electricity Network Company logo
Between
30 Jun and 16 Jul 2025
Details
View Map
Share
Follow
Holdenhurst Avenue

Electricity Network Company are proposing to carry out Utility asset works on Holdenhurst Avenue, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 16 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 13 Nov 2024 at 15:27.

Bournemouth, Christchurch And Poole Council logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Whitelegg Way

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Whitelegg Way, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 16 May 2025 at 10:59.

Bournemouth, Christchurch And Poole Council logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Whitelegg Way

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Whitelegg Way, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 16 May 2025 at 14:51.

Hampshire County Council logo
LONG TERM
Between
30 Jun 2025 and 4 Jul 2026
Details
View Map
Share
Follow
Salisbury Road

Hampshire County Council are proposing to carry out Highway improvement works on Salisbury Road, Sopley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 8 Jan 2025 at 13:00.

Hampshire County Council logo
Between
30 Jun and 5 Jul 2025
Details
View Map
Share
Follow
Salisbury Road

Hampshire County Council are proposing to carry out Highway improvement works on Salisbury Road, Sopley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 15 Jan 2025 at 12:45.

Hampshire County Council logo
Between
30 Jun and 5 Jul 2025
Details
View Map
Share
Follow
Salisbury Road

Hampshire County Council are proposing to carry out Highway improvement works on Salisbury Road, Sopley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 15 Jan 2025 at 13:58.

Electricity Network Company logo
Between
1 and 23 Jul 2025
Details
View Map
Share
Follow
Petersfield Road

Electricity Network Company are proposing to carry out Utility asset works on Petersfield Road, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 22 Oct 2024 at 16:34.

Electricity Network Company logo
Between
1 and 23 Jul 2025
Details
View Map
Share
Follow
Petersfield Road

Electricity Network Company are proposing to carry out Utility asset works on Petersfield Road, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 23 Oct 2024 at 12:54.

Electricity Network Company logo
Between
1 and 15 Jul 2025
Details
View Map
Share
Follow
Holdenhurst Avenue

Electricity Network Company are proposing to carry out Utility asset works on Holdenhurst Avenue, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 15 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 22 Oct 2024 at 16:33.

Electricity Network Company logo
Between
1 and 15 Jul 2025
Details
View Map
Share
Follow
Riverside Avenue

Electricity Network Company are proposing to carry out Utility asset works on Riverside Avenue, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 22 Oct 2024 at 16:31.

Electricity Network Company logo
Between
2 and 23 Jul 2025
Details
View Map
Share
Follow
Petersfield Road

Electricity Network Company are proposing to carry out Utility asset works on Petersfield Road, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 21 May 2025 at 09:28.

Electricity Network Company logo
Between
2 and 18 Jul 2025
Details
View Map
Share
Follow
Holdenhurst Avenue

Electricity Network Company are proposing to carry out Utility asset works on Holdenhurst Avenue, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 21 May 2025 at 09:27.

Electricity Network Company logo
Between
2 and 18 Jul 2025
Details
View Map
Share
Follow
Riverside Avenue

Electricity Network Company are proposing to carry out Utility asset works on Riverside Avenue, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 21 May 2025 at 09:26.

Bournemouth, Christchurch And Poole Council logo
Between
4 and 18 Jul 2025
Details
View Map
Share
Follow
Ashridge Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Ashridge Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 20 May 2025 at 11:57.

Bournemouth, Christchurch And Poole Council logo
Between
4 and 18 Jul 2025
Details
View Map
Share
Follow
Ferncroft Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ferncroft Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 20 May 2025 at 15:11.

Bournemouth, Christchurch And Poole Council logo
Between
4 and 18 Jul 2025
Details
View Map
Share
Follow
Pinewood Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Pinewood Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 20 May 2025 at 15:07.

Bournemouth, Christchurch And Poole Council logo
Between
4 and 18 Jul 2025
Details
View Map
Share
Follow
Wimborne Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Wimborne Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 16 May 2025 at 13:40.

Bournemouth, Christchurch And Poole Council logo
Between
4 and 18 Jul 2025
Details
View Map
Share
Wimborne Road

Bournemouth, Christchurch And Poole Council were proposing to carry out Highway improvement works on Wimborne Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 16 May 2025 at 16:52.

Bournemouth, Christchurch And Poole Council logo
Between
4 and 18 Jul 2025
Details
View Map
Share
Follow
Wimborne Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Wimborne Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 20 May 2025 at 14:58.

Bournemouth, Christchurch And Poole Council logo
Between
4 and 18 Jul 2025
Details
View Map
Share
Follow
Wimborne Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Wimborne Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 May 2025 at 09:12.

Bournemouth, Christchurch And Poole Council logo
Between
4 and 18 Jul 2025
Details
View Map
Share
Follow
Northbourne Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Northbourne Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 20 May 2025 at 15:07.

Bournemouth, Christchurch And Poole Council logo
Between
4 and 18 Jul 2025
Details
View Map
Share
Follow
Avebury Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Avebury Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 May 2025 at 09:04.

Bournemouth, Christchurch And Poole Council logo
Between
4 and 18 Jul 2025
Details
View Map
Share
Follow
New Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on New Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 20 May 2025 at 15:10.

Southern Gas Networks logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Gresham Road

Southern Gas Networks are proposing to carry out New service connection on Gresham Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 09:56.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
7 Jul and 9 Aug 2025
Details
View Map
Share
Redhill Drive

Bournemouth, Christchurch And Poole Council were proposing to carry out Highway improvement works on Redhill Drive, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 16 May 2025 at 10:45.

Bournemouth, Christchurch And Poole Council logo
Between
14 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Victoria Crescent

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Victoria Crescent, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 16 May 2025 at 10:24.

Bournemouth, Christchurch And Poole Council logo
Between
14 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Victoria Crescent

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Victoria Crescent, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 16 May 2025 at 14:18.

Bournemouth, Christchurch And Poole Council logo
Between
14 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Victoria Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Victoria Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 7 May 2025 at 14:13.

Bournemouth, Christchurch And Poole Council logo
Between
14 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Victoria Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Victoria Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 16 May 2025 at 13:45.

Scottish Hydro Electric Power Dis logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Knighton Heath Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Knighton Heath Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Apr 2025 at 10:09.

Scottish Hydro Electric Power Dis logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Knighton Heath Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Knighton Heath Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Apr 2025 at 12:57.

Bournemouth, Christchurch And Poole Council logo
Between
16 and 18 Jul 2025
Details
View Map
Share
Follow
Bargates

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Bargates, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 2 Jun 2025 at 13:06.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
18 Jul and 30 Aug 2025
Details
View Map
Share
Follow
Willow Drive

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Willow Drive, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Aug 2024 at 14:49.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
18 Jul and 30 Aug 2025
Details
View Map
Share
Sopers Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Sopers Lane, Christchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 July 2025 and run through until 30 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Aug 2024 at 11:20.

Southern Gas Networks logo
LONG TERM
Between
20 Jul and 4 Sep 2025
Details
View Map
Share
Constitution Hill Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Constitution Hill Road, Poole.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 July 2025 and run through until 4 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 09:22.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 4 Sep 2025
Details
View Map
Share
Follow
North Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on North Road, Poole.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 13:10.

Southern Gas Networks logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Harbour View Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harbour View Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 13:25.

Southern Gas Networks logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Pauntley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pauntley Road, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 10:27.

Southern Gas Networks logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Mudeford Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mudeford Lane, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 10:55.

Network Rail logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Stony Lane

Network Rail are proposing to carry out Works for Rail Purposes on Stony Lane, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Mar 2025 at 11:30.

Network Rail logo
Between
21 and 26 Jul 2025
Details
View Map
Share
Follow
Stony Lane

Network Rail are proposing to carry out Works for Rail Purposes on Stony Lane, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 19 Mar 2025 at 12:55.

Bournemouth, Christchurch And Poole Council logo
Between
21 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Holdenhurst Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Holdenhurst Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 30 May 2025 at 15:52.

Dorset Council logo
LONG TERM
Between
21 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Church Road

Dorset Council are proposing to carry out Highway improvement works on Church Road, Ferndown.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Dorset Council on 3 Apr 2025 at 10:45.

Scottish Hydro Electric Power Dis logo
Between
23 and 30 Jul 2025
Details
View Map
Share
Heron Court Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Heron Court Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 30 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 May 2025 at 10:21.

Bournemouth, Christchurch And Poole Council logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Christchurch Bypass

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Christchurch Bypass, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the verge only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 29 Apr 2025 at 14:42.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
23 Jul and 6 Sep 2025
Details
View Map
Share
Follow
High Howe Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on High Howe Lane, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 6 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Apr 2025 at 09:45.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
23 Jul and 6 Sep 2025
Details
View Map
Share
Follow
High Howe Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on High Howe Lane, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 6 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Apr 2025 at 10:10.

Dorset Council logo
LONG TERM
Between
23 Jul and 11 Sep 2025
Details
View Map
Share
Follow
Albert Road

Dorset Council are proposing to carry out Highway improvement works on Albert Road, Ferndown.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 22 May 2025 at 09:55.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
24 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Parkwood Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Parkwood Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Apr 2025 at 15:41.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
24 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Willow Drive

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Willow Drive, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Dec 2024 at 12:36.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
24 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Sopers Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Sopers Lane, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Dec 2024 at 12:11.

Scottish Hydro Electric Power Dis logo
Between
25 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Sopers Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Sopers Lane, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Sep 2024 at 14:55.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Darracott Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Darracott Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Aug 2024 at 10:18.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Parkwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Parkwood Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jan 2025 at 13:19.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Parkwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Parkwood Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Jan 2025 at 15:22.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Darracott Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Darracott Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2024 at 15:14.

Southern Gas Networks logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Mudeford Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mudeford Lane, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 May 2025 at 08:08.

Southern Gas Networks logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Mudeford Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mudeford Lane, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 08:34.

Southern Gas Networks logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Sandown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandown Road, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 May 2025 at 13:51.

Bournemouth, Christchurch And Poole Council logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Clingan Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Clingan Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 24 Mar 2025 at 11:22.

Bournemouth, Christchurch And Poole Council logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Clingan Road

Bournemouth, Christchurch And Poole Council were proposing to carry out Highway improvement works on Clingan Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 8 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 15 Apr 2025 at 09:32.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Yeomans Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Yeomans Road, Bournemouth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 09:56.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Yeomans Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Yeomans Road, Bournemouth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Jan 2025 at 13:12.

Southern Gas Networks logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Castle Lane West

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Lane West, Bournemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 15:52.

Scottish Hydro Electric Power Dis logo
Between
29 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Footpath From Aspen Way Adjacent 38-50 To Broadmayne Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Footpath From Aspen Way Adjacent 38-50 To Broadmayne Road, Alderney, Poole.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 29 July 2025 and could run through until 15 August 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Jun 2025 at 15:44.

Bournemouth, Christchurch And Poole Council logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
St Clement's Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on St Clement's Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 17 Apr 2025 at 08:16.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Pauntley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pauntley Road, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 May 2025 at 10:17.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Pauntley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pauntley Road, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 09:33.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 5 Sep 2025
Details
View Map
Share
Mudeford Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Mudeford Lane, Christchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 May 2025 at 08:05.

Southern Gas Networks logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Mudeford Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mudeford Lane, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 10:45.

Southern Gas Networks logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Mudeford Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mudeford Lane, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 10:08.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Mudeford Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mudeford Lane, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 May 2025 at 12:00.

Southern Gas Networks logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Sandown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandown Road, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 10:56.

Southern Gas Networks logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Sandown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandown Road, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 10:18.

Southern Gas Networks logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Castle Lane West

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Lane West, Bournemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Feb 2025 at 10:16.

Bournemouth, Christchurch And Poole Council logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Park Lane

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Park Lane, Bournemouth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 16 May 2025 at 11:07.

Bournemouth, Christchurch And Poole Council logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Redhill Drive

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Redhill Drive, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 16 May 2025 at 13:15.

Bournemouth, Christchurch And Poole Council logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Redhill Drive

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Redhill Drive, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 16 May 2025 at 16:11.

Bournemouth, Christchurch And Poole Council logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Holdenhurst Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Holdenhurst Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 30 May 2025 at 15:55.

South West Water logo
Between
14 and 18 Aug 2025
Details
View Map
Share
Church Road

South West Water were proposing to carry out Utility asset works on Church Road, Ferndown.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 24 Apr 2025 at 11:29.

South West Water logo
Between
14 and 18 Aug 2025
Details
View Map
Share
Church Road

South West Water were proposing to carry out Utility asset works on Church Road, Ferndown.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 8 May 2025 at 11:53.

Scottish Hydro Electric Power Dis logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Heron Court Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Heron Court Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 May 2025 at 14:10.

Wessex Water logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Daws Avenue

Wessex Water are proposing to carry out Utility repair and maintenance works on Daws Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 7 May 2025 at 14:35.

Wessex Water logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Daws Avenue

Wessex Water are proposing to carry out Utility repair and maintenance works on Daws Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 7 May 2025 at 15:02.

Southern Gas Networks logo
Between
25 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Charminster Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charminster Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 8 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Feb 2025 at 16:30.

Scottish Hydro Electric Power Dis logo
Between
26 Aug and 12 Sep 2025
Details
View Map
Share
Paisley Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Paisley Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Dec 2024 at 13:02.

Scottish Hydro Electric Power Dis logo
Between
26 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Paisley Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Paisley Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Dec 2024 at 11:40.

Scottish Hydro Electric Power Dis logo
Between
26 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Paisley Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Paisley Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Jan 2025 at 10:20.


Roadworks Map near to Charminster Road, BOURNEMOUTH, BH8 9SQ (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 12:48
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Charminster Road, BOURNEMOUTH, BH8 9SQ (31 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Gas Networks logo
URGENT
  
SUTTON ROAD 
(0.1 miles)
Southern Gas Networks
Disconnection or alteration of supply - Footway, Carriageway - Give and take
Complete
30 May 2025 08:00 - 3 Jun 2025 10:31
0.1
Details
Share
2
South West Water logo
CHARMINSTER ROAD 
(0.4 miles)
South West Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 2 Jun 2025 - 4 Jun 2025
0.4
Details
Share
Follow
3
South West Water logo
URGENT
  
LUCKHAM ROAD 
(0.4 miles)
South West Water
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 2 Jun 2025 09:09
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
0.4
Details
Share
Follow
4
South West Water logo
URGENT
  
LIMITED ROAD 
(0.5 miles)
South West Water
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 29 May 2025 09:34
(Scheduled: 29 May 2025 - 4 Jun 2025)
0.5
Details
Share
Follow
5
Bournemouth, Christchurch And Poole Council logo
MAJOR
  
CASTLE LANE WEST 
(0.5 miles)
Bournemouth, Christchurch And Poole Council
Highway improvement works - Footway, Carriageway, Verge, Cycleway - Lane closure
Planned
Scheduled: 9 Sep 2024 - 5 Sep 2025
0.5
Details
Share
Follow
6
Wessex Water logo
CASTLE LANE WEST 
(0.5 miles)
Wessex Water
Utility repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 3 Jun 2025 - 4 Jun 2025
0.5
Details
Share
Follow
7
Bournemouth, Christchurch And Poole Council logo
MAJOR
  
CASTLE LANE WEST - SIDE SECTION 169 TO 219 
(0.5 miles)
Bournemouth, Christchurch And Poole Council
Highway improvement works - Footway, Carriageway, Verge, Cycleway - Road closure
Planned
Scheduled: 18 Mar 2024 - 13 Jun 2025
0.5
Details
Share
Follow
8
South West Water logo
URGENT
  
RICHMOND WOOD ROAD 
(0.7 miles)
South West Water
Utility repair and maintenance works - Carriageway - Give and take
In Progress
Since: 22 May 2025 11:00
(Scheduled: 22 May 2025 - 3 Jun 2025)
0.7
Details
Share
Follow
9
Wessex Water logo
WIMBORNE ROAD 
(0.7 miles)
Wessex Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 2 Jun 2025 11:46
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
0.7
Details
Share
Follow
10
South West Water logo
URGENT
  
WYCLIFFE ROAD 
(0.8 miles)
South West Water
Utility repair and maintenance works - Footway - Give and take
Complete
28 May 2025 14:42 - 15:47