ROADWORKS SUMMARY
The Oaks, VERWOOD, BH31 6YL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Oaks, BH31 6YL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Oaks, VERWOOD, BH31 6YL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Oaks are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Verwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Verwood Road, Three Legged Cross.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 13:50.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Verwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Verwood Road, Three Legged Cross.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2024 at 10:00.

Southern Gas Networks logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Lions Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Lions Lane, Ashley Heath.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 October 2024 at 11:15 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 16:55.

Dorset Council logo
LONG TERM
Until
4 May 2026
Details
View Map
Share
Follow
Mill Lane

Dorset Council are carrying out Highway improvement works on Mill Lane, Cranborne.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 11:09 and could run through until 4 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 4 Nov 2024 at 13:05.

Southern Gas Networks logo
LONG TERM
Between
18 Nov 2024 and 11 Jul 2025
Details
View Map
Share
Follow
Woolsbridge Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woolsbridge Road, Ashley Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 11 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Aug 2024 at 11:30.

Southern Gas Networks logo
LONG TERM
Between
18 Nov 2024 and 11 Jul 2025
Details
View Map
Share
Follow
Woolsbridge Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woolsbridge Road, Ashley Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 11 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 10:20.

Southern Gas Networks logo
LONG TERM
Until
11 Jul 2025
Details
View Map
Share
Follow
Woolsbridge Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Woolsbridge Road, Ashley Heath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:15 and could run through until 11 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 09:38.

Southern Gas Networks logo
Between
18 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Verwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Verwood Road, Three Legged Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 10:15.

Finishing
Saturday
Details
View Map
Share
Follow
Station Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Station Road, Fordingbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 16 Sep 2024 at 11:30.

Finishing
Saturday
Details
View Map
Share
Follow
Station Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Station Road, Fordingbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 19 Sep 2024 at 09:45.

Finishing
Saturday
Details
View Map
Share
Follow
Station Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Station Road, Fordingbridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:42 and could run through until 23 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Nov 2024 at 09:58.

Southern Gas Networks logo
Between
19 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Verwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Verwood Road, Three Legged Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:47.

Southern Gas Networks logo
Until
3 Dec 2024
Details
View Map
Share
Follow
Church Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Church Road, Three Legged Cross.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 15:00 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 17:00.

Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Station Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Station Road, Fordingbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 5 Sep 2024 at 15:53.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Fordingbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:17.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Fordingbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 13:55.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Ashford Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashford Close, Fordingbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:17.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Ashford Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashford Close, Fordingbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 13:55.

South West Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Ringwood Road

South West Water are proposing to carry out Utility repair and maintenance works on Ringwood Road, Alderholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 19 Sep 2024 at 15:10.

South West Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Ringwood Road

South West Water are proposing to carry out Utility repair and maintenance works on Ringwood Road, Alderholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 14 Nov 2024 at 15:15.

Dorset Council logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Ringwood Road

Dorset Council are proposing to carry out Remedial works on Ringwood Road, Alderholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 14 Nov 2024 at 15:15.

Hampshire County Council logo
Between
13 and 16 Dec 2024
Details
View Map
Share
Follow
Ivy Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Ivy Lane, Blashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 30 Sep 2024 at 12:13.

Hampshire County Council logo
Between
13 and 16 Dec 2024
Details
View Map
Share
Follow
Ivy Lane

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Ivy Lane, Blashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 30 Sep 2024 at 11:53.

Dorset Council logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Harbridge Drove

Dorset Council are proposing to carry out Highway improvement works on Harbridge Drove, Alderholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 24 Oct 2024 at 11:00.

Dorset Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Harbridge Drove

Dorset Council are proposing to carry out Highway improvement works on Harbridge Drove, Alderholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 31 Oct 2024 at 10:40.

Hampshire County Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Station Road

Hampshire County Council are proposing to carry out Section 50 on Station Road, Fordingbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 18 Nov 2024 at 08:54.

South West Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
War Memorial To Amen Corner - Street

South West Water are proposing to carry out Utility repair and maintenance works on War Memorial To Amen Corner - Street, Gussage All Saints.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 13 Nov 2024 at 14:19.

South West Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Horton Road Church Hill Woodlands To Horton Lane

South West Water are proposing to carry out Utility repair and maintenance works on Horton Road Church Hill Woodlands To Horton Lane, Woodlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 7 Nov 2024 at 15:52.

South West Water logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Horton Road Church Hill Woodlands To Horton Lane

South West Water were proposing to carry out Utility repair and maintenance works on Horton Road Church Hill Woodlands To Horton Lane, Woodlands.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 January 2025 and run through until 20 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 7 Nov 2024 at 15:16.

Southern Gas Networks logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Fordingbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 09:03.

Southern Gas Networks logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Ashford Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashford Close, Fordingbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 09:07.

South West Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
War Memorial To Amen Corner - Street

South West Water were proposing to carry out Utility repair and maintenance works on War Memorial To Amen Corner - Street, Gussage All Saints.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 27 Oct 2024 at 15:57.

South West Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
War Memorial To Amen Corner - Street

South West Water were proposing to carry out Utility repair and maintenance works on War Memorial To Amen Corner - Street, Gussage All Saints.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 30 Oct 2024 at 11:52.

South West Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Ringwood Road

South West Water were proposing to carry out Remedial works on Ringwood Road, Alderholt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by South West Water on 30 Oct 2024 at 11:58.


Roadworks Map near to The Oaks, VERWOOD, BH31 6YL

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Oaks, VERWOOD, BH31 6YL (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Dorset Council logo
RINGWOOD ROAD 
(0.3 miles)
Dorset Council
Section 50 - Footway - No carriageway incursion
In Progress
Since: 18 Nov 2024 08:00
(Scheduled: 18 Nov 2024 - 21 Nov 2024)
0.3
Details
Share
Follow
2
Dorset Council logo
ALBION WAY 
(0.4 miles)
Dorset Council
Utility asset works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 20 Nov 2024 09:15
(Scheduled: 20 Nov 2024 - 22 Nov 2024)
0.4
Details
Share
Follow
3
South West Water logo
RINGWOOD ROAD 
(0.7 miles)
South West Water
Remedial works - Footway - Some carriageway incursion
Planned
Scheduled: 20 Nov 2024 - 22 Nov 2024
0.7
Details
Share
Follow
4
Southern Gas Networks logo
MAJOR
  
OWLS ROAD 
(0.9 miles)
Southern Gas Networks
Utility repair and maintenance works - Verge - Give and take
Planned
Scheduled: 21 Oct 2024 - 6 Dec 2024
0.9
Details
Share
Follow
5
Dorset Council logo
EMERGENCY
  
MILL LANE 
(1.0 miles)
Dorset Council
Highway improvement works - Carriageway - Road closure
In Progress
Since: 4 Nov 2024 11:09
(Scheduled: 4 Nov 2024 - 4 May 2026)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.