ROADWORKS SUMMARY
Meadow Way, RINGWOOD, BH24 1RY
Introduction
View current and future planned roadworks and road closures for Meadow Way, BH24 1RY and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Meadow Way, RINGWOOD, BH24 1RY
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Meadow Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
18 Nov 2024 and 11 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woolsbridge Road, Ashley Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 11 July 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 10:20.
18 Nov 2024 and 11 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woolsbridge Road, Ashley Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 11 July 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 15 Aug 2024 at 11:30.
11 Jul 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Woolsbridge Road, Ashley Heath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:15 and could run through until 11 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 10:15.
21 Mar 2025
Dorset Council are carrying out Highway improvement works on Hurn Road, Ashley Heath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 08:01 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dorset Council on 6 Jan 2025 at 08:05.
Today
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Verwood Road, Three Legged Cross.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 13:35.
Wednesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Verwood Road, Three Legged Cross.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 January 2025 at 20:04 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Jan 2025 at 10:25.
Wednesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Butlers Lane, Poulner.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 January 2025 at 12:16 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Jan 2025 at 13:12.
Wednesday
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Rockford Road, Rockford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 29 Jan 2025 at 08:13.
Wednesday
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Beechwood Lane, Burley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 28 Jan 2025 at 09:26.
Wednesday
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Beechwood Lane, Burley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 28 Jan 2025 at 08:33.
Wednesday
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Beechwood Lane, Burley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 27 Jan 2025 at 16:31.
Wednesday
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Beechwood Lane, Burley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 23 Jan 2025 at 15:15.
Wednesday
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Beechwood Lane, Burley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 16 Jan 2025 at 16:08.
3 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Verwood Road, Three Legged Cross.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Jan 2025 at 10:25.
Wednesday
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Rockford Road, Rockford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 28 Jan 2025 at 17:32.
5 and 7 Feb 2025
South West Water were proposing to carry out Remedial works on Ringwood Road, Alderholt.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by South West Water on 30 Oct 2024 at 11:58.
12 and 14 Feb 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Crow Hill, Crow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 17 Jan 2025 at 13:30.
12 and 14 Feb 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Crow Hill, Crow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 23 Jan 2025 at 13:43.
12 and 14 Feb 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Crow Hill, Crow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 28 Jan 2025 at 08:43.
12 and 14 Feb 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Crow Hill, Crow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 28 Jan 2025 at 10:25.
17 and 19 Feb 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Frogham Hill, Frogham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 29 Jan 2025 at 10:10.
17 and 19 Feb 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Frogham Hill, Frogham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 20 Jan 2025 at 12:28.
17 and 19 Feb 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Frogham Hill, Frogham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 23 Jan 2025 at 13:46.
17 and 19 Feb 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Frogham Hill, Frogham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 28 Jan 2025 at 13:12.
18 and 20 Feb 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Road Through Linwood, Linwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 28 Jan 2025 at 17:22.
18 and 20 Feb 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Road Through Linwood, Linwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 29 Jan 2025 at 08:29.
27 Feb and 3 Mar 2025
South West Water are proposing to carry out Utility repair and maintenance works on Cowpitts Lane, North Poulner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 13 Nov 2024 at 14:09.
27 Feb and 3 Mar 2025
South West Water are proposing to carry out Utility repair and maintenance works on Cowpitts Lane, North Poulner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 16 Jan 2025 at 13:26.
3 and 7 Mar 2025
Dorset Council are proposing to carry out Highway improvement works on Ringwood Road, Alderholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Dorset Council on 21 Jan 2025 at 13:40.
4 and 6 Mar 2025
South West Water are proposing to carry out Permanent reinstatement on Road Through Furze Hill, Furze Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 24 Jan 2025 at 14:00.
4 and 6 Mar 2025
South West Water are proposing to carry out Permanent reinstatement on Road Through Furze Hill, Furze Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 25 Nov 2024 at 17:37.
4 and 6 Mar 2025
South West Water were proposing to carry out Permanent reinstatement on Road Through Furze Hill, Furze Hill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 March 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 25 Nov 2024 at 10:56.
4 and 6 Mar 2025
South West Water were proposing to carry out Permanent reinstatement on Road Through Furze Hill, Furze Hill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 March 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 25 Nov 2024 at 10:50.
10 and 31 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Pinehurst Road, West Moors.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 31 Dec 2024 at 10:21.
10 and 31 Mar 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Pinehurst Road, West Moors.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 31 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Dec 2024 at 12:55.
19 and 26 Mar 2025
Hampshire County Council are proposing to carry out Highway improvement works on Ringwood Road, Verwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 21 Jan 2025 at 15:08.
19 and 26 Mar 2025
Hampshire County Council are proposing to carry out Highway improvement works on Ringwood Road, Verwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 4 Dec 2024 at 12:07.
19 and 26 Mar 2025
Hampshire County Council are proposing to carry out Highway improvement works on Ringwood Road, Verwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 4 Dec 2024 at 11:10.
19 and 26 Mar 2025
Hampshire County Council are proposing to carry out Highway improvement works on Ringwood Road, Verwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 21 Jan 2025 at 14:45.
19 and 26 Mar 2025
Hampshire County Council were proposing to carry out Highway improvement works on Ringwood Road, Sandford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 4 Dec 2024 at 09:01.
19 and 26 Mar 2025
Hampshire County Council are proposing to carry out Highway improvement works on Ringwood Road, Sandford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 27 Nov 2024 at 15:27.
7 and 10 Apr 2025
Dorset Council are proposing to carry out Highway improvement works on Spur Road, Ashley Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dorset Council on 14 Jan 2025 at 13:55.
7 and 11 Apr 2025
Dorset Council are proposing to carry out Highway improvement works on Spur Road, Ashley Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Dorset Council on 21 Jan 2025 at 16:05.
24 Apr and 8 May 2025
Hampshire County Council are proposing to carry out Highway improvement works on Ringwood Road, Verwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2025 and could run through until 8 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 21 Jan 2025 at 15:11.
29 Apr and 1 May 2025
Southern Gas Networks are proposing to carry out Remedial works on Ringwood Road, Verwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 21 Jan 2025 at 16:00.
Roadworks Map near to Meadow Way, RINGWOOD, BH24 1RY
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Meadow Way, RINGWOOD, BH24 1RY (10 Events)
(Scheduled Dates)
(miles)
(Scheduled: 30 Jan 2025 - 6 Feb 2025)
(Scheduled: 30 Jan 2025 - 5 Feb 2025)
(Scheduled: 29 Jan 2025 - 5 Feb 2025)
(Scheduled: 4 Nov 2024 - 7 Feb 2025)
(Scheduled: 3 Dec 2024 - 31 Mar 2025)
Contains public sector information licensed under the Open Government Licence v3.0.