ROADWORKS SUMMARY
Britannia Way, CHRISTCHURCH, BH23 4JL
Introduction
View current and future planned roadworks and road closures for Britannia Way, BH23 4JL and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Britannia Way, CHRISTCHURCH, BH23 4JL
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Britannia Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Friday
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Christchurch Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 10 Sep 2024 at 08:54.
30 Sep 2024 and 25 Oct 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Seafield Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 25 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Aug 2024 at 09:51.
30 Sep 2024 and 19 Oct 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Seafield Road, Bournemouth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 19 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Sep 2024 at 10:32.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queens Park Avenue, Bournemouth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 13:30.
26 Oct 2024 and 22 Nov 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Gloucester Road, Bournemouth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 October 2024 and run through until 22 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Aug 2024 at 11:18.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Road, New Milton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 15:39.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Common Road, New Milton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 15:39.
7 Nov 2024 and 5 Dec 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Southbourne Road, Bournemouth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 November 2024 and run through until 5 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Aug 2024 at 12:25.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lymington Road, Christchurch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 13:29.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lymington Road, Christchurch.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 16:34.
Monday
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Warwick Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 26 Nov 2024 at 10:57.
Friday
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Hannington Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 26 Nov 2024 at 10:56.
Friday
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Cranleigh Road, Bournemouth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Aug 2024 at 11:37.
Friday
Scottish Hydro Electric Power Dis are carrying out Utility asset works on Watcombe Road, Bournemouth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 07:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Nov 2024 at 08:06.
Friday
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Seafield Road, Bournemouth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 09:53.
Friday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Smugglers Lane South, Christchurch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 12:14.
21 Mar 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Queens Park Avenue, Bournemouth.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 10:38 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 10:42.
Saturday
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Somerset Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Oct 2024 at 14:28.
Saturday
Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Somerset Road, Bournemouth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 10 Dec 2024 at 09:04.
Saturday
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Rosebery Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Oct 2024 at 14:39.
Saturday
Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Rosebery Road, Bournemouth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 10 Dec 2024 at 09:03.
Today
Southern Gas Networks are carrying out Utility repair and maintenance works on Old Milton Road, New Milton.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 12:30 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 16:44.
Today
Southern Gas Networks are carrying out Utility repair and maintenance works on Whitefield Road, New Milton.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 12:30 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 16:44.
Friday
BT were proposing to carry out Utility asset works on Bridge Street, Christchurch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 19 Nov 2024 at 12:05.
5 and 31 Jan 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Parkwood Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 22 Nov 2024 at 13:29.
5 and 31 Jan 2025
Bournemouth, Christchurch And Poole Council were proposing to carry out Highway improvement works on Queensland Road, Bournemouth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 17 Dec 2024 at 14:51.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southwood Avenue, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:16.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southbourne Overcliff Drive, Bournemouth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:06.
6 and 10 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Beresford Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 15:03.
6 and 10 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Beresford Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 15:04.
6 Jan and 30 Mar 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ashley Road, Bournemouth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 26 Apr 2024 at 07:00.
6 and 31 Jan 2025
Bournemouth, Christchurch And Poole Council were proposing to carry out Highway improvement works on Somerset Road, Bournemouth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 17 Dec 2024 at 14:52.
6 and 18 Jan 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Warwick Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Oct 2024 at 14:30.
6 and 18 Jan 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Warwick Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Oct 2024 at 15:29.
6 and 18 Jan 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Morley Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Oct 2024 at 14:34.
6 and 18 Jan 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Morley Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Oct 2024 at 16:05.
6 Jan and 7 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Seafield Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Dec 2024 at 12:20.
6 Jan and 18 Mar 2025
Electricity Network Company are proposing to carry out Utility asset works on Petersfield Road, Bournemouth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 22 Oct 2024 at 16:29.
6 Jan and 18 Mar 2025
Electricity Network Company are proposing to carry out Utility asset works on Petersfield Road, Bournemouth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 29 Oct 2024 at 09:26.
6 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Road, New Milton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:11.
6 Jan and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Road, New Milton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 15:31.
6 Jan and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Road, New Milton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 13:54.
6 Jan and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Road, New Milton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 09:00.
6 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Common Road, New Milton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:11.
6 Jan and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Common Road, New Milton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 15:30.
6 Jan and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Common Road, New Milton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 13:54.
6 Jan and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Common Road, New Milton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 09:01.
7 Jan and 3 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Petersfield Road, Bournemouth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 13 Nov 2024 at 15:02.
9 Jan and 4 Mar 2025
Electricity Network Company are proposing to carry out Utility asset works on Riverside Avenue, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 22 Oct 2024 at 16:27.
9 Jan and 4 Mar 2025
Electricity Network Company are proposing to carry out Utility asset works on Riverside Avenue, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 29 Oct 2024 at 16:38.
13 Jan and 21 Feb 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Section 50 on Southbourne Coast Road, Bournemouth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 22 Nov 2024 at 14:33.
13 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Avenue, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:34.
13 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southbourne Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:36.
13 and 16 Jan 2025
Wessex Water are proposing to carry out Utility repair and maintenance works on Fountain Way, Christchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wessex Water on 3 Dec 2024 at 16:14.
13 and 16 Jan 2025
Wessex Water are proposing to carry out Utility repair and maintenance works on Bargates, Christchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wessex Water on 3 Dec 2024 at 16:12.
13 Jan and 7 Feb 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Lymington Road, Christchurch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 18 Oct 2024 at 09:50.
13 and 24 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Lymington Road, Christchurch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 30 Sep 2024 at 11:40.
13 and 24 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Lymington Road, Christchurch.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 2 Oct 2024 at 09:05.
13 and 24 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Wortley Road Car Park, Christchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 30 Sep 2024 at 11:41.
13 and 24 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Wortley Road Car Park, Christchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 7 Oct 2024 at 09:27.
20 and 25 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Carbery Lane, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Oct 2024 at 14:19.
20 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stourwood Avenue, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:51.
20 Jan and 1 Feb 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Queensland Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Oct 2024 at 14:41.
20 Jan and 1 Feb 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Queensland Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Oct 2024 at 16:10.
20 Jan and 1 Feb 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Hannington Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Oct 2024 at 14:32.
20 Jan and 1 Feb 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Hannington Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Oct 2024 at 16:01.
20 and 24 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Fairfield, Christchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 10:20.
20 and 24 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Fairfield, Christchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 09:35.
27 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stourwood Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 16:16.
29 Jan and 2 Apr 2025
Electricity Network Company are proposing to carry out Utility asset works on Riverside Avenue, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 2 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 13 Nov 2024 at 14:58.
3 and 8 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Carbery Lane, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Oct 2024 at 15:04.
3 and 8 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Carbery Lane, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Oct 2024 at 13:24.
3 and 28 Feb 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Gloucester Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 18 Sep 2024 at 12:46.
3 and 14 Feb 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Gloucester Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 14 Nov 2024 at 11:03.
3 and 21 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Bargates, Christchurch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 09:54.
3 and 21 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Bargates, Christchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Nov 2024 at 09:30.
3 and 21 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Bargates, Christchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Dec 2024 at 11:38.
4 and 17 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Castle Lane East, Bournemouth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 18 Nov 2024 at 11:07.
5 and 7 Feb 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Salisbury Road, Sopley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 18 Nov 2024 at 15:22.
5 and 7 Feb 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Salisbury Road, Sopley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 19 Nov 2024 at 16:30.
10 Feb and 7 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Fountain Way, Christchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Aug 2024 at 16:42.
10 Feb and 7 Mar 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Fountain Way, Christchurch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 09:54.
10 Feb and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lymington Road, Christchurch.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 16:05.
10 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodbury Avenue, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 14:03.
10 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodbury Avenue, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:13.
10 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodbury Avenue, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 11:50.
11 and 14 Feb 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Hillside Drive, Christchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 11 Dec 2024 at 15:38.
11 and 14 Feb 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Hillside Drive, Christchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 11 Dec 2024 at 17:07.
17 and 21 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Seabourne Road, Bournemouth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 11:47.
17 and 22 Feb 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Parkwood Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Oct 2024 at 14:43.
17 Feb and 7 Mar 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Fountain Way, Christchurch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Dec 2024 at 15:06.
17 Feb and 7 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Fountain Way, Christchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Dec 2024 at 08:26.
18 and 24 Feb 2025
South West Water are proposing to carry out Utility repair and maintenance works on Dark Lane, Hinton St Michael.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 23 Oct 2024 at 14:34.
24 Feb and 8 Mar 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Wolverton Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Oct 2024 at 14:23.
24 Feb and 8 Mar 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Wolverton Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Oct 2024 at 11:53.
24 Feb and 11 Apr 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Castlemain Avenue, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Dec 2024 at 11:59.
10 and 22 Mar 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Portman Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Oct 2024 at 14:20.
10 and 22 Mar 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Portman Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Oct 2024 at 11:58.
10 Mar and 11 Apr 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Castlemain Avenue, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Aug 2024 at 14:42.
10 and 21 Mar 2025
Hampshire County Council are proposing to carry out Highway improvement works on Bashley Common Road, New Milton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 11 Dec 2024 at 09:31.
13 and 25 Mar 2025
Wessex Water are proposing to carry out Utility repair and maintenance works on Drummond Road, Bournemouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 25 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wessex Water on 13 Dec 2024 at 10:01.
14 Mar and 18 Apr 2025
Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Christchurch Bypass, Christchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 18 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 21 Aug 2024 at 10:34.
Roadworks Map near to Britannia Way, CHRISTCHURCH, BH23 4JL
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Britannia Way, CHRISTCHURCH, BH23 4JL (5 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.