ROADWORKS SUMMARY
Green Lane, SKIPTON, BD23 6LL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Green Lane, BD23 6LL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Green Lane, SKIPTON, BD23 6LL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Green Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

North Yorkshire County Council logo
LONG TERM
Between
21 Jan and 31 Jul 2025
Details
View Map
Share
Follow
Craven Street

North Yorkshire County Council are proposing to carry out Highway improvement works on Craven Street, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 3 Jan 2025 at 09:31.

North Yorkshire County Council logo
LONG TERM
Between
21 Jan and 31 Jul 2025
Details
View Map
Share
Follow
Carleton Street

North Yorkshire County Council are proposing to carry out Highway improvement works on Carleton Street, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 3 Jan 2025 at 09:17.

North Yorkshire County Council logo
LONG TERM
Between
21 Jan and 31 Jul 2025
Details
View Map
Share
Follow
Gas Street

North Yorkshire County Council are proposing to carry out Highway improvement works on Gas Street, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 3 Jan 2025 at 09:18.

North Yorkshire County Council logo
LONG TERM
Between
21 Jan and 31 Jul 2025
Details
View Map
Share
Follow
Cross Street

North Yorkshire County Council are proposing to carry out Highway improvement works on Cross Street, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 3 Jan 2025 at 09:32.

North Yorkshire County Council logo
LONG TERM
Between
21 Jan and 31 Jul 2025
Details
View Map
Share
Follow
Cavendish Street

North Yorkshire County Council are proposing to carry out Highway improvement works on Cavendish Street, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 3 Jan 2025 at 09:23.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Main Road Through Thorpe

North Yorkshire County Council are proposing to carry out Highway improvement works on Main Road Through Thorpe, Thorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 6 Mar 2025 at 09:02.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Thorpe Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on Thorpe Lane, Thorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 6 Mar 2025 at 08:18.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Winterburn Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on Winterburn Lane, Winterburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 6 Mar 2025 at 08:39.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Bolland Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on Bolland Lane, Thorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 6 Mar 2025 at 08:54.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Gordale Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on Gordale Lane, Malham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 21 Mar 2025 at 10:41.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Winterburn Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on Winterburn Lane, Winterburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 6 Mar 2025 at 09:00.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Hellifield Road

North Yorkshire County Council are proposing to carry out Highway improvement works on Hellifield Road, Airton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 6 Mar 2025 at 08:31.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Skipton Bypass To The Bailey

North Yorkshire County Council are proposing to carry out Highway improvement works on Skipton Bypass To The Bailey, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 6 Mar 2025 at 08:56.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Chapel Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on Chapel Lane, Winterburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 6 Mar 2025 at 08:21.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Norton View Farm To Croft House

North Yorkshire County Council are proposing to carry out Highway improvement works on Norton View Farm To Croft House, Hetton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 6 Mar 2025 at 08:59.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
The Bailey

North Yorkshire County Council are proposing to carry out Highway improvement works on The Bailey, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 09:20.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Craven Street

North Yorkshire County Council were proposing to carry out Highway improvement works on Craven Street, Skipton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 30 May 2025 at 13:20.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Cavendish Street

North Yorkshire County Council were proposing to carry out Highway improvement works on Cavendish Street, Skipton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 30 May 2025 at 13:20.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 31 Oct 2025
Details
View Map
Share
Follow
Calton Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on Calton Lane, Airton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Yorkshire County Council on 6 Mar 2025 at 08:40.

North Yorkshire County Council logo
LONG TERM
Between
19 May and 30 Sep 2025
Details
View Map
Share
Follow
Craven Street

North Yorkshire County Council are proposing to carry out Highway improvement works on Craven Street, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 8 May 2025 at 08:49.

North Yorkshire County Council logo
LONG TERM
Between
19 May and 30 Sep 2025
Details
View Map
Share
Follow
Cavendish Street

North Yorkshire County Council are proposing to carry out Highway improvement works on Cavendish Street, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 9 May 2025 at 10:31.

North Yorkshire County Council logo
LONG TERM
Between
19 May and 30 Sep 2025
Details
View Map
Share
Follow
Cross Street

North Yorkshire County Council are proposing to carry out Highway improvement works on Cross Street, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 8 May 2025 at 08:38.

North Yorkshire County Council logo
LONG TERM
Between
19 May and 30 Sep 2025
Details
View Map
Share
Follow
Gas Street

North Yorkshire County Council are proposing to carry out Highway improvement works on Gas Street, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 8 May 2025 at 08:41.

North Yorkshire County Council logo
LONG TERM
Between
19 May and 30 Sep 2025
Details
View Map
Share
Follow
Carleton Street

North Yorkshire County Council are proposing to carry out Highway improvement works on Carleton Street, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 8 May 2025 at 08:42.

North Yorkshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Meadowcroft

North Yorkshire County Council are carrying out Highway repair and maintenance works on Meadowcroft, Gargrave.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 09:30 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 30 May 2025 at 08:55.

North Yorkshire County Council logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Bolland Lane

North Yorkshire County Council are carrying out Highway improvement works on Bolland Lane, Thorpe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 June 2025 at 09:30 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 2 Jun 2025 at 09:52.

North Yorkshire County Council logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Main Road Through Thorpe

North Yorkshire County Council are carrying out Highway improvement works on Main Road Through Thorpe, Thorpe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 May 2025 at 08:00 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 2 Jun 2025 at 09:52.

North Yorkshire County Council logo
LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Gordale Lane

North Yorkshire County Council are carrying out Highway improvement works on Gordale Lane, Malham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 2 Jun 2025 at 09:54.

North Yorkshire County Council logo
Between
27 May and 25 Jun 2025
Details
View Map
Share
Follow
Chapel Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on Chapel Lane, Winterburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 16 May 2025 at 07:41.

North Yorkshire County Council logo
Between
30 May and 16 Jun 2025
Details
View Map
Share
Follow
Swire Croft Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Swire Croft Road, Gargrave.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 15 Apr 2025 at 13:37.

North Yorkshire County Council logo
Between
30 May and 16 Jun 2025
Details
View Map
Share
Follow
Meadowcroft

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Meadowcroft, Gargrave.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 22 Apr 2025 at 09:29.

North Yorkshire County Council logo
Until
1 Jul 2025
Details
View Map
Share
Follow
Winterburn Lane

North Yorkshire County Council are carrying out Highway improvement works on Winterburn Lane, Winterburn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 2 Jun 2025 at 09:55.

North Yorkshire County Council logo
Until
1 Jul 2025
Details
View Map
Share
Follow
Winterburn Lane

North Yorkshire County Council are carrying out Highway improvement works on Winterburn Lane, Winterburn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:30 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 2 Jun 2025 at 09:56.

North Yorkshire County Council logo
Until
1 Jul 2025
Details
View Map
Share
Follow
Calton Lane

North Yorkshire County Council are carrying out Highway improvement works on Calton Lane, Airton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 2 Jun 2025 at 09:56.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 31 Oct 2025
Details
View Map
Share
Follow
Robins Barn To Coniston Bridge

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Robins Barn To Coniston Bridge, Coniston Cold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 09:08.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 31 Oct 2025
Details
View Map
Share
Follow
Mark House Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Mark House Lane, Gargrave.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 26 Mar 2025 at 08:36.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 31 Oct 2025
Details
View Map
Share
Follow
Ray Bridge Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Ray Bridge Lane, Gargrave.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:53.

North Yorkshire County Council logo
Until
1 Jul 2025
Details
View Map
Share
Follow
Hellifield Road

North Yorkshire County Council are carrying out Highway improvement works on Hellifield Road, Airton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 2 Jun 2025 at 09:55.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 31 Oct 2025
Details
View Map
Share
Follow
Raikes Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Raikes Road, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:35.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 31 Oct 2025
Details
View Map
Share
Follow
Mill Bridge

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Mill Bridge, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:38.

North Yorkshire County Council logo
Between
3 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Skipton Bypass To The Bailey

North Yorkshire County Council are proposing to carry out Highway improvement works on Skipton Bypass To The Bailey, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 3 Jun 2025 at 10:06.

North Yorkshire County Council logo
Between
3 Jun and 2 Jul 2025
Details
View Map
Share
Follow
The Bailey

North Yorkshire County Council are proposing to carry out Highway improvement works on The Bailey, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 3 Jun 2025 at 10:05.

North Yorkshire County Council logo
LONG TERM
Between
16 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Thorpe Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Thorpe Lane, Thorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 8 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by North Yorkshire County Council on 15 Apr 2025 at 08:01.

Network Rail logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Carleton New Road

Network Rail are proposing to carry out Works for Rail Purposes on Carleton New Road, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Apr 2025 at 13:34.

Network Rail logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Carleton New Road

Network Rail are proposing to carry out Works for Rail Purposes on Carleton New Road, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 May 2025 at 11:40.

Northern Gas Networks logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Skipton Bypass To The Bailey

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Skipton Bypass To The Bailey, Skipton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 09:19.

North Yorkshire County Council logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Station Road To Church Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Station Road To Church Road, Threshfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 29 Apr 2025 at 08:58.

North Yorkshire County Council logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Station Road To Church Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Station Road To Church Road, Threshfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 29 May 2025 at 11:30.

North Yorkshire County Council logo
LONG TERM
Between
21 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Ray Bridge Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Ray Bridge Lane, Gargrave.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 23 May 2025 at 13:19.

North Yorkshire County Council logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Mark House Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Mark House Lane, Gargrave.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 2 Jun 2025 at 07:39.

North Yorkshire County Council logo
Between
19 and 22 Aug 2025
Details
View Map
Share
Follow
Robins Barn To Coniston Bridge

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Robins Barn To Coniston Bridge, Coniston Cold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 23 May 2025 at 13:02.

North Yorkshire County Council logo
Between
27 Aug and 3 Sep 2025
Details
View Map
Share
Follow
Raikes Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Raikes Road, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 23 May 2025 at 13:08.

North Yorkshire County Council logo
Between
27 Aug and 3 Sep 2025
Details
View Map
Share
Follow
Mill Bridge

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Mill Bridge, Skipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 23 May 2025 at 13:06.

North Yorkshire County Council logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Hellifield Road

North Yorkshire County Council are proposing to carry out roadworks on Hellifield Road, Gargrave.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 24 Apr 2025 at 07:56.

North Yorkshire County Council logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Robins Barn To Coniston Bridge

North Yorkshire County Council are proposing to carry out roadworks on Robins Barn To Coniston Bridge, Coniston Cold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 24 Apr 2025 at 07:58.


Roadworks Map near to Green Lane, SKIPTON, BD23 6LL (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 4 Jun 2025 01:47
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Green Lane, SKIPTON, BD23 6LL (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
North Yorkshire County Council logo
MAJOR
  
NORTON VIEW FARM TO CROFT HOUSE 
(0.5 miles)
North Yorkshire County Council
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 1 Apr 2025 - 31 Oct 2025
0.5
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.