ROADWORKS SUMMARY
Park Lane Bottom, KEIGHLEY, BD22 0ND

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Park Lane Bottom, BD22 0ND and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Park Lane Bottom, KEIGHLEY, BD22 0ND

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Park Lane Bottom are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Between
1 Aug 2024 and 1 Aug 2025
Details
View Map
Share
Follow
Denby Court

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Denby Court, Oakworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 10:09.

LONG TERM
Between
1 Aug 2024 and 1 Aug 2025
Details
View Map
Share
Follow
Tim Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Tim Lane, Oakworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 10:10.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Keighley Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Keighley Road, Cross Hills.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 07:52 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 29 Oct 2024 at 08:41.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Keighley Road

Cadent Gas are proposing to carry out Utility asset works on Keighley Road, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Sep 2024 at 14:18.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Keighley Road

Cadent Gas are carrying out Utility asset works on Keighley Road, Colne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 January 2025 at 08:50 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 08:58.

Yorkshire Water logo
LONG TERM
Between
15 Jan and 17 Apr 2025
Details
View Map
Share
Follow
Meadow Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Meadow Lane, Cononley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 16 Jan 2025 at 14:08.

Northern Gas Networks logo
Until
14 Feb 2025
Details
View Map
Share
Follow
Skipton Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Skipton Road, Cross Hills.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 08:00 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 20 Jan 2025 at 08:49.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Portland Street

Cadent Gas are proposing to carry out Utility asset works on Portland Street, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 09:59.

Cadent Gas logo
Until
12 Feb 2025
Details
View Map
Share
Follow
Portland Street

Cadent Gas are carrying out Utility asset works on Portland Street, Colne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 January 2025 at 14:00 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 14:11.

Cadent Gas logo
LONG TERM
Between
27 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Carry Lane

Cadent Gas are proposing to carry out Utility asset works on Carry Lane, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Dec 2024 at 09:26.

Cadent Gas logo
LONG TERM
Between
27 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Carry Lane

Cadent Gas are proposing to carry out Utility asset works on Carry Lane, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 11:30.

Cadent Gas logo
LONG TERM
Between
28 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Keighley Road

Cadent Gas are proposing to carry out Utility asset works on Keighley Road, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 09:51.

Cadent Gas logo
LONG TERM
Until
11 Apr 2025
Details
View Map
Share
Follow
Cotton Tree Lane

Cadent Gas are carrying out Utility asset works on Cotton Tree Lane, Colne.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 January 2025 at 08:00 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 13:34.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Parkinson Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Parkinson Lane, Halifax.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 3 Feb 2025 at 11:40.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Colne Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Colne Road, Glusburn.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 January 2025 at 17:54 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 4 Feb 2025 at 10:08.

Electricity North West (NorWeb) logo
Finishing
Friday
Details
View Map
Share
Follow
Reedymoor Lane

Electricity North West (NorWeb) are carrying out New service connection on Reedymoor Lane, Foulridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 09:00 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 3 Feb 2025 at 09:29.

Cadent Gas logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Cotton Tree Lane

Cadent Gas are proposing to carry out Utility asset works on Cotton Tree Lane, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Sep 2024 at 14:20.

Cadent Gas logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Cotton Tree Lane

Cadent Gas are proposing to carry out Utility asset works on Cotton Tree Lane, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 15:11.

United Utilities Water (formerly North West Water) logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Hill Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Hill Lane, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 10:39.

United Utilities Water (formerly North West Water) logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Hill Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Hill Lane, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 17:59.

United Utilities Water (formerly North West Water) logo
Until
17 Feb 2025
Details
View Map
Share
Follow
Hill Lane

United Utilities Water (formerly North West Water) are carrying out Utility asset works on Hill Lane, Colne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 10:15 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Feb 2025 at 12:09.

United Utilities Water (formerly North West Water) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Skipton Old Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Skipton Old Road, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 10:41.

United Utilities Water (formerly North West Water) logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
Skipton Old Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Skipton Old Road, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 18:04.

United Utilities Water (formerly North West Water) logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
Skipton Old Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Skipton Old Road, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Dec 2024 at 12:29.

Northern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Gill Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Gill Lane, Cowling.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 22 Jan 2025 at 11:09.

Quickline Commucations logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Scar Top Road

Quickline Commucations are proposing to carry out Utility asset works on Scar Top Road, Stanbury, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 11 Nov 2024 at 14:18.

Quickline Commucations logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Scar Top Road

Quickline Commucations are proposing to carry out Utility asset works on Scar Top Road, Stanbury, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 11 Nov 2024 at 08:51.

Quickline Commucations logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Scar Top Road

Quickline Commucations are proposing to carry out Utility asset works on Scar Top Road, Stanbury, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 5 Dec 2024 at 10:03.

United Utilities Water (formerly North West Water) logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Castle Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Castle Road, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Feb 2025 at 10:46.

United Utilities Water (formerly North West Water) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Castle Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Castle Road, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 10:43.

LONG TERM
Between
17 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Scar Top Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Scar Top Road, Stanbury, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Dec 2024 at 12:46.

United Utilities Water (formerly North West Water) logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Castle Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Castle Road, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 17:50.

Northern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
School Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on School Street, Steeton, Steeton With Eastburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 11 Oct 2024 at 12:51.

United Utilities Water (formerly North West Water) logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Castle Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Castle Road, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Feb 2025 at 10:49.

Yorkshire Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Earby Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Earby Road, Salterforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 28 Nov 2024 at 10:31.

LONG TERM
Between
24 Feb and 2 May 2025
Details
View Map
Share
Follow
Scar Top Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Scar Top Road, Stanbury, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 Jan 2025 at 15:31.

United Utilities Water (formerly North West Water) logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Castle Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Castle Road, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 17:34.

United Utilities Water (formerly North West Water) logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Castle Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Castle Road, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 10:42.

LONG TERM
Between
24 Feb and 2 May 2025
Details
View Map
Share
Follow
New Laithe Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on New Laithe Road, Stanbury, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 Jan 2025 at 15:33.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Hollington Street

Cadent Gas are proposing to carry out Utility asset works on Hollington Street, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 09:05.

Cadent Gas logo
LONG TERM
Between
24 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Carry Lane

Cadent Gas are proposing to carry out Utility asset works on Carry Lane, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 10:07.

Yorkshire Water logo
Between
28 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Meadow Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Meadow Lane, Cononley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 28 Jan 2025 at 10:53.

Yorkshire Water logo
Between
28 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Meadow Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Meadow Lane, Cononley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 28 Jan 2025 at 10:40.

Northern Gas Networks logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Gill Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gill Lane, Cowling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 14 Jan 2025 at 10:24.

North Yorkshire County Council logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Moor Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Moor Lane, Elslack.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 27 Jan 2025 at 11:09.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Gable End 187 Cotton Tree Lane

Cadent Gas are proposing to carry out Utility asset works on Gable End 187 Cotton Tree Lane, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 14:08.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Gable End 187 Cotton Tree Lane

Cadent Gas are proposing to carry out Utility asset works on Gable End 187 Cotton Tree Lane, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 13:38.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Hollington Street

Cadent Gas are proposing to carry out Utility asset works on Hollington Street, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 14:06.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Hollington Street

Cadent Gas are proposing to carry out Utility asset works on Hollington Street, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 13:28.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Winewall Road

Cadent Gas are proposing to carry out Utility asset works on Winewall Road, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 09:58.

Lancashire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Edward Street

Lancashire County Council are proposing to carry out Highway improvement works on Edward Street, Earby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 13 Jan 2025 at 15:22.

Lancashire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Edward Street

Lancashire County Council are proposing to carry out Highway improvement works on Edward Street, Earby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 10 Dec 2024 at 15:43.

Cadent Gas logo
Between
10 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Trawden Road

Cadent Gas are proposing to carry out Utility asset works on Trawden Road, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 10:00.

Cadent Gas logo
Between
12 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Colne Road

Cadent Gas are proposing to carry out Utility asset works on Colne Road, Earby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 09:45.

Cadent Gas logo
Between
12 and 28 Mar 2025
Details
View Map
Share
Follow
George Street

Cadent Gas are proposing to carry out Utility asset works on George Street, Earby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 09:42.

Cadent Gas logo
Between
19 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Applegarth Street

Cadent Gas are proposing to carry out Utility asset works on Applegarth Street, Earby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 09:04.

Northern Gas Networks logo
Between
4 and 22 Apr 2025
Details
View Map
Share
Follow
Gill Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gill Lane, Cowling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 14 Jan 2025 at 10:38.

Yorkshire Water logo
Between
7 Apr and 4 May 2025
Details
View Map
Share
Follow
Holme House Lane

Yorkshire Water are proposing to carry out Utility asset works on Holme House Lane, Laycock, Keighley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 4 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Jan 2025 at 07:40.

Yorkshire Water logo
LONG TERM
Between
7 Apr and 8 Jun 2025
Details
View Map
Share
Follow
Holme House Lane

Yorkshire Water are proposing to carry out Utility asset works on Holme House Lane, Laycock, Keighley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Jan 2025 at 14:24.

Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
New Laithe Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on New Laithe Road, Stanbury, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Dec 2024 at 12:45.

Yorkshire Water logo
LONG TERM
Between
28 Apr and 8 Jun 2025
Details
View Map
Share
Follow
Mackingstone Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Mackingstone Lane, Oakworth, Keighley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Jan 2025 at 07:45.

Yorkshire Water logo
LONG TERM
Between
28 Apr and 8 Jun 2025
Details
View Map
Share
Mackingstone Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Mackingstone Lane, Oakworth, Keighley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 8 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Jan 2025 at 15:45.

LONG TERM
Between
1 May and 31 Aug 2025
Details
View Map
Share
Follow
Green Sykes Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Green Sykes Road, Laycock, Keighley.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 09:55.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Thornhill Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Thornhill Road, Steeton, Steeton With Eastburn.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Sep 2024 at 14:53.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Elm View

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Elm View, Steeton, Steeton With Eastburn.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Sep 2024 at 14:50.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Laycock Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Laycock Lane, Keighley.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Sep 2024 at 08:33.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Styveton Way

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Styveton Way, Steeton, Steeton With Eastburn.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Sep 2024 at 14:51.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Sutton Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Sutton Lane, Eastburn, Steeton With Eastburn.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Sep 2024 at 14:57.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Sycamore Grove

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Sycamore Grove, Eastburn, Steeton With Eastburn.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Sep 2024 at 14:52.

LONG TERM
Between
1 May and 1 Aug 2025
Details
View Map
Share
Follow
Skipton Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Skipton Road, Steeton With Eastburn.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Nov 2024 at 08:37.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
New Laithe Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on New Laithe Road, Stanbury, Keighley.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Sep 2024 at 08:35.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Wide Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Wide Lane, Oakworth, Keighley.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 Sep 2024 at 15:51.

LONG TERM
Between
1 May and 31 Jul 2025
Details
View Map
Share
Follow
Laycock Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Laycock Lane, Keighley.

These works are categorised as Major.

The works will start on or after 1 May 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Sep 2024 at 08:32.


Roadworks Map near to Park Lane Bottom, KEIGHLEY, BD22 0ND (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 5 Feb 2025 21:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Park Lane Bottom, KEIGHLEY, BD22 0ND (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.