ROADWORKS SUMMARY
The Coppice, KEIGHLEY, BD20 8BT
Introduction
View current and future planned roadworks and road closures for The Coppice, BD20 8BT and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to The Coppice, KEIGHLEY, BD20 8BT
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Coppice are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Parson Street, Lawkholme, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:28.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Tim Lane, Oakworth, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 10:10.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Denby Court, Oakworth, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 10:09.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Southlea Avenue, Oakworth, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:54.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bradley Road, Silsden, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 10:09.
1 Aug 2024 and 2 Nov 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Elliott Street, Silsden, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 2 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:24.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on West Bank Close, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:30.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Howden Road, Silsden, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 10:10.
1 Aug 2024 and 2 Nov 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bath Street, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 2 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:23.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Well Street, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:26.
11 Dec 2024
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Keighley Road, Silsden, Keighley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 August 2024 at 07:30 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Nov 2024 at 07:58.
11 Dec 2024
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Belton Road, Silsden, Keighley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 August 2024 at 07:30 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Nov 2024 at 16:12.
3 Sep and 3 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bradford Road, Riddlesden, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 4 Jun 2024 at 07:58.
7 Oct and 13 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Swartha Lane, Silsden, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Aug 2024 at 10:35.
13 Dec 2024
City Of Bradford Metropolitan District Council are carrying out Highway repair and maintenance works on Swartha Lane, Silsden, Keighley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 08:00 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Oct 2024 at 08:36.
7 Feb 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Keighley Road, Cross Hills.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 07:52 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 29 Oct 2024 at 08:41.
5 Dec 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Winston Avenue, Cross Hills.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 08:52 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 15 Nov 2024 at 08:52.
17 Jan 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Wimborne Drive, Keighley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:30 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 09:41.
23 Jan 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Raynham Crescent, Keighley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 08:00 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 08:53.
10 Dec 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Aire Crescent, Cross Hills.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 08:00 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 09:02.
Tuesday
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Howden Road, Silsden, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Oct 2024 at 13:47.
Today
North Yorkshire County Council are proposing to carry out roadworks on Jerry Croft, Skipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are in progress during today only. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 24 Apr 2024 at 08:01.
25 Nov and 13 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Keighley Road To Aire Street, Glusburn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 29 May 2024 at 08:56.
1 Dec 2024
North Yorkshire County Council are proposing to carry out roadworks on Jerry Croft, Skipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 1 December 2024 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 24 Apr 2024 at 08:05.
8 Dec 2024
North Yorkshire County Council are proposing to carry out roadworks on Jerry Croft, Skipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 8 December 2024 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 24 Apr 2024 at 08:09.
9 Dec 2024 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Aire Street, Cross Hills.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 23 May 2024 at 11:32.
9 Dec 2024 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Aire Street, Cross Hills.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 30 May 2024 at 08:00.
16 and 18 Dec 2024
Network Rail were proposing to carry out Works for Rail Purposes on Low Mill Lane, Keighley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 21 Oct 2024 at 15:53.
6 and 10 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Back West View, Silsden, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 25 Oct 2024 at 10:48.
6 and 31 Jan 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Raynham Crescent, Keighley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Aug 2024 at 15:19.
10 and 14 Jan 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Hospital Road, Riddlesden, Keighley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 January 2025 and run through until 14 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 22 Nov 2024 at 11:55.
10 and 15 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Spring Gardens Lane, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 7 Oct 2024 at 10:54.
13 and 24 Jan 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Swartha Lane, Silsden, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Aug 2024 at 12:40.
13 Jan and 7 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Skipton Road, Cross Hills.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 6 Jun 2024 at 09:40.
13 and 24 Jan 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Swartha Lane, Silsden, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 Sep 2024 at 10:27.
19 and 21 Jan 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Gresley Road, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Nov 2024 at 13:05.
19 and 21 Jan 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Gresley Road, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Nov 2024 at 09:17.
21 and 23 Jan 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on East Parade, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Nov 2024 at 13:52.
21 and 23 Jan 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on East Parade, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Nov 2024 at 09:43.
10 and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Head Lane, Utley, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 11:16.
10 and 14 Feb 2025
Quickline Commucations are proposing to carry out Utility asset works on Scar Top Road, Stanbury, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 11 Nov 2024 at 08:51.
10 and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Head Lane, Utley, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 16:14.
10 and 14 Feb 2025
Quickline Commucations are proposing to carry out Utility asset works on Scar Top Road, Stanbury, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 22 Nov 2024 at 17:56.
10 and 14 Feb 2025
Quickline Commucations are proposing to carry out Utility asset works on Scar Top Road, Stanbury, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 11 Nov 2024 at 14:18.
17 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on School Street, Steeton, Steeton With Eastburn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 11 Oct 2024 at 12:51.
Roadworks Map near to The Coppice, KEIGHLEY, BD20 8BT
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to The Coppice, KEIGHLEY, BD20 8BT (5 Events)
(Scheduled Dates)
(miles)
(Scheduled: 25 Oct 2024 - 7 Feb 2025)
(Scheduled: 11 Nov 2024 - 5 Dec 2024)
(Scheduled: 18 Nov 2024 - 10 Dec 2024)
(Scheduled: 21 Nov 2024 - 27 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.