ROADWORKS SUMMARY
Bank Street, CLECKHEATON, BD19 5EP
Introduction
View current and future planned roadworks and road closures for Bank Street, BD19 5EP and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Bank Street, CLECKHEATON, BD19 5EP
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bank Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
1 Jan 2024 and 30 Mar 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on The Tyrls, Bradford.
These works are categorised as Major.
The works will start on or after 1 January 2024 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 28 Jun 2023 at 09:43.
1 Jan 2024 and 30 Mar 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Centenary Square, City Park, Bradford.
These works are categorised as Major.
The works will start on or after 1 January 2024 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 28 Jun 2023 at 09:41.
20 Dec 2024
Network Rail are carrying out roadworks on Bog Green Lane, Colne Bridge, Huddersfield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 09:30 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 25 Nov 2024 at 10:46.
31 Dec 2024
Kirklees Council are carrying out Highway repair and maintenance works on Dalton Bank Road, Dalton, Huddersfield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 January 2024 at 15:00 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 20 Aug 2024 at 09:10.
30 Nov 2025
Network Rail are carrying out roadworks on Thornhill Road, Dewsbury.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 08:00 and could run through until 30 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 18 Mar 2024 at 12:12.
25 Feb 2025
City Of Bradford Metropolitan District Council are carrying out Highway repair and maintenance works on Hall Ings, Bradford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 19 February 2024 at 00:01 and could run through until 25 February 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 Feb 2024 at 16:07.
30 Jun 2026
Network Rail are carrying out roadworks on Calder Road, Ravensthorpe, Dewsbury.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 07:00 and could run through until 30 June 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 18 Mar 2024 at 08:14.
8 Dec 2024
Yorkshire Water are carrying out Utility asset works on Oak Road, Bradley, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 08:00 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 26 Nov 2024 at 08:24.
15 Jun 2024 and 31 Mar 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Stirling Crescent, Holme Wood, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 24 Apr 2024 at 13:50.
27 Jun 2025
Kirklees Council are carrying out Highway repair and maintenance works on Royle Fold, Heckmondwike.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 June 2024 at 07:30 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 18 Jun 2024 at 14:29.
27 Jun 2025
Kirklees Council are carrying out Highway repair and maintenance works on George Street, Heckmondwike.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 June 2024 at 07:30 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 18 Jun 2024 at 14:28.
Friday
Kirklees Council are carrying out Highway improvement works on Primrose Lane, Hightown, Liversedge.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 June 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 22 Nov 2024 at 12:55.
20 Dec 2024
Network Rail are carrying out roadworks on Ravensthorpe Road, Thornhill Lees, Dewsbury.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 June 2024 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 18 Jun 2024 at 08:05.
20 Dec 2024
Network Rail are carrying out roadworks on Calder Road, Ravensthorpe, Dewsbury.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 June 2024 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 18 Jun 2024 at 08:06.
30 Jun 2025
Kirklees Council are carrying out Highway improvement works on Town Hall Way, Dewsbury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 July 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Kirklees Council on 15 Jul 2024 at 07:10.
15 Jul and 31 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Dealburn Road, Low Moor, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Mar 2024 at 15:43.
15 Jul and 31 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on New Works Road, Low Moor, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Mar 2024 at 15:46.
15 Jul and 31 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Roydsdale Way, Euroway Industrial Estate, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Mar 2024 at 15:47.
15 Jul and 31 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Fenwick Drive, Woodside, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Mar 2024 at 12:44.
15 Jul and 31 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Saxton Avenue, Buttershaw, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Mar 2024 at 12:38.
15 Jul and 31 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Little Horton Lane, Little Horton, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 Mar 2024 at 08:25.
15 Jul and 31 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Havelock Street, Great Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Mar 2024 at 15:44.
15 Jul and 31 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Little Horton Lane, Little Horton, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 Mar 2024 at 08:22.
15 Jul and 31 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Ludlam Street, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Mar 2024 at 15:45.
15 Jul and 31 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Heddon Close, Little Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Mar 2024 at 12:42.
15 Jul and 31 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Little Horton Lane, Little Horton, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 Mar 2024 at 08:20.
15 Jul and 31 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bowling Back Lane, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Mar 2024 at 15:40.
29 Jul 2024 and 31 Mar 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Town Gate, Wyke, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 8 Apr 2024 at 14:58.
29 Jul 2024 and 31 Mar 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Cutler Heights Lane, Dudley Hill, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 8 Apr 2024 at 14:57.
26 Jan 2025
Yorkshire Water are carrying out Utility asset works on Leeds Road, Hipperholme, Brighouse.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:00 and could run through until 26 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 23 Aug 2024 at 16:14.
2 Sep and 31 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Southfield Road, Little Horton, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 21 Aug 2024 at 15:03.
2 Sep and 31 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Horton Park Avenue, Great Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Aug 2024 at 15:11.
Friday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Lane, Little Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 30 Jul 2024 at 16:29.
6 Dec 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Park Lane, Little Horton, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 September 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Sep 2024 at 11:30.
Sunday
Yorkshire Water are proposing to carry out Utility asset works on Bramley Lane, Hipperholme, Brighouse.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 8 Aug 2024 at 16:18.
Sunday
Yorkshire Water are proposing to carry out Utility asset works on Syke Lane, Lightcliffe, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 26 Jul 2024 at 09:29.
31 Jan 2025
Yorkshire Water are carrying out Utility asset works on Syke Lane, Lightcliffe, Brighouse.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 08:30 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 14 Nov 2024 at 14:41.
28 Mar 2025
Yorkshire Water are carrying out Utility asset works on Bramley Lane, Hipperholme, Brighouse.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 09:00 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 11 Oct 2024 at 08:47.
25 Dec 2024
Network Rail are carrying out roadworks on Whitacre Street, Deighton, Huddersfield.
These works are categorised as Major.
The works started on 17 September 2024 at 08:00 and could run through until 25 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 26 Sep 2024 at 14:40.
6 Dec 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Crackenedge Lane, Dewsbury.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 September 2024 at 09:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 07:37.
30 Sep 2024 and 29 Apr 2025
Kirklees Council are proposing to carry out Highway improvement works on Bond Street, Dewsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 10:02.
30 Sep 2024 and 29 Apr 2025
Kirklees Council are proposing to carry out Highway improvement works on Bond Street, Dewsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:16.
30 Sep and 6 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Holme Top Lane, Little Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 2 Aug 2024 at 11:43.
30 Sep and 6 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Holme Top Lane, Little Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 27 Aug 2024 at 14:41.
6 Dec 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Holme Top Lane, Little Horton, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 07:37 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Sep 2024 at 07:37.
Friday
Kirklees Council are carrying out Highway repair and maintenance works on New Road, Kirkheaton, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 October 2024 at 08:30 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 3 Oct 2024 at 09:58.
Friday
Kirklees Council are carrying out Highway repair and maintenance works on Leafield Close, Sheepridge, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 October 2024 at 08:30 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 3 Oct 2024 at 09:48.
Friday
Kirklees Council are carrying out Highway repair and maintenance works on Pentland Road, Savile Town, Dewsbury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 October 2024 at 08:30 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 3 Oct 2024 at 09:58.
Friday
Kirklees Council are carrying out Highway repair and maintenance works on South Street, Savile Town, Dewsbury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 October 2024 at 08:30 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 3 Oct 2024 at 09:57.
Friday
Kirklees Council are carrying out Highway repair and maintenance works on Purlwell Avenue, Batley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 October 2024 at 08:30 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 3 Oct 2024 at 09:51.
Friday
Kirklees Council are carrying out Highway repair and maintenance works on Park Croft, Staincliffe, Batley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 October 2024 at 08:30 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 3 Oct 2024 at 09:57.
Friday
Kirklees Council are carrying out Highway repair and maintenance works on Bridle Street, Soothill, Batley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 October 2024 at 08:30 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 3 Oct 2024 at 09:51.
Friday
Kirklees Council are carrying out Highway repair and maintenance works on Monk Ings, Birstall, Batley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 October 2024 at 08:30 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 3 Oct 2024 at 09:53.
Friday
Kirklees Council are carrying out Highway repair and maintenance works on Monk Ings Avenue, Birstall, Batley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 October 2024 at 08:30 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 3 Oct 2024 at 09:52.
21 May 2025
Kirklees Council are carrying out Highway improvement works on Bond Street, Dewsbury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 10:30 and could run through until 21 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 7 Oct 2024 at 12:45.
21 Oct 2024 and 5 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Broadfield Close, Holme Wood, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 5 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Jul 2024 at 07:14.
21 Oct 2024 and 5 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Cordingley Street, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 5 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jul 2024 at 15:12.
21 Oct 2024 and 5 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on St Margarets Avenue, Holme Wood, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 5 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jul 2024 at 15:15.
21 Oct 2024 and 5 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Launceston Drive, Holme Wood, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 5 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jul 2024 at 15:14.
21 Oct 2024 and 5 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Landscove Avenue, Holme Wood, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 5 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jul 2024 at 15:13.
Monday
City Of Bradford Metropolitan District Council were proposing to carry out Highway repair and maintenance works on Brownroyd Hill Road, Wibsey, Bradford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 October 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Nov 2024 at 08:28.
28 Oct and 20 Dec 2024
Kirklees Council were proposing to carry out roadworks on Headfield Road, Savile Town, Dewsbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 9 Sep 2024 at 11:14.
28 Oct and 20 Dec 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Warren Street, Savile Town, Dewsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 22 Aug 2024 at 15:45.
28 Oct and 20 Dec 2024
Kirklees Council are proposing to carry out Highway improvement works on Sunny Bank Avenue, Mirfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 16 Sep 2024 at 14:10.
10 Jan 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Halifax Road, Brighouse.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 October 2024 at 09:30 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 11:08.
10 Jan 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Brighouse Road, Hipperholme, Brighouse.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 October 2024 at 09:30 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 11:09.
30 Oct 2024 and 5 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Horsham Road, Holme Wood, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 5 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Jul 2024 at 15:43.
30 Oct 2024 and 5 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Knowles Lane, Holme Wood, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 5 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Jul 2024 at 15:45.
30 Oct 2024 and 5 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Kesteven Road, Holme Wood, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 5 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Jul 2024 at 15:44.
30 Oct 2024 and 5 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Holsworthy Road, Holme Wood, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 5 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Jul 2024 at 15:42.
30 Oct 2024 and 5 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Stirling Crescent, Holme Wood, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 5 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Jul 2024 at 15:46.
1 Nov 2024 and 1 Nov 2025
Network Rail were proposing to carry out Works for Rail Purposes on Whitacre Street, Deighton, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 November 2024 and run through until 1 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 14 Aug 2024 at 14:26.
Saturday
Yorkshire Water are proposing to carry out Utility asset works on Curzon Street, Bradley, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 8 Nov 2024 at 15:52.
3 Jan 2025
Network Rail are carrying out roadworks on Thornhill Road, Dewsbury.
These works are categorised as Major.
The works started on 4 November 2024 at 09:30 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 4 Nov 2024 at 09:30.
Friday
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Low Road, Dewsbury Moor, Dewsbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Nov 2024 at 12:20.
Friday
Leeds City Council are proposing to carry out Highway repair and maintenance works on Wakefield Road, Drighlington, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 5 Nov 2024 at 11:41.
Friday
Leeds City Council are proposing to carry out Highway repair and maintenance works on Bradford Road, Gildersome, Morley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 5 Nov 2024 at 11:44.
Saturday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fleece Street, Buttershaw, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Oct 2024 at 08:13.
11 Nov and 20 Dec 2024
Yorkshire Water are proposing to carry out Utility asset works on Springbank Road, Gildersome, Morley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 13:39.
20 Dec 2024
Yorkshire Water are carrying out Utility asset works on Springbank Road, Gildersome, Morley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 10:33.
12 Nov and 20 Dec 2024
Kirklees Council are proposing to carry out Highway improvement works on Sunny Bank Avenue, Mirfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 23 Sep 2024 at 08:26.
18 Dec 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Footpath To 58-74 Groves Hall Road, Dewsbury Moor, Dewsbury.
These works are categorised as Major.
The works started on 15 November 2024 at 13:25 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 13:34.
18 Nov and 6 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Selbourne Avenue, Savile Town, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Sep 2024 at 08:28.
23 Dec 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Footpath To 80-94 Groves Hall Road/22-30 Lowfield Road, Dewsbury Moor, Dewsbury.
These works are categorised as Major.
The works started on 21 November 2024 at 08:00 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 08:18.
17 Dec 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Access To Rear Of 38-52 Groves Hall Road, Dewsbury Moor, Dewsbury.
These works are categorised as Major.
The works started on 20 November 2024 at 11:00 and could run through until 17 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 12:49.
6 Dec 2024
Quickline Commucations are carrying out Utility asset works on Thornhills Lane, Clifton, Brighouse.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 10:52 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Quickline Commucations on 18 Nov 2024 at 10:52.
Sunday
Yorkshire Water are proposing to carry out Utility asset works on Syke Lane, Lightcliffe, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 2 Oct 2024 at 07:23.
Sunday
Yorkshire Water are carrying out Utility asset works on Syke Lane, Lightcliffe, Brighouse.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 10:00 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 18 Nov 2024 at 10:24.
Friday
Kirklees Council are carrying out Highway repair and maintenance works on Brookroyd Lane, Birstall, Batley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 18 Nov 2024 at 09:07.
Friday
Kirklees Council are proposing to carry out Highway repair and maintenance works on Brookroyd Lane, Birstall, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 23 Aug 2024 at 14:03.
Friday
Kirklees Council are proposing to carry out Highway repair and maintenance works on Brownhill Road, Birstall, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 23 Aug 2024 at 14:02.
Friday
Kirklees Council are carrying out Highway repair and maintenance works on Brownhill Road, Birstall, Batley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 18 Nov 2024 at 09:07.
18 Nov 2024 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Silver Birch Drive, Wyke, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Jun 2024 at 14:22.
18 Nov and 6 Dec 2024
Leeds City Council are proposing to carry out Highway repair and maintenance works on Wakefield Road, Drighlington, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 7 Nov 2024 at 10:43.
6 Dec 2024
Leeds City Council are carrying out Highway repair and maintenance works on Wakefield Road, Drighlington, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 10:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 20 Nov 2024 at 11:40.
18 Nov and 6 Dec 2024
Leeds City Council are proposing to carry out Highway repair and maintenance works on Wakefield Road, Drighlington, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 14 Nov 2024 at 15:41.
6 Dec 2024
Leeds City Council are carrying out Highway repair and maintenance works on Wakefield Road, Drighlington, Bradford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 20 Nov 2024 at 13:23.
18 Nov and 6 Dec 2024
Leeds City Council were proposing to carry out Highway repair and maintenance works on Bradford Road, Gildersome, Morley.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Leeds City Council on 14 Nov 2024 at 09:27.
18 Nov and 7 Dec 2024
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Farfield Grove, Buttershaw, Bradford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 7 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 13:13.
Today
Yorkshire Water are carrying out Utility repair and maintenance works on Footpath Fronting 1007-1037 Leeds Road, Deighton, Huddersfield.
The works should not impact the carriageway.
The works started on 21 November 2024 at 21:43 and could run through until 27 November 2024. The works will impact the verge only.
This roadwork event was last updated by Yorkshire Water on 25 Nov 2024 at 13:30.
21 Nov and 11 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Lane, Drighlington, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 11 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 28 Aug 2024 at 15:03.
Tomorrow
Yorkshire Water are carrying out Utility repair and maintenance works on Blake Hall Road, Mirfield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 03:25 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 22 Nov 2024 at 09:55.
Tomorrow
Yorkshire Water are carrying out Utility repair and maintenance works on Rookery Place, Brighouse.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 11:20 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 22 Nov 2024 at 11:59.
25 Nov and 13 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Selbourne Road, Savile Town, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Sep 2024 at 08:30.
Tomorrow
Network Rail are proposing to carry out Works for Rail Purposes on Cooper Bridge Road, Cooper Bridge, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 23 Aug 2024 at 08:15.
Tomorrow
Network Rail are proposing to carry out Works for Rail Purposes on Cooper Bridge Road, Cooper Bridge, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 29 Aug 2024 at 10:22.
Tomorrow
Network Rail are proposing to carry out Works for Rail Purposes on Cooper Bridge Road, Cooper Bridge, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 6 Sep 2024 at 13:50.
Tomorrow
Network Rail are proposing to carry out Works for Rail Purposes on Cooper Bridge Road, Cooper Bridge, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 17 Sep 2024 at 10:35.
Tomorrow
Network Rail are proposing to carry out Works for Rail Purposes on Cooper Bridge Road, Cooper Bridge, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 18 Sep 2024 at 12:11.
Tomorrow
Network Rail are carrying out Works for Rail Purposes on Cooper Bridge Road, Cooper Bridge, Brighouse.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 23:30 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 26 Nov 2024 at 08:50.
Friday
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Ogden Lane, Brighouse.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 9 Sep 2024 at 12:21.
25 Nov and 18 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cycle Way From Well Lane To Ravenshouse Road, Dewsbury Moor, Dewsbury.
These works are categorised as Major.
The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 14:11.
25 Nov and 18 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To Cycle Way From Well Lane, Dewsbury Moor, Dewsbury.
These works are categorised as Major.
The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 14:11.
25 Nov and 6 Dec 2024
Quickline Commucations are proposing to carry out Utility asset works on Thornhills Beck Lane, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Quickline Commucations on 4 Oct 2024 at 06:58.
25 Nov and 6 Dec 2024
Quickline Commucations are proposing to carry out Utility asset works on Sutcliffe Wood Lane, Hipperholme, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Quickline Commucations on 2 Sep 2024 at 15:04.
25 Nov and 6 Dec 2024
Quickline Commucations are proposing to carry out Utility asset works on Sutcliffe Wood Lane, Hipperholme, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Quickline Commucations on 17 Sep 2024 at 10:53.
6 Dec 2024
Quickline Commucations are carrying out Utility asset works on Sutcliffe Wood Lane, Hipperholme, Brighouse.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 10:40 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Quickline Commucations on 25 Nov 2024 at 10:40.
25 Nov and 6 Dec 2024
Quickline Commucations are proposing to carry out Utility asset works on Sutcliffe Wood Lane, Hipperholme, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Quickline Commucations on 17 Sep 2024 at 10:46.
25 Nov and 6 Dec 2024
Quickline Commucations are proposing to carry out Utility asset works on Sutcliffe Wood Lane, Hipperholme, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Quickline Commucations on 25 Sep 2024 at 15:01.
Friday
Kirklees Council are proposing to carry out Highway repair and maintenance works on Northgate, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 1 Oct 2024 at 13:17.
Friday
Kirklees Council are proposing to carry out Highway repair and maintenance works on Market Street, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 1 Oct 2024 at 13:10.
Friday
Kirklees Council are proposing to carry out Highway repair and maintenance works on Serpentine Road, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 1 Oct 2024 at 13:18.
Friday
Kirklees Council are proposing to carry out Highway repair and maintenance works on Horncastle Street, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 1 Oct 2024 at 13:20.
25 Nov and 6 Dec 2024
Kirklees Council were proposing to carry out Highway repair and maintenance works on Whitcliffe Road, Cleckheaton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 16 Oct 2024 at 08:48.
Friday
Kirklees Council are proposing to carry out Highway repair and maintenance works on Scott Lane, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 1 Oct 2024 at 13:15.
Friday
Kirklees Council are proposing to carry out Highway repair and maintenance works on Whitcliffe Road, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 1 Oct 2024 at 13:12.
25 Nov 2024 and 7 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Halifax Road, Bradford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 12:28.
25 Nov and 20 Dec 2024
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Fleece Street, Buttershaw, Bradford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 12:28.
Today
BT were proposing to carry out Utility asset works on Reevy Avenue, Wibsey, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 30 Aug 2024 at 15:21.
Today
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Copley Street, Little Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 2 Sep 2024 at 15:59.
Today
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Copley Street, Little Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 6 Sep 2024 at 15:57.
Saturday
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Hall Ings, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 26 Nov 2024 at 11:13.
Saturday
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Hall Ings, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 26 Nov 2024 at 11:13.
26 Nov and 20 Dec 2024
Kirklees Council are proposing to carry out Highway improvement works on Sunny Bank Avenue, Mirfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 27 Sep 2024 at 09:39.
20 Dec 2024
Kirklees Council are carrying out Highway improvement works on Sunny Bank Avenue, Mirfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 26 Nov 2024 at 08:03.
Tomorrow
Cityfibre Metro Networks are proposing to carry out Remedial works on Bowling Hall Road, East Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 15 Aug 2024 at 08:29.
2 and 5 Dec 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Ashbrow Road, Sheepridge, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 2 Oct 2024 at 13:47.
2 and 5 Dec 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Ashbrow Road, Sheepridge, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 30 Oct 2024 at 14:29.
2 and 23 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Forge Lane, Thornhill Lees, Dewsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Aug 2024 at 12:17.
2 Dec 2024 and 10 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To Rear Of 9/11 Lowfield Road, Dewsbury Moor, Dewsbury.
These works are categorised as Major.
The works will start on or after 2 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 14:09.
2 and 18 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To Rear Of 34-46 Lowfield Road, Dewsbury Moor, Dewsbury.
These works are categorised as Major.
The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 14:07.
2 and 6 Dec 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on West View, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 10 Oct 2024 at 11:58.
2 and 6 Dec 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on West View, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 11 Nov 2024 at 11:38.
2 and 13 Dec 2024
Quickline Commucations are proposing to carry out Utility asset works on Whitley Lane, Southowram, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 30 Sep 2024 at 07:41.
2 and 13 Dec 2024
Quickline Commucations are proposing to carry out Utility asset works on Whitley Lane, Southowram, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 3 Oct 2024 at 15:34.
2 and 13 Dec 2024
Quickline Commucations are proposing to carry out Utility asset works on Whitley Lane, Southowram, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 4 Oct 2024 at 15:07.
2 and 13 Dec 2024
Quickline Commucations are proposing to carry out Utility asset works on Whitley Lane, Southowram, Halifax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 13 Nov 2024 at 18:35.
2 and 6 Dec 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Leeside Road, Heckmondwike.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 11 Oct 2024 at 08:53.
2 and 6 Dec 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Leeside Road, Heckmondwike.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 1 Nov 2024 at 12:35.
2 and 6 Dec 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Leeside Road, White Lee, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 11 Oct 2024 at 08:55.
2 and 6 Dec 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Leeside Road, White Lee, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 1 Nov 2024 at 12:36.
2 and 6 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on High Fernley Road, Wyke, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Sep 2024 at 11:39.
2 and 6 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on High Fernley Road, Wyke, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 Sep 2024 at 14:52.
2 and 6 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on High Fernley Road, Wyke, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Nov 2024 at 11:43.
4 and 10 Dec 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Station Lane, Birkenshaw, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 2 Oct 2024 at 16:27.
4 and 10 Dec 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Station Lane, Birkenshaw, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 4 Nov 2024 at 09:02.
6 and 19 Dec 2024
Quickline Commucations are proposing to carry out Utility asset works on Sutcliffe Wood Lane, Hipperholme, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Quickline Commucations on 2 Sep 2024 at 15:05.
9 and 15 Dec 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Long Hill Road, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 7 Oct 2024 at 13:54.
9 and 15 Dec 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Long Hill Road, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 9 Oct 2024 at 10:30.
9 and 15 Dec 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Gardens Road, Ravensthorpe, Dewsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 30 Sep 2024 at 08:52.
9 and 15 Dec 2024
Kirklees Council are proposing to carry out Highway repair and maintenance works on Gardens Road, Ravensthorpe, Dewsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 1 Oct 2024 at 16:26.
9 and 13 Dec 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Moor Lane, Gomersal, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 8 Oct 2024 at 09:19.
9 and 13 Dec 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Moor Lane, Gomersal, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 18 Nov 2024 at 09:23.
9 and 13 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Whitehall Grove, Drighlington, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Nov 2024 at 13:52.
9 and 13 Dec 2024
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Whitehall Grove, Drighlington, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 Nov 2024 at 17:22.
9 Dec 2024 and 17 Jan 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Allandale Road, Buttershaw, Bradford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 17 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 13:25.
9 Dec 2024 and 18 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scott Green, Gildersome, Morley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 18 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 28 Aug 2024 at 15:04.
9 and 23 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gildersome Lane, Gildersome, Morley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 22 Aug 2024 at 11:22.
9 and 23 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gildersome Lane, Gildersome, Morley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 Sep 2024 at 13:54.
16 and 18 Dec 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Beechwood Road, Wibsey, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 20 Sep 2024 at 11:42.
16 and 18 Dec 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Beechwood Road, Wibsey, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 23 Sep 2024 at 15:42.
18 and 20 Dec 2024
BT are proposing to carry out Utility asset works on Hopton Hall Lane, Upper Hopton, Mirfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 23 Sep 2024 at 08:19.
18 and 20 Dec 2024
BT are proposing to carry out Utility asset works on Hopton Hall Lane, Upper Hopton, Mirfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 25 Nov 2024 at 10:43.
1 Jan 2025 and 31 May 2026
Kirklees Council were proposing to carry out Highway improvement works on Link Road, Dewsbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Kirklees Council on 15 Oct 2024 at 14:33.
1 Jan 2025 and 31 May 2026
Kirklees Council are proposing to carry out Highway improvement works on Aldams Road, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:27.
1 Jan 2025 and 31 May 2026
Kirklees Council were proposing to carry out Highway improvement works on Aldams Road, Dewsbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:05.
1 Jan 2025 and 31 May 2026
Kirklees Council are proposing to carry out Highway improvement works on Wilton Street, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:28.
1 Jan 2025 and 31 May 2026
Kirklees Council were proposing to carry out Highway improvement works on Wilton Street, Dewsbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:06.
1 Jan 2025 and 31 May 2026
Kirklees Council were proposing to carry out Highway improvement works on Longcauseway, Dewsbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Kirklees Council on 15 Oct 2024 at 14:33.
1 Jan 2025 and 31 May 2026
Kirklees Council are proposing to carry out Highway improvement works on South Street, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:42.
1 Jan 2025 and 31 May 2026
Kirklees Council were proposing to carry out Highway improvement works on South Street, Dewsbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:10.
1 Jan 2025 and 31 May 2026
Kirklees Council are proposing to carry out Highway improvement works on Railway Street, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:38.
1 Jan 2025 and 31 May 2026
Kirklees Council were proposing to carry out Highway improvement works on Railway Street, Dewsbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:07.
1 Jan 2025 and 31 May 2026
Kirklees Council are proposing to carry out Highway improvement works on Battye Street, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:40.
1 Jan 2025 and 31 May 2026
Kirklees Council were proposing to carry out Highway improvement works on Battye Street, Dewsbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:07.
1 Jan 2025 and 31 May 2026
Kirklees Council are proposing to carry out Highway improvement works on Dewsbury Ring Road, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:37.
1 Jan 2025 and 31 May 2026
Kirklees Council were proposing to carry out Highway improvement works on Dewsbury Ring Road, Dewsbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:07.
1 Jan 2025 and 31 May 2026
Kirklees Council are proposing to carry out Highway improvement works on Alfred Street, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:41.
1 Jan 2025 and 31 May 2026
Kirklees Council were proposing to carry out Highway improvement works on Alfred Street, Dewsbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:09.
1 Jan 2025 and 31 May 2026
Kirklees Council are proposing to carry out Highway improvement works on Ings Road, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:42.
1 Jan 2025 and 31 May 2026
Kirklees Council were proposing to carry out Highway improvement works on Ings Road, Dewsbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:09.
1 Jan 2025 and 30 Jul 2026
Kirklees Council are proposing to carry out Highway improvement works on Commercial Road, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:21.
1 Jan 2025 and 30 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Commercial Road, Dewsbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:11.
1 Jan 2025 and 30 Jul 2026
Kirklees Council are proposing to carry out Highway improvement works on Victoria Road, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:22.
1 Jan 2025 and 30 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Victoria Road, Dewsbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:11.
1 Jan 2025 and 30 Jul 2026
Kirklees Council are proposing to carry out Highway improvement works on Carlton Road, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:22.
1 Jan 2025 and 30 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Carlton Road, Dewsbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:12.
1 Jan 2025 and 30 Jul 2026
Kirklees Council are proposing to carry out Highway improvement works on Mill Road, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:23.
1 Jan 2025 and 30 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Mill Road, Dewsbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:12.
1 Jan 2025 and 30 Jul 2026
Kirklees Council are proposing to carry out Highway improvement works on Town Street, Batley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 10 Sep 2024 at 09:42.
1 Jan 2025 and 30 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Town Street, Batley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:13.
1 Jan 2025 and 30 Jul 2026
Kirklees Council are proposing to carry out Highway improvement works on Jack Lane, Batley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 10 Sep 2024 at 16:23.
1 Jan 2025 and 30 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Jack Lane, Batley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:13.
1 Jan 2025 and 30 Jul 2026
Kirklees Council are proposing to carry out Highway improvement works on Howard Street, Batley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:14.
1 Jan 2025 and 30 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Howard Street, Batley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:14.
1 Jan 2025 and 30 Jul 2026
Kirklees Council are proposing to carry out Highway improvement works on Rink Street, Batley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:17.
1 Jan 2025 and 30 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Rink Street, Batley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:15.
1 Jan 2025 and 30 Jul 2026
Kirklees Council are proposing to carry out Highway improvement works on Mount Street, Batley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:18.
1 Jan 2025 and 30 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Mount Street, Batley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:15.
1 Jan 2025 and 30 Jul 2026
Kirklees Council are proposing to carry out Highway improvement works on Grafton Street, Batley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:20.
1 Jan 2025 and 30 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Grafton Street, Batley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:16.
1 Jan 2025 and 30 Jul 2026
Kirklees Council are proposing to carry out Highway improvement works on Alexandra Road, Batley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:21.
1 Jan 2025 and 30 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Alexandra Road, Batley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:17.
1 Jan 2025 and 30 Jul 2026
Kirklees Council are proposing to carry out Highway improvement works on Mill Lane, Hanging Heaton, Batley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 13 Sep 2024 at 09:27.
1 Jan 2025 and 30 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Mill Lane, Hanging Heaton, Batley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:18.
1 Jan and 30 Jul 2025
Kirklees Council are proposing to carry out Highway improvement works on Alexandra Road, Batley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:09.
1 Jan and 30 Jul 2025
Kirklees Council were proposing to carry out Highway improvement works on Alexandra Road, Batley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 30 July 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:16.
1 Jan 2025 and 30 Jul 2026
Kirklees Council are proposing to carry out Highway improvement works on Challenge Way, Hanging Heaton, Batley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 16 Aug 2024 at 10:35.
1 Jan 2025 and 30 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Challenge Way, Hanging Heaton, Batley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:20.
1 Jan 2025 and 30 Jul 2026
Kirklees Council are proposing to carry out Highway improvement works on Grange Road, Batley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:10.
1 Jan 2025 and 30 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Grange Road, Batley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:19.
1 Jan 2025 and 30 Jul 2026
Kirklees Council are proposing to carry out Highway improvement works on Mill Forest Way, Soothill, Batley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:12.
1 Jan 2025 and 30 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Mill Forest Way, Soothill, Batley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:19.
1 Jan 2025 and 30 Jul 2026
Kirklees Council are proposing to carry out Highway improvement works on Rouse Mill Lane, Batley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:04.
1 Jan 2025 and 30 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Rouse Mill Lane, Batley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:17.
1 Jan and 30 Jul 2025
Kirklees Council are proposing to carry out Highway improvement works on Bradford Road, Batley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 23 Aug 2024 at 13:18.
1 Jan and 30 Jul 2025
Kirklees Council were proposing to carry out Highway improvement works on Bradford Road, Batley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 30 July 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:10.
6 Jan and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Clough Lane, Fixby, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 11:04.
6 Jan and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Clough Lane, Fixby, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Nov 2024 at 13:19.
6 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Clough Lane, Rastrick, Brighouse.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 16:30.
6 Jan and 28 Feb 2025
Kirklees Council are proposing to carry out roadworks on Headfield Road, Savile Town, Dewsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 16 Sep 2024 at 07:52.
6 Jan and 28 Feb 2025
Kirklees Council are proposing to carry out roadworks on Chapel Street, Savile Town, Dewsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 20 Sep 2024 at 07:38.
6 Jan and 28 Feb 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Warren Street, Savile Town, Dewsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 19 Sep 2024 at 11:46.
6 Jan and 28 Feb 2025
Kirklees Council are proposing to carry out roadworks on South Street, Savile Town, Dewsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 20 Sep 2024 at 07:39.
6 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on South Street, Savile Town, Dewsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 10:13.
6 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Orchard Street, Savile Town, Dewsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 10:13.
6 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Savile Road, Savile Town, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 10:11.
6 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Link Road, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Sep 2024 at 07:31.
6 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Longcauseway, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Sep 2024 at 07:32.
6 and 17 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Sunny Bank Avenue, Mirfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 14 Oct 2024 at 13:12.
6 and 17 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Sunny Bank Avenue, Mirfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 29 Oct 2024 at 15:54.
6 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pump Lane, Dewsbury Moor, Dewsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 14:54.
6 and 20 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Road, Dewsbury Moor, Dewsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 14:53.
6 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath Between 10/12 Groves Hall Road, Dewsbury Moor, Dewsbury.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 13:36.
6 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Heckmondwike Road, Dewsbury Moor, Dewsbury.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 12:55.
6 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To Rear Of 1-7 Woodland Grove, Dewsbury Moor, Dewsbury.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 14:29.
6 and 10 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on School Street, Norristhorpe, Liversedge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 13:38.
6 and 8 Jan 2025
T-Mobile (UK) are proposing to carry out Utility asset works on Miry Lane, Hightown, Liversedge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 11 Nov 2024 at 10:38.
6 and 31 Jan 2025
Kirklees Council are proposing to carry out roadworks on Moorside, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 10 Oct 2024 at 11:30.
6 and 31 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Moorbottom, Moorbottom, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 5 Nov 2024 at 11:57.
6 and 31 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Moorbottom, Moorbottom, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 20 Nov 2024 at 08:23.
6 and 31 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Westgate, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 5 Nov 2024 at 11:55.
6 and 31 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Westgate, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 20 Nov 2024 at 08:21.
6 and 31 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on St Peg Lane, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 14 Oct 2024 at 13:18.
6 and 31 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on St Peg Lane, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 12 Nov 2024 at 14:04.
6 and 31 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Spen Bank, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 14 Oct 2024 at 13:15.
6 and 31 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Spen Bank, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 12 Nov 2024 at 07:46.
6 and 10 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Whitcliffe Road, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 1 Nov 2024 at 13:10.
6 and 10 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Whitcliffe Road, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 19 Nov 2024 at 07:25.
6 and 31 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Spen Lane, Gomersal, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 14 Oct 2024 at 13:09.
6 and 31 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Spen Lane, Gomersal, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 5 Nov 2024 at 12:07.
6 and 24 Jan 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Wyke Lane, Wyke, Bradford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Sep 2024 at 12:44.
6 and 24 Jan 2025
Yorkshire Water are proposing to carry out Utility asset works on Church Avenue, Gildersome, Morley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 15:04.
6 and 24 Jan 2025
Yorkshire Water are proposing to carry out Utility asset works on Springbank Crescent, Gildersome, Morley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 14:59.
7 and 9 Jan 2025
BT were proposing to carry out Utility asset works on Reevy Avenue, Wibsey, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 9 Oct 2024 at 10:36.
7 and 9 Jan 2025
BT are proposing to carry out Utility asset works on Reevy Avenue, Wibsey, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 21 Oct 2024 at 15:30.
7 and 9 Jan 2025
BT are proposing to carry out Utility asset works on Reevy Avenue, Wibsey, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 1 Oct 2024 at 14:03.
7 and 9 Jan 2025
BT are proposing to carry out Utility asset works on Reevy Avenue, Wibsey, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 3 Oct 2024 at 13:44.
10 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fall Lane, Scout Hill, Dewsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 14:00.
10 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Temple Road, Westtown, Dewsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 14:00.
11 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fall Lane, Scout Hill, Dewsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 14:52.
11 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Temple Road, Westtown, Dewsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 14:52.
13 and 15 Jan 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Headfield Road, Savile Town, Dewsbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway and footpath.
This roadwork event was last updated by Yorkshire Water on 24 Oct 2024 at 13:48.
13 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath To Rear Of 2-12 Lowfield Road, Dewsbury Moor, Dewsbury.
These works are categorised as Major.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 12:45.
13 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To Rear Of 98-106 Groves Hall Road, Dewsbury Moor, Dewsbury.
These works are categorised as Major.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 12:46.
13 and 21 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Hill Street, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 5 Nov 2024 at 16:21.
13 and 21 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Hill Street, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 18 Nov 2024 at 09:44.
13 and 21 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Grange Road, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 5 Nov 2024 at 15:37.
13 and 21 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Grange Road, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 18 Nov 2024 at 09:42.
13 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Windsor Walk, Birstall, Batley.
These works are categorised as Major.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 11:13.
13 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Windsor Walk, Birstall, Batley.
These works are categorised as Major.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 07:13.
14 and 22 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Trafalgar Street, Healey, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 18 Nov 2024 at 11:09.
14 and 22 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Trafalgar Street, Healey, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 18 Nov 2024 at 14:44.
20 and 24 Jan 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Nettleton Road, Mirfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Nov 2024 at 11:41.
20 Jan and 7 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Forge Lane, Thornhill Lees, Dewsbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:41.
20 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sugar Lane, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 09:44.
20 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Moor Park Lane, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 09:43.
20 and 31 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Church Road, Roberttown, Liversedge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 21 Nov 2024 at 10:44.
20 and 24 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Liversedge Hall Lane, Norristhorpe, Liversedge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 11 Nov 2024 at 11:03.
20 and 24 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Liversedge Hall Lane, Norristhorpe, Liversedge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 18 Nov 2024 at 11:26.
20 and 24 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Liversedge Hall Lane, Liversedge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 11 Nov 2024 at 11:02.
20 and 24 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Liversedge Hall Lane, Liversedge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 18 Nov 2024 at 11:25.
20 Jan and 7 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Batley Low Lane, Birstall, Batley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 10:12.
20 Jan and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wyke Lane, Wyke, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Jun 2024 at 14:23.
22 and 29 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Mayman Lane, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 11 Nov 2024 at 11:54.
22 and 29 Jan 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Mayman Lane, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 20 Nov 2024 at 08:25.
23 and 25 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Cliffe Road, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 10 Oct 2024 at 15:54.
23 and 25 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Cliffe Road, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 14 Oct 2024 at 08:01.
23 and 25 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Cliffe Road, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 24 Oct 2024 at 08:35.
27 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lightridge Road, Fixby, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 09:24.
27 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lightridge Road, Fixby, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 14:51.
27 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Link Road, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 31 Oct 2024 at 10:48.
27 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Longcauseway, Dewsbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 31 Oct 2024 at 10:46.
27 Jan and 1 Feb 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Wellington Street, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 13 Nov 2024 at 14:18.
27 Jan and 1 Feb 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Wellington Street, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 26 Nov 2024 at 15:32.
27 Jan and 1 Feb 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Hick Lane, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 13 Nov 2024 at 14:21.
27 Jan and 1 Feb 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Hick Lane, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 26 Nov 2024 at 15:20.
27 Jan and 21 Mar 2025
Yorkshire Water were proposing to carry out Utility asset works on Spring Avenue, Gildersome, Morley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 24 Sep 2024 at 13:07.
27 Jan and 21 Mar 2025
Yorkshire Water were proposing to carry out Utility asset works on Spring Avenue, Gildersome, Morley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 28 Oct 2024 at 14:01.
27 Jan and 21 Mar 2025
Yorkshire Water are proposing to carry out Utility asset works on Spring Avenue, Gildersome, Morley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 8 Nov 2024 at 13:55.
27 Jan and 10 Feb 2025
Yorkshire Water are proposing to carry out Utility asset works on Springbank Road, Gildersome, Morley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 14:40.
29 Jan and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Birstall, Batley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 07:33.
30 Jan and 6 Feb 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cheviot Way, Upper Hopton, Mirfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 28 Oct 2024 at 14:05.
30 Jan and 12 Mar 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Brownroyd Hill Road, Wibsey, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Nov 2024 at 08:35.
3 and 21 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on South Street, Savile Town, Dewsbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:44.
3 and 21 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Park Road, Savile Town, Dewsbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:42.
3 and 21 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Orchard Street, Savile Town, Dewsbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:42.
3 Feb and 21 Mar 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Savile Road, Savile Town, Dewsbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:42.
3 and 10 Feb 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Throstle Nest, Healey, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 22 Nov 2024 at 07:47.
3 and 10 Feb 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Throstle Nest, Healey, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 26 Nov 2024 at 15:40.
3 and 10 Feb 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on West Park Road, Healey, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 19 Nov 2024 at 08:35.
3 and 10 Feb 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Deighton Lane, Healey, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 19 Nov 2024 at 09:10.
3 and 10 Feb 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Trafalgar Street, Healey, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 19 Nov 2024 at 09:18.
3 and 10 Feb 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Healey Lane, Healey, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 19 Nov 2024 at 08:53.
3 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Eden Close, Wyke, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 20 Jun 2024 at 14:27.
3 Feb and 25 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Little Horton Lane, Little Horton, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Oct 2024 at 14:37.
4 Feb and 5 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Great Horton Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 5 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 12:30.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Ripley Street, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Nov 2024 at 11:56.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bolling Road, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:43.
10 Feb and 21 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fixby Road, Fixby, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 11:06.
10 Feb and 21 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fixby Road, Fixby, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Nov 2024 at 13:18.
17 Feb and 14 Mar 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Warren Street, Savile Town, Dewsbury.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:45.
17 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on School Street, Norristhorpe, Liversedge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 28 Oct 2024 at 14:21.
17 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on School Street, Norristhorpe, Liversedge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 10:50.
17 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on School Street, Norristhorpe, Liversedge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 11:24.
17 and 28 Feb 2025
Quickline Commucations are proposing to carry out Utility asset works on Ashday Lane, Southowram, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 8 Nov 2024 at 11:28.
17 and 28 Feb 2025
Quickline Commucations were proposing to carry out Utility asset works on Ashday Lane, Southowram, Brighouse.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 14 Nov 2024 at 09:54.
17 Feb and 14 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Shibden Fold Footpath, Halifax.
These works are categorised as Major.
The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Nov 2024 at 10:48.
17 Feb and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Lane, Drighlington, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 12:51.
24 Feb and 28 Mar 2025
Kirklees Council are proposing to carry out Highway improvement works on High Wood Road, Birstall, Batley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 22 Nov 2024 at 07:48.
24 Feb and 4 Mar 2025
BT were proposing to carry out Utility asset works on Drake Street, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 4 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 25 Nov 2024 at 10:48.
Roadworks Map near to Bank Street, CLECKHEATON, BD19 5EP
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Bank Street, CLECKHEATON, BD19 5EP (23 Events)
(Scheduled Dates)
(miles)
(Scheduled: 20 Nov 2024 - 27 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.