ROADWORKS SUMMARY
Navigation Way, BRADFORD, BD11 2PP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Navigation Way, BD11 2PP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Navigation Way, BRADFORD, BD11 2PP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Navigation Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Yorkshire Water logo
LONG TERM
Between
8 Jan 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Ring Road Bramley To Spring Valley Crescent

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Ring Road Bramley To Spring Valley Crescent, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 4 Aug 2023 at 13:47.

Yorkshire Water logo
LONG TERM
Between
8 Jan 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Ring Road Bramley

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Ring Road Bramley, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 4 Aug 2023 at 11:50.

Network Rail logo
LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Thornhill Road

Network Rail are carrying out roadworks on Thornhill Road, Dewsbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 08:00 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Mar 2024 at 12:12.

Network Rail logo
LONG TERM
Until
30 Jun 2026
Details
View Map
Share
Follow
Calder Road

Network Rail are carrying out Works for Rail Purposes on Calder Road, Ravensthorpe, Dewsbury.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 07:00 and could run through until 30 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Jan 2025 at 14:42.

LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Town Hall Way

Kirklees Council are carrying out Highway improvement works on Town Hall Way, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 08:00 and could run through until 3 October 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Kirklees Council on 1 Sep 2025 at 09:35.

LONG TERM
Between
18 Nov 2024 and 24 Nov 2025
Details
View Map
Share
Follow
Chidswell Lane

Kirklees Council are proposing to carry out Section 50 on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 18 Nov 2024 at 11:38.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Link Road

Kirklees Council were proposing to carry out Highway improvement works on Link Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 15 Oct 2024 at 14:33.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Aldams Road

Kirklees Council are proposing to carry out Highway improvement works on Aldams Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:27.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Aldams Road

Kirklees Council were proposing to carry out Highway improvement works on Aldams Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:05.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Wilton Street

Kirklees Council are proposing to carry out Highway improvement works on Wilton Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:28.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Wilton Street

Kirklees Council were proposing to carry out Highway improvement works on Wilton Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:06.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Longcauseway

Kirklees Council were proposing to carry out Highway improvement works on Longcauseway, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 15 Oct 2024 at 14:33.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
South Street

Kirklees Council are proposing to carry out Highway improvement works on South Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:42.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
South Street

Kirklees Council were proposing to carry out Highway improvement works on South Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:10.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Railway Street

Kirklees Council are proposing to carry out Highway improvement works on Railway Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:38.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Railway Street

Kirklees Council were proposing to carry out Highway improvement works on Railway Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:07.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Battye Street

Kirklees Council are proposing to carry out Highway improvement works on Battye Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:40.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Battye Street

Kirklees Council were proposing to carry out Highway improvement works on Battye Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:07.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Dewsbury Ring Road

Kirklees Council are proposing to carry out Highway improvement works on Dewsbury Ring Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:37.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Dewsbury Ring Road

Kirklees Council were proposing to carry out Highway improvement works on Dewsbury Ring Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:07.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Alfred Street

Kirklees Council are proposing to carry out Highway improvement works on Alfred Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:41.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Alfred Street

Kirklees Council were proposing to carry out Highway improvement works on Alfred Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:09.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Ings Road

Kirklees Council are proposing to carry out Highway improvement works on Ings Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:42.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Ings Road

Kirklees Council were proposing to carry out Highway improvement works on Ings Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:09.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Commercial Road

Kirklees Council are proposing to carry out Highway improvement works on Commercial Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:21.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Commercial Road

Kirklees Council were proposing to carry out Highway improvement works on Commercial Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:11.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Victoria Road

Kirklees Council are proposing to carry out Highway improvement works on Victoria Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:22.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Victoria Road

Kirklees Council were proposing to carry out Highway improvement works on Victoria Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:11.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Carlton Road

Kirklees Council are proposing to carry out Highway improvement works on Carlton Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:22.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Carlton Road

Kirklees Council were proposing to carry out Highway improvement works on Carlton Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:12.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mill Road

Kirklees Council are proposing to carry out Highway improvement works on Mill Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:23.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mill Road

Kirklees Council were proposing to carry out Highway improvement works on Mill Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:12.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Town Street

Kirklees Council are proposing to carry out Highway improvement works on Town Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 10 Sep 2024 at 09:42.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Town Street

Kirklees Council were proposing to carry out Highway improvement works on Town Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:13.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Jack Lane

Kirklees Council are proposing to carry out Highway improvement works on Jack Lane, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 10 Sep 2024 at 16:23.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Jack Lane

Kirklees Council were proposing to carry out Highway improvement works on Jack Lane, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:13.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Howard Street

Kirklees Council are proposing to carry out Highway improvement works on Howard Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:14.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Howard Street

Kirklees Council were proposing to carry out Highway improvement works on Howard Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:14.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Rink Street

Kirklees Council are proposing to carry out Highway improvement works on Rink Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:17.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Rink Street

Kirklees Council were proposing to carry out Highway improvement works on Rink Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:15.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mount Street

Kirklees Council are proposing to carry out Highway improvement works on Mount Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:18.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mount Street

Kirklees Council were proposing to carry out Highway improvement works on Mount Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:15.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Leeds Road

Kirklees Council are proposing to carry out Highway improvement works on Leeds Road, Shaw Cross, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 13 Sep 2024 at 10:00.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Leeds Road

Kirklees Council were proposing to carry out Highway improvement works on Leeds Road, Shaw Cross, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:21.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Grafton Street

Kirklees Council are proposing to carry out Highway improvement works on Grafton Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:20.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Grafton Street

Kirklees Council were proposing to carry out Highway improvement works on Grafton Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:16.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Alexandra Road

Kirklees Council are proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:21.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Alexandra Road

Kirklees Council were proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:17.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mill Lane

Kirklees Council are proposing to carry out Highway improvement works on Mill Lane, Hanging Heaton, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 13 Sep 2024 at 09:27.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mill Lane

Kirklees Council were proposing to carry out Highway improvement works on Mill Lane, Hanging Heaton, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:18.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Challenge Way

Kirklees Council are proposing to carry out Highway improvement works on Challenge Way, Hanging Heaton, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 16 Aug 2024 at 10:35.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Challenge Way

Kirklees Council were proposing to carry out Highway improvement works on Challenge Way, Hanging Heaton, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:20.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Grange Road

Kirklees Council are proposing to carry out Highway improvement works on Grange Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:10.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Grange Road

Kirklees Council were proposing to carry out Highway improvement works on Grange Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:19.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mill Forest Way

Kirklees Council are proposing to carry out Highway improvement works on Mill Forest Way, Soothill, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:12.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mill Forest Way

Kirklees Council were proposing to carry out Highway improvement works on Mill Forest Way, Soothill, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:19.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Rouse Mill Lane

Kirklees Council are proposing to carry out Highway improvement works on Rouse Mill Lane, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:04.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Rouse Mill Lane

Kirklees Council were proposing to carry out Highway improvement works on Rouse Mill Lane, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:17.

Leeds City Council logo
LONG TERM
Between
6 Jan and 20 Dec 2025
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 December 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 9 Oct 2024 at 12:19.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Ripley Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Ripley Street, West Bowling, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Nov 2024 at 11:56.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Bolling Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bolling Road, West Bowling, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:43.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Killinghall Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Killinghall Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:23.

Network Rail logo
LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Bog Green Lane

Network Rail are carrying out roadworks on Bog Green Lane, Colne Bridge, Huddersfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 07:00 and could run through until 31 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 1 Jul 2025 at 14:02.

Northern Gas Networks logo
LONG TERM
Between
1 Apr 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Low Moorside Court

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moorside Court, New Farnley, Leeds.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 14 Mar 2024 at 09:46.

Northern Gas Networks logo
LONG TERM
Between
1 Apr 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Gainsborough Fields

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gainsborough Fields, New Farnley, Leeds.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 14 Mar 2024 at 09:46.

Network Rail logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Station Road

Network Rail are carrying out roadworks on Station Road, Mirfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 April 2025 at 07:00 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Sep 2025 at 09:11.

LONG TERM
Between
30 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Longcauseway

Kirklees Council are proposing to carry out Highway improvement works on Longcauseway, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 30 September 2025. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 9 Apr 2025 at 07:46.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Longcauseway

Kirklees Council are carrying out Highway improvement works on Longcauseway, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 April 2025 at 09:00 and could run through until 30 September 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Kirklees Council on 14 Jul 2025 at 09:55.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Huddersfield Road

Kirklees Council are proposing to carry out Highway improvement works on Huddersfield Road, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 7 Apr 2025 at 12:45.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Kitson Hill Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Kitson Hill Road, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 7 Apr 2025 at 12:56.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Clough Lane

Kirklees Council are proposing to carry out Highway improvement works on Clough Lane, Hightown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 7 Apr 2025 at 12:52.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Clough Lane

Kirklees Council were proposing to carry out Highway improvement works on Clough Lane, Hightown, Liversedge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 17 Apr 2025 at 10:57.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Liversedge Hall Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Liversedge Hall Lane, Norristhorpe, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 7 Apr 2025 at 12:55.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
School Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on School Lane, Hartshead, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 7 Apr 2025 at 12:55.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Liversedge Hall Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Liversedge Hall Lane, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 7 Apr 2025 at 12:53.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Mayman Lane

Kirklees Council are proposing to carry out Highway improvement works on Mayman Lane, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 31 Mar 2025 at 11:29.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Wellington Street

Kirklees Council are proposing to carry out Highway improvement works on Wellington Street, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 31 Mar 2025 at 11:27.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Hick Lane

Kirklees Council are proposing to carry out Highway improvement works on Hick Lane, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 31 Mar 2025 at 11:25.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Moorbottom

Kirklees Council are proposing to carry out Highway improvement works on Moorbottom, Moorbottom, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 26 Mar 2025 at 16:42.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Westgate

Kirklees Council are proposing to carry out Highway improvement works on Westgate, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 26 Mar 2025 at 16:38.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Hill Street

Kirklees Council are proposing to carry out Highway improvement works on Hill Street, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 31 Mar 2025 at 09:55.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Hill Street

Kirklees Council are carrying out Highway improvement works on Hill Street, Cleckheaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 13 May 2025 at 12:04.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Grange Road

Kirklees Council are proposing to carry out Highway improvement works on Grange Road, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 31 Mar 2025 at 10:40.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Grange Road

Kirklees Council are carrying out Highway improvement works on Grange Road, Cleckheaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 13 May 2025 at 12:03.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Station Lane

Kirklees Council are proposing to carry out Highway improvement works on Station Lane, Birkenshaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 31 Mar 2025 at 10:19.

Leeds City Council logo
LONG TERM
Until
7 Dec 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 7 December 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Leeds City Council on 20 May 2025 at 08:12.

Yorkshire Water logo
LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Leeds Old Road

Yorkshire Water are carrying out Utility asset works on Leeds Old Road, Thornbury, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 May 2025 at 08:00 and could run through until 5 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Yorkshire Water on 19 Aug 2025 at 15:00.

Yorkshire Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Leeds Old Road

Yorkshire Water are proposing to carry out Utility asset works on Leeds Old Road, Thornbury, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 September 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 3 Feb 2025 at 14:24.

Yorkshire Water logo
LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Intake Road

Yorkshire Water are carrying out Utility asset works on Intake Road, Fagley, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2025 at 13:03.

LONG TERM
Between
16 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Rooley Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Rooley Lane, Bradford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 16:19.

Network Rail logo
LONG TERM
Between
23 Jun and 19 Dec 2025
Details
View Map
Share
Follow
Calder Road

Network Rail are proposing to carry out Works for Rail Purposes on Calder Road, Ravensthorpe, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 23 Apr 2025 at 07:01.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Bierley Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bierley Lane, Bierley, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:49.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Manchester Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Manchester Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 11:24.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Smiddles Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Smiddles Lane, Little Horton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 11:15.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Great Horton Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Great Horton Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 15:42.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Quebec Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Quebec Street, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 1 May 2025 at 16:01.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Westgate

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Westgate, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 11:17.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Wigan Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wigan Street, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 1 May 2025 at 15:55.

Leeds City Council logo
LONG TERM
Between
23 Jun 2025 and 1 May 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 May 2026. The works will impact the verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 11 Jun 2025 at 09:06.

Leeds City Council logo
LONG TERM
Between
23 Jun 2025 and 1 May 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 May 2026. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 11 Jun 2025 at 09:03.

Leeds City Council logo
LONG TERM
Until
1 May 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 08:00 and could run through until 1 May 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Leeds City Council on 4 Jul 2025 at 14:35.

Leeds City Council logo
LONG TERM
Until
1 May 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 08:00 and could run through until 1 May 2026. The works will impact the verge and footpath.

This roadwork event was last updated by Leeds City Council on 4 Jul 2025 at 14:36.

Yorkshire Water logo
LONG TERM
Until
28 Oct 2025
Details
View Map
Share
Follow
Ward Street

Yorkshire Water are carrying out Utility repair and maintenance works on Ward Street, Great Horton, Bradford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 June 2025 at 15:53 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 29 Jul 2025 at 13:46.

LONG TERM
Between
26 Jun 2025 and 1 Apr 2026
Details
View Map
Share
Lower Wyke Green

City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Lower Wyke Green, Lower Wyke, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 1 April 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Apr 2025 at 15:44.

LONG TERM
Between
7 Jul and 10 Oct 2025
Details
View Map
Share
Follow
Knowler Hill

Kirklees Council are proposing to carry out Highway improvement works on Knowler Hill, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 14 Jul 2025 at 11:32.

LONG TERM
Between
7 Jul and 10 Oct 2025
Details
View Map
Share
Bradford Road

Kirklees Council were proposing to carry out Highway improvement works on Bradford Road, Littletown, Liversedge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 4 Jul 2025 at 07:47.

LONG TERM
Between
7 Jul and 30 Oct 2025
Details
View Map
Share
Bradford Road

Kirklees Council were proposing to carry out Highway improvement works on Bradford Road, Littletown, Liversedge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 30 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 4 Jul 2025 at 07:57.

LONG TERM
Between
7 Jul and 30 Oct 2025
Details
View Map
Share
Follow
Upper Carr Street

Kirklees Council are proposing to carry out Highway improvement works on Upper Carr Street, Littletown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 14 Jul 2025 at 11:32.

LONG TERM
Between
7 Jul and 30 Oct 2025
Details
View Map
Share
Follow
Garden Avenue

Kirklees Council are proposing to carry out Highway improvement works on Garden Avenue, Littletown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 14 Jul 2025 at 11:32.

LONG TERM
Between
7 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Landscove Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Landscove Avenue, Holme Wood, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Apr 2025 at 15:10.

LONG TERM
Between
7 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Heysham Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Heysham Drive, Holme Wood, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Apr 2025 at 14:25.

LONG TERM
Between
7 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Leeds Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Leeds Road, Thornbury, Bradford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Oct 2024 at 14:30.

LONG TERM
Between
9 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Little Horton Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Little Horton Lane, Little Horton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 16:13.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Birch Close

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Birch Close, West Bowling, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 16:00.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Fenby Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Fenby Avenue, Dudley Hill, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 15:50.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Prospect Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Prospect Street, East Bowling, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 10:22.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Wakefield Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wakefield Road, Bradford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:27.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
New Otley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on New Otley Road, Barkerend, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 15:59.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Otley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Otley Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:30.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Killinghall Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Killinghall Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:28.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Dudley Hill Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Dudley Hill Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:29.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Harrogate Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Harrogate Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Apr 2025 at 14:44.

LONG TERM
Between
11 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Killinghall Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Killinghall Road, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 14:19.

LONG TERM
Between
11 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Fagley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Fagley Road, Fagley, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 15:25.

LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Whitehall Road

Kirklees Council are proposing to carry out Highway improvement works on Whitehall Road, Wyke, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 20 Mar 2025 at 12:44.

LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Whitehall Road

Kirklees Council are carrying out Highway improvement works on Whitehall Road, Wyke, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 July 2025 at 09:30 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 14 Jul 2025 at 09:31.

LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Westfield Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Westfield Lane, Wyke, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 29 May 2025 at 08:08.

LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Westfield Lane

Kirklees Council are carrying out Highway repair and maintenance works on Westfield Lane, Wyke, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 July 2025 at 09:30 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 14 Jul 2025 at 09:31.

LONG TERM
Finishing
Sunday
Details
View Map
Share
Westfield Lane

Kirklees Council were proposing to carry out Highway repair and maintenance works on Westfield Lane, Wyke, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 21 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 29 Apr 2025 at 13:50.

LONG TERM
Between
14 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
North Brook Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on North Brook Street, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 16:29.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Verdun Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Verdun Road, Buttershaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Apr 2025 at 16:12.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
St Helena Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on St Helena Road, Wibsey, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Apr 2025 at 14:12.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Royds Hall Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Royds Hall Avenue, Odsal, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:23.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Reevy Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Reevy Road, Wibsey, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Apr 2025 at 14:16.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Reevy Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Reevy Road, Wibsey, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:33.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
St Helena Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on St Helena Road, Wibsey, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Apr 2025 at 14:16.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Torre Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Torre Road, Horton Bank Top, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:33.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Speeton Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Speeton Avenue, Horton Bank Top, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:12.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Ned Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Ned Lane, Holme Wood, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:23.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Tyersal Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Tyersal Lane, Tyersal, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:33.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Whitcliffe Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Whitcliffe Road, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 27 Feb 2025 at 08:49.

Northern Gas Networks logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Whitcliffe Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Whitcliffe Road, Cleckheaton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 July 2025 at 09:35 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Sep 2025 at 16:01.

Northern Gas Networks logo
LONG TERM
Until
20 Oct 2025
Details
View Map
Share
Follow
Dewsbury Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Dewsbury Road, Morley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 July 2025 at 08:30 and could run through until 20 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Jul 2025 at 09:56.

Northern Gas Networks logo
LONG TERM
Until
20 Oct 2025
Details
View Map
Share
Follow
Topcliffe Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Topcliffe Lane, Morley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 July 2025 at 08:30 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 23 Jul 2025 at 09:59.

LONG TERM
Between
28 Jul and 3 Oct 2025
Details
View Map
Share
Follow
Shetcliffe Lane

City Of Bradford Metropolitan District Council are proposing to carry out Section 50 on Shetcliffe Lane, Bierley, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 28 Jul 2025 at 10:55.

LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Shetcliffe Lane

City Of Bradford Metropolitan District Council are carrying out Section 50 on Shetcliffe Lane, Bierley, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 08:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 28 Jul 2025 at 14:56.

Energy Assets Networks (formerly Utility Distribution Networks) logo
LONG TERM
Between
28 Jul and 3 Oct 2025
Details
View Map
Share
Shetcliffe Lane

Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out Utility asset works on Shetcliffe Lane, Bierley, Bradford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 9 Jul 2025 at 10:59.

Energy Assets Networks (formerly Utility Distribution Networks) logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Shetcliffe Lane

Energy Assets Networks (formerly Utility Distribution Networks) are carrying out Utility asset works on Shetcliffe Lane, Bierley, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 10:49 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 28 Jul 2025 at 10:49.

LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Leeds Road

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Leeds Road, Thornbury, Bradford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 07:30 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 28 Jul 2025 at 08:45.

Yorkshire Water logo
LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Thornbury Road

Yorkshire Water are carrying out Utility asset works on Thornbury Road, Thornbury, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 12:30 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2025 at 08:37.

Network Rail logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
George Street

Network Rail are proposing to carry out Works for Rail Purposes on George Street, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 23 Apr 2025 at 13:25.

Network Rail logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Jack Lane

Network Rail are proposing to carry out Works for Rail Purposes on Jack Lane, Hanging Heaton, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 31 Mar 2025 at 09:50.

Network Rail logo
LONG TERM
Until
14 Nov 2025
Details
View Map
Share
Follow
Jack Lane

Network Rail are carrying out Works for Rail Purposes on Jack Lane, Hanging Heaton, Batley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 07:00 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Aug 2025 at 09:06.

Northern Gas Networks logo
LONG TERM
Between
4 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Westcliffe Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcliffe Road, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 27 Feb 2025 at 10:21.

Northern Gas Networks logo
LONG TERM
Until
20 Nov 2025
Details
View Map
Share
Follow
Westcliffe Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Westcliffe Road, Cleckheaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 August 2025 at 10:45 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Aug 2025 at 10:54.

Leeds City Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Ring Road Farsley

Leeds City Council are proposing to carry out Highway improvement works on Ring Road Farsley, Farsley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 30 Jul 2025 at 13:20.

Leeds City Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Ring Road Farsley

Leeds City Council are carrying out Highway improvement works on Ring Road Farsley, Farsley, Pudsey.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2025 at 09:30 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 18 Aug 2025 at 08:50.

Northern Gas Networks logo
LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Robin Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Robin Lane, Pudsey.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2025 at 08:00 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Sep 2025 at 14:45.

LONG TERM
Between
17 Aug 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Lower Wyke Green

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Lower Wyke Green, Lower Wyke, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 August 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Apr 2025 at 16:21.

Northern Gas Networks logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Claremont

Northern Gas Networks are carrying out Utility repair and maintenance works on Claremont, Heckmondwike.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 11:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Sep 2025 at 10:44.

Northern Gas Networks logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Upper George Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Upper George Street, Heckmondwike.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 11:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Sep 2025 at 10:45.

Northern Gas Networks logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Brighton Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Brighton Street, Heckmondwike.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 11:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Sep 2025 at 10:46.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Upper Castle Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Castle Street, West Bowling, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Apr 2025 at 10:26.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Upper Castle Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Castle Street, West Bowling, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Apr 2025 at 10:36.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 3 Oct 2025
Details
View Map
Share
Upper Castle Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Upper Castle Street, West Bowling, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2025 at 07:56.

Northern Gas Networks logo
LONG TERM
Until
6 Oct 2025
Details
View Map
Share
Follow
Upper Castle Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Upper Castle Street, West Bowling, Bradford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2025 at 14:00 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2025 at 14:42.

Energy Assets Pipelines logo
LONG TERM
Between
18 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Listerhills Road

Energy Assets Pipelines are proposing to carry out Utility asset works on Listerhills Road, Listerhills, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Energy Assets Pipelines on 20 Jun 2025 at 14:23.

Energy Assets Pipelines logo
LONG TERM
Between
18 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Listerhills Road

Energy Assets Pipelines are proposing to carry out Utility asset works on Listerhills Road, Listerhills, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Energy Assets Pipelines on 9 Jul 2025 at 16:14.

Energy Assets Pipelines logo
LONG TERM
Between
18 Aug and 24 Oct 2025
Details
View Map
Share
Listerhills Road

Energy Assets Pipelines were proposing to carry out Utility asset works on Listerhills Road, Listerhills, Bradford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 25 Jul 2025 at 09:46.

Energy Assets Pipelines logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Listerhills Road

Energy Assets Pipelines are carrying out Utility asset works on Listerhills Road, Listerhills, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 13:15 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 22 Aug 2025 at 13:21.

Northern Gas Networks logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
New Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on New Lane, Moorside, Cleckheaton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 13:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2025 at 08:50.

Northern Gas Networks logo
LONG TERM
Between
22 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Cemetery Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cemetery Road, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2025 at 11:15.

Northern Gas Networks logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Cemetery Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Cemetery Road, Heckmondwike.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 08:00 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Aug 2025 at 08:48.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Holdsworth Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Holdsworth Street, Cleckheaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 11:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 12 Sep 2025 at 08:59.

Energy Assets Pipelines logo
LONG TERM
Between
25 Aug and 24 Oct 2025
Details
View Map
Share
Listerhills Road

Energy Assets Pipelines were proposing to carry out Utility asset works on Listerhills Road, Listerhills, Bradford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 19 Jun 2025 at 11:39.

Leeds City Council logo
LONG TERM
Between
25 Aug 2025 and 2 May 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 2 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 11 Jun 2025 at 09:01.

Leeds City Council logo
LONG TERM
Until
2 May 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 05:00 and could run through until 2 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 26 Aug 2025 at 10:49.

Northern Gas Networks logo
LONG TERM
Between
26 Aug 2025 and 14 Jan 2026
Details
View Map
Share
Planetrees Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Planetrees Road, Laisterdyke, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 14 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Aug 2025 at 10:57.

Northern Gas Networks logo
LONG TERM
Until
20 Oct 2025
Details
View Map
Share
Follow
Bradford Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Bradford Road, Tingley, Wakefield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 10:00 and could run through until 20 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 2 Sep 2025 at 11:04.

Leeds City Council logo
LONG TERM
Between
27 Aug 2025 and 2 May 2026
Details
View Map
Share
Follow
Stanningley Bypass

Leeds City Council are proposing to carry out Highway improvement works on Stanningley Bypass, Stanningley, Pudsey.

These works are categorised as Major.

The works will start on or after 27 August 2025 and could run through until 2 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 25 Jul 2025 at 12:54.

Northern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Stunsteads Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Stunsteads Road, Cleckheaton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 09:00 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Sep 2025 at 09:07.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
2 Oct 2025
Details
View Map
Share
Follow
Woodhall Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Woodhall Road, Calverley, Pudsey.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 13:00 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 1 Sep 2025 at 13:29.

LONG TERM
Between
1 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Valley Road

Kirklees Council are proposing to carry out Highway improvement works on Valley Road, Millbridge, Liversedge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 14 Jul 2025 at 11:33.

Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Valley Road

Kirklees Council are proposing to carry out Highway improvement works on Valley Road, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 21 Jul 2025 at 10:54.

Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Valley Road

Kirklees Council are proposing to carry out Highway improvement works on Valley Road, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 21 Jul 2025 at 14:00.

LONG TERM
Between
1 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Valley Road

Kirklees Council are proposing to carry out Highway improvement works on Valley Road, Millbridge, Liversedge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 14 Jul 2025 at 11:33.

LONG TERM
Between
1 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Knowler Hill

Kirklees Council are proposing to carry out Highway improvement works on Knowler Hill, Millbridge, Liversedge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 14 Jul 2025 at 11:33.

Between
1 and 30 Sep 2025
Details
View Map
Share
Follow
Moorbottom

Kirklees Council are proposing to carry out Highway improvement works on Moorbottom, Moorbottom, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 11 Aug 2025 at 10:13.

Between
1 and 30 Sep 2025
Details
View Map
Share
Follow
Westgate

Kirklees Council are proposing to carry out Highway improvement works on Westgate, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 11 Aug 2025 at 10:13.

Northern Powergrid (Yorkshire) logo
Until
30 Sep 2025
Details
View Map
Share
Follow
Gain Lane

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Gain Lane, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 10:30 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Sep 2025 at 14:41.

Northern Powergrid (Yorkshire) logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Gain Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Gain Lane, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Aug 2025 at 13:50.

Northern Powergrid (Yorkshire) logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Gain Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Gain Lane, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Aug 2025 at 09:03.

Northern Gas Networks logo
Until
2 Oct 2025
Details
View Map
Share
Follow
Stanley Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Stanley Street, Cleckheaton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 September 2025 at 13:30 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Sep 2025 at 15:10.

Yorkshire Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Killinghall Road

Yorkshire Water are proposing to carry out Utility asset works on Killinghall Road, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Feb 2025 at 15:20.

Yorkshire Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Killinghall Road

Yorkshire Water are proposing to carry out Utility asset works on Killinghall Road, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 25 Mar 2025 at 13:47.

Yorkshire Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Barkerend Road

Yorkshire Water are proposing to carry out roadworks on Barkerend Road, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 09:12.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
4 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Woodhall Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Woodhall Road, Calverley, Pudsey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Aug 2025 at 08:34.

Northern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Little Horton Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Little Horton Lane, Little Horton, Bradford.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 September 2025 at 13:49 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Sep 2025 at 10:38.

Network Rail logo
LONG TERM
Until
4 Nov 2025
Details
View Map
Share
Follow
George Street

Network Rail are carrying out Works for Rail Purposes on George Street, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 September 2025 at 07:00 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Sep 2025 at 08:58.

Northern Gas Networks logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Claremont

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Claremont, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2025 at 11:17.

Northern Gas Networks logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Goose Hill

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Goose Hill, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2025 at 11:19.

Northern Gas Networks logo
Until
29 Sep 2025
Details
View Map
Share
Follow
Goose Hill

Northern Gas Networks are carrying out Utility repair and maintenance works on Goose Hill, Heckmondwike.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 12:30 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2025 at 13:45.

Northern Gas Networks logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Upper George Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper George Street, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2025 at 11:17.

Northern Gas Networks logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Brighton Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brighton Street, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Jul 2025 at 11:18.

LONG TERM
Between
8 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Hare Park Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Hare Park Lane, Hightown, Liversedge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 3 Sep 2025 at 12:59.

LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Hare Park Lane

Kirklees Council are carrying out Highway repair and maintenance works on Hare Park Lane, Hightown, Liversedge.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 08:00 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 8 Sep 2025 at 08:05.

Northern Gas Networks logo
LONG TERM
Between
8 Sep and 20 Oct 2025
Details
View Map
Share
Moorside

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Moorside, Cleckheaton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Jul 2025 at 14:48.

Northern Gas Networks logo
Until
2 Oct 2025
Details
View Map
Share
Follow
Prospect Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Prospect Road, Cleckheaton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 September 2025 at 08:30 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Sep 2025 at 08:36.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Follow
Lower Green Avenue

Yorkshire Water are proposing to carry out Utility asset works on Lower Green Avenue, Scholes, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 21 Jul 2025 at 11:34.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Follow
Lower Green Avenue

Yorkshire Water are carrying out Utility asset works on Lower Green Avenue, Scholes, Cleckheaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 08:30 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Sep 2025 at 10:00.

LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Shetcliffe Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Shetcliffe Lane, Bierley, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Jun 2025 at 15:49.

LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Shetcliffe Lane

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Shetcliffe Lane, Bierley, Bradford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 09:00 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Sep 2025 at 16:07.

Yorkshire Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Charles Avenue

Yorkshire Water are proposing to carry out Utility asset works on Charles Avenue, Thornbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Feb 2025 at 11:09.

Yorkshire Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Charles Avenue

Yorkshire Water are carrying out Utility asset works on Charles Avenue, Thornbury, Bradford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 09:00 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Sep 2025 at 10:29.

BT logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Bradford Road

BT are proposing to carry out Utility repair and maintenance works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Jun 2025 at 15:38.

BT logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Bradford Road

BT are carrying out Utility repair and maintenance works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 07:30 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Sep 2025 at 07:32.

Between
10 and 26 Sep 2025
Details
View Map
Share
Follow
Staincliffe Road

Kirklees Council are proposing to carry out Remedial works on Staincliffe Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 10 Sep 2025 at 07:56.

Until
26 Sep 2025
Details
View Map
Share
Follow
Staincliffe Road

Kirklees Council are carrying out Remedial works on Staincliffe Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:30 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 15 Sep 2025 at 09:31.

Northern Powergrid (Yorkshire) logo
Until
27 Sep 2025
Details
View Map
Share
Follow
Leeds Road

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Leeds Road, Littletown, Liversedge.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2025 at 08:30 and could run through until 27 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Sep 2025 at 07:08.

Northern Gas Networks logo
LONG TERM
Between
10 Sep and 11 Nov 2025
Details
View Map
Share
Follow
Castle Ings Gardens

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Ings Gardens, New Farnley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Mar 2025 at 08:56.

Yorkshire Water logo
Today
Details
View Map
Share
Roydstone Terrace

Yorkshire Water carried out Utility repair and maintenance works on Roydstone Terrace, Bradford Moor, Bradford.

The road was closed for some or all of the period.

The works were originally planned between 12 Sep 2025 and 19 Sep 2025 and were actually completed between 12 Sep 2025 (11:45) and 18 Sep 2025 (15:01). The works impacted the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Sep 2025 at 15:22.

LONG TERM
Until
16 Oct 2025
Details
View Map
Share
Follow
Killinghall Road

Grain Communications (formerly Solway Communications) are carrying out Utility asset works on Killinghall Road, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 September 2025 at 08:25 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 12 Sep 2025 at 08:55.

Finishing
Today
Details
View Map
Share
Follow
Leeds Road

Kirklees Council are carrying out Highway repair and maintenance works on Leeds Road, Mirfield.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2025 at 12:36 and could run through until 19 September 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Kirklees Council on 16 Sep 2025 at 07:41.

Finishing
Today
Details
View Map
Share
Follow
Leeds Road

Kirklees Council are carrying out Highway repair and maintenance works on Leeds Road, Mirfield.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 07:00 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 16 Sep 2025 at 07:39.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Wormald Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wormald Street, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 31 Jul 2025 at 11:42.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Wormald Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wormald Street, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Aug 2025 at 06:49.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Westgate

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westgate, Heckmondwike.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Aug 2025 at 08:34.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Westgate

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Westgate, Heckmondwike.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Aug 2025 at 08:51.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Westgate

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westgate, Heckmondwike.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Aug 2025 at 08:54.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Westgate

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westgate, Heckmondwike.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2025 at 14:18.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Flush

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Flush, Millbridge, Liversedge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 14 Aug 2025 at 08:34.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Flush

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Flush, Millbridge, Liversedge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2025 at 14:16.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Flush

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Flush, Millbridge, Liversedge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 12 Sep 2025 at 10:46.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Follow
Brighton Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Brighton Street, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Jun 2025 at 14:20.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Brighton Street

Yorkshire Water were proposing to carry out New service connection on Brighton Street, Heckmondwike.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 8 Sep 2025 at 11:13.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Mount Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mount Street, Cleckheaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Sep 2025 at 12:57.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Whitworth Road

Yorkshire Water are carrying out Utility repair and maintenance works on Whitworth Road, Westtown, Dewsbury.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 11:17 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2025 at 11:50.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Victoria Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Victoria Street, Cleckheaton.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 22 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2025 at 11:32.

Northern Gas Networks logo
Until
1 Oct 2025
Details
View Map
Share
Follow
Ripley Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Ripley Street, West Bowling, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 12:00 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Sep 2025 at 12:55.

Northern Gas Networks logo
Until
1 Oct 2025
Details
View Map
Share
Follow
Spring Mill Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Spring Mill Street, West Bowling, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 12:00 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Sep 2025 at 12:56.

Yorkshire Water logo
LONG TERM
Until
19 Oct 2025
Details
View Map
Share
Follow
Warley Drive

Yorkshire Water are carrying out Utility asset works on Warley Drive, Bradford Moor, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 10:30 and could run through until 19 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2025 at 10:58.

Northern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Huddersfield Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Huddersfield Road, Mirfield.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 09:34 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 17 Sep 2025 at 10:54.

Network Rail logo
Between
19 Sep and 12 Oct 2025
Details
View Map
Share
Follow
George Street

Network Rail are proposing to carry out Works for Rail Purposes on George Street, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 9 Apr 2025 at 07:39.

Yorkshire Water logo
Between
22 and 29 Sep 2025
Details
View Map
Share
Follow
Trafalgar Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Trafalgar Street, Healey, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Aug 2025 at 14:15.

Yorkshire Water logo
Between
22 and 29 Sep 2025
Details
View Map
Share
Follow
Trafalgar Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Trafalgar Street, Healey, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 19 Aug 2025 at 10:54.

Yorkshire Water logo
Between
22 and 30 Sep 2025
Details
View Map
Share
Trafalgar Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Trafalgar Street, Healey, Batley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 1 Aug 2025 at 14:37.

Northern Gas Networks logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
New Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Lane, Moorside, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 08:04.

LONG TERM
Between
22 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Abb Scott Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Abb Scott Lane, Buttershaw, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Aug 2025 at 12:28.

Finishing
Thursday
Details
View Map
Share
Follow
Fenby Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Fenby Avenue, Dudley Hill, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 8 Sep 2025 at 15:36.

Yorkshire Water logo
LONG TERM
Between
22 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Warley Drive

Yorkshire Water are proposing to carry out Utility asset works on Warley Drive, Bradford Moor, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 18 Feb 2025 at 08:28.

Between
25 and 29 Sep 2025
Details
View Map
Share
Follow
Prospect Road

Kirklees Council are proposing to carry out Highway improvement works on Prospect Road, Hartshead, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 4 Aug 2025 at 12:45.

Between
25 and 29 Sep 2025
Details
View Map
Share
Follow
Prospect Road

Kirklees Council are proposing to carry out Highway improvement works on Prospect Road, Hartshead, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 28 Jul 2025 at 14:26.

LONG TERM
Between
25 Sep 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Bolton Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bolton Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Jun 2025 at 16:10.

LONG TERM
Between
25 Sep 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Holdsworth Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Holdsworth Street, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Jun 2025 at 17:13.

Between
26 and 30 Sep 2025
Details
View Map
Share
Follow
Willow Walk

Kirklees Council are proposing to carry out Highway improvement works on Willow Walk, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 28 Jul 2025 at 14:27.

Between
26 and 30 Sep 2025
Details
View Map
Share
Follow
Frederick Walker Gardens

Kirklees Council are proposing to carry out Highway improvement works on Frederick Walker Gardens, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 28 Jul 2025 at 14:27.

Between
26 and 30 Sep 2025
Details
View Map
Share
Follow
Fagley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Fagley Road, Fagley, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Sep 2025 at 15:34.

Between
27 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Great Horton Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Great Horton Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Sep 2025 at 15:25.

Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Bennett Lane

Kirklees Council are proposing to carry out Highway improvement works on Bennett Lane, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 28 Jul 2025 at 14:29.

Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Bennett Lane

Kirklees Council are proposing to carry out Highway improvement works on Bennett Lane, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 4 Aug 2025 at 12:45.

Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Knowler Hill

Kirklees Council are proposing to carry out Highway improvement works on Knowler Hill, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 21 Jul 2025 at 10:55.

Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Knowler Hill

Kirklees Council are proposing to carry out Highway improvement works on Knowler Hill, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 21 Jul 2025 at 14:19.

Energy Assets Pipelines logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Norcroft Street

Energy Assets Pipelines were proposing to carry out roadworks on Norcroft Street, Listerhills, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 24 Jun 2025 at 13:30.

Energy Assets Pipelines logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Norcroft Street

Energy Assets Pipelines are proposing to carry out roadworks on Norcroft Street, Listerhills, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 24 Jun 2025 at 14:36.

Between
30 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Croft Street

Kirklees Council are proposing to carry out Highway improvement works on Croft Street, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 28 Jul 2025 at 14:29.

Yorkshire Water logo
Between
1 and 7 Oct 2025
Details
View Map
Share
Burgh Mill Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Burgh Mill Lane, Dewsbury Moor, Dewsbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 7 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Aug 2025 at 14:28.

LONG TERM
Between
1 Oct and 11 Nov 2025
Details
View Map
Share
New Cross Street

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on New Cross Street, West Bowling, Bradford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 11 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 30 May 2025 at 14:37.

LONG TERM
Between
1 Oct and 11 Nov 2025
Details
View Map
Share
Follow
New Cross Street

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on New Cross Street, West Bowling, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 30 May 2025 at 15:21.

LONG TERM
Between
1 Oct and 11 Nov 2025
Details
View Map
Share
New Cross Street

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on New Cross Street, West Bowling, Bradford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 11 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 30 May 2025 at 11:38.

Yorkshire Water logo
Between
1 and 9 Oct 2025
Details
View Map
Share
Swinnow Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Swinnow Lane, Swinnow, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 9 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2025 at 14:37.

Between
3 and 8 Oct 2025
Details
View Map
Share
Follow
New Otley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on New Otley Road, Barkerend, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Sep 2025 at 15:31.

Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Nelson Street

Kirklees Council are proposing to carry out Highway repair and maintenance works on Nelson Street, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 9 Jun 2025 at 10:32.

Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Nelson Street

Kirklees Council are proposing to carry out Highway repair and maintenance works on Nelson Street, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 9 Jun 2025 at 13:51.

Northern Gas Networks logo
LONG TERM
Between
6 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Bridle Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridle Street, Soothill, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Sep 2025 at 14:48.

LONG TERM
Between
6 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Bradford Road

Kirklees Council are proposing to carry out Highway improvement works on Bradford Road, Littletown, Liversedge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 09:28.

LONG TERM
Between
6 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Abb Scott Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Abb Scott Lane, Buttershaw, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Aug 2025 at 14:42.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Bradford Road

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Jun 2025 at 09:44.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Ring Road Farsley

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Ring Road Farsley, Farsley, Pudsey.

These works are categorised as Major.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Jun 2025 at 09:45.

Northern Gas Networks logo
Between
7 and 24 Oct 2025
Details
View Map
Share
Follow
Britannia Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Britannia Road, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Aug 2025 at 13:32.

Northern Gas Networks logo
Between
7 and 24 Oct 2025
Details
View Map
Share
Follow
Fountain Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fountain Street, Morley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Aug 2025 at 11:19.

Between
8 and 11 Oct 2025
Details
View Map
Share
Follow
Prospect Road

Kirklees Council are proposing to carry out Highway improvement works on Prospect Road, Hartshead, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 6 Aug 2025 at 07:52.

Between
8 and 11 Oct 2025
Details
View Map
Share
Follow
Bennett Lane

Kirklees Council are proposing to carry out Highway improvement works on Bennett Lane, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 6 Aug 2025 at 07:51.

Network Rail logo
LONG TERM
Between
13 Oct 2025 and 30 Jun 2026
Details
View Map
Share
Follow
Calder Road

Network Rail are proposing to carry out Works for Rail Purposes on Calder Road, Ravensthorpe, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 30 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 16 Sep 2025 at 12:57.

Northern Gas Networks logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Follow
Glen Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Glen Road, Morley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 Sep 2025 at 10:18.

Northern Gas Networks logo
LONG TERM
Between
13 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Oakway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakway, Birkenshaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Sep 2025 at 13:41.

Yorkshire Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Prospect Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Prospect Street, Farsley, Pudsey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 22 Jul 2025 at 12:37.

Yorkshire Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Prospect Street

Yorkshire Water were proposing to carry out New service connection on Prospect Street, Farsley, Pudsey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Jul 2025 at 11:05.

Northern Gas Networks logo
LONG TERM
Between
15 Oct and 25 Nov 2025
Details
View Map
Share
Follow
Castle Ings Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Ings Drive, New Farnley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 25 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 13:53.

Between
16 Oct and 5 Nov 2025
Details
View Map
Share
Follow
The Greenway

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on The Greenway, Barkerend, Bradford.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 16 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 17 Jul 2025 at 13:23.

Quickline Commucations logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Steanard Lane

Quickline Commucations are proposing to carry out Utility asset works on Steanard Lane, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 18 Aug 2025 at 10:49.

Northern Gas Networks logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Oaks Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oaks Road, Soothill, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 15:14.

Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Valley Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Valley Road, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 3 Sep 2025 at 13:18.

Yorkshire Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Hudson Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hudson Crescent, Great Horton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Jul 2025 at 12:28.

Northern Powergrid (Yorkshire) logo
Between
20 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Church Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Church Lane, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 Aug 2025 at 20:12.

Northern Powergrid (Yorkshire) logo
Between
20 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Church Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Church Lane, Pudsey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2025 at 12:18.

Northern Powergrid (Yorkshire) logo
Between
20 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Church Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Church Lane, Pudsey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Sep 2025 at 12:27.

Yorkshire Water logo
Between
20 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Thornbury Grove

Yorkshire Water are proposing to carry out Utility asset works on Thornbury Grove, Thornbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Feb 2025 at 11:14.

Yorkshire Water logo
Between
20 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Thornbury Grove

Yorkshire Water are proposing to carry out Utility asset works on Thornbury Grove, Thornbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Mar 2025 at 16:51.

Leeds City Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Cote Lane

Leeds City Council are proposing to carry out Highway improvement works on Cote Lane, Farsley, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 15 Sep 2025 at 11:37.

Leeds City Council logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Woodlands Avenue

Leeds City Council are proposing to carry out Highway improvement works on Woodlands Avenue, Stanningley, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 15 Sep 2025 at 11:36.

Northern Gas Networks logo
Between
23 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Spen Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Spen Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2025 at 09:32.

Northern Gas Networks logo
LONG TERM
Between
23 Oct and 24 Dec 2025
Details
View Map
Share
Follow
Ring Road Lower Wortley

Northern Gas Networks are proposing to carry out Utility asset works on Ring Road Lower Wortley, Lower Wortley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 24 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 May 2025 at 12:01.

Leeds City Council logo
Between
23 and 25 Oct 2025
Details
View Map
Share
Follow
Stanningley Bypass

Leeds City Council are proposing to carry out Highway improvement works on Stanningley Bypass, Stanningley, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 16 Sep 2025 at 12:35.

Northern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
City Road

Northern Gas Networks are proposing to carry out New service connection on City Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 09:03.

Northern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
City Road

Northern Gas Networks are proposing to carry out New service connection on City Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Sep 2025 at 16:17.

Leeds City Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Branch Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Branch Road, Farnley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 4 Jul 2025 at 11:23.

Leeds City Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Branch Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Branch Road, Farnley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 12 Sep 2025 at 13:07.

Yorkshire Water logo
Between
29 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Old Lane

Yorkshire Water are proposing to carry out New service connection on Old Lane, Brighouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 08:12.

Between
3 and 16 Nov 2025
Details
View Map
Share
Follow
Fir Walk

Kirklees Council are proposing to carry out Highway repair and maintenance works on Fir Walk, Ravensthorpe, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 3 Sep 2025 at 14:11.

Between
3 and 16 Nov 2025
Details
View Map
Share
Follow
Fir Walk

Kirklees Council are proposing to carry out Highway repair and maintenance works on Fir Walk, Ravensthorpe, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 15 Sep 2025 at 10:24.

Between
3 and 16 Nov 2025
Details
View Map
Share
Follow
Fir Avenue

Kirklees Council are proposing to carry out Highway repair and maintenance works on Fir Avenue, Ravensthorpe, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 3 Sep 2025 at 14:10.

Between
3 and 16 Nov 2025
Details
View Map
Share
Follow
Fir Avenue

Kirklees Council are proposing to carry out Highway repair and maintenance works on Fir Avenue, Ravensthorpe, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 15 Sep 2025 at 10:22.

Between
3 and 16 Nov 2025
Details
View Map
Share
Follow
Fir Parade

Kirklees Council are proposing to carry out Highway repair and maintenance works on Fir Parade, Ravensthorpe, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 3 Sep 2025 at 14:11.

Between
3 and 16 Nov 2025
Details
View Map
Share
Follow
Fir Parade

Kirklees Council are proposing to carry out Highway repair and maintenance works on Fir Parade, Ravensthorpe, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 15 Sep 2025 at 10:23.

Yorkshire Water logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Nelson Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Nelson Street, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 13 Aug 2025 at 11:59.

Northern Gas Networks logo
Between
5 and 21 Nov 2025
Details
View Map
Share
Follow
Oaks Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oaks Road, Soothill, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Sep 2025 at 12:41.

Northern Gas Networks logo
Between
6 and 28 Nov 2025
Details
View Map
Share
Follow
Footpath Fronting 21-33 Beech Walk

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath Fronting 21-33 Beech Walk, Birkenshaw, Bradford.

These works are categorised as Major.

The works will start on or after 6 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Aug 2025 at 09:26.

Between
6 and 23 Nov 2025
Details
View Map
Share
Follow
Whitehall Road East

Kirklees Council are proposing to carry out Highway repair and maintenance works on Whitehall Road East, Birkenshaw, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 21 Aug 2025 at 14:51.

Northern Gas Networks logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Dale Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dale Lane, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Jun 2025 at 15:21.

Northern Gas Networks logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Dale Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dale Lane, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Jun 2025 at 11:11.

Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Valley Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Valley Road, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 16 Sep 2025 at 11:48.

Northern Gas Networks logo
LONG TERM
Between
10 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Nunroyd

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Nunroyd, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 07:18.

Cityfibre Metro Networks logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Miles Hill Crescent

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Miles Hill Crescent, Bierley, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Aug 2025 at 09:00.

Cityfibre Metro Networks logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Miles Hill Crescent

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Miles Hill Crescent, Bierley, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 29 Aug 2025 at 14:41.

Northern Powergrid (Yorkshire) logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Back Dirkhill Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Back Dirkhill Road, Great Horton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Sep 2025 at 16:05.

Yorkshire Water logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Nelson Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Nelson Street, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 21 Aug 2025 at 12:04.

Yorkshire Water logo
Between
10 and 23 Nov 2025
Details
View Map
Share
Follow
Thornbury Crescent

Yorkshire Water are proposing to carry out Utility asset works on Thornbury Crescent, Thornbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Feb 2025 at 11:13.

Yorkshire Water logo
Between
10 and 23 Nov 2025
Details
View Map
Share
Follow
Thornbury Crescent

Yorkshire Water are proposing to carry out Utility asset works on Thornbury Crescent, Thornbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 11:39.

Telefonica UK logo
Between
11 and 13 Nov 2025
Details
View Map
Share
Follow
Listing Lane

Telefonica UK are proposing to carry out Utility asset works on Listing Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 22 Aug 2025 at 14:54.

Telefonica UK logo
Between
11 and 14 Nov 2025
Details
View Map
Share
Listing Lane

Telefonica UK were proposing to carry out Utility asset works on Listing Lane, Gomersal, Cleckheaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 26 Aug 2025 at 14:54.

Telefonica UK logo
Between
11 and 13 Nov 2025
Details
View Map
Share
Follow
Listing Lane

Telefonica UK are proposing to carry out Utility asset works on Listing Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 26 Aug 2025 at 15:26.

Telefonica UK logo
Between
11 and 13 Nov 2025
Details
View Map
Share
Follow
Listing Lane

Telefonica UK are proposing to carry out Utility asset works on Listing Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 4 Sep 2025 at 13:47.

Northern Gas Networks logo
LONG TERM
Between
11 Nov 2025 and 8 Jan 2026
Details
View Map
Share
Follow
Low Moor Side Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moor Side Lane, New Farnley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 8 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Aug 2025 at 14:51.

Network Rail logo
Between
17 and 24 Nov 2025
Details
View Map
Share
Follow
Bradford Road

Network Rail are proposing to carry out Works for Rail Purposes on Bradford Road, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 Jul 2025 at 14:04.

Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Valley Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Valley Road, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 16 Sep 2025 at 12:48.

Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Valley Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Valley Road, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 10:34.

Yorkshire Water logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Farringdon Grove

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Farringdon Grove, Buttershaw, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 26 Aug 2025 at 19:33.

Yorkshire Water logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Farringdon Grove

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Farringdon Grove, Buttershaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Sep 2025 at 16:20.

Yorkshire Water logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Farringdon Grove

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Farringdon Grove, Buttershaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2025 at 12:01.

Northern Gas Networks logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Wapping Road

Northern Gas Networks are proposing to carry out Utility asset works on Wapping Road, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Aug 2025 at 13:39.

Northern Gas Networks logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Wapping Road

Northern Gas Networks are proposing to carry out Utility asset works on Wapping Road, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Aug 2025 at 14:51.

Northern Gas Networks logo
LONG TERM
Between
19 Nov 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Low Moor Side

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moor Side, New Farnley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Mar 2025 at 12:07.

Northern Gas Networks logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Redfearn Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Redfearn Avenue, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Jun 2025 at 15:21.

Northern Gas Networks logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Redfearn Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Redfearn Avenue, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Jun 2025 at 11:12.

Northern Gas Networks logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Kingsley Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsley Drive, Birkenshaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Sep 2025 at 13:43.

Network Rail logo
Between
28 Nov and 6 Dec 2025
Details
View Map
Share
Follow
Colne Bridge Road

Network Rail are proposing to carry out Works for Rail Purposes on Colne Bridge Road, Colne Bridge, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2025 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 25 Jun 2024 at 08:55.

Network Rail logo
Between
28 Nov and 13 Dec 2025
Details
View Map
Share
Follow
Colne Bridge Road

Network Rail are proposing to carry out Works for Rail Purposes on Colne Bridge Road, Colne Bridge, Huddersfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2025 and could run through until 13 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 9 Sep 2024 at 11:54.

Network Rail logo
Between
1 and 8 Dec 2025
Details
View Map
Share
Follow
Bradford Road

Network Rail are proposing to carry out Works for Rail Purposes on Bradford Road, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 8 Jul 2025 at 10:20.

Northern Gas Networks logo
LONG TERM
Between
3 Dec 2025 and 23 Feb 2026
Details
View Map
Share
Follow
Pudsey Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pudsey Road, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2025 and could run through until 23 February 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 9 Sep 2025 at 15:06.

Between
3 and 17 Dec 2025
Details
View Map
Share
Follow
Leeds Road

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Leeds Road, Eccleshill, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 4 Sep 2025 at 08:32.

Between
5 and 19 Dec 2025
Details
View Map
Share
Leeds Road

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Leeds Road, Eccleshill, Bradford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2025 and run through until 19 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 3 Sep 2025 at 12:14.

Telefonica UK logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Listing Lane

Telefonica UK are proposing to carry out Utility asset works on Listing Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 22 Aug 2025 at 14:54.

Yorkshire Water logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Briarwood Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Briarwood Drive, Wibsey, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Sep 2025 at 16:40.

Yorkshire Water logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Dawson Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Dawson Lane, Bierley, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Sep 2025 at 16:57.

Telefonica UK logo
Between
9 and 13 Dec 2025
Details
View Map
Share
Follow
Listing Lane

Telefonica UK are proposing to carry out Utility asset works on Listing Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 13 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 26 Aug 2025 at 15:25.

Telefonica UK logo
Between
9 and 13 Dec 2025
Details
View Map
Share
Follow
Listing Lane

Telefonica UK are proposing to carry out Utility asset works on Listing Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 13 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 4 Sep 2025 at 13:50.

Yorkshire Water logo
LONG TERM
Between
15 Dec 2025 and 8 Feb 2026
Details
View Map
Share
Thornbury Avenue

Yorkshire Water were proposing to carry out Utility asset works on Thornbury Avenue, Thornbury, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 December 2025 and run through until 8 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Feb 2025 at 15:31.


Roadworks Map near to Navigation Way, BRADFORD, BD11 2PP (9 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Marker
Last Updated: 18 Sep 2025 23:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Navigation Way, BRADFORD, BD11 2PP (9 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Metro West Yorkshire Combined Authority logo
BRADFORD ROAD, BIRKENSHAW 
(0.3 miles)
Metro West Yorkshire Combined Authority
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 17 Sep 2025 - 19 Sep 2025
0.3
Details
Share
Follow
2
Northern Powergrid (Yorkshire) logo
MOOR LANE, GOMERSAL 
(0.6 miles)
Northern Powergrid (Yorkshire)
New service connection - Footway, Carriageway - Two-way signals
Planned
Scheduled: 16 Sep 2025 - 24 Sep 2025
0.6
Details
Share
Follow
3
Northern Powergrid (Yorkshire) logo
MOOR LANE, GOMERSAL 
(0.6 miles)
Northern Powergrid (Yorkshire)
New service connection - Footway, Carriageway - Two-way signals
Planned
Scheduled: 16 Sep 2025 - 22 Sep 2025
0.6
Details
Share
Follow
4
Cityfibre Metro Networks logo
LATHAM LANE, GOMERSAL 
(0.6 miles)
Cityfibre Metro Networks
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 19 Sep 2025
0.6
Details
Share
Follow
5
Northern Powergrid (Yorkshire) logo
URGENT
  
TOWN STREET, BIRKENSHAW 
(0.7 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
15 Sep 2025 11:00 - 13:00
0.7
Details
Share
6
Northern Powergrid (Yorkshire) logo
URGENT
  
TOWN STREET, BIRKENSHAW 
(0.7 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 15 Sep 2025 13:51
(Scheduled: 15 Sep 2025 - 19 Sep 2025)
0.7
Details
Share
Follow
7
MAJOR
  
STATION LANE, BIRKENSHAW 
(0.7 miles)
Kirklees Council
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 12 May 2025 - 30 Sep 2025
0.7
Details
Share
Follow
8
MAJOR
  
STATION LANE, BIRKENSHAW 
(0.7 miles)
Kirklees Council
Highway improvement works - Carriageway - Road closure
Complete
12 May 2025 08:00 - 8 Aug 2025 09:50
0.7
Details
Share
9
Northern Gas Networks logo
MAJOR
  
SHIRLEY ROAD, GOMERSAL 
(1.0 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 30 Jun 2025 - 19 Sep 2025
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.