ROADWORKS SUMMARY
Warley Wise Lane, COLNE, BB8 7ES
Introduction
View current and future planned roadworks and road closures for Warley Wise Lane, BB8 7ES and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Warley Wise Lane, COLNE, BB8 7ES
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Warley Wise Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
7 Feb 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Keighley Road, Cross Hills.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 07:52 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 29 Oct 2024 at 08:41.
9 Dec 2024 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Aire Street, Cross Hills.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 23 May 2024 at 11:32.
9 Dec 2024 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Aire Street, Cross Hills.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 30 May 2024 at 08:00.
Monday
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Merclesden Avenue, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 23 Sep 2024 at 14:18.
Thursday
Electricity North West (NorWeb) are proposing to carry out New service connection on Reedymoor Lane, Foulridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 14 Oct 2024 at 10:55.
26 Dec 2024 and 7 Jan 2025
Electricity North West (NorWeb) were proposing to carry out New service connection on Cross Street West, Colne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 December 2024 and run through until 7 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Oct 2024 at 10:19.
6 and 17 Jan 2025
Lancashire County Council are proposing to carry out Highway improvement works on Victoria Road, Earby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 10 Dec 2024 at 15:47.
6 and 17 Jan 2025
Lancashire County Council were proposing to carry out Highway improvement works on Victoria Road, Earby.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 27 Nov 2024 at 09:07.
6 and 17 Jan 2025
Lancashire County Council were proposing to carry out Highway improvement works on Victoria Road, Earby.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 26 Nov 2024 at 16:16.
6 and 8 Jan 2025
Cadent Gas are proposing to carry out New service connection on Back Rainhall Road, Barnoldswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:47.
6 Jan and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Keighley Road, Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 12:58.
6 Jan and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Carry Lane, Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 09:02.
13 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Keighley Road, Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Sep 2024 at 14:18.
13 Jan and 14 Feb 2025
Lancashire County Council are proposing to carry out Section 50 on Coates Lane, Barnoldswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 18 Nov 2024 at 09:29.
13 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Ayrton Street, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 14:03.
14 and 22 Jan 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Cross Street West, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 14 Dec 2024 at 09:12.
14 and 22 Jan 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Cross Street West, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Oct 2024 at 16:16.
15 Jan and 7 Mar 2025
Lancashire County Council were proposing to carry out Highway improvement works on Newtown, Barnoldswick.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 January 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 15 Nov 2024 at 16:53.
15 Jan and 7 Mar 2025
Lancashire County Council are proposing to carry out Highway improvement works on Newtown, Barnoldswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 10 Dec 2024 at 14:27.
17 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Ayrton Street, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 13:56.
17 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Keighley Road, Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 13:00.
20 Jan and 28 Feb 2025
National Highways are proposing to carry out Works for Rail Purposes on Red Lane, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 11 Nov 2024 at 15:26.
20 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Portland Street, Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 09:59.
27 Jan and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Carry Lane, Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 11:30.
27 Jan and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Carry Lane, Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 7 Dec 2024 at 09:26.
28 and 30 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Earby Road, Salterforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 6 Nov 2024 at 14:54.
28 Jan and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Keighley Road, Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 09:51.
3 Feb and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Cotton Tree Lane, Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 15:11.
3 Feb and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Cotton Tree Lane, Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Sep 2024 at 14:20.
3 and 7 Feb 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Reedymoor Lane, Foulridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Dec 2024 at 14:54.
3 and 17 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Hill Lane, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 17:59.
3 and 14 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Hill Lane, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 10:39.
5 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Colne Road, Earby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:52.
5 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on George Street, Earby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:54.
10 and 17 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Skipton Old Road, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Dec 2024 at 12:29.
10 and 17 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Skipton Old Road, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 18:04.
10 and 14 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Skipton Old Road, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 10:41.
12 and 18 Feb 2025
Lancashire County Council are proposing to carry out Highway improvement works on Garden Street, Barnoldswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 10 Dec 2024 at 14:22.
12 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Applegarth Street, Earby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:55.
17 and 24 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Castle Road, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 17:50.
17 and 21 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Castle Road, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 10:43.
18 Feb and 14 Mar 2025
Lancashire County Council were proposing to carry out Highway improvement works on Rainhall Road, Barnoldswick.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 27 Nov 2024 at 09:44.
18 and 20 Feb 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Earby Road, Salterforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 28 Nov 2024 at 10:31.
18 Feb and 14 Mar 2025
Lancashire County Council are proposing to carry out Highway improvement works on Rainhall Road, Barnoldswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 16 Dec 2024 at 10:08.
18 Feb and 14 Mar 2025
Lancashire County Council were proposing to carry out Highway improvement works on Rainhall Road, Barnoldswick.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 27 Nov 2024 at 09:35.
19 and 25 Feb 2025
Lancashire County Council are proposing to carry out Highway improvement works on Market Street, Barnoldswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 10 Dec 2024 at 14:29.
24 Feb and 21 Mar 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Castle Road, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 17:34.
24 Feb and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Hollington Street, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 09:05.
24 Feb and 21 Mar 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Castle Road, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 10:42.
3 and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Gable End 187 Cotton Tree Lane, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 14:08.
3 and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Gable End 187 Cotton Tree Lane, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 13:38.
3 and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Hollington Street, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 14:06.
3 and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Hollington Street, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 13:28.
3 and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Winewall Road, Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 09:58.
10 and 14 Mar 2025
Lancashire County Council are proposing to carry out Highway improvement works on York Street, Barnoldswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 16 Dec 2024 at 10:09.
10 Mar and 2 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Trawden Road, Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 10:00.
10 and 21 Mar 2025
Lancashire County Council are proposing to carry out Highway improvement works on Edward Street, Earby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 10 Dec 2024 at 15:43.
10 and 12 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Newtown, Barnoldswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 12:26.
17 Mar and 1 Apr 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Oxford Road, Nelson.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 1 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 20 Dec 2024 at 13:17.
Roadworks Map near to Warley Wise Lane, COLNE, BB8 7ES
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Warley Wise Lane, COLNE, BB8 7ES (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.