ROADWORKS SUMMARY
River Lea Gardens, CLITHEROE, BB7 1QQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for River Lea Gardens, BB7 1QQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to River Lea Gardens, CLITHEROE, BB7 1QQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for River Lea Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Between
7 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Chatburn Road

Cadent Gas are proposing to carry out Utility asset works on Chatburn Road, Clitheroe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 15 Jul 2024 at 14:58.

Cadent Gas logo
LONG TERM
Between
7 Oct and 9 Dec 2024
Details
View Map
Share
Waterloo Road

Cadent Gas were proposing to carry out Utility asset works on Waterloo Road, Clitheroe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 10:48.

Cadent Gas logo
LONG TERM
Today
Details
View Map
Share
Henthorn Road

Cadent Gas carried out Utility asset works on Henthorn Road, Clitheroe.

These works were categorised as Major.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 18 Oct 2024 and 21 Nov 2024 and were actually completed between 18 Oct 2024 (10:30) and 21 Nov 2024 (15:30). The works impacted the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 15:30.

Cadent Gas logo
LONG TERM
Between
21 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Chatburn Road

Cadent Gas are proposing to carry out Utility asset works on Chatburn Road, Clitheroe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 12:27.

Cadent Gas logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Castle View

Cadent Gas are carrying out Utility asset works on Castle View, Clitheroe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:20.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
West Bradford Road

Cadent Gas are proposing to carry out Utility asset works on West Bradford Road, Clitheroe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 12:15.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Kirkmoor Road

Cadent Gas are carrying out Utility asset works on Kirkmoor Road, Clitheroe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 12:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:18.

Cadent Gas logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Ennerdale Road

Cadent Gas are carrying out Utility asset works on Ennerdale Road, Clitheroe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 07:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 08:04.

Cadent Gas logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Whalley Road

Cadent Gas were proposing to carry out Utility asset works on Whalley Road, Billington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:24.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Claremont Avenue

Cadent Gas are proposing to carry out Utility asset works on Claremont Avenue, Clitheroe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2024 at 11:15.

Cadent Gas logo
Between
15 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Pendle Road

Cadent Gas are proposing to carry out Utility asset works on Pendle Road, Clitheroe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2024 at 11:18.

Cadent Gas logo
Between
15 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Highmoor Park

Cadent Gas are proposing to carry out Utility asset works on Highmoor Park, Clitheroe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2024 at 11:21.

Cadent Gas logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Well Terrace

Cadent Gas were proposing to carry out Utility asset works on Well Terrace, Clitheroe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 10:53.

Cadent Gas logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Pendle Road

Cadent Gas are proposing to carry out Utility asset works on Pendle Road, Clitheroe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2024 at 11:12.

Cadent Gas logo
Between
26 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Whalley Road

Cadent Gas are proposing to carry out Utility asset works on Whalley Road, Billington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 13:35.

Cadent Gas logo
Between
26 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Castle View

Cadent Gas are proposing to carry out Utility asset works on Castle View, Clitheroe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 11:38.

Cadent Gas logo
Between
26 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Queens Road

Cadent Gas are proposing to carry out Utility asset works on Queens Road, Clitheroe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:49.

Network Rail logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Whalley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 26 Sep 2024 at 12:30.

Network Rail logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Whalley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Sep 2024 at 13:46.

Electricity North West (NorWeb) logo
Between
9 and 16 Dec 2024
Details
View Map
Share
Follow
Cross Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Cross Lane, Barley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Nov 2024 at 10:53.

Electricity North West (NorWeb) logo
Between
9 and 16 Dec 2024
Details
View Map
Share
Follow
Cross Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Cross Lane, Barley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 30 Sep 2024 at 13:47.

United Utilities Water (formerly North West Water) logo
Between
11 and 18 Dec 2024
Details
View Map
Share
Follow
Pendle Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Pendle Road, Downham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Nov 2024 at 15:17.

United Utilities Water (formerly North West Water) logo
Between
11 and 18 Dec 2024
Details
View Map
Share
Follow
Pendle Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Pendle Road, Downham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 14 Oct 2024 at 10:30.

United Utilities Water (formerly North West Water) logo
Between
11 and 18 Dec 2024
Details
View Map
Share
Follow
Pendle Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Pendle Road, Downham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 1 Oct 2024 at 08:29.

Cadent Gas logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Whalley Road

Cadent Gas are proposing to carry out Utility asset works on Whalley Road, Billington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 10:36.

Cadent Gas logo
Between
2 and 29 Jan 2025
Details
View Map
Share
Follow
Moor Lane

Cadent Gas are proposing to carry out Utility asset works on Moor Lane, Whalley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Sep 2024 at 13:57.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Queens Road

Cadent Gas are proposing to carry out Utility asset works on Queens Road, Clitheroe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 09:10.

Lancashire County Council logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Mitton Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Mitton Road, Whalley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 7 Nov 2024 at 11:15.

Lancashire County Council logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Mitton Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Mitton Road, Great Mitton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 12 Nov 2024 at 09:57.

Cadent Gas logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Littlemoor Road

Cadent Gas are proposing to carry out Utility asset works on Littlemoor Road, Clitheroe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 16:04.

Lancashire County Council logo
Between
4 and 10 Feb 2025
Details
View Map
Share
Follow
Mitton Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Mitton Road, Great Mitton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 8 Nov 2024 at 11:44.

Lancashire County Council logo
Between
4 and 10 Feb 2025
Details
View Map
Share
Follow
Mitton Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Mitton Road, Whalley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 6 Nov 2024 at 14:39.

Lancashire County Council logo
Between
6 and 17 Feb 2025
Details
View Map
Share
Follow
Wellgate

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Wellgate, Clitheroe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 14 Nov 2024 at 08:38.

Lancashire County Council logo
Between
18 and 25 Feb 2025
Details
View Map
Share
Follow
York Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on York Street, Clitheroe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 14 Nov 2024 at 08:57.


Roadworks Map near to River Lea Gardens, CLITHEROE, BB7 1QQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 22:24
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to River Lea Gardens, CLITHEROE, BB7 1QQ (16 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
MAJOR
  
WATERLOO ROAD 
(0.1 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Cancelled
(Scheduled: 7 Oct 2024 - 9 Dec 2024)
0.1
Details
Share
2
Cadent Gas logo
MAJOR
  
WELL TERRACE 
(0.1 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 18 Nov 2024 - 6 Dec 2024)
0.1
Details
Share
3
Cadent Gas logo
MAJOR
  
PENDLE ROAD 
(0.3 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 15 Nov 2024 - 12 Dec 2024
0.3
Details
Share
Follow
4
Cadent Gas logo
BOLLAND PROSPECT 
(0.3 miles)
Cadent Gas
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 20 Nov 2024 08:00
(Scheduled: 19 Nov 2024 - 22 Nov 2024)
0.3
Details
Share
Follow
5
Cadent Gas logo
MAJOR
  
HIGHMOOR PARK 
(0.3 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 15 Nov 2024 - 12 Dec 2024
0.3
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
KIRKMOOR ROAD 
(0.4 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 5 Nov 2024 12:00
(Scheduled: 4 Nov 2024 - 25 Nov 2024)
0.4
Details
Share
Follow
7
Cadent Gas logo
MAJOR
  
CASTLE VIEW 
(0.4 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 21 Oct 2024 08:30
(Scheduled: 21 Oct 2024 - 29 Nov 2024)
0.4
Details
Share
Follow
8
Cadent Gas logo
MAJOR
  
CHATBURN ROAD 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 21 Oct 2024 - 13 Dec 2024
0.5
Details
Share
Follow
9
Cadent Gas logo
MAJOR
  
CHATBURN ROAD 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 7 Oct 2024 - 29 Nov 2024
0.5
Details
Share
Follow
10
BT logo
CHATBURN ROAD 
(0.5 miles)
BT
New service connection - Footway - Some carriageway incursion
Cancelled
(Scheduled: 20 Nov 2024 - 22 Nov 2024)
0.5
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.