ROADWORKS SUMMARY
Oakenhead, ROSSENDALE, BB4 8RT
Introduction

View current and future planned roadworks and road closures for Oakenhead, BB4 8RT and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Oakenhead, ROSSENDALE, BB4 8RT
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Oakenhead are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
5 Jul 2023 and 18 Jul 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on York Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 July 2023 and could run through until 18 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Lancashire County Council on 27 Apr 2023 at 08:10.
1 Jan 2026
are carrying out Utility repair and maintenance works on Footpath From Nuttall Lane East To Manchester Road Gollinroad, Ramsbottom.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 January 2024 at 17:00 and could run through until 1 January 2026. The works will impact the footpath only.
This roadwork event was last updated by on 2 Jan 2024 at 17:06.
1 Jan 2026
Lancashire County Council are carrying out Highway repair and maintenance works on Haslingden Old Road, Oswaldtwistle.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 January 2025 at 10:00 and could run through until 1 January 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Lancashire County Council on 7 Jan 2025 at 08:42.
14 Jun 2025
Cadent Gas are carrying out Utility asset works on Burnley Road, Rawtenstall, Rossendale.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 February 2025 at 10:28 and could run through until 14 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 May 2025 at 10:39.
Friday
Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 20 Oct 2024 at 15:01.
Friday
Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:50.
Friday
Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:21.
Today
Cadent Gas are carrying out Utility repair and maintenance works on Grane Road, Haslingden.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 March 2025 at 09:09 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 27 May 2025 at 15:33.
Monday
Lancashire County Council are carrying out Highway repair and maintenance works on Fairfield Street, Accrington.
These works are categorised as Major.
The works started on 16 May 2025 at 06:00 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 27 May 2025 at 15:15.
13 Jun 2025
Cadent Gas are carrying out Utility asset works on Harvey Street, Oswaldtwistle.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 09:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 14:48.
Thursday
Cadent Gas are proposing to carry out Utility asset works on Harvey Street, Oswaldtwistle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 13:49.
19 May and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Union Road, Oswaldtwistle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Feb 2025 at 15:02.
Thursday
Cadent Gas are proposing to carry out Utility asset works on Harvey Street, Oswaldtwistle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Feb 2025 at 15:05.
23 May and 13 Jun 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility asset works on Burnley Road, Accrington.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 May 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 4 Mar 2025 at 14:48.
26 May and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Lord Street, Oswaldtwistle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 12:03.
26 May and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Rhyddings Street, Oswaldtwistle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Feb 2025 at 15:04.
26 May and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Rhyddings Street, Oswaldtwistle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 14:21.
12 Jun 2025
Lancashire County Council are carrying out Highway repair and maintenance works on Rockliffe Road, Bacup.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:00 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 28 May 2025 at 07:12.
11 Jun 2025
Lancashire County Council are carrying out Highway repair and maintenance works on Lancaster Avenue, Haslingden.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:00 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 28 May 2025 at 07:11.
Friday
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Church Street, Haslingden.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 June 2025 at 12:40 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Jun 2025 at 09:50.
10 Jun 2025
Cadent Gas are carrying out Utility repair and maintenance works on Burnley Road East, Rawtenstall.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 10:40 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 12:48.
Monday
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Back York Street, Rawtenstall.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2025 at 08:55 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Jun 2025 at 15:10.
9 and 16 Jun 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Ascot Way, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 21 Mar 2025 at 14:12.
9 and 16 Jun 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Ascot Way, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 14 Apr 2025 at 08:53.
16 Jun and 8 Aug 2025
Murphy Power Distribution are proposing to carry out New service connection on Blackburn Road, Rising Bridge, Accrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 3 Jun 2025 at 13:08.
16 Jun and 8 Aug 2025
Murphy Power Distribution are proposing to carry out New service connection on Blackburn Road, Rising Bridge, Accrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 3 Jun 2025 at 16:42.
17 Jun and 1 Jul 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Fairfield Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 17 Mar 2025 at 12:37.
20 Jun and 11 Jul 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Tong Lane, Bacup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 8 Apr 2025 at 15:23.
23 and 27 Jun 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Leaches Road, Ramsbottom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Apr 2025 at 10:59.
23 and 27 Jun 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Leaches Road, Ramsbottom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 22 May 2025 at 09:17.
23 and 27 Jun 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Leaches Road, Ramsbottom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 22 May 2025 at 11:42.
25 Jun and 10 Jul 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Lancaster Avenue, Haslingden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 8 Apr 2025 at 15:30.
26 Jun and 11 Jul 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Abbey Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 10 Apr 2025 at 12:20.
27 Jun and 9 Jul 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Hazel Grove, Bacup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 June 2025 and could run through until 9 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 7 Apr 2025 at 09:43.
7 and 30 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Marlborough Road, Accrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Apr 2025 at 15:49.
7 Jul and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Union Road, Oswaldtwistle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 May 2025 at 15:01.
10 and 28 Jul 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Rockliffe Road, Bacup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 11 Apr 2025 at 15:47.
21 Jul and 7 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Rhyddings Street, Oswaldtwistle.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 May 2025 at 09:10.
23 Jul and 8 Aug 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Royds Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 10 Apr 2025 at 12:37.
28 Jul and 11 Aug 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Hollins Lane, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 11 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 10 Apr 2025 at 12:55.
4 and 18 Aug 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Haslingden Road, Rawtenstall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 20 May 2025 at 16:02.
4 and 8 Aug 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Exchange Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 13 May 2025 at 09:17.
8 and 18 Aug 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Top Barn Lane, Rawtenstall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 25 Apr 2025 at 13:27.
11 and 29 Aug 2025
Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Holcombe Lee, Ramsbottom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bury Metropolitan Borough Council on 13 May 2025 at 11:34.
12 and 15 Aug 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Commerce Street, Haslingden, Rossendale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 15 August 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 3 Jun 2025 at 15:35.
12 and 15 Aug 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Commerce Street, Haslingden, Rossendale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 15 August 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 20 May 2025 at 15:53.
12 and 15 Aug 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Commerce Street, Haslingden, Rossendale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 15 August 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 29 May 2025 at 11:16.
12 and 15 Aug 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Commerce Street, Haslingden, Rossendale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 15 August 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 2 Jun 2025 at 13:12.
20 and 28 Aug 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Chestnut Drive, Rawtenstall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 28 May 2025 at 14:46.
21 Aug and 12 Sep 2025
Transport For Greater Manchester are proposing to carry out Highway improvement works on Manchester Road, Ramsbottom.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport For Greater Manchester on 20 May 2025 at 16:16.
22 Aug and 1 Sep 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Haslingden Road, Rawtenstall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Jun 2025 at 13:33.
28 Aug and 4 Sep 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Conway Close, Ramsbottom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 2 Jun 2025 at 10:03.
Roadworks Map near to Oakenhead, ROSSENDALE, BB4 8RT (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Oakenhead, ROSSENDALE, BB4 8RT (19 Events)
(Scheduled Dates)
(miles)
(Scheduled: 20 May 2025 - 13 Jun 2025)