View current and future planned roadworks and road closures for Penny Lodge Lane, BB4 8PD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Penny Lodge Lane, ROSSENDALE, BB4 8PD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Penny Lodge Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Lancashire County Council logo
LONG TERM
Until
1 Jan 2026
Details
View Map
Share
Follow
Haslingden Old Road

Lancashire County Council are carrying out Highway repair and maintenance works on Haslingden Old Road, Oswaldtwistle.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 January 2025 at 10:00 and could run through until 1 January 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Lancashire County Council on 7 Jan 2025 at 08:42.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Whalley Road

Cadent Gas were proposing to carry out Utility asset works on Whalley Road, Clayton-le-moors.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jun 2025 at 14:18.

Lancashire County Council logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Newchurch Road

Lancashire County Council are carrying out Highway improvement works on Newchurch Road, Stacksteads.

These works are categorised as Major.

The works started on 3 September 2025 at 08:00 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 19 Sep 2025 at 13:38.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
George Street

Cadent Gas are proposing to carry out Utility asset works on George Street, Clayton-le-moors.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Jul 2025 at 09:31.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Schofield Road

Cadent Gas are proposing to carry out Utility asset works on Schofield Road, Rawtenstall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2025 at 10:30.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Schofield Road

Cadent Gas are carrying out Utility asset works on Schofield Road, Rawtenstall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 September 2025 at 15:49 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 15:49.

Lancashire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Burnley Road

Lancashire County Council are proposing to carry out Highway improvement works on Burnley Road, Holme Chapel, Cliviger.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 23 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Lancashire County Council on 9 Sep 2025 at 10:00.

United Utilities Water (formerly North West Water) logo
Until
1 Oct 2025
Details
View Map
Share
Follow
Union Street

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Union Street, Rawtenstall.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2025 at 10:23 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Sep 2025 at 08:45.

Cadent Gas logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Rhyddings Street

Cadent Gas were proposing to carry out Utility asset works on Rhyddings Street, Oswaldtwistle.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2025 at 07:25.

Lancashire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Rimington Avenue

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Rimington Avenue, Burnley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 1 Jul 2025 at 16:12.

Lancashire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Brunshaw Avenue

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Brunshaw Avenue, Burnley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 1 Jul 2025 at 16:11.

Lancashire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Ladbrooke Grove

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Ladbrooke Grove, Burnley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 1 Jul 2025 at 16:13.

Cadent Gas logo
Until
2 Oct 2025
Details
View Map
Share
Follow
Accrington Road

Cadent Gas are carrying out Utility asset works on Accrington Road, Burnley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 09:00 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 09:15.

United Utilities Water (formerly North West Water) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
St Marys Terrace

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on St Marys Terrace, Rawtenstall.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2025 at 10:23 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Sep 2025 at 10:49.

Electricity North West (NorWeb) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Altham Lane

Electricity North West (NorWeb) are carrying out Highway repair and maintenance works on Altham Lane, Altham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 11:00 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 22 Sep 2025 at 12:50.

Lancashire County Council logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
South Drive

Lancashire County Council are proposing to carry out Section 50 on South Drive, Padiham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lancashire County Council on 16 Sep 2025 at 11:34.

Lancashire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Northfield Road

Lancashire County Council are carrying out Highway repair and maintenance works on Northfield Road, Haslingden.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 15:00 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 22 Sep 2025 at 14:57.

Lancashire County Council logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
South Drive

Lancashire County Council are proposing to carry out Section 50 on South Drive, Padiham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lancashire County Council on 16 Sep 2025 at 11:08.

Lancashire County Council logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
South Drive

Lancashire County Council are proposing to carry out Section 50 on South Drive, Padiham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lancashire County Council on 16 Sep 2025 at 11:10.

Lancashire County Council logo
Between
23 Sep and 2 Oct 2025
Details
View Map
Share
Follow
St Marys Way

Lancashire County Council are proposing to carry out Highway repair and maintenance works on St Marys Way, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 1 Jul 2025 at 14:08.

Lancashire County Council logo
Between
23 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Haslingden Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Haslingden Road, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 4 Jun 2025 at 09:46.

Lancashire County Council logo
Between
23 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Haslingden Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Haslingden Road, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 1 Jul 2025 at 14:09.

Lancashire County Council logo
Between
23 Sep and 2 Oct 2025
Details
View Map
Share
Follow
St Marys Way

Lancashire County Council are proposing to carry out Highway repair and maintenance works on St Marys Way, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 4 Jun 2025 at 09:39.

BT logo
Finishing
Friday
Details
View Map
Share
Ightenhill Park Lane

BT were proposing to carry out Utility repair and maintenance works on Ightenhill Park Lane, Burnley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 3 Jul 2025 at 13:13.

Lancashire County Council logo
Between
2 and 21 Oct 2025
Details
View Map
Share
Follow
Market Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Market Street, Bacup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 9 Jun 2025 at 13:56.

Lancashire County Council logo
Between
2 and 21 Oct 2025
Details
View Map
Share
Follow
Market Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Market Street, Bacup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 21 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 1 Jul 2025 at 14:16.

Cadent Gas logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Schofield Road

Cadent Gas are proposing to carry out Utility asset works on Schofield Road, Rawtenstall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jun 2025 at 14:13.

Cadent Gas logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Schofield Road

Cadent Gas are proposing to carry out Utility asset works on Schofield Road, Rawtenstall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 14:01.

Cadent Gas logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Mill Street

Cadent Gas are proposing to carry out New service connection on Mill Street, Padiham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 14:29.

Cadent Gas logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Lawrence Street

Cadent Gas are proposing to carry out Utility asset works on Lawrence Street, Padiham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 09:16.

Cadent Gas logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Grove Lane

Cadent Gas are proposing to carry out Utility asset works on Grove Lane, Padiham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 09:12.

Cadent Gas logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
George Street

Cadent Gas are proposing to carry out Utility asset works on George Street, Clayton-le-moors.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2025 at 09:02.

United Utilities Water (formerly North West Water) logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Altham Lane

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Altham Lane, Altham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Jul 2025 at 11:12.

Cadent Gas logo
Between
13 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Rossendale Road

Cadent Gas are proposing to carry out Utility asset works on Rossendale Road, Burnley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 13:04.

Cadent Gas logo
Between
13 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Rossendale Road

Cadent Gas are proposing to carry out Utility asset works on Rossendale Road, Burnley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:24.

United Utilities Water (formerly North West Water) logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
Rear 2 To 24 Cotton Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Rear 2 To 24 Cotton Street, Padiham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Jul 2025 at 15:50.

United Utilities Water (formerly North West Water) logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
Rear 2 To 24 Cotton Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Rear 2 To 24 Cotton Street, Padiham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Aug 2025 at 15:12.

Lancashire County Council logo
Between
15 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Burnley Road East

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Burnley Road East, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 2 Jun 2025 at 13:51.

Lancashire County Council logo
Between
15 and 29 Oct 2025
Details
View Map
Share
Follow
Hollins Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Hollins Lane, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 30 Jun 2025 at 13:40.

Lancashire County Council logo
Between
15 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Burnley Road East

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Burnley Road East, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 1 Jul 2025 at 14:09.

Electricity North West (NorWeb) logo
Between
20 and 27 Oct 2025
Details
View Map
Share
Follow
Cowley Crescent

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Cowley Crescent, Padiham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 23 Jul 2025 at 15:36.

Electricity North West (NorWeb) logo
Between
20 and 27 Oct 2025
Details
View Map
Share
Follow
Cowley Crescent

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Cowley Crescent, Padiham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Aug 2025 at 14:48.

Lancashire County Council logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
South Drive

Lancashire County Council are proposing to carry out Section 50 on South Drive, Padiham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lancashire County Council on 18 Sep 2025 at 09:57.

Electricity North West (NorWeb) logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Altham Lane

Electricity North West (NorWeb) are proposing to carry out Highway repair and maintenance works on Altham Lane, Altham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 31 Jul 2025 at 11:20.

Electricity North West (NorWeb) logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Altham Lane

Electricity North West (NorWeb) are proposing to carry out Highway repair and maintenance works on Altham Lane, Altham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Jul 2025 at 08:55.

United Utilities Water (formerly North West Water) logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Bolton Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Bolton Avenue, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Aug 2025 at 15:38.

United Utilities Water (formerly North West Water) logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Bolton Avenue

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Bolton Avenue, Accrington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Aug 2025 at 13:23.

United Utilities Water (formerly North West Water) logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Towneley Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Towneley Avenue, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Jul 2025 at 16:28.

Cadent Gas logo
Between
22 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Partridge Hill

Cadent Gas are proposing to carry out Utility asset works on Partridge Hill, Padiham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 09:15.

Cadent Gas logo
Between
3 and 26 Nov 2025
Details
View Map
Share
Follow
Wyre Street

Cadent Gas are proposing to carry out Utility asset works on Wyre Street, Padiham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 13:22.

Cadent Gas logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Lawrence Street

Cadent Gas are proposing to carry out Utility asset works on Lawrence Street, Padiham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 10:29.

Cadent Gas logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Grove Lane

Cadent Gas are proposing to carry out Utility asset works on Grove Lane, Padiham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 10:28.

BT logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Off Mount Pleasant Street

BT are proposing to carry out Utility asset works on Off Mount Pleasant Street, Oswaldtwistle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 26 Jul 2025 at 11:30.

United Utilities Water (formerly North West Water) logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Back 3-63 Warwick Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back 3-63 Warwick Street, Haslingden, Rossendale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 1 Sep 2025 at 16:03.

United Utilities Water (formerly North West Water) logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Fallbarn Road

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Fallbarn Road, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Sep 2025 at 09:20.

Cadent Gas logo
Between
5 and 7 Nov 2025
Details
View Map
Share
Follow
Mill Street

Cadent Gas are proposing to carry out New service connection on Mill Street, Padiham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Aug 2025 at 14:14.

Cadent Gas logo
Between
10 and 26 Nov 2025
Details
View Map
Share
Follow
Partridge Hill

Cadent Gas are proposing to carry out Utility asset works on Partridge Hill, Padiham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 10:28.

Electricity North West (NorWeb) logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Blackburn Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Blackburn Road, Haslingden, Rossendale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 19 Sep 2025 at 13:44.

Cadent Gas logo
Between
8 and 24 Dec 2025
Details
View Map
Share
Follow
Hapton Road

Cadent Gas are proposing to carry out Utility asset works on Hapton Road, Padiham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Sep 2025 at 10:55.

Electricity North West (NorWeb) logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Commercial Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Commercial Street, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 22 Sep 2025 at 11:09.

United Utilities Water (formerly North West Water) logo
Between
15 and 17 Dec 2025
Details
View Map
Share
Follow
Rear 1 To 87 Parkinson Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Rear 1 To 87 Parkinson Street, Burnley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Sep 2025 at 13:05.


Roadworks Map near to Penny Lodge Lane, ROSSENDALE, BB4 8PD (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 23 Sep 2025 03:13
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Penny Lodge Lane, ROSSENDALE, BB4 8PD (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
United Utilities Water (formerly North West Water) logo
URGENT
  
BURNLEY ROAD, LOVECLOUGH 
(0.4 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 17 Sep 2025 13:46
(Scheduled: 17 Sep 2025 - 23 Sep 2025)
0.4
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.