ROADWORKS SUMMARY
Cross Street, ROSSENDALE, BB4 8NH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Cross Street, BB4 8NH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Cross Street, ROSSENDALE, BB4 8NH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cross Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Lancashire County Council logo
LONG TERM
Between
5 Jul 2023 and 18 Jul 2025
Details
View Map
Share
Follow
York Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on York Street, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2023 and could run through until 18 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 27 Apr 2023 at 08:10.

Lancashire County Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Market Street

Lancashire County Council are carrying out Section 50 on Market Street, Bacup.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 09:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 20 Nov 2024 at 09:19.

Lancashire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Burnley Road

Lancashire County Council are carrying out Highway repair and maintenance works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 18 Oct 2024 at 09:02.

Lancashire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Burnley Road

Lancashire County Council are carrying out Highway repair and maintenance works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 22 Nov 2024 at 15:38.

Lancashire County Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Henrietta Street

Lancashire County Council are carrying out Section 50 on Henrietta Street, Bacup.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 10:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 20 Nov 2024 at 09:16.

Cadent Gas logo
LONG TERM
Between
29 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Union Road

Cadent Gas are proposing to carry out Utility asset works on Union Road, Oswaldtwistle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 14:22.

Cadent Gas logo
LONG TERM
Between
29 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Union Road

Cadent Gas are proposing to carry out Utility asset works on Union Road, Oswaldtwistle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2024 at 16:30.

Cadent Gas logo
LONG TERM
Between
29 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Rhyddings Street

Cadent Gas are proposing to carry out Utility asset works on Rhyddings Street, Oswaldtwistle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 14:24.

Cadent Gas logo
LONG TERM
Between
29 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Rhyddings Street

Cadent Gas are proposing to carry out Utility asset works on Rhyddings Street, Oswaldtwistle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2024 at 16:30.

Cadent Gas logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Park Road

Cadent Gas are carrying out Utility asset works on Park Road, Rawtenstall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 15:40 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 10:22.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Booth Crescent

Cadent Gas are carrying out Utility asset works on Booth Crescent, Rawtenstall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 09:46 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:46.

Lancashire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Manchester Road

Lancashire County Council are carrying out Highway repair and maintenance works on Manchester Road, Accrington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 07:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 11 Nov 2024 at 08:44.

Lancashire County Council logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Dawson Close

Lancashire County Council are proposing to carry out Section 50 on Dawson Close, Accrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 7 Nov 2024 at 09:09.

Cadent Gas logo
Until
13 Dec 2024
Details
View Map
Share
Follow
Goodshaw Avenue

Cadent Gas are carrying out Utility asset works on Goodshaw Avenue, Loveclough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 10:34 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 13:50.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Annie Street

Cadent Gas are carrying out Utility repair and maintenance works on Annie Street, Accrington.

The works started on 20 November 2024 at 13:55 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 16:30.

Cadent Gas logo
Between
21 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Owen Street

Cadent Gas are proposing to carry out Utility asset works on Owen Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2024 at 09:29.

Cadent Gas logo
Between
21 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Liverpool Road

Cadent Gas are proposing to carry out Utility asset works on Liverpool Road, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2024 at 08:59.

United Utilities Water (formerly North West Water) logo
Finishing
Today
Details
View Map
Share
Follow
Avenue Parade

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Avenue Parade, Accrington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 18:37 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 24 Nov 2024 at 08:38.

United Utilities Water (formerly North West Water) logo
Finishing
Today
Details
View Map
Share
Follow
Cambridge Street

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Cambridge Street, Accrington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 10:25 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 24 Nov 2024 at 08:39.

Electricity North West (NorWeb) logo
Finishing
Monday
Details
View Map
Share
Follow
Rosegrove Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Rosegrove Lane, Burnley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2024 at 10:00.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Lane Head Lane

BT were proposing to carry out Utility repair and maintenance works on Lane Head Lane, Bacup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 30 Oct 2024 at 14:22.

Cadent Gas logo
Between
27 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Accrington Road

Cadent Gas are proposing to carry out Utility asset works on Accrington Road, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Nov 2024 at 10:05.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lane Head Lane

BT are proposing to carry out Utility repair and maintenance works on Lane Head Lane, Bacup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Oct 2024 at 16:01.

Cadent Gas logo
Between
27 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Accrington Road

Cadent Gas are proposing to carry out Utility asset works on Accrington Road, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 14:00.

Cadent Gas logo
Between
27 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Accrington Road

Cadent Gas are proposing to carry out Utility asset works on Accrington Road, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 12:00.

Cadent Gas logo
Between
27 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Villiers Street

Cadent Gas are proposing to carry out Utility asset works on Villiers Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 15:52.

Cadent Gas logo
Between
27 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Hartley Street

Cadent Gas are proposing to carry out Utility asset works on Hartley Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2024 at 09:41.

Cadent Gas logo
Between
28 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Lord Street

Cadent Gas are proposing to carry out New service connection on Lord Street, Bacup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 14:44.

Cadent Gas logo
Between
28 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Walnut Avenue

Cadent Gas are proposing to carry out Utility asset works on Walnut Avenue, Haslingden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 14:55.

Cadent Gas logo
Between
28 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Lowerhouse Lane

Cadent Gas are proposing to carry out Utility asset works on Lowerhouse Lane, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2024 at 09:07.

Lancashire County Council logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Fairfield Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Fairfield Street, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 8 Nov 2024 at 09:17.

Cadent Gas logo
Between
4 and 20 Dec 2024
Details
View Map
Share
Follow
Brush Street

Cadent Gas are proposing to carry out Utility asset works on Brush Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 15:53.

BT logo
Between
6 and 10 Dec 2024
Details
View Map
Share
Follow
Back 552-568 Bacup Road

BT are proposing to carry out Utility repair and maintenance works on Back 552-568 Bacup Road, Waterfoot, Rossendale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Sep 2024 at 15:08.

Cadent Gas logo
Between
9 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Abingdon Road

Cadent Gas were proposing to carry out Utility asset works on Abingdon Road, Padiham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 3 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 09:25.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Warwick Drive

Cadent Gas were proposing to carry out Utility asset works on Warwick Drive, Padiham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 09:23.

Cadent Gas logo
Between
10 and 31 Dec 2024
Details
View Map
Share
Follow
New Line

Cadent Gas are proposing to carry out Utility asset works on New Line, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Oct 2024 at 13:01.

Cadent Gas logo
Between
10 and 31 Dec 2024
Details
View Map
Share
Follow
Lane End Road

Cadent Gas are proposing to carry out Utility asset works on Lane End Road, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Oct 2024 at 11:38.

Cadent Gas logo
Between
10 and 31 Dec 2024
Details
View Map
Share
Follow
New Line

Cadent Gas are proposing to carry out Utility asset works on New Line, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Oct 2024 at 11:46.

Lancashire County Council logo
LONG TERM
Between
16 Dec 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Holcombe Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Holcombe Road, Haslingden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 23 Sep 2024 at 16:18.

Lancashire County Council logo
LONG TERM
Between
23 Dec 2024 and 5 Mar 2025
Details
View Map
Share
Follow
Burnley Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 30 Sep 2024 at 13:18.

Cadent Gas logo
Between
2 and 18 Jan 2025
Details
View Map
Share
Follow
Accrington Road

Cadent Gas are proposing to carry out Utility asset works on Accrington Road, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:14.

Cadent Gas logo
Between
2 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Villiers Street

Cadent Gas are proposing to carry out Utility asset works on Villiers Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Oct 2024 at 10:14.

Cadent Gas logo
LONG TERM
Between
2 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Dorset Street

Cadent Gas are proposing to carry out Utility asset works on Dorset Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 08:52.

Cadent Gas logo
Between
2 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Dorset Street

Cadent Gas are proposing to carry out Utility asset works on Dorset Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 08:58.

Cadent Gas logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Cumberland Avenue

Cadent Gas are proposing to carry out Utility asset works on Cumberland Avenue, Burnley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 10:04.

Cadent Gas logo
Between
2 and 18 Jan 2025
Details
View Map
Share
Follow
Hartley Street

Cadent Gas are proposing to carry out Utility asset works on Hartley Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Oct 2024 at 10:11.

Cadent Gas logo
Between
6 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Cumberland Avenue

Cadent Gas are proposing to carry out Utility asset works on Cumberland Avenue, Burnley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 10:30.

Lancashire County Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Bank Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Bank Street, Rawtenstall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 20 Oct 2024 at 14:44.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Bold Street

BT are proposing to carry out Utility repair and maintenance works on Bold Street, Bacup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Nov 2024 at 09:06.

Cadent Gas logo
Between
8 and 24 Jan 2025
Details
View Map
Share
Follow
Brush Street

Cadent Gas are proposing to carry out Utility asset works on Brush Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Oct 2024 at 10:04.

Cadent Gas logo
Between
8 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Walnut Avenue

Cadent Gas are proposing to carry out Utility asset works on Walnut Avenue, Haslingden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 14:08.

Lancashire County Council logo
Between
8 and 24 Jan 2025
Details
View Map
Share
Follow
Burnley Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 25 Oct 2024 at 13:53.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Rutland Avenue

Cadent Gas are proposing to carry out Utility asset works on Rutland Avenue, Burnley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 10:03.

Lancashire County Council logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Fairfield Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Fairfield Street, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 18 Oct 2024 at 15:37.

Cadent Gas logo
Between
22 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Goodshaw Lane

Cadent Gas are proposing to carry out Utility asset works on Goodshaw Lane, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 13:07.

Cadent Gas logo
Between
22 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Goodshaw Lane

Cadent Gas are proposing to carry out Utility asset works on Goodshaw Lane, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Nov 2024 at 13:21.

Cadent Gas logo
Between
23 Jan and 20 Feb 2025
Details
View Map
Share
Burnley Road

Cadent Gas were proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 January 2025 and run through until 20 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 08:33.

Lancashire County Council logo
LONG TERM
Between
27 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Manchester Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Manchester Road, Accrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 6 Nov 2024 at 10:36.

Cadent Gas logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Abingdon Road

Cadent Gas were proposing to carry out Utility asset works on Abingdon Road, Padiham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:32.

BT logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Bold Street

BT are proposing to carry out Utility repair and maintenance works on Bold Street, Bacup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Nov 2024 at 11:43.

BT logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Chapel Street

BT are proposing to carry out Utility asset works on Chapel Street, Haslingden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 6 Nov 2024 at 11:59.

Cadent Gas logo
Between
29 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Liverpool Road

Cadent Gas are proposing to carry out Utility asset works on Liverpool Road, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 10:15.

Cadent Gas logo
LONG TERM
Between
29 Jan and 2 May 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 11:21.

Cadent Gas logo
LONG TERM
Between
29 Jan and 2 May 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:32.

Cadent Gas logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Warwick Drive

Cadent Gas are proposing to carry out Utility asset works on Warwick Drive, Padiham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 14:28.

Electricity North West (NorWeb) logo
Between
4 and 10 Feb 2025
Details
View Map
Share
Goodshaw Lane

Electricity North West (NorWeb) were proposing to carry out New service connection on Goodshaw Lane, Rawtenstall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Nov 2024 at 10:49.

Electricity North West (NorWeb) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Goodshaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Goodshaw Lane, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Nov 2024 at 11:00.

Cadent Gas logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Hapton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Nov 2024 at 09:51.

Cadent Gas logo
LONG TERM
Between
19 Feb and 28 Mar 2025
Details
View Map
Share
Follow
New Line

Cadent Gas are proposing to carry out Utility asset works on New Line, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:10.

Cadent Gas logo
LONG TERM
Between
19 Feb and 28 Mar 2025
Details
View Map
Share
Follow
New Line

Cadent Gas are proposing to carry out Utility asset works on New Line, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 15:10.

Cadent Gas logo
Between
19 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Lane End Road

Cadent Gas are proposing to carry out Utility asset works on Lane End Road, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:07.

Cadent Gas logo
Between
19 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Owen Street

Cadent Gas are proposing to carry out Utility asset works on Owen Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 10:16.

Cadent Gas logo
Between
19 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Lane End Road

Cadent Gas are proposing to carry out Utility asset works on Lane End Road, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:18.

Cadent Gas logo
Between
25 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Riding Barn Street

Cadent Gas are proposing to carry out Utility asset works on Riding Barn Street, Church.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 12:30.


Roadworks Map near to Cross Street, ROSSENDALE, BB4 8NH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 23:26
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Cross Street, ROSSENDALE, BB4 8NH (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
CRAWSHAW GRANGE 
(0.2 miles)
BT
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 26 Nov 2024 - 28 Nov 2024)
0.2
Details
Share
2
Cadent Gas logo
MAJOR
  
GOODSHAW AVENUE 
(0.6 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 18 Nov 2024 10:34
(Scheduled: 18 Nov 2024 - 13 Dec 2024)
0.6
Details
Share
Follow
3
Lancashire County Council logo
MAJOR
  
BURNLEY ROAD, RAWTENSTALL 
(0.7 miles)
Lancashire County Council
Highway repair and maintenance works - Footway, Carriageway - Two-way signals
In Progress
Since: 25 Oct 2024 09:00
(Scheduled: 25 Oct 2024 - 20 Dec 2024)
0.7
Details
Share
Follow