ROADWORKS SUMMARY
Millar Barn Lane, ROSSENDALE, BB4 7AU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Millar Barn Lane, BB4 7AU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Millar Barn Lane, ROSSENDALE, BB4 7AU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Millar Barn Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
1 Jan 2026
Details
View Map
Share
Follow
Footpath From Nuttall Lane East To Manchester Road Gollinroad

are carrying out Utility repair and maintenance works on Footpath From Nuttall Lane East To Manchester Road Gollinroad, Ramsbottom.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2024 at 17:00 and could run through until 1 January 2026. The works will impact the footpath only.

This roadwork event was last updated by on 2 Jan 2024 at 17:06.

Rochdale Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Over Town Lane

Rochdale Borough Council are carrying out Utility asset works on Over Town Lane, Norden North, Rochdale.

These works are categorised as Major.

The works started on 2 April 2024 at 07:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Rochdale Borough Council on 2 Dec 2024 at 10:47.

Lancashire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Burnley Road

Lancashire County Council are carrying out Highway repair and maintenance works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 18 Oct 2024 at 09:02.

Lancashire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Manchester Road

Lancashire County Council are carrying out Highway repair and maintenance works on Manchester Road, Accrington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 07:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 11 Nov 2024 at 08:44.

Cadent Gas logo
Between
10 and 31 Dec 2024
Details
View Map
Share
Follow
New Line

Cadent Gas are proposing to carry out Utility asset works on New Line, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Oct 2024 at 13:01.

Cadent Gas logo
Between
10 and 31 Dec 2024
Details
View Map
Share
Follow
New Line

Cadent Gas are proposing to carry out Utility asset works on New Line, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Oct 2024 at 11:46.

Cadent Gas logo
Between
10 and 31 Dec 2024
Details
View Map
Share
Follow
Lane End Road

Cadent Gas are proposing to carry out Utility asset works on Lane End Road, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Oct 2024 at 11:38.

Lancashire County Council logo
LONG TERM
Between
16 Dec 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Holcombe Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Holcombe Road, Haslingden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 23 Sep 2024 at 16:18.

Lancashire County Council logo
LONG TERM
Between
23 Dec 2024 and 5 Mar 2025
Details
View Map
Share
Follow
Burnley Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 30 Sep 2024 at 13:18.

Lancashire County Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Bank Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Bank Street, Rawtenstall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 20 Oct 2024 at 14:44.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Bold Street

BT are proposing to carry out Utility repair and maintenance works on Bold Street, Bacup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Nov 2024 at 09:06.

Lancashire County Council logo
Between
8 and 24 Jan 2025
Details
View Map
Share
Follow
Burnley Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 25 Oct 2024 at 13:53.

Cadent Gas logo
Between
8 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Walnut Avenue

Cadent Gas are proposing to carry out Utility asset works on Walnut Avenue, Haslingden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 14:08.

Electricity North West (NorWeb) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Goodshaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Goodshaw Lane, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Dec 2024 at 16:01.

Electricity North West (NorWeb) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Goodshaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Goodshaw Lane, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 10 Dec 2024 at 13:21.

Cadent Gas logo
Between
22 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Goodshaw Lane

Cadent Gas are proposing to carry out Utility asset works on Goodshaw Lane, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Nov 2024 at 13:21.

Cadent Gas logo
Between
22 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Goodshaw Lane

Cadent Gas are proposing to carry out Utility asset works on Goodshaw Lane, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 13:07.

Cadent Gas logo
Between
23 Jan and 20 Feb 2025
Details
View Map
Share
Burnley Road

Cadent Gas were proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 January 2025 and run through until 20 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 08:33.

BT logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Bold Street

BT are proposing to carry out Utility repair and maintenance works on Bold Street, Bacup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Nov 2024 at 11:43.

Lancashire County Council logo
LONG TERM
Between
27 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Manchester Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Manchester Road, Accrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 6 Nov 2024 at 10:36.

BT logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Chapel Street

BT are proposing to carry out Utility asset works on Chapel Street, Haslingden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 6 Nov 2024 at 11:59.

BT logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Chapel Street

BT are proposing to carry out Utility asset works on Chapel Street, Haslingden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Dec 2024 at 15:15.

Cadent Gas logo
LONG TERM
Between
29 Jan and 2 May 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 11:21.

Cadent Gas logo
LONG TERM
Between
29 Jan and 2 May 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:32.

Cadent Gas logo
LONG TERM
Between
29 Jan and 2 May 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 16:08.

Bury Metropolitan Borough Council logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Helmshore Road

Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Helmshore Road, Ramsbottom.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bury Metropolitan Borough Council on 21 Nov 2024 at 09:26.

Electricity North West (NorWeb) logo
Between
4 and 10 Feb 2025
Details
View Map
Share
Goodshaw Lane

Electricity North West (NorWeb) were proposing to carry out New service connection on Goodshaw Lane, Rawtenstall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Nov 2024 at 10:49.

Electricity North West (NorWeb) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Goodshaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Goodshaw Lane, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Nov 2024 at 11:00.

Cadent Gas logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Booth Crescent

Cadent Gas are proposing to carry out Utility asset works on Booth Crescent, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Dec 2024 at 10:02.

Cadent Gas logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 15:16.

Cadent Gas logo
LONG TERM
Between
19 Feb and 28 Mar 2025
Details
View Map
Share
Follow
New Line

Cadent Gas are proposing to carry out Utility asset works on New Line, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:10.

Cadent Gas logo
Between
19 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Lane End Road

Cadent Gas are proposing to carry out Utility asset works on Lane End Road, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:18.

Cadent Gas logo
Between
19 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Lane End Road

Cadent Gas are proposing to carry out Utility asset works on Lane End Road, Bacup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:07.

Cadent Gas logo
LONG TERM
Between
19 Feb and 28 Mar 2025
Details
View Map
Share
New Line

Cadent Gas were proposing to carry out Utility asset works on New Line, Bacup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 09:01.

Cadent Gas logo
Between
21 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Booth Crescent

Cadent Gas are proposing to carry out Utility asset works on Booth Crescent, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 12:15.

Cadent Gas logo
Between
21 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 11:38.

Lancashire County Council logo
Between
26 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Townsend Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Townsend Street, Haslingden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 4 Dec 2024 at 11:14.

Cadent Gas logo
LONG TERM
Between
5 Mar and 6 Jun 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Oct 2024 at 15:01.

Cadent Gas logo
LONG TERM
Between
5 Mar and 6 Jun 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:50.

Cadent Gas logo
LONG TERM
Between
5 Mar and 6 Jun 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:21.

Lancashire County Council logo
Between
9 and 13 Mar 2025
Details
View Map
Share
Follow
Tong Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Tong Lane, Bacup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 9 Dec 2024 at 10:57.


Roadworks Map near to Millar Barn Lane, ROSSENDALE, BB4 7AU

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 06:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Millar Barn Lane, ROSSENDALE, BB4 7AU (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
United Utilities Water (formerly North West Water) logo
URGENT
  
BURNLEY ROAD EAST 
(0.2 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 12 Dec 2024 08:23
(Scheduled: 12 Dec 2024 - 18 Dec 2024)
0.2
Details
Share
Follow
2
Cadent Gas logo
EMERGENCY
  
RAKEHEAD LANE, STACKSTEADS 
(0.6 miles)
Cadent Gas
Utility repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 6 Dec 2024 12:50
(Scheduled: 6 Dec 2024 - 23 Dec 2024)
0.6
Details
Share
Follow
3
Virgin Media logo
NEWCHURCH ROAD 
(0.9 miles)
Virgin Media
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.9
Details
Share
Follow
4
Lancashire County Council logo
HEATHBOURNE ROAD 
(0.9 miles)
Lancashire County Council
Section 50 - Footway, Carriageway - Some carriageway incursion
Complete
12 Dec 2024 16:01 - 13 Dec 2024 13:28
0.9
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.