ROADWORKS SUMMARY
Syke Street, ROSSENDALE, BB4 6LY
Introduction
View current and future planned roadworks and road closures for Syke Street, BB4 6LY and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Syke Street, ROSSENDALE, BB4 6LY
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Syke Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Dec 2026
Lancashire County Council are carrying out Highway repair and maintenance works on Haslingden Old Road, Oswaldtwistle.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 January 2025 at 10:00 and could run through until 31 December 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Lancashire County Council on 8 Jun 2026 at 12:33.
4 Mar 2026 and 3 Mar 2027
Lancashire County Council are proposing to carry out Highway improvement works on Haslingden Road, Rawtenstall.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2026 and could run through until 3 March 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Lancashire County Council on 21 Oct 2025 at 08:35.
26 May and 6 Nov 2026
Lancashire County Council are proposing to carry out Highway improvement works on Lord Street, Oswaldtwistle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2026 and could run through until 6 November 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Lancashire County Council on 29 May 2026 at 14:39.
2 Jun 2026 and 19 Feb 2027
Lancashire County Council are proposing to carry out Highway improvement works on Nuttall Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2026 and could run through until 19 February 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Lancashire County Council on 10 Jun 2026 at 10:50.
22 Jun 2026 and 22 Jun 2027
Lancashire County Council are proposing to carry out Highway improvement works on Bury Road, Rawtenstall.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 June 2026 and could run through until 22 June 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Lancashire County Council on 11 Jun 2026 at 10:27.
22 Jun 2026 and 22 Jun 2027
Lancashire County Council are proposing to carry out Highway improvement works on Rawtenstall Spur, Rawtenstall.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 June 2026 and could run through until 22 June 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Lancashire County Council on 11 Jun 2026 at 10:29.
22 Jun 2026 and 22 Jun 2027
Lancashire County Council are proposing to carry out Highway improvement works on Haslingden Road, Rawtenstall.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 June 2026 and could run through until 22 June 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Lancashire County Council on 11 Jun 2026 at 10:30.
22 Jun 2026 and 22 Jun 2027
Lancashire County Council are proposing to carry out Highway improvement works on Bacup Road, Rawtenstall.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 June 2026 and could run through until 22 June 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Lancashire County Council on 11 Jun 2026 at 10:31.
22 Jun 2026 and 22 Jun 2027
Lancashire County Council are proposing to carry out Highway improvement works on St Marys Way, Rawtenstall.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 June 2026 and could run through until 22 June 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Lancashire County Council on 11 Jun 2026 at 10:30.
2 Nov 2026
United Utilities Water (formerly North West Water) are carrying out Highway improvement works on Manchester Road, Haslingden.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 July 2026 at 06:30 and could run through until 2 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Aug 2026 at 09:59.
18 Dec 2026
United Utilities Water (formerly North West Water) are carrying out Highway improvement works on Haslingden Road, Rawtenstall.
These works are categorised as Major.
The works started on 13 July 2026 at 10:00 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 13 Jul 2026 at 10:45.
16 Jul 2026 and 19 Feb 2027
Lancashire County Council are proposing to carry out Highway improvement works on Countess Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2026 and could run through until 19 February 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Lancashire County Council on 10 Jul 2026 at 14:27.
Tomorrow
Lancashire County Council are carrying out Highway improvement works on Charter Street, Accrington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 August 2026 at 06:00 and could run through until 17 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 28 Aug 2026 at 10:23.
Friday
Lancashire County Council are carrying out Highway improvement works on Penny House Lane, Accrington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 August 2026 at 06:00 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 28 Aug 2026 at 15:35.
Monday
Lancashire County Council are carrying out Highway improvement works on Southwood Drive, Baxenden, Accrington.
These works are categorised as Major.
The works started on 24 August 2026 at 06:00 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 26 Aug 2026 at 11:19.
Saturday
Lancashire County Council are carrying out Highway improvement works on Plantation Street, Accrington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 August 2026 at 06:00 and could run through until 19 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 1 Sep 2026 at 09:11.
Monday
Lancashire County Council are carrying out Highway improvement works on Bury Road, Haslingden.
These works are categorised as Major.
The works started on 25 August 2026 at 06:00 and could run through until 21 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 28 Aug 2026 at 10:18.
Sunday
Lancashire County Council are carrying out Highway improvement works on Regent Street, Haslingden.
These works are categorised as Major.
The works started on 25 August 2026 at 06:00 and could run through until 20 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 28 Aug 2026 at 10:24.
Sunday
Electricity North West (NorWeb) are carrying out Diversionary works on Burnley Road, Accrington.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 August 2026 at 14:00 and could run through until 20 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2026 at 09:21.
17 Aug and 18 Dec 2026
Lancashire County Council are proposing to carry out Highway improvement works on Fallbarn Crescent, Rawtenstall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 August 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 16 Jul 2026 at 15:47.
Tomorrow
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Kay Brow, Ramsbottom.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 August 2026 at 09:26 and could run through until 17 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 4 Sep 2026 at 12:22.
1 Oct 2026
Lancashire County Council are carrying out Highway improvement works on Booth Road, Stacksteads.
These works are categorised as Major.
The works started on 4 September 2026 at 06:00 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 7 Sep 2026 at 07:41.
31 Aug 2026 and 18 Jun 2027
Lancashire County Council are proposing to carry out Highway improvement works on St Marys Way, Rawtenstall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 August 2026 and could run through until 18 June 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 21 Aug 2026 at 12:09.
1 Sep and 1 Oct 2026
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Rochdale Road, Ramsbottom.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 1 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Aug 2026 at 12:06.
1 Oct 2026
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Rochdale Road, Ramsbottom.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2026 at 16:35 and could run through until 1 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Sep 2026 at 09:24.
28 Sep 2026
Lancashire County Council are carrying out Highway improvement works on Cotton Street, Accrington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2026 at 09:45 and could run through until 28 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 2 Sep 2026 at 14:04.
9 Oct 2026
Lancashire County Council are carrying out Highway improvement works on Countess Street, Accrington.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:30 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 15 Sep 2026 at 12:42.
22 Nov 2026
Lancashire County Council are carrying out Remedial works on Bacup Road, Rawtenstall.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 September 2026 at 08:00 and could run through until 22 November 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Lancashire County Council on 10 Sep 2026 at 14:52.
2 Oct 2026
Lancashire County Council are carrying out Highway improvement works on Mount Street, Accrington.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 September 2026 at 08:30 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 8 Sep 2026 at 09:43.
8 Sep and 3 Nov 2026
Lancashire County Council are proposing to carry out Highway improvement works on St Marys Way, Rawtenstall.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2026 and could run through until 3 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 26 Jun 2026 at 14:23.
Tomorrow
Cadent Gas are carrying out Utility repair and maintenance works on Burnley Road, Bacup.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 September 2026 at 19:49 and could run through until 17 September 2026. The works will impact the carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 10:38.
10 and 25 Sep 2026
Lancashire County Council are proposing to carry out Highway improvement works on Royds Street, Accrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 5 Jun 2026 at 09:34.
23 Sep 2026
Electricity North West (NorWeb) are carrying out Diversionary works on Bradshaw Street East, Accrington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2026 at 09:38 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Sep 2026 at 09:45.
14 Sep and 9 Oct 2026
BT are proposing to carry out Utility repair and maintenance works on Haslingden Road, Rawtenstall.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Sep 2026 at 13:14.
14 Sep and 9 Oct 2026
BT are proposing to carry out Utility repair and maintenance works on Haslingden Road, Rawtenstall.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 9 Sep 2026 at 11:10.
9 Oct 2026
BT are carrying out Utility repair and maintenance works on Haslingden Road, Rawtenstall.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 08:00 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 14 Sep 2026 at 08:18.
Today
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Deardengate, Haslingden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 16 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Jul 2026 at 07:59.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Burnley Road, Bacup.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 10:46 and could run through until 22 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 11:03.
23 Sep 2026
Electricity North West (NorWeb) are carrying out New service connection on Clough End Road, Haslingden.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 14:02 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 14 Sep 2026 at 16:01.
14 Sep and 1 Oct 2026
Lancashire County Council are proposing to carry out Highway improvement works on Russia Street, Accrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 1 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 8 Jul 2026 at 14:02.
14 and 23 Sep 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Hood Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 2 Sep 2026 at 12:26.
14 and 23 Sep 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Hood Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2026 at 09:08.
14 and 23 Sep 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Maudsley Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 20 Aug 2026 at 13:17.
16 Sep and 26 Oct 2026
Lancashire County Council are proposing to carry out Highway improvement works on Nuttall Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 10 Jun 2026 at 10:55.
16 and 30 Sep 2026
Lancashire County Council were proposing to carry out Section 50 on Rhyddings Street, Oswaldtwistle.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 September 2026 and run through until 30 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 14 Sep 2026 at 14:36.
16 and 30 Sep 2026
Lancashire County Council are proposing to carry out Section 50 on Howard Close, Accrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 16 Sep 2026 at 08:42.
Today
Lancashire County Council are carrying out Highway repair and maintenance works on Blake Street, Accrington.
The road is closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 16 September 2026 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 16 Sep 2026 at 08:38.
18 Sep and 5 Oct 2026
Lancashire County Council are proposing to carry out Highway improvement works on Lister Street, Accrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 8 Jun 2026 at 08:55.
21 Sep and 1 Oct 2026
Lancashire County Council are proposing to carry out Highway improvement works on Lister Street, Accrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 1 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 8 Jun 2026 at 08:55.
21 and 30 Sep 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Derby Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Aug 2026 at 16:11.
21 and 30 Sep 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Derby Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 30 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 28 Aug 2026 at 15:26.
24 Sep and 8 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Mount Avenue, Rawtenstall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Jul 2026 at 09:53.
24 Sep and 8 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Mount Avenue, Rawtenstall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 15:07.
24 Sep and 3 Oct 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Meadow Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 3 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Aug 2026 at 16:12.
24 Sep and 3 Oct 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Meadow Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 3 October 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 27 Aug 2026 at 16:31.
25 Sep and 22 Oct 2026
Lancashire County Council are proposing to carry out Highway improvement works on Lemonius Street, Accrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 11 Jun 2026 at 14:39.
28 Sep and 2 Oct 2026
Electricity North West (NorWeb) are proposing to carry out New service connection on Pot Green, Ramsbottom.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 24 Jun 2026 at 13:47.
28 Sep and 23 Oct 2026
Electricity North West (NorWeb) are proposing to carry out New service connection on Clayton Avenue, Rawtenstall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 24 Aug 2026 at 15:26.
28 Sep and 23 Oct 2026
Electricity North West (NorWeb) are proposing to carry out New service connection on Clayton Avenue, Rawtenstall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 14 Sep 2026 at 15:03.
28 Sep and 23 Oct 2026
Electricity North West (NorWeb) are proposing to carry out New service connection on Bury Road, Rawtenstall.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 11 Aug 2026 at 09:40.
28 Sep and 23 Oct 2026
Electricity North West (NorWeb) are proposing to carry out New service connection on Bury Road, Rawtenstall.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 14 Sep 2026 at 15:53.
28 Sep and 26 Oct 2026
Lancashire County Council are proposing to carry out Highway improvement works on Fallbarn Crescent, Rawtenstall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 5 Sep 2026 at 09:26.
28 Sep and 26 Oct 2026
Lancashire County Council are proposing to carry out Highway improvement works on Fallbarn Crescent, Rawtenstall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 14 Sep 2026 at 10:43.
28 Sep 2026 and 9 Jul 2027
Lancashire County Council are proposing to carry out Highway improvement works on Bank Street, Rawtenstall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 9 July 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 10 Aug 2026 at 13:51.
28 Sep and 16 Oct 2026
Lancashire County Council are proposing to carry out Highway improvement works on Hudson Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 10 Jun 2026 at 10:58.
28 Sep and 9 Oct 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Owen Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Aug 2026 at 16:13.
28 Sep and 9 Oct 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Owen Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2026 at 15:08.
28 Sep and 9 Oct 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Aitken Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Aug 2026 at 16:14.
28 Sep and 9 Oct 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Aitken Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2026 at 15:07.
5 and 25 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Heron Way, Oswaldtwistle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Aug 2026 at 12:59.
5 and 25 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Back Heys, Oswaldtwistle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Aug 2026 at 13:01.
5 and 23 Oct 2026
Lancashire County Council are proposing to carry out Highway improvement works on Belfield Road, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 8 Sep 2026 at 14:16.
5 Oct and 3 Nov 2026
Lancashire County Council are proposing to carry out Highway improvement works on Portland Street, Accrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 3 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 8 Jun 2026 at 08:53.
5 and 16 Oct 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Marlborough Road, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Aug 2026 at 16:14.
5 and 16 Oct 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Marlborough Road, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2026 at 15:07.
8 and 22 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Millar Barn Lane, Waterfoot, Rossendale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 8 Jul 2026 at 09:56.
12 and 23 Oct 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Clifton Avenue, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 19 Aug 2026 at 10:54.
14 and 30 Oct 2026
Lancashire County Council are proposing to carry out Highway improvement works on Hyndburn Street, Accrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 10 Jul 2026 at 10:02.
20 Oct and 19 Nov 2026
Lancashire County Council are proposing to carry out Highway improvement works on Park Road, Accrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 8 Jun 2026 at 08:59.
20 Oct and 19 Nov 2026
Lancashire County Council are proposing to carry out Highway improvement works on Park Road, Accrington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 26 May 2026 at 14:40.
26 and 30 Oct 2026
Cadent Gas are proposing to carry out Utility asset works on Hud Rake, Haslingden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 09:50.
26 Oct and 9 Dec 2026
Lancashire County Council are proposing to carry out Highway improvement works on Belfield Road, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 9 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 10 Jun 2026 at 10:56.
26 Oct and 13 Nov 2026
Lancashire County Council are proposing to carry out Highway improvement works on Nuttall Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 8 Sep 2026 at 14:28.
27 Oct and 10 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Holcombe Road, Haslingden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Aug 2026 at 16:13.
27 Oct and 10 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Holcombe Road, Haslingden.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2026 at 15:30.
27 Oct and 18 Nov 2026
Lancashire County Council are proposing to carry out Highway improvement works on Hall Carr Road, Rawtenstall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 18 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 5 Sep 2026 at 09:25.
27 Oct 2026 and 15 Feb 2027
Cadent Gas are proposing to carry out Utility asset works on Grane Road, Haslingden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 15 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Aug 2026 at 16:12.
27 Oct 2026 and 15 Feb 2027
Cadent Gas are proposing to carry out Utility asset works on Grane Road, Haslingden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 15 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2026 at 14:31.
27 Oct and 20 Nov 2026
Lancashire County Council are proposing to carry out Highway improvement works on Fallbarn Crescent, Rawtenstall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 5 Sep 2026 at 09:26.
28 and 30 Oct 2026
BT are proposing to carry out Utility repair and maintenance works on Pocklington Street, Baxenden, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by BT on 19 Aug 2026 at 16:29.
2 and 6 Nov 2026
Electricity North West (NorWeb) were proposing to carry out New service connection on Commercial Street, Rawtenstall.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 November 2026 and run through until 6 November 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 2 Sep 2026 at 09:37.
3 Nov and 2 Dec 2026
Lancashire County Council are proposing to carry out Highway improvement works on Steiner Street, Accrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2026 and could run through until 2 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 8 Jun 2026 at 08:54.
9 and 11 Nov 2026
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Chatterton Road, Edenfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 25 Aug 2026 at 15:18.
11 and 17 Nov 2026
Electricity North West (NorWeb) are proposing to carry out New service connection on Oaklands Drive, Rawtenstall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2026 and could run through until 17 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 26 Aug 2026 at 10:41.
16 and 24 Nov 2026
Electricity North West (NorWeb) are proposing to carry out New service connection on Glenshiels Avenue, Hoddlesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 24 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 25 Aug 2026 at 14:35.
16 and 24 Nov 2026
Electricity North West (NorWeb) are proposing to carry out New service connection on Glenshiels Avenue, Hoddlesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 24 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 28 Aug 2026 at 14:45.
16 and 24 Nov 2026
Electricity North West (NorWeb) are proposing to carry out New service connection on Glenshiels Avenue, Hoddlesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 24 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 11 Sep 2026 at 10:08.
16 and 30 Nov 2026
Cadent Gas are proposing to carry out Utility asset works on Blackburn Road, Rising Bridge, Accrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 09:56.
16 and 20 Nov 2026
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Cambridge Street, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 4 Sep 2026 at 15:39.
23 Nov and 11 Dec 2026
Lancashire County Council are proposing to carry out Highway improvement works on Fallbarn Crescent, Rawtenstall.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 11 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Lancashire County Council on 5 Sep 2026 at 09:25.
23 Nov 2026 and 7 Jan 2027
Lancashire County Council are proposing to carry out Highway improvement works on Princess Street, Accrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 7 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 8 Jun 2026 at 08:50.
25 Nov and 2 Dec 2026
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Whalley Road, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2026 and could run through until 2 December 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Sep 2026 at 12:44.
3 and 10 Dec 2026
Electricity North West (NorWeb) are proposing to carry out New service connection on Oaklands Drive, Rawtenstall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2026 and could run through until 10 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Sep 2026 at 08:40.
4 Dec 2026 and 19 Jan 2027
Lancashire County Council are proposing to carry out Highway improvement works on Persia Street, Accrington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2026 and could run through until 19 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 12 Jun 2026 at 15:26.
Roadworks Map near to Syke Street, ROSSENDALE, BB4 6LY
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Syke Street, ROSSENDALE, BB4 6LY (15 Events)
(Scheduled Dates)
(miles)
(Scheduled: 13 Jul 2026 - 2 Nov 2026)
(Scheduled: 14 Sep 2026 - 9 Oct 2026)
(Scheduled: 8 Sep 2026 - 17 Sep 2026)
(Scheduled: 13 Jul 2026 - 18 Dec 2026)
(Scheduled: 13 Aug 2026 - 17 Sep 2026)
(Scheduled: 4 Jun 2026 - 2 Oct 2026)
(Scheduled: 11 Sep 2026 - 18 Sep 2026)
(Scheduled: 13 Sep 2026 - 17 Sep 2026)