ROADWORKS SUMMARY
Highfield Street, ROSSENDALE, BB4 5EX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Highfield Street, BB4 5EX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Highfield Street, ROSSENDALE, BB4 5EX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Highfield Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Lancashire County Council logo
LONG TERM
Between
5 Jul 2023 and 18 Jul 2025
Details
View Map
Share
Follow
York Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on York Street, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2023 and could run through until 18 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 27 Apr 2023 at 08:10.

LONG TERM
Until
1 Jan 2026
Details
View Map
Share
Follow
Footpath From Nuttall Lane East To Manchester Road Gollinroad

are carrying out Utility repair and maintenance works on Footpath From Nuttall Lane East To Manchester Road Gollinroad, Ramsbottom.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2024 at 17:00 and could run through until 1 January 2026. The works will impact the footpath only.

This roadwork event was last updated by on 2 Jan 2024 at 17:06.

Cadent Gas logo
LONG TERM
Until
2 Dec 2024
Details
View Map
Share
Follow
Rhyddings Street

Cadent Gas are carrying out Utility asset works on Rhyddings Street, Oswaldtwistle.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 09:30 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 12:40.

Cadent Gas logo
LONG TERM
Until
2 Dec 2024
Details
View Map
Share
Follow
Union Road

Cadent Gas are carrying out Utility asset works on Union Road, Oswaldtwistle.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 09:30 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 12:39.

Lancashire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Burnley Road

Lancashire County Council are carrying out Highway repair and maintenance works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 18 Oct 2024 at 09:02.

Lancashire County Council logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Burnley Road

Lancashire County Council are carrying out Highway repair and maintenance works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 09:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 30 Oct 2024 at 14:40.

Cadent Gas logo
LONG TERM
Between
29 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Union Road

Cadent Gas are proposing to carry out Utility asset works on Union Road, Oswaldtwistle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2024 at 16:30.

Cadent Gas logo
LONG TERM
Between
29 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Rhyddings Street

Cadent Gas are proposing to carry out Utility asset works on Rhyddings Street, Oswaldtwistle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 14:24.

Cadent Gas logo
LONG TERM
Between
29 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Rhyddings Street

Cadent Gas are proposing to carry out Utility asset works on Rhyddings Street, Oswaldtwistle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2024 at 16:30.

Cadent Gas logo
LONG TERM
Between
29 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Union Road

Cadent Gas are proposing to carry out Utility asset works on Union Road, Oswaldtwistle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 14:22.

Cadent Gas logo
Until
28 Nov 2024
Details
View Map
Share
Follow
Park Road

Cadent Gas are carrying out Utility asset works on Park Road, Rawtenstall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 15:40 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 15:44.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Riding Barn Street

Cadent Gas were proposing to carry out Utility asset works on Riding Barn Street, Church.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2024 and run through until 26 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 13:05.

Cadent Gas logo
Until
28 Nov 2024
Details
View Map
Share
Follow
Booth Crescent

Cadent Gas are carrying out Utility asset works on Booth Crescent, Rawtenstall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 09:46 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:46.

Lancashire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Manchester Road

Lancashire County Council are carrying out Highway repair and maintenance works on Manchester Road, Accrington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 07:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 11 Nov 2024 at 08:44.

Lancashire County Council logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Dawson Close

Lancashire County Council are proposing to carry out Section 50 on Dawson Close, Accrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 7 Nov 2024 at 09:09.

Bury Metropolitan Borough Council logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Helmshore Road

Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Helmshore Road, Ramsbottom.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bury Metropolitan Borough Council on 14 Aug 2024 at 09:19.

United Utilities Water (formerly North West Water) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Abbey Street

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Abbey Street, Accrington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 02:42 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Nov 2024 at 16:14.

Electricity North West (NorWeb) logo
Finishing
Monday
Details
View Map
Share
Follow
Aspen Lane

Electricity North West (NorWeb) are carrying out New service connection on Aspen Lane, Oswaldtwistle.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 16:45 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 19 Nov 2024 at 08:28.

Cadent Gas logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Riding Barn Street

Cadent Gas are carrying out Utility repair and maintenance works on Riding Barn Street, Church.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 13:35 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 14:23.

Cadent Gas logo
Until
13 Dec 2024
Details
View Map
Share
Follow
Goodshaw Avenue

Cadent Gas are carrying out Utility asset works on Goodshaw Avenue, Loveclough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 10:34 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 13:50.

Cadent Gas logo
Until
28 Nov 2024
Details
View Map
Share
Follow
Annie Street

Cadent Gas are carrying out Utility repair and maintenance works on Annie Street, Accrington.

The works started on 20 November 2024 at 13:55 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 13:57.

Electricity North West (NorWeb) logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Moorside Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Moorside Road, Edgworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 30 Oct 2024 at 13:35.

Lancashire County Council logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Fairfield Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Fairfield Street, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 8 Nov 2024 at 09:17.

BT logo
Between
6 and 10 Dec 2024
Details
View Map
Share
Follow
Back 552-568 Bacup Road

BT are proposing to carry out Utility repair and maintenance works on Back 552-568 Bacup Road, Waterfoot, Rossendale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Sep 2024 at 15:08.

Bury Metropolitan Borough Council logo
LONG TERM
Between
16 Dec 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Rowlands Road

Bury Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Rowlands Road, Ramsbottom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bury Metropolitan Borough Council on 16 Oct 2024 at 14:11.

Lancashire County Council logo
LONG TERM
Between
16 Dec 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Holcombe Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Holcombe Road, Haslingden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 23 Sep 2024 at 16:18.

Electricity North West (NorWeb) logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Moorside Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Moorside Road, Edgworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 23 Oct 2024 at 16:21.

Lancashire County Council logo
LONG TERM
Between
23 Dec 2024 and 5 Mar 2025
Details
View Map
Share
Follow
Burnley Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 30 Sep 2024 at 13:18.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
5 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Broadhead Road

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on Broadhead Road, Edgworth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 3 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 5 Nov 2024 at 14:26.

Blackburn With Darwen Borough Council logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
From M65 To B6232

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on From M65 To B6232, Blackburn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 25 Oct 2024 at 14:24.

Lancashire County Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Bank Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Bank Street, Rawtenstall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 20 Oct 2024 at 14:44.

Lancashire County Council logo
Between
8 and 24 Jan 2025
Details
View Map
Share
Follow
Burnley Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 25 Oct 2024 at 13:53.

Cadent Gas logo
Between
8 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Walnut Avenue

Cadent Gas are proposing to carry out Utility asset works on Walnut Avenue, Haslingden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 14:08.

Bury Metropolitan Borough Council logo
LONG TERM
Between
13 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Rowlands Road

Bury Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Rowlands Road, Ramsbottom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bury Metropolitan Borough Council on 28 Oct 2024 at 11:10.

Lancashire County Council logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Fairfield Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Fairfield Street, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 18 Oct 2024 at 15:37.

Cadent Gas logo
Between
22 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Goodshaw Lane

Cadent Gas are proposing to carry out Utility asset works on Goodshaw Lane, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Nov 2024 at 13:21.

Cadent Gas logo
Between
22 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Goodshaw Lane

Cadent Gas are proposing to carry out Utility asset works on Goodshaw Lane, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 13:07.

Cadent Gas logo
Between
23 Jan and 20 Feb 2025
Details
View Map
Share
Burnley Road

Cadent Gas were proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 January 2025 and run through until 20 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 08:33.

Lancashire County Council logo
LONG TERM
Between
27 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Manchester Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Manchester Road, Accrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 6 Nov 2024 at 10:36.

BT logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Chapel Street

BT are proposing to carry out Utility asset works on Chapel Street, Haslingden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 6 Nov 2024 at 11:59.

Cadent Gas logo
LONG TERM
Between
29 Jan and 2 May 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 11:10.

Cadent Gas logo
LONG TERM
Between
29 Jan and 2 May 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 11:21.

Bury Metropolitan Borough Council logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Helmshore Road

Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Helmshore Road, Ramsbottom.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bury Metropolitan Borough Council on 21 Nov 2024 at 09:26.

Electricity North West (NorWeb) logo
Between
4 and 10 Feb 2025
Details
View Map
Share
Goodshaw Lane

Electricity North West (NorWeb) were proposing to carry out New service connection on Goodshaw Lane, Rawtenstall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Nov 2024 at 10:49.

Electricity North West (NorWeb) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Goodshaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Goodshaw Lane, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Nov 2024 at 11:00.


Roadworks Map near to Highfield Street, ROSSENDALE, BB4 5EX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Highfield Street, ROSSENDALE, BB4 5EX (34 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
EMERGENCY
  
GRANE ROAD 
(0.1 miles)
Cadent Gas
Utility repair and maintenance works - Footpath - Some carriageway incursion
In Progress
Since: 18 Nov 2024 17:30
(Scheduled: 18 Nov 2024 - 26 Nov 2024)
0.1
Details
Share
Follow
2
Nexfibre Networks Limited logo
GRANE ROAD 
(0.1 miles)
Nexfibre Networks Limited
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 20 Nov 2024 09:00
(Scheduled: 19 Nov 2024 - 21 Nov 2024)
0.1
Details
Share
Follow
3
Nexfibre Networks Limited logo
HELMSHORE ROAD, HELMSHORE 
(0.3 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 21 Nov 2024 09:00
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
0.3
Details
Share
Follow
4
Nexfibre Networks Limited logo
OSBORNE WAY 
(0.3 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway - Give and take
In Progress
Since: 19 Nov 2024 08:45
(Scheduled: 19 Nov 2024 - 25 Nov 2024)
0.3
Details
Share
Follow
5
Nexfibre Networks Limited logo
WARNER STREET 
(0.3 miles)
Nexfibre Networks Limited
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 21 Nov 2024 - 25 Nov 2024
0.3
Details
Share
Follow
6
Nexfibre Networks Limited logo
MANCHESTER ROAD 
(0.3 miles)
Nexfibre Networks Limited
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 21 Nov 2024 - 25 Nov 2024
0.3
Details
Share
Follow
7
Nexfibre Networks Limited logo
DALESFORD 
(0.4 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway - Give and take
In Progress
Since: 20 Nov 2024 09:00
(Scheduled: 20 Nov 2024 - 3 Dec 2024)
0.4
Details
Share
Follow
8
Nexfibre Networks Limited logo
MERCER CRESCENT 
(0.4 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway - Give and take
Planned
Scheduled: 19 Nov 2024 - 25 Nov 2024
0.4
Details
Share
Follow
9
Nexfibre Networks Limited logo
LANESIDE ROAD 
(0.4 miles)
Nexfibre Networks Limited
Utility asset works - Footway, Carriageway - Give and take
In Progress
Since: 11 Nov 2024 12:30
(Scheduled: 11 Nov 2024 - 22 Nov 2024)
0.4
Details
Share
Follow
10
Nexfibre Networks Limited logo
MANCHESTER ROAD 
(0.4 miles)
Nexfibre Networks Limited
Utility asset works - Footway - No carriageway incursion
In Progress
Since: 20 Nov 2024 14:30
(Scheduled: 19 Nov 2024 - 22 Nov 2024)
0.4
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.