ROADWORKS SUMMARY
Waterfield Avenue, DARWEN, BB3 2EE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Waterfield Avenue, BB3 2EE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Waterfield Avenue, DARWEN, BB3 2EE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Waterfield Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Lancashire County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Bolton Road

Lancashire County Council are carrying out Highway repair and maintenance works on Bolton Road, Withnell.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 July 2023 at 13:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 4 Jul 2024 at 12:16.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
16 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Belmont Road

Blackburn With Darwen Borough Council are proposing to carry out Highway repair and maintenance works on Belmont Road, Belmont.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 24 Sep 2024 at 12:05.

Cadent Gas logo
LONG TERM
Between
28 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Belmont Road

Cadent Gas are proposing to carry out Utility asset works on Belmont Road, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 14:05.

Cadent Gas logo
LONG TERM
Between
28 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Belmont Road

Cadent Gas are proposing to carry out Utility asset works on Belmont Road, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2024 at 14:49.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Monmouth Road

Cadent Gas are carrying out Utility asset works on Monmouth Road, Blackburn.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:33.

Cadent Gas logo
LONG TERM
Between
6 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Bury Lane

Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:03.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Chorley Road

Cadent Gas are proposing to carry out Utility asset works on Chorley Road, Withnell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:04.

Cadent Gas logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Devon Road

Cadent Gas are carrying out Utility asset works on Devon Road, Blackburn.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 16:45 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:37.

Blackburn With Darwen Borough Council logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Audley Range

Blackburn With Darwen Borough Council are proposing to carry out Works for road purposes on Audley Range, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 7 Oct 2024 at 12:08.

Cadent Gas logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Belmont Road

Cadent Gas are carrying out Utility asset works on Belmont Road, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 08:15 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:19.

United Utilities Water (formerly North West Water) logo
Today
Details
View Map
Share
Rear 2 To 26 Malvern Avenue

United Utilities Water (formerly North West Water) carried out Utility repair and maintenance works on Rear 2 To 26 Malvern Avenue, Blackburn.

The road was closed for some or all of the period.

The works were originally planned between 15 Nov 2024 and 21 Nov 2024 and were actually completed between 15 Nov 2024 (08:23) and 21 Nov 2024 (13:37). The works impacted the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Nov 2024 at 15:01.

Electricity North West (NorWeb) logo
Finishing
Monday
Details
View Map
Share
Follow
Aspen Lane

Electricity North West (NorWeb) are carrying out New service connection on Aspen Lane, Oswaldtwistle.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 16:45 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 19 Nov 2024 at 08:28.

Murphy Power Distribution logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Hollins Grove Street

Murphy Power Distribution are proposing to carry out Utility asset works on Hollins Grove Street, Darwen.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 11 Sep 2024 at 14:44.

Electricity North West (NorWeb) logo
Until
5 Dec 2024
Details
View Map
Share
Follow
Harwood Street

Electricity North West (NorWeb) are carrying out Disconnection or alteration of supply on Harwood Street, Blackburn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 14:00 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 19 Nov 2024 at 15:54.

Electricity North West (NorWeb) logo
Between
18 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Harwood Street

Electricity North West (NorWeb) are proposing to carry out Disconnection or alteration of supply on Harwood Street, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Sep 2024 at 14:44.

Electricity North West (NorWeb) logo
Until
5 Dec 2024
Details
View Map
Share
Follow
Furthergate

Electricity North West (NorWeb) are carrying out Disconnection or alteration of supply on Furthergate, Blackburn.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 16:45 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Nov 2024 at 09:06.

Electricity North West (NorWeb) logo
Between
18 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Furthergate

Electricity North West (NorWeb) are proposing to carry out Disconnection or alteration of supply on Furthergate, Blackburn.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Sep 2024 at 14:42.

Blackburn With Darwen Borough Council logo
Between
20 Nov and 4 Dec 2024
Details
View Map
Share
Follow
King Street

Blackburn With Darwen Borough Council are proposing to carry out Works for road purposes on King Street, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 7 Oct 2024 at 12:08.

Electricity North West (NorWeb) logo
Between
21 Nov and 5 Dec 2024
Details
View Map
Share
Furthergate

Electricity North West (NorWeb) were proposing to carry out Disconnection or alteration of supply on Furthergate, Blackburn.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2024 and run through until 5 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Aug 2024 at 14:08.

Cadent Gas logo
Between
25 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Hereford Road

Cadent Gas are proposing to carry out Utility asset works on Hereford Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 12:21.

Blackburn With Darwen Borough Council logo
Until
30 Nov 2024
Details
View Map
Share
Follow
Vale Street

Blackburn With Darwen Borough Council are carrying out Highway repair and maintenance works on Vale Street, Darwen.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 07:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 21 Oct 2024 at 14:31.

Electricity North West (NorWeb) logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Moorside Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Moorside Road, Edgworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 30 Oct 2024 at 13:35.

Blackburn With Darwen Borough Council logo
Between
27 Nov and 17 Dec 2024
Details
View Map
Share
Follow
Audley Range

Blackburn With Darwen Borough Council are proposing to carry out Works for road purposes on Audley Range, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 7 Oct 2024 at 12:10.

United Utilities Water (formerly North West Water) logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Horseshoe Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Horseshoe Lane, Bromley Cross, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Oct 2024 at 12:13.

United Utilities Water (formerly North West Water) logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Horseshoe Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Horseshoe Lane, Bromley Cross, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Nov 2024 at 15:01.

Murphy Power Distribution logo
Between
11 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Hollins Grove Street

Murphy Power Distribution are proposing to carry out Utility asset works on Hollins Grove Street, Darwen.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 3 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 19 Sep 2024 at 13:19.

Lancashire County Council logo
LONG TERM
Between
16 Dec 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Holcombe Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Holcombe Road, Haslingden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 23 Sep 2024 at 16:18.

Electricity North West (NorWeb) logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Moorside Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Moorside Road, Edgworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 23 Oct 2024 at 16:21.

Murphy Power Distribution logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Hollins Grove Street

Murphy Power Distribution are proposing to carry out Utility asset works on Hollins Grove Street, Darwen.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 19 Sep 2024 at 14:30.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
5 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Broadhead Road

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on Broadhead Road, Edgworth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 3 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 5 Nov 2024 at 14:26.

Blackburn With Darwen Borough Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
A6077 From Guide Roundabout To M65

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on A6077 From Guide Roundabout To M65, Blackburn.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 1 Nov 2024 at 14:32.

Blackburn With Darwen Borough Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
M65 J5 Join E

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on M65 J5 Join E, Blackburn With Darwen.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 1 Nov 2024 at 14:38.

Cadent Gas logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Fairfields

Cadent Gas were proposing to carry out Utility asset works on Fairfields, Egerton, Bolton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:30.

Blackburn With Darwen Borough Council logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
M65 J5 Join E

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on M65 J5 Join E, Blackburn With Darwen.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 25 Oct 2024 at 14:00.

Blackburn With Darwen Borough Council logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
M65 J5 Join W

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on M65 J5 Join W, Blackburn With Darwen.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 25 Oct 2024 at 14:08.

Blackburn With Darwen Borough Council logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
From M65 To B6232

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on From M65 To B6232, Blackburn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 25 Oct 2024 at 14:24.

Blackburn With Darwen Borough Council logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
M65 J5 Leave E

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on M65 J5 Leave E, Blackburn With Darwen.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 25 Oct 2024 at 14:18.

Blackburn With Darwen Borough Council logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
A6077 From Guide Roundabout To M65

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on A6077 From Guide Roundabout To M65, Blackburn.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the verge only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 25 Oct 2024 at 13:53.

Cadent Gas logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Follow
Fairfields

Cadent Gas are proposing to carry out Utility asset works on Fairfields, Egerton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:39.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Bury Lane

Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 16:22.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Bury Lane

Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:53.

Blackburn With Darwen Borough Council logo
Between
15 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Accrington Road

Blackburn With Darwen Borough Council are proposing to carry out Works for road purposes on Accrington Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 4 Nov 2024 at 15:45.

Blackburn With Darwen Borough Council logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Great Bolton Street

Blackburn With Darwen Borough Council are proposing to carry out Works for road purposes on Great Bolton Street, Blackburn.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 4 Nov 2024 at 15:45.

Cadent Gas logo
LONG TERM
Between
13 Feb and 24 Apr 2025
Details
View Map
Share
Follow
Bury Lane

Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:38.

Cadent Gas logo
LONG TERM
Between
13 Feb and 24 Apr 2025
Details
View Map
Share
Follow
Bury Lane

Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 16:10.

Cadent Gas logo
Between
13 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Chorley Road

Cadent Gas are proposing to carry out Utility asset works on Chorley Road, Withnell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:41.

Electricity North West (NorWeb) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Earnsdale Road

Electricity North West (NorWeb) were proposing to carry out New service connection on Earnsdale Road, Darwen.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 19 Nov 2024 at 11:53.


Roadworks Map near to Waterfield Avenue, DARWEN, BB3 2EE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 19:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Waterfield Avenue, DARWEN, BB3 2EE (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Blackburn With Darwen Borough Council logo
URGENT
  
SOUGH ROAD 
(0.4 miles)
Blackburn With Darwen Borough Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 18 Nov 2024 07:00
(Scheduled: 18 Nov 2024 - 22 Nov 2024)
0.4
Details
Share
Follow
2
Electricity North West (NorWeb) logo
URGENT
  
COBDEN STREET 
(0.8 miles)
Electricity North West (NorWeb)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 20 Nov 2024 16:35
(Scheduled: 20 Nov 2024 - 26 Nov 2024)
0.8
Details
Share
Follow
3
Virgin Media logo
BRANDWOOD STREET 
(0.9 miles)
Virgin Media
Utility asset works - Footway - Some carriageway incursion
Complete
20 Nov 2024 12:36 - 15:00
0.9
Details
Share
4
Cadent Gas logo
MARSH HOUSE LANE 
(0.9 miles)
Cadent Gas
Remedial works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 22 Nov 2024 - 26 Nov 2024
0.9
Details
Share
Follow