ROADWORKS SUMMARY
Vicarage Lane, BLACKBURN, BB1 9HY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Vicarage Lane, BB1 9HY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Vicarage Lane, BLACKBURN, BB1 9HY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Vicarage Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Blackburn With Darwen Borough Council logo
LONG TERM
Until
5 May 2025
Details
View Map
Share
Follow
Davies Road

Blackburn With Darwen Borough Council are carrying out Section 50 on Davies Road, Blackburn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 August 2024 at 07:00 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 16 Aug 2024 at 10:42.

Cadent Gas logo
LONG TERM
Until
9 Nov 2024
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are carrying out Utility asset works on Burnley Road, Clayton-le-moors.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 11:00 and could run through until 9 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 09:16.

Cadent Gas logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Cliff Street

Cadent Gas are carrying out Utility asset works on Cliff Street, Rishton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 08:53 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:02.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Riding Barn Street

Cadent Gas are proposing to carry out Utility asset works on Riding Barn Street, Church.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2024 at 09:00.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Riding Barn Street

Cadent Gas are proposing to carry out Utility asset works on Riding Barn Street, Church.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 10:56.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Brecon Road

Cadent Gas are proposing to carry out Utility asset works on Brecon Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 16:13.

Cadent Gas logo
LONG TERM
Between
10 Oct and 14 Nov 2024
Details
View Map
Share
Follow
Devon Road

Cadent Gas are proposing to carry out Utility asset works on Devon Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 16:13.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hereford Road

Cadent Gas are proposing to carry out Utility asset works on Hereford Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 16:10.

Cadent Gas logo
LONG TERM
Between
14 Oct and 15 Nov 2024
Details
View Map
Share
Elker Lane

Cadent Gas were proposing to carry out Utility asset works on Elker Lane, Billington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 09:29.

Cadent Gas logo
LONG TERM
Between
14 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Elker Lane

Cadent Gas are proposing to carry out Utility asset works on Elker Lane, Billington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jul 2024 at 09:24.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Monmouth Road

Cadent Gas are proposing to carry out Utility asset works on Monmouth Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 16:14.

Cadent Gas logo
LONG TERM
Until
2 Dec 2024
Details
View Map
Share
Follow
Rhyddings Street

Cadent Gas are carrying out Utility asset works on Rhyddings Street, Oswaldtwistle.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 09:30 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:53.

Cadent Gas logo
LONG TERM
Until
2 Dec 2024
Details
View Map
Share
Follow
Union Road

Cadent Gas are carrying out Utility asset works on Union Road, Oswaldtwistle.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 09:30 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:53.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Heys Lane

Cadent Gas are carrying out Utility repair and maintenance works on Heys Lane, Great Harwood.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 08:38 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 09:24.

Cadent Gas logo
LONG TERM
Between
21 Oct and 2 Dec 2024
Details
View Map
Share
Follow
Cliff Street

Cadent Gas are proposing to carry out Utility asset works on Cliff Street, Rishton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 14:21.

Lancashire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Union Road

Lancashire County Council are carrying out Highway repair and maintenance works on Union Road, Oswaldtwistle.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 06:00 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 28 Oct 2024 at 16:30.

Cadent Gas logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are carrying out Utility repair and maintenance works on Burnley Road, Altham, Accrington.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 October 2024 at 11:11 and could run through until 8 November 2024. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 10:20.

Cadent Gas logo
Until
18 Nov 2024
Details
View Map
Share
Follow
Brecon Road

Cadent Gas are carrying out Utility asset works on Brecon Road, Blackburn.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 08:25.

Cadent Gas logo
Until
15 Nov 2024
Details
View Map
Share
Follow
Whalley Range

Cadent Gas are carrying out Utility asset works on Whalley Range, Blackburn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 08:26.

Cadent Gas logo
Between
28 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Whalley Range

Cadent Gas are proposing to carry out Utility asset works on Whalley Range, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 15:26.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
George Lane

Cadent Gas are carrying out Utility repair and maintenance works on George Lane, Read.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 14:31 and could run through until 5 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 15:50.

Cadent Gas logo
LONG TERM
Between
29 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Union Road

Cadent Gas are proposing to carry out Utility asset works on Union Road, Oswaldtwistle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2024 at 16:30.

United Utilities Water (formerly North West Water) logo
Finishing
Monday
Details
View Map
Share
Follow
George Lane

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on George Lane, Read.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 00:23 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Oct 2024 at 09:19.

Cadent Gas logo
LONG TERM
Between
29 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Rhyddings Street

Cadent Gas are proposing to carry out Utility asset works on Rhyddings Street, Oswaldtwistle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2024 at 16:30.

Cadent Gas logo
LONG TERM
Between
29 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Rhyddings Street

Cadent Gas are proposing to carry out Utility asset works on Rhyddings Street, Oswaldtwistle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 14:24.

Cadent Gas logo
LONG TERM
Between
29 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Union Road

Cadent Gas are proposing to carry out Utility asset works on Union Road, Oswaldtwistle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 14:22.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Higher Croft Road

BT are proposing to carry out Utility asset works on Higher Croft Road, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 Sep 2024 at 09:44.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Higher Croft Road

BT are proposing to carry out Utility asset works on Higher Croft Road, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 3 Sep 2024 at 16:18.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Montague Street

BT are proposing to carry out Utility repair and maintenance works on Montague Street, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Aug 2024 at 09:38.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Montague Street

Cadent Gas are carrying out Utility repair and maintenance works on Montague Street, Blackburn.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 11:58 and could run through until 5 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 13:37.

Blackburn With Darwen Borough Council logo
Until
6 Nov 2024
Details
View Map
Share
Follow
Kelsall Avenue

Blackburn With Darwen Borough Council are carrying out Highway repair and maintenance works on Kelsall Avenue, Blackburn.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 07:00 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 21 Oct 2024 at 14:27.

Blackburn With Darwen Borough Council logo
Until
6 Nov 2024
Details
View Map
Share
Follow
Troy Street

Blackburn With Darwen Borough Council are carrying out Highway repair and maintenance works on Troy Street, Blackburn.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 07:00 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 21 Oct 2024 at 14:28.

United Utilities Water (formerly North West Water) logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Mellor Brow

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Mellor Brow, Mellor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 6 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 1 Oct 2024 at 09:23.

Cadent Gas logo
Between
4 and 21 Nov 2024
Details
View Map
Share
Follow
Monmouth Road

Cadent Gas are proposing to carry out Utility asset works on Monmouth Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:47.

Cadent Gas logo
Between
5 and 26 Nov 2024
Details
View Map
Share
Follow
Riding Barn Street

Cadent Gas are proposing to carry out Utility asset works on Riding Barn Street, Church.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 09:45.

Blackburn With Darwen Borough Council logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Audley Range

Blackburn With Darwen Borough Council are proposing to carry out Works for road purposes on Audley Range, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 7 Oct 2024 at 12:08.

Electricity North West (NorWeb) logo
Between
11 and 18 Nov 2024
Details
View Map
Share
Follow
Aspen Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Aspen Lane, Oswaldtwistle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 28 Aug 2024 at 16:29.

Cadent Gas logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Whalley Road

Cadent Gas are proposing to carry out Utility asset works on Whalley Road, Billington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 16:46.

Cadent Gas logo
LONG TERM
Between
14 Nov and 19 Dec 2024
Details
View Map
Share
Follow
Devon Road

Cadent Gas are proposing to carry out Utility asset works on Devon Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 15:11.

Electricity North West (NorWeb) logo
Between
18 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Furthergate

Electricity North West (NorWeb) are proposing to carry out Disconnection or alteration of supply on Furthergate, Blackburn.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Sep 2024 at 14:42.

Electricity North West (NorWeb) logo
Between
18 and 25 Nov 2024
Details
View Map
Share
Follow
Aspen Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Aspen Lane, Oswaldtwistle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Sep 2024 at 09:18.

Electricity North West (NorWeb) logo
Between
18 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Harwood Street

Electricity North West (NorWeb) are proposing to carry out Disconnection or alteration of supply on Harwood Street, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 17 Sep 2024 at 14:44.

United Utilities Water (formerly North West Water) logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Dukes Brow

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Dukes Brow, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Sep 2024 at 10:23.

Blackburn With Darwen Borough Council logo
Between
20 Nov and 4 Dec 2024
Details
View Map
Share
Follow
King Street

Blackburn With Darwen Borough Council are proposing to carry out Works for road purposes on King Street, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 7 Oct 2024 at 12:08.

Electricity North West (NorWeb) logo
Between
21 Nov and 5 Dec 2024
Details
View Map
Share
Furthergate

Electricity North West (NorWeb) were proposing to carry out Disconnection or alteration of supply on Furthergate, Blackburn.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2024 and run through until 5 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Aug 2024 at 14:08.

Cadent Gas logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Preston New Road

Cadent Gas were proposing to carry out Utility asset works on Preston New Road, Blackburn.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 14:17.

Cadent Gas logo
LONG TERM
Between
25 Nov 2024 and 24 Feb 2025
Details
View Map
Share
Follow
St James's Road

Cadent Gas are proposing to carry out Utility asset works on St James's Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 13:27.

Cadent Gas logo
LONG TERM
Between
26 Nov 2024 and 25 Feb 2025
Details
View Map
Share
Follow
St James's Road

Cadent Gas are proposing to carry out Utility asset works on St James's Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 16:00.

Cadent Gas logo
Between
26 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Whalley Road

Cadent Gas are proposing to carry out Utility asset works on Whalley Road, Billington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 13:35.

Cadent Gas logo
Between
26 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Whalley Range

Cadent Gas are proposing to carry out Utility asset works on Whalley Range, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 15:59.

Blackburn With Darwen Borough Council logo
Between
27 Nov and 17 Dec 2024
Details
View Map
Share
Follow
Audley Range

Blackburn With Darwen Borough Council are proposing to carry out Works for road purposes on Audley Range, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 7 Oct 2024 at 12:10.

Network Rail logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Whalley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 26 Sep 2024 at 12:30.

Network Rail logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Whalley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Sep 2024 at 13:46.

Electricity North West (NorWeb) logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Abbott Brow

Electricity North West (NorWeb) were proposing to carry out New service connection on Abbott Brow, Mellor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 8 Oct 2024 at 09:45.

Electricity North West (NorWeb) logo
Between
9 and 16 Dec 2024
Details
View Map
Share
Follow
Abbott Brow

Electricity North West (NorWeb) are proposing to carry out New service connection on Abbott Brow, Mellor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 28 Sep 2024 at 11:44.

Cadent Gas logo
Between
9 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Hereford Road

Cadent Gas are proposing to carry out Utility asset works on Hereford Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 2 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 15:11.

Cadent Gas logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Whalley Road

Cadent Gas are proposing to carry out Utility asset works on Whalley Road, Billington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 10:36.

Cadent Gas logo
Between
2 and 29 Jan 2025
Details
View Map
Share
Follow
Moor Lane

Cadent Gas are proposing to carry out Utility asset works on Moor Lane, Whalley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Sep 2024 at 13:57.

Blackburn With Darwen Borough Council logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
M65 J5 Join W

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on M65 J5 Join W, Blackburn With Darwen.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 25 Oct 2024 at 14:08.

Blackburn With Darwen Borough Council logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
M65 J5 Join E

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on M65 J5 Join E, Blackburn With Darwen.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 25 Oct 2024 at 14:00.

Blackburn With Darwen Borough Council logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
A6077 From Guide Roundabout To M65

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on A6077 From Guide Roundabout To M65, Blackburn.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the verge only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 25 Oct 2024 at 13:53.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Osbaldeston Lane

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Osbaldeston Lane, Osbaldeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Oct 2024 at 10:40.

Cadent Gas logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Conway Avenue

Cadent Gas are proposing to carry out Utility asset works on Conway Avenue, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 09:43.

Blackburn With Darwen Borough Council logo
Between
15 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Accrington Road

Blackburn With Darwen Borough Council are proposing to carry out Works for road purposes on Accrington Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 7 Oct 2024 at 11:58.

Cadent Gas logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Pleckgate Road

Cadent Gas are proposing to carry out Utility asset works on Pleckgate Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 13:00.

Cadent Gas logo
LONG TERM
Between
27 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Rhodes Avenue

Cadent Gas are proposing to carry out Utility asset works on Rhodes Avenue, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 13:30.


Roadworks Map near to Vicarage Lane, BLACKBURN, BB1 9HY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Oct 2024 17:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Vicarage Lane, BLACKBURN, BB1 9HY (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
URGENT
  
DURHAM ROAD 
(0.2 miles)
BT
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 29 Oct 2024 15:44
(Scheduled: 29 Oct 2024 - 31 Oct 2024)
0.2
Details
Share
Follow
2
BT logo
THE HAZELS 
(0.3 miles)
BT
New service connection - Footway - Some carriageway incursion
Complete
26 Oct 2024 11:48 - 12:56
0.3
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.