ROADWORKS SUMMARY
Kelbrook Road, BARNOLDSWICK, BB18 5TF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Kelbrook Road, BB18 5TF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Kelbrook Road, BARNOLDSWICK, BB18 5TF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Kelbrook Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Lancashire County Council logo
LONG TERM
Between
1 Nov 2024 and 31 May 2025
Details
View Map
Share
Follow
Holme Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Holme Street, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 31 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 14 Mar 2024 at 13:06.

Lancashire County Council logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
New Scotland Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on New Scotland Road, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 14 Mar 2024 at 12:24.

Lancashire County Council logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Leeds Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Leeds Road, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 14 Mar 2024 at 12:41.

Lancashire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Brogden Lane

Lancashire County Council are carrying out Section 50 on Brogden Lane, Barnoldswick.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lancashire County Council on 5 Dec 2024 at 16:26.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Colne Road

Cadent Gas are proposing to carry out Utility asset works on Colne Road, Earby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Oct 2024 at 09:13.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Colne Road

Cadent Gas are proposing to carry out Utility asset works on Colne Road, Earby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Sep 2024 at 13:58.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Colne Road

Cadent Gas are proposing to carry out Utility asset works on Colne Road, Earby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2024 at 15:19.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Applegarth Street

Cadent Gas are proposing to carry out Utility asset works on Applegarth Street, Earby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2024 at 15:31.

Lancashire County Council logo
Between
16 and 27 Dec 2024
Details
View Map
Share
Follow
Trash Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Trash Lane, Rimington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 17 Sep 2024 at 12:31.

Electricity North West (NorWeb) logo
Finishing
Friday
Details
View Map
Share
Follow
Reedymoor Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Reedymoor Lane, Foulridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Oct 2024 at 08:18.

Lancashire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Skipton Old Road

Lancashire County Council are carrying out Highway repair and maintenance works on Skipton Old Road, Colne.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 08:00 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 17 Dec 2024 at 09:07.

Lancashire County Council logo
Between
23 and 30 Dec 2024
Details
View Map
Share
Follow
Merclesden Avenue

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Merclesden Avenue, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 23 Sep 2024 at 14:18.

Electricity North West (NorWeb) logo
Between
24 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Reedymoor Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Reedymoor Lane, Foulridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 14 Oct 2024 at 10:55.

Electricity North West (NorWeb) logo
Between
26 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Cross Street West

Electricity North West (NorWeb) were proposing to carry out New service connection on Cross Street West, Colne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 December 2024 and run through until 7 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Oct 2024 at 10:19.

Lancashire County Council logo
Between
1 and 9 Jan 2025
Details
View Map
Share
Follow
Appleby Drive

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Appleby Drive, Barrowford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 2 Oct 2024 at 11:16.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Carry Lane

Cadent Gas are proposing to carry out Utility asset works on Carry Lane, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 09:02.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Keighley Road

Cadent Gas are proposing to carry out Utility asset works on Keighley Road, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 12:58.

Cadent Gas logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Back Rainhall Road

Cadent Gas are proposing to carry out New service connection on Back Rainhall Road, Barnoldswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:47.

Lancashire County Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Victoria Road

Lancashire County Council were proposing to carry out Highway improvement works on Victoria Road, Earby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 26 Nov 2024 at 16:16.

Lancashire County Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Lancashire County Council are proposing to carry out Highway improvement works on Victoria Road, Earby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 10 Dec 2024 at 15:47.

Lancashire County Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Victoria Road

Lancashire County Council were proposing to carry out Highway improvement works on Victoria Road, Earby.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 27 Nov 2024 at 09:07.

Lancashire County Council logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Coates Lane

Lancashire County Council are proposing to carry out Section 50 on Coates Lane, Barnoldswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 18 Nov 2024 at 09:29.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Ayrton Street

Cadent Gas are proposing to carry out Utility asset works on Ayrton Street, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 14:03.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Ayrton Street

Cadent Gas are proposing to carry out Utility asset works on Ayrton Street, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 13:52.

Cadent Gas logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Keighley Road

Cadent Gas are proposing to carry out Utility asset works on Keighley Road, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Sep 2024 at 14:18.

Cadent Gas logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Keighley Road

Cadent Gas are proposing to carry out Utility asset works on Keighley Road, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:54.

Electricity North West (NorWeb) logo
Between
14 and 22 Jan 2025
Details
View Map
Share
Follow
Cross Street West

Electricity North West (NorWeb) are proposing to carry out New service connection on Cross Street West, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 14 Dec 2024 at 09:12.

Electricity North West (NorWeb) logo
Between
14 and 22 Jan 2025
Details
View Map
Share
Follow
Cross Street West

Electricity North West (NorWeb) are proposing to carry out New service connection on Cross Street West, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Oct 2024 at 16:16.

Lancashire County Council logo
LONG TERM
Between
15 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Newtown

Lancashire County Council are proposing to carry out Highway improvement works on Newtown, Barnoldswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 10 Dec 2024 at 14:27.

Lancashire County Council logo
LONG TERM
Between
15 Jan and 7 Mar 2025
Details
View Map
Share
Newtown

Lancashire County Council were proposing to carry out Highway improvement works on Newtown, Barnoldswick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 15 Nov 2024 at 16:53.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Portland Street

Cadent Gas are proposing to carry out Utility asset works on Portland Street, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 09:59.

National Highways logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Red Lane

National Highways are proposing to carry out Works for Rail Purposes on Red Lane, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Nov 2024 at 15:26.

Cadent Gas logo
Between
22 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Warren Drive

Cadent Gas are proposing to carry out Utility asset works on Warren Drive, Barrowford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Sep 2024 at 13:45.

Cadent Gas logo
LONG TERM
Between
27 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Carry Lane

Cadent Gas are proposing to carry out Utility asset works on Carry Lane, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Dec 2024 at 09:26.

Cadent Gas logo
LONG TERM
Between
27 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Carry Lane

Cadent Gas are proposing to carry out Utility asset works on Carry Lane, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 11:30.

Yorkshire Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Earby Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Earby Road, Salterforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Nov 2024 at 14:54.

Cadent Gas logo
LONG TERM
Between
28 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Keighley Road

Cadent Gas are proposing to carry out Utility asset works on Keighley Road, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 09:51.

United Utilities Water (formerly North West Water) logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Hill Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Hill Lane, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 17:59.

United Utilities Water (formerly North West Water) logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Hill Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Hill Lane, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 10:39.

Cadent Gas logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Cotton Tree Lane

Cadent Gas are proposing to carry out Utility asset works on Cotton Tree Lane, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 15:11.

Cadent Gas logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Cotton Tree Lane

Cadent Gas are proposing to carry out Utility asset works on Cotton Tree Lane, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Sep 2024 at 14:20.

Cadent Gas logo
Between
5 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Colne Road

Cadent Gas are proposing to carry out Utility asset works on Colne Road, Earby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:52.

Cadent Gas logo
Between
5 and 21 Feb 2025
Details
View Map
Share
Follow
George Street

Cadent Gas are proposing to carry out Utility asset works on George Street, Earby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:54.

United Utilities Water (formerly North West Water) logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
Skipton Old Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Skipton Old Road, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 18:04.

United Utilities Water (formerly North West Water) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Skipton Old Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Skipton Old Road, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 10:41.

Cadent Gas logo
Between
12 and 28 Feb 2025
Details
View Map
Share
Follow
Applegarth Street

Cadent Gas are proposing to carry out Utility asset works on Applegarth Street, Earby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:55.

Lancashire County Council logo
Between
12 and 18 Feb 2025
Details
View Map
Share
Follow
Garden Street

Lancashire County Council are proposing to carry out Highway improvement works on Garden Street, Barnoldswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 10 Dec 2024 at 14:22.

United Utilities Water (formerly North West Water) logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Castle Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Castle Road, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 17:50.

United Utilities Water (formerly North West Water) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Castle Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Castle Road, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 10:43.

Yorkshire Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Earby Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Earby Road, Salterforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 28 Nov 2024 at 10:31.

Lancashire County Council logo
Between
18 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Rainhall Road

Lancashire County Council are proposing to carry out Highway improvement works on Rainhall Road, Barnoldswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 16 Dec 2024 at 10:08.

Lancashire County Council logo
Between
18 Feb and 14 Mar 2025
Details
View Map
Share
Rainhall Road

Lancashire County Council were proposing to carry out Highway improvement works on Rainhall Road, Barnoldswick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 27 Nov 2024 at 09:35.

Lancashire County Council logo
Between
18 Feb and 14 Mar 2025
Details
View Map
Share
Rainhall Road

Lancashire County Council were proposing to carry out Highway improvement works on Rainhall Road, Barnoldswick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 27 Nov 2024 at 09:44.

Cadent Gas logo
Between
19 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Marsden Hall Road

Cadent Gas are proposing to carry out Utility asset works on Marsden Hall Road, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 11:28.

Lancashire County Council logo
Between
19 and 25 Feb 2025
Details
View Map
Share
Follow
Market Street

Lancashire County Council are proposing to carry out Highway improvement works on Market Street, Barnoldswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 10 Dec 2024 at 14:29.

Cadent Gas logo
Between
19 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Marsden Hall Road

Cadent Gas are proposing to carry out Utility asset works on Marsden Hall Road, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 10:01.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Hollington Street

Cadent Gas are proposing to carry out Utility asset works on Hollington Street, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 09:05.

United Utilities Water (formerly North West Water) logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Castle Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Castle Road, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 10:42.

United Utilities Water (formerly North West Water) logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Castle Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Castle Road, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 17:34.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Gable End 187 Cotton Tree Lane

Cadent Gas are proposing to carry out Utility asset works on Gable End 187 Cotton Tree Lane, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 14:08.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Gable End 187 Cotton Tree Lane

Cadent Gas are proposing to carry out Utility asset works on Gable End 187 Cotton Tree Lane, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 13:38.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Hollington Street

Cadent Gas are proposing to carry out Utility asset works on Hollington Street, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 14:06.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Hollington Street

Cadent Gas are proposing to carry out Utility asset works on Hollington Street, Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 13:28.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Winewall Road

Cadent Gas are proposing to carry out Utility asset works on Winewall Road, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 09:58.

Lancashire County Council logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
York Street

Lancashire County Council are proposing to carry out Highway improvement works on York Street, Barnoldswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 16 Dec 2024 at 10:09.

Cadent Gas logo
Between
10 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Trawden Road

Cadent Gas are proposing to carry out Utility asset works on Trawden Road, Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 10:00.

Lancashire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Edward Street

Lancashire County Council are proposing to carry out Highway improvement works on Edward Street, Earby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 10 Dec 2024 at 15:43.

Cadent Gas logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Newtown

Cadent Gas are proposing to carry out Utility asset works on Newtown, Barnoldswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 12:26.


Roadworks Map near to Kelbrook Road, BARNOLDSWICK, BB18 5TF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Kelbrook Road, BARNOLDSWICK, BB18 5TF (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.