ROADWORKS SUMMARY
Higher Park, Kelbrook Road, BARNOLDSWICK, BB18 5TD
Introduction
View current and future planned roadworks and road closures for Higher Park, Kelbrook Road, BB18 5TD and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Higher Park, Kelbrook Road, BARNOLDSWICK, BB18 5TD
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Higher Park, Kelbrook Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
1 Nov 2024 and 30 Apr 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Leeds Road, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 14 Mar 2024 at 12:41.
Friday
Lancashire County Council are proposing to carry out Section 50 on Greenfield Road, Colne.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 6 Nov 2024 at 16:19.
Tuesday
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Merclesden Avenue, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 21 Oct 2024 at 11:39.
25 Nov and 12 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Back 28-52 Bracewell Street, Barnoldswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 10:50.
25 Nov and 12 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Back 28-52 Bracewell Street, Barnoldswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 13:29.
25 Nov and 16 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Bruce Street, Barnoldswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 13:50.
25 Nov and 2 Dec 2024
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Black Moss Road, Barley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Sep 2024 at 14:33.
25 Nov and 2 Dec 2024
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Black Moss Road, Barley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Sep 2024 at 12:31.
25 Nov and 2 Dec 2024
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Black Moss Road, Barley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Sep 2024 at 11:37.
27 Nov and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on George Street, Earby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Sep 2024 at 15:21.
27 Nov and 24 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Colne Road, Earby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Sep 2024 at 15:19.
27 Nov and 24 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Colne Road, Earby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Sep 2024 at 13:58.
27 Nov and 24 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Colne Road, Earby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Oct 2024 at 09:13.
29 Nov and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Bruce Street, Barnoldswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:54.
2 and 6 Dec 2024
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Trash Lane, Rimington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 12 Nov 2024 at 14:34.
4 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Applegarth Street, Earby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Sep 2024 at 15:31.
9 and 11 Dec 2024
Cadent Gas are proposing to carry out New service connection on Back Rainhall Road, Barnoldswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Oct 2024 at 09:13.
16 and 27 Dec 2024
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Trash Lane, Rimington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 17 Sep 2024 at 12:31.
16 and 20 Dec 2024
Electricity North West (NorWeb) are proposing to carry out New service connection on Reedymoor Lane, Foulridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Oct 2024 at 08:18.
23 and 30 Dec 2024
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Merclesden Avenue, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 23 Sep 2024 at 14:18.
24 Dec 2024 and 2 Jan 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Reedymoor Lane, Foulridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 14 Oct 2024 at 10:55.
26 Dec 2024 and 7 Jan 2025
Electricity North West (NorWeb) were proposing to carry out New service connection on Cross Street West, Colne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 December 2024 and run through until 7 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Oct 2024 at 10:19.
1 and 9 Jan 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Appleby Drive, Barrowford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Oct 2024 at 11:16.
6 and 8 Jan 2025
Cadent Gas are proposing to carry out New service connection on Back Rainhall Road, Barnoldswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:47.
6 and 17 Jan 2025
Lancashire County Council are proposing to carry out Highway improvement works on Victoria Road, Earby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 15 Nov 2024 at 17:33.
6 and 17 Jan 2025
Lancashire County Council are proposing to carry out Highway improvement works on Victoria Road, Earby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 22 Nov 2024 at 17:16.
13 Jan and 14 Feb 2025
Lancashire County Council are proposing to carry out Section 50 on Coates Lane, Barnoldswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 18 Nov 2024 at 09:29.
13 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Ayrton Street, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 14:03.
13 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Keighley Road, Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Sep 2024 at 14:18.
14 and 22 Jan 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Cross Street West, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Oct 2024 at 16:16.
15 Jan and 7 Mar 2025
Lancashire County Council were proposing to carry out Highway improvement works on Newtown, Barnoldswick.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 January 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 15 Nov 2024 at 16:53.
15 Jan and 7 Mar 2025
Lancashire County Council are proposing to carry out Highway improvement works on Newtown, Barnoldswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 22 Nov 2024 at 15:50.
20 Jan and 28 Feb 2025
National Highways are proposing to carry out Works for Rail Purposes on Red Lane, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 11 Nov 2024 at 15:26.
20 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Portland Street, Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 09:59.
22 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Warren Drive, Barrowford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Sep 2024 at 13:45.
27 Jan and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Carry Lane, Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 11:30.
28 and 30 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Earby Road, Salterforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 6 Nov 2024 at 14:54.
28 Jan and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Keighley Road, Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 09:51.
28 and 30 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Earby Road, Salterforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 13 Nov 2024 at 08:54.
3 Feb and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Cotton Tree Lane, Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 15:11.
3 Feb and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Cotton Tree Lane, Colne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Sep 2024 at 14:20.
3 and 14 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Hill Lane, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Nov 2024 at 11:54.
5 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Colne Road, Earby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:52.
5 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on George Street, Earby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:54.
10 and 14 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Skipton Old Road, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Nov 2024 at 12:08.
12 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Applegarth Street, Earby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:55.
17 and 21 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Castle Road, Colne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Nov 2024 at 15:42.
18 Feb and 14 Mar 2025
Lancashire County Council are proposing to carry out Highway improvement works on Rainhall Road, Barnoldswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 22 Nov 2024 at 16:54.
18 Feb and 14 Mar 2025
Lancashire County Council are proposing to carry out Highway improvement works on Rainhall Road, Barnoldswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 15 Nov 2024 at 17:17.
Roadworks Map near to Higher Park, Kelbrook Road, BARNOLDSWICK, BB18 5TD
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Higher Park, Kelbrook Road, BARNOLDSWICK, BB18 5TD (3 Events)
(Scheduled Dates)
(miles)
(Scheduled: 22 Nov 2024 - 28 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.