ROADWORKS SUMMARY
Rydal Road, BLACKBURN, BB1 5NR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Rydal Road, BB1 5NR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Rydal Road, BLACKBURN, BB1 5NR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Rydal Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Blackburn With Darwen Borough Council logo
LONG TERM
Until
5 Feb 2026
Details
View Map
Share
Follow
Davies Road

Blackburn With Darwen Borough Council are carrying out Section 50 on Davies Road, Blackburn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 August 2024 at 07:00 and could run through until 5 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 24 Jul 2025 at 13:59.

Lancashire County Council logo
LONG TERM
Until
1 Jan 2026
Details
View Map
Share
Follow
Haslingden Old Road

Lancashire County Council are carrying out Highway repair and maintenance works on Haslingden Old Road, Oswaldtwistle.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 January 2025 at 10:00 and could run through until 1 January 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Lancashire County Council on 7 Jan 2025 at 08:42.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
5 May 2025 and 1 Jan 2027
Details
View Map
Share
M65 J5 Join E

Blackburn With Darwen Borough Council were proposing to carry out Highway improvement works on M65 J5 Join E, Blackburn With Darwen.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 1 January 2027. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 9 Apr 2025 at 08:35.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
5 May 2025 and 1 Jan 2027
Details
View Map
Share
M65 J5 Join W

Blackburn With Darwen Borough Council were proposing to carry out Highway improvement works on M65 J5 Join W, Blackburn With Darwen.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 1 January 2027. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 9 Apr 2025 at 08:37.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
5 May 2025 and 1 Jan 2027
Details
View Map
Share
Follow
From M65 To B6232

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on From M65 To B6232, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 1 January 2027. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 29 Nov 2024 at 12:24.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
5 May 2025 and 1 Jan 2027
Details
View Map
Share
M65 J5 Leave E

Blackburn With Darwen Borough Council were proposing to carry out Highway improvement works on M65 J5 Leave E, Blackburn With Darwen.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 1 January 2027. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 9 Apr 2025 at 08:35.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
5 May 2025 and 1 Jan 2027
Details
View Map
Share
M65 J5 Leave W

Blackburn With Darwen Borough Council were proposing to carry out Highway improvement works on M65 J5 Leave W, Blackburn With Darwen.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 1 January 2027. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 9 Apr 2025 at 08:36.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
5 May 2025 and 1 Jan 2027
Details
View Map
Share
Follow
A6077 From Guide Roundabout To M65

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on A6077 From Guide Roundabout To M65, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 1 January 2027. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 29 Nov 2024 at 12:24.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
14 Jul 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Ainsworth Street

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on Ainsworth Street, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 30 January 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 4 Jul 2025 at 10:17.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
11 Aug 2025 and 8 Mar 2027
Details
View Map
Share
Follow
M65 J5 Leave W

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on M65 J5 Leave W, Blackburn With Darwen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 8 March 2027. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 3 Jun 2025 at 16:30.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
11 Aug 2025 and 8 Mar 2027
Details
View Map
Share
Follow
M65 J5 Leave E

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on M65 J5 Leave E, Blackburn With Darwen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 8 March 2027. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 3 Jun 2025 at 16:30.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
11 Aug 2025 and 8 Mar 2027
Details
View Map
Share
Follow
M65 J5 Join E

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on M65 J5 Join E, Blackburn With Darwen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 8 March 2027. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 3 Jun 2025 at 16:30.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
11 Aug 2025 and 8 Mar 2027
Details
View Map
Share
Follow
M65 J5 Join W

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on M65 J5 Join W, Blackburn With Darwen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 8 March 2027. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 3 Jun 2025 at 16:30.

Cadent Gas logo
LONG TERM
Until
15 Oct 2025
Details
View Map
Share
Follow
Harwood Road

Cadent Gas are carrying out Utility repair and maintenance works on Harwood Road, Rishton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 August 2025 at 03:35 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2025 at 14:24.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
18 Aug and 17 Oct 2025
Details
View Map
Share
Follow
School Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on School Lane, Blackburn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Sep 2025 at 11:04.

United Utilities Water (formerly North West Water) logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
School Lane

United Utilities Water (formerly North West Water) are carrying out Utility asset works on School Lane, Blackburn.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2025 at 12:51.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Chapels

Cadent Gas are proposing to carry out Utility asset works on Chapels, Darwen.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Jun 2025 at 08:52.

Cadent Gas logo
LONG TERM
Until
15 Oct 2025
Details
View Map
Share
Follow
Daisy Street

Cadent Gas are carrying out Utility repair and maintenance works on Daisy Street, Blackburn.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2025 at 09:43 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 6 Oct 2025 at 10:28.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Higher Ramsgreave Road

Cadent Gas are proposing to carry out Utility asset works on Higher Ramsgreave Road, Ramsgreave.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 14:22.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
22 Sep 2025 and 30 Mar 2027
Details
View Map
Share
Follow
Staffa Crescent

Blackburn With Darwen Borough Council are proposing to carry out Section 50 on Staffa Crescent, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 30 March 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 14 Aug 2025 at 11:44.

Blackburn With Darwen Borough Council logo
Between
22 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Bennington Street

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on Bennington Street, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 5 Sep 2025 at 11:15.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
22 Sep 2025 and 16 Mar 2026
Details
View Map
Share
Follow
Staffa Crescent

Blackburn With Darwen Borough Council are proposing to carry out Section 50 on Staffa Crescent, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 16 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 11 Jul 2025 at 16:03.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Chapel Lane

Cadent Gas are carrying out Utility repair and maintenance works on Chapel Lane, Langho.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 10:30 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2025 at 11:26.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Chapel Lane

Cadent Gas are carrying out Utility repair and maintenance works on Chapel Lane, Langho.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 10:30 and could run through until 10 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 2 Oct 2025 at 09:51.

United Utilities Water (formerly North West Water) logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Spring Lane

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Spring Lane, Samlesbury.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 September 2025 at 08:55 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Sep 2025 at 10:59.

Cadent Gas logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Elker Lane

Cadent Gas are proposing to carry out Utility asset works on Elker Lane, Billington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 May 2025 at 12:02.

Cadent Gas logo
LONG TERM
Between
29 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Preston New Road

Cadent Gas are proposing to carry out Utility asset works on Preston New Road, Mellor Brook.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2025 at 13:00.

Cadent Gas logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Preston New Road

Cadent Gas are carrying out Utility asset works on Preston New Road, Mellor Brook.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 September 2025 at 08:00 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Sep 2025 at 08:19.

Cadent Gas logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Elker Lane

Cadent Gas are proposing to carry out Utility asset works on Elker Lane, Billington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2025 at 09:42.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Chapel Lane

Cadent Gas were proposing to carry out Utility repair and maintenance works on Chapel Lane, Langho.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 9 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Oct 2025 at 08:52.

Lancashire County Council logo
LONG TERM
Between
1 and 31 Oct 2025
Details
View Map
Share
Burnley Road

Lancashire County Council were proposing to carry out Highway improvement works on Burnley Road, Clayton-le-moors.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 24 Sep 2025 at 09:28.

Network Rail logo
Today
Details
View Map
Share
Enfield Road

Network Rail carried out Works for Rail Purposes on Enfield Road, Accrington.

The road was closed for some or all of the period.

The works were originally planned between 7 Oct 2025 and 8 Oct 2025 and were actually completed between 7 Oct 2025 (23:55) and 8 Oct 2025 (06:00). The works impacted the carriageway only.

This roadwork event was last updated by Network Rail on 8 Oct 2025 at 10:29.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Goose House Lane

Cadent Gas are carrying out Utility repair and maintenance works on Goose House Lane, Darwen.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 October 2025 at 10:11 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2025 at 17:19.

Lancashire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Surrey Street

Lancashire County Council are carrying out Highway repair and maintenance works on Surrey Street, Accrington.

The road is closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 8 October 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 8 Oct 2025 at 08:22.

Blackburn With Darwen Borough Council logo
Between
8 and 17 Oct 2025
Details
View Map
Share
Preston New Road

Blackburn With Darwen Borough Council were proposing to carry out Highway repair and maintenance works on Preston New Road, Blackburn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 2 Sep 2025 at 14:40.

Lancashire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Beech Crescent

Lancashire County Council are carrying out Highway repair and maintenance works on Beech Crescent, Altham West, Accrington.

The road is closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 8 October 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 8 Oct 2025 at 15:37.

United Utilities Water (formerly North West Water) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Clayton Hall Drive

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Clayton Hall Drive, Clayton-le-moors.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2025 at 09:12 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 Oct 2025 at 10:21.

United Utilities Water (formerly North West Water) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Fairclough Road

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Fairclough Road, Accrington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2025 at 13:10 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 Oct 2025 at 15:06.

Lancashire County Council logo
Between
9 and 30 Oct 2025
Details
View Map
Share
Follow
Longsight Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Longsight Road, Langho.

These works are categorised as Major.

The works will start on or after 9 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 18 Jul 2025 at 11:10.

Lancashire County Council logo
Between
9 and 30 Oct 2025
Details
View Map
Share
Follow
Longsight Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Longsight Road, Copster Green.

These works are categorised as Major.

The works will start on or after 9 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 18 Jul 2025 at 11:09.

Blackburn With Darwen Borough Council logo
Between
13 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Gib Lane

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on Gib Lane, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 22 Sep 2025 at 16:19.

Cadent Gas logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
George Street

Cadent Gas are proposing to carry out Utility asset works on George Street, Clayton-le-moors.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2025 at 09:02.

Lancashire County Council logo
Between
13 and 30 Oct 2025
Details
View Map
Share
Follow
High Street

Lancashire County Council are proposing to carry out Highway improvement works on High Street, Rishton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 24 Sep 2025 at 08:48.

Electricity North West (NorWeb) logo
Between
15 and 21 Oct 2025
Details
View Map
Share
Rear 1 To 65 Knowles Street

Electricity North West (NorWeb) were proposing to carry out New service connection on Rear 1 To 65 Knowles Street, Rishton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2025 and run through until 21 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Jul 2025 at 11:27.

Lancashire County Council logo
Between
15 and 29 Oct 2025
Details
View Map
Share
Follow
Hollins Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Hollins Lane, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 30 Jun 2025 at 13:40.

United Utilities Water (formerly North West Water) logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Bolton Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Bolton Avenue, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 7 Oct 2025 at 11:09.

BT logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Morecambe Road

BT were proposing to carry out Utility repair and maintenance works on Morecambe Road, Blackburn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 1 Oct 2025 at 15:42.

United Utilities Water (formerly North West Water) logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Bolton Avenue

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Bolton Avenue, Accrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 7 Oct 2025 at 11:04.

United Utilities Water (formerly North West Water) logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Bolton Avenue

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Bolton Avenue, Accrington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Aug 2025 at 13:23.

United Utilities Water (formerly North West Water) logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Bolton Avenue

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Bolton Avenue, Accrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 7 Oct 2025 at 11:00.

United Utilities Water (formerly North West Water) logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Bolton Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Bolton Avenue, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 7 Oct 2025 at 10:50.

United Utilities Water (formerly North West Water) logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Bolton Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Bolton Avenue, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 25 Sep 2025 at 14:11.

United Utilities Water (formerly North West Water) logo
Between
21 and 25 Oct 2025
Details
View Map
Share
Follow
Gorse Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Gorse Street, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Oct 2025 at 16:25.

United Utilities Water (formerly North West Water) logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Back Street Rear 16 To 50 Marsh House Lane And 115 To 129 Sudellside Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Street Rear 16 To 50 Marsh House Lane And 115 To 129 Sudellside Street, Darwen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Sep 2025 at 11:25.

Blackburn With Darwen Borough Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Sudell Road

Blackburn With Darwen Borough Council are proposing to carry out Highway repair and maintenance works on Sudell Road, Darwen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 29 Aug 2025 at 15:44.

Cadent Gas logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Chapels

Cadent Gas are proposing to carry out Utility asset works on Chapels, Darwen.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Sep 2025 at 16:24.

Lancashire County Council logo
Between
27 Oct and 20 Nov 2025
Details
View Map
Share
Burnley Road

Lancashire County Council were proposing to carry out Highway improvement works on Burnley Road, Clayton-le-moors.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 20 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 24 Sep 2025 at 09:28.

Blackburn With Darwen Borough Council logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Hindle Street

Blackburn With Darwen Borough Council are proposing to carry out Section 50 on Hindle Street, Darwen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 23 Jul 2025 at 13:22.

Electricity North West (NorWeb) logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Rosebay Avenue

Electricity North West (NorWeb) are proposing to carry out New service connection on Rosebay Avenue, Feniscowles, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Sep 2025 at 08:45.

Electricity North West (NorWeb) logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Granville Road

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Granville Road, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Jul 2025 at 14:13.

Electricity North West (NorWeb) logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Rosebay Avenue

Electricity North West (NorWeb) are proposing to carry out New service connection on Rosebay Avenue, Feniscowles, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Sep 2025 at 14:50.

Cadent Gas logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Chapels Brow

Cadent Gas are proposing to carry out Utility asset works on Chapels Brow, Darwen.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 16:06.

Cadent Gas logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Victoria Street

Cadent Gas are proposing to carry out New service connection on Victoria Street, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2025 at 10:43.

Electricity North West (NorWeb) logo
Between
28 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Rear 1 To 65 Knowles Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Rear 1 To 65 Knowles Street, Rishton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Sep 2025 at 16:13.

Electricity North West (NorWeb) logo
Between
28 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Rear 1 To 65 Knowles Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Rear 1 To 65 Knowles Street, Rishton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 30 Jul 2025 at 14:04.

Electricity North West (NorWeb) logo
Between
28 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Holden Fold

Electricity North West (NorWeb) are proposing to carry out New service connection on Holden Fold, Darwen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Oct 2025 at 11:18.

Electricity North West (NorWeb) logo
Between
28 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Holden Fold

Electricity North West (NorWeb) are proposing to carry out New service connection on Holden Fold, Darwen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 22 Aug 2025 at 15:06.

Cadent Gas logo
Between
3 and 26 Nov 2025
Details
View Map
Share
Follow
Long Meadow

Cadent Gas are proposing to carry out Utility asset works on Long Meadow, Samlesbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 10:57.

Blackburn With Darwen Borough Council logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Gib Lane

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on Gib Lane, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 1 Oct 2025 at 16:14.

Blackburn With Darwen Borough Council logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Gib Lane

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on Gib Lane, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 2 Oct 2025 at 11:27.

BT logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Off Mount Pleasant Street

BT are proposing to carry out Utility asset works on Off Mount Pleasant Street, Oswaldtwistle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 26 Jul 2025 at 11:30.

Cadent Gas logo
Between
3 Nov and 3 Dec 2025
Details
View Map
Share
Follow
Bennington Street

Cadent Gas are proposing to carry out Utility asset works on Bennington Street, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2025 at 11:00.

Cadent Gas logo
Between
3 Nov and 3 Dec 2025
Details
View Map
Share
Follow
Bennington Street

Cadent Gas are proposing to carry out Utility asset works on Bennington Street, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Aug 2025 at 12:41.

Cadent Gas logo
LONG TERM
Between
3 Nov 2025 and 21 Jan 2026
Details
View Map
Share
Follow
Preston New Road

Cadent Gas are proposing to carry out Utility asset works on Preston New Road, Mellor Brook.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 10:31.

Cadent Gas logo
Between
10 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Branch Road

Cadent Gas are proposing to carry out Utility asset works on Branch Road, Mellor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2025 at 10:29.

United Utilities Water (formerly North West Water) logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Back Street Rear 16 To 50 Marsh House Lane And 115 To 129 Sudellside Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Street Rear 16 To 50 Marsh House Lane And 115 To 129 Sudellside Street, Darwen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Aug 2025 at 15:13.

Cadent Gas logo
Between
10 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Branch Road

Cadent Gas are proposing to carry out Utility asset works on Branch Road, Mellor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2025 at 10:06.

Lancashire County Council logo
LONG TERM
Between
10 Nov 2025 and 21 Aug 2026
Details
View Map
Share
Follow
Vine Street

Lancashire County Council are proposing to carry out Highway improvement works on Vine Street, Accrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 August 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Lancashire County Council on 8 Oct 2025 at 13:46.

Lancashire County Council logo
LONG TERM
Between
10 Nov 2025 and 10 Nov 2026
Details
View Map
Share
Follow
Wesley Street

Lancashire County Council are proposing to carry out Highway improvement works on Wesley Street, Church.

These works are categorised as Major.

The works will start on or after 10 November 2025 and could run through until 10 November 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Lancashire County Council on 8 Oct 2025 at 12:45.

Cadent Gas logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
East Park Road

Cadent Gas are proposing to carry out Utility asset works on East Park Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 16:16.

Cadent Gas logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
East Park Road

Cadent Gas are proposing to carry out Utility asset works on East Park Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 08:35.

Blackburn With Darwen Borough Council logo
Between
12 and 19 Nov 2025
Details
View Map
Share
A6077 From Guide Roundabout To M65

Blackburn With Darwen Borough Council were proposing to carry out Highway improvement works on A6077 From Guide Roundabout To M65, Blackburn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 26 Sep 2025 at 14:24.

Blackburn With Darwen Borough Council logo
Between
12 and 19 Nov 2025
Details
View Map
Share
M65 J5 Join E

Blackburn With Darwen Borough Council were proposing to carry out Highway improvement works on M65 J5 Join E, Blackburn With Darwen.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 26 Sep 2025 at 14:25.

Blackburn With Darwen Borough Council logo
Between
13 and 20 Nov 2025
Details
View Map
Share
Follow
A6077 From Guide Roundabout To M65

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on A6077 From Guide Roundabout To M65, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 20 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 2 Oct 2025 at 14:48.

Blackburn With Darwen Borough Council logo
Between
13 and 20 Nov 2025
Details
View Map
Share
Follow
M65 J5 Join E

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on M65 J5 Join E, Blackburn With Darwen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 20 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 26 Sep 2025 at 15:03.

United Utilities Water (formerly North West Water) logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Belthorn Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Belthorn Road, Belthorn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Sep 2025 at 14:16.

Cadent Gas logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Haslingden Road

Cadent Gas are proposing to carry out Utility asset works on Haslingden Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2025 at 11:30.

Cadent Gas logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Haslingden Road

Cadent Gas are proposing to carry out Utility asset works on Haslingden Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Aug 2025 at 12:46.

Blackburn With Darwen Borough Council logo
Between
20 and 27 Nov 2025
Details
View Map
Share
Follow
A6077 From Guide Roundabout To M65

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on A6077 From Guide Roundabout To M65, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 27 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 2 Oct 2025 at 14:49.

Blackburn With Darwen Borough Council logo
Between
20 and 27 Nov 2025
Details
View Map
Share
Follow
M65 J5 Leave E

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on M65 J5 Leave E, Blackburn With Darwen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 27 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 29 Sep 2025 at 12:41.

United Utilities Water (formerly North West Water) logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Gorse Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Gorse Street, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Sep 2025 at 15:14.

Blackburn With Darwen Borough Council logo
Between
27 Nov and 4 Dec 2025
Details
View Map
Share
Follow
M65 J5 Join W

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on M65 J5 Join W, Blackburn With Darwen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2025 and could run through until 4 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 29 Sep 2025 at 12:59.

Blackburn With Darwen Borough Council logo
Between
27 Nov and 4 Dec 2025
Details
View Map
Share
Follow
A6077 From Guide Roundabout To M65

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on A6077 From Guide Roundabout To M65, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2025 and could run through until 4 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 2 Oct 2025 at 14:51.

Cadent Gas logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Higher Ramsgreave Road

Cadent Gas are proposing to carry out Utility asset works on Higher Ramsgreave Road, Ramsgreave.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Jul 2025 at 14:39.

Blackburn With Darwen Borough Council logo
Between
4 and 11 Dec 2025
Details
View Map
Share
Follow
M65 J5 Leave W

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on M65 J5 Leave W, Blackburn With Darwen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 11 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 29 Sep 2025 at 13:12.

Blackburn With Darwen Borough Council logo
Between
4 and 11 Dec 2025
Details
View Map
Share
Follow
From M65 To B6232

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on From M65 To B6232, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 11 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 2 Oct 2025 at 14:52.

Cadent Gas logo
Between
5 and 10 Dec 2025
Details
View Map
Share
Follow
Victoria Street

Cadent Gas are proposing to carry out New service connection on Victoria Street, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2025 at 11:58.

United Utilities Water (formerly North West Water) logo
Between
26 Dec 2025 and 16 Jan 2026
Details
View Map
Share
Follow
Nightfield Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Nightfield Lane, Balderstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2025 and could run through until 16 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Oct 2025 at 10:12.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
26 Dec 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Nightfield Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Nightfield Lane, Balderstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2025 and could run through until 30 January 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Oct 2025 at 10:27.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
26 Dec 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Commons Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Commons Lane, Balderstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2025 and could run through until 20 February 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Oct 2025 at 09:37.


Roadworks Map near to Rydal Road, BLACKBURN, BB1 5NR (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 8 Oct 2025 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Rydal Road, BLACKBURN, BB1 5NR (19 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
IX Wireless logo
CEDAR STREET 
(0.3 miles)
IX Wireless
Statutory Infrastructure Works - Footway - Multi-way signals
Planned
Scheduled: 8 Oct 2025 - 10 Oct 2025
0.3
Details
Share
Follow
2
Virgin Media logo
URGENT
  
FOUNTAINS AVENUE 
(0.3 miles)
Virgin Media
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
8 Oct 2025 08:15 - 09:11
0.3
Details
Share
3
BT logo
WHALLEY NEW ROAD, BLACKBURN WITH DARWEN 
(0.4 miles)
BT
Utility asset works - Footway - No carriageway incursion
In Progress
Since: 8 Oct 2025 10:30
(Scheduled: 7 Oct 2025 - 9 Oct 2025)
0.4
Details
Share
Follow
4
United Utilities Water (formerly North West Water) logo
ST MICHAELS STREET 
(0.4 miles)
United Utilities Water (formerly North West Water)
Disconnection or alteration of supply - Footway, Carriageway - Give and take
Planned
Scheduled: 6 Oct 2025 - 8 Oct 2025
0.4
Details
Share
Follow
5
United Utilities Water (formerly North West Water) logo
URGENT
  
HOLLY STREET 
(0.4 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
6 Oct 2025 09:28 - 8 Oct 2025 14:14
0.4
Details
Share
6
United Utilities Water (formerly North West Water) logo
WHALLEY OLD ROAD 
(0.4 miles)
United Utilities Water (formerly North West Water)
Disconnection or alteration of supply - Footway - Lane closure
Complete
6 Oct 2025 11:32 - 8 Oct 2025 15:20
0.4
Details
Share
7
Cadent Gas logo
EMERGENCY
  
DAISY STREET 
(0.5 miles)
Cadent Gas
Utility repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 11 Sep 2025 09:43
(Scheduled: 11 Sep 2025 - 15 Oct 2025)
0.5
Details
Share
Follow
8
United Utilities Water (formerly North West Water) logo
BANK HEY CLOSE 
(0.6 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 8 Oct 2025 - 10 Oct 2025
0.6
Details
Share
Follow
9
Blackburn With Darwen Borough Council logo
MAJOR
  
NEWTON STREET 
(0.7 miles)
Blackburn With Darwen Borough Council
Highway improvement works - Footway - Road closure
Planned
Scheduled: 6 Oct 2025 - 8 Oct 2025
0.7
Details
Share
Follow
10
Blackburn With Darwen Borough Council logo
MAJOR
  
NEWTON STREET 
(0.7 miles)
Blackburn With Darwen Borough Council
Highway improvement works - Footway - Road closure
Complete
6 Oct 2025 09:00 - 7 Oct 2025 15:45
0.7
Details
Share