ROADWORKS SUMMARY
Grisedale Drive, BURNLEY, BB12 8AR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Grisedale Drive, BB12 8AR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Grisedale Drive, BURNLEY, BB12 8AR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Grisedale Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Lancashire County Council logo
LONG TERM
Between
5 Jul 2023 and 18 Jul 2025
Details
View Map
Share
Follow
York Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on York Street, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2023 and could run through until 18 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 27 Apr 2023 at 08:10.

Lancashire County Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Brook Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Brook Street, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 14 Mar 2024 at 13:32.

Lancashire County Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Sagar Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Sagar Street, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 14 Mar 2024 at 13:21.

Lancashire County Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Netherfield Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Netherfield Road, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 14 Mar 2024 at 13:25.

Lancashire County Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Broadway

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Broadway, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 14 Mar 2024 at 13:28.

Lancashire County Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Chapel Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Chapel Street, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 14 Mar 2024 at 13:18.

Lancashire County Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Holme Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Holme Street, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 14 Mar 2024 at 13:12.

Lancashire County Council logo
LONG TERM
Between
28 Oct 2024 and 29 Apr 2025
Details
View Map
Share
Sagar Street

Lancashire County Council were proposing to carry out Highway repair and maintenance works on Sagar Street, Nelson.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 29 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 12 Nov 2024 at 11:33.

Lancashire County Council logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
New Scotland Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on New Scotland Road, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 14 Mar 2024 at 12:24.

Lancashire County Council logo
LONG TERM
Between
1 Nov 2024 and 31 May 2025
Details
View Map
Share
Follow
Holme Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Holme Street, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 31 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 14 Mar 2024 at 13:06.

Lancashire County Council logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Leeds Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Leeds Road, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 14 Mar 2024 at 12:41.

Lancashire County Council logo
LONG TERM
Between
19 Nov 2024 and 21 May 2025
Details
View Map
Share
Broadway

Lancashire County Council were proposing to carry out Highway repair and maintenance works on Broadway, Nelson.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 21 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 12 Nov 2024 at 11:38.

Cadent Gas logo
LONG TERM
Until
10 Jan 2025
Details
View Map
Share
Follow
Accrington Road

Cadent Gas are carrying out Utility repair and maintenance works on Accrington Road, Burnley.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 09:52 and could run through until 10 January 2025. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 11:57.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Warwick Drive

Cadent Gas were proposing to carry out Utility asset works on Warwick Drive, Padiham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 09:23.

Cadent Gas logo
Between
9 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Abingdon Road

Cadent Gas were proposing to carry out Utility asset works on Abingdon Road, Padiham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 3 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 09:25.

United Utilities Water (formerly North West Water) logo
Finishing
Today
Details
View Map
Share
Follow
Briercliffe Road

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Briercliffe Road, Burnley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 December 2024 at 00:17 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Dec 2024 at 10:42.

Lancashire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Merclesden Avenue

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Merclesden Avenue, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 23 Sep 2024 at 14:18.

Lancashire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Extwistle Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Extwistle Road, Worsthorne-with-hurstwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 26 Sep 2024 at 15:21.

Lancashire County Council logo
Between
1 and 9 Jan 2025
Details
View Map
Share
Follow
Appleby Drive

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Appleby Drive, Barrowford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 2 Oct 2024 at 11:16.

Cadent Gas logo
Between
2 and 18 Jan 2025
Details
View Map
Share
Follow
Lower Rosegrove Lane

Cadent Gas are proposing to carry out Utility asset works on Lower Rosegrove Lane, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 09:58.

Cadent Gas logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Cumberland Avenue

Cadent Gas are proposing to carry out Utility asset works on Cumberland Avenue, Burnley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 10:04.

Cadent Gas logo
LONG TERM
Between
2 Jan and 15 Feb 2025
Details
View Map
Share
Follow
Wheatley Lane Road

Cadent Gas are proposing to carry out Utility asset works on Wheatley Lane Road, Fence.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 09:44.

Cadent Gas logo
Between
2 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Dorset Street

Cadent Gas are proposing to carry out Utility asset works on Dorset Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 08:58.

Cadent Gas logo
Between
6 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Cumberland Avenue

Cadent Gas are proposing to carry out Utility asset works on Cumberland Avenue, Burnley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 15:58.

Cadent Gas logo
Between
6 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Cumberland Avenue

Cadent Gas are proposing to carry out Utility asset works on Cumberland Avenue, Burnley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 10:30.

Cadent Gas logo
Between
8 and 24 Jan 2025
Details
View Map
Share
Follow
Warren Drive

Cadent Gas are proposing to carry out Utility asset works on Warren Drive, Barrowford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 15:59.

Cadent Gas logo
Between
8 and 24 Jan 2025
Details
View Map
Share
Reedley Road

Cadent Gas were proposing to carry out Utility asset works on Reedley Road, Reedley, Burnley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 13:01.

Cadent Gas logo
Between
8 and 24 Jan 2025
Details
View Map
Share
Follow
Reedley Road

Cadent Gas are proposing to carry out Utility asset works on Reedley Road, Reedley, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 11:31.

United Utilities Water (formerly North West Water) logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Rear 2 To 34 Albion Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Rear 2 To 34 Albion Street, Brierfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Oct 2024 at 09:08.

Cadent Gas logo
Between
8 and 24 Jan 2025
Details
View Map
Share
Follow
Reedley Road

Cadent Gas are proposing to carry out Utility asset works on Reedley Road, Reedley, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Aug 2024 at 10:55.

Cadent Gas logo
LONG TERM
Between
13 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Dorset Street

Cadent Gas are proposing to carry out Utility asset works on Dorset Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 14:15.

Electricity North West (NorWeb) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Goodshaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Goodshaw Lane, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 10 Dec 2024 at 13:21.

Electricity North West (NorWeb) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Goodshaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Goodshaw Lane, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Dec 2024 at 14:17.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Rutland Avenue

Cadent Gas are proposing to carry out Utility asset works on Rutland Avenue, Burnley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 10:03.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Rutland Avenue

Cadent Gas are proposing to carry out Utility asset works on Rutland Avenue, Burnley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 00:10.

Cadent Gas logo
Between
15 and 31 Jan 2025
Details
View Map
Share
Follow
Hartley Street

Cadent Gas are proposing to carry out Utility asset works on Hartley Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 09:55.

Cadent Gas logo
Between
15 and 31 Jan 2025
Details
View Map
Share
Follow
Accrington Road

Cadent Gas are proposing to carry out Utility asset works on Accrington Road, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 09:54.

Cadent Gas logo
Between
15 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Villiers Street

Cadent Gas are proposing to carry out Utility asset works on Villiers Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 09:58.

Cadent Gas logo
Between
22 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Warren Drive

Cadent Gas are proposing to carry out Utility asset works on Warren Drive, Barrowford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Sep 2024 at 13:45.

Cadent Gas logo
Between
22 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Goodshaw Lane

Cadent Gas are proposing to carry out Utility asset works on Goodshaw Lane, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 13:07.

Cadent Gas logo
Between
22 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Goodshaw Lane

Cadent Gas are proposing to carry out Utility asset works on Goodshaw Lane, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Nov 2024 at 13:21.

Cadent Gas logo
Between
22 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Brush Street

Cadent Gas are proposing to carry out Utility asset works on Brush Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 10:03.

Cadent Gas logo
Between
23 Jan and 20 Feb 2025
Details
View Map
Share
Burnley Road

Cadent Gas were proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 January 2025 and run through until 20 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 08:33.

Electricity North West (NorWeb) logo
Between
27 Jan and 5 Feb 2025
Details
View Map
Share
Todmorden Road

Electricity North West (NorWeb) were proposing to carry out New service connection on Todmorden Road, Briercliffe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 10 Dec 2024 at 12:58.

Lancashire County Council logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Standen Hall Drive

Lancashire County Council are proposing to carry out Section 50 on Standen Hall Drive, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 4 Dec 2024 at 15:05.

Cadent Gas logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Abingdon Road

Cadent Gas were proposing to carry out Utility asset works on Abingdon Road, Padiham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:32.

Cadent Gas logo
LONG TERM
Between
29 Jan and 2 May 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 11:21.

Cadent Gas logo
LONG TERM
Between
29 Jan and 2 May 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:32.

Cadent Gas logo
LONG TERM
Between
29 Jan and 2 May 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 16:08.

Cadent Gas logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Warwick Drive

Cadent Gas are proposing to carry out Utility asset works on Warwick Drive, Padiham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 14:28.

Electricity North West (NorWeb) logo
Between
4 and 10 Feb 2025
Details
View Map
Share
Goodshaw Lane

Electricity North West (NorWeb) were proposing to carry out New service connection on Goodshaw Lane, Rawtenstall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Nov 2024 at 10:49.

Lancashire County Council logo
LONG TERM
Between
4 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Netherfield Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Netherfield Road, Nelson.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 13 Nov 2024 at 14:21.

Lancashire County Council logo
LONG TERM
Between
4 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Sagar Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Sagar Street, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 20 Nov 2024 at 12:23.

Cadent Gas logo
Between
5 and 28 Feb 2025
Details
View Map
Share
Follow
Liverpool Road

Cadent Gas are proposing to carry out Utility asset works on Liverpool Road, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 09:59.

Electricity North West (NorWeb) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Goodshaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Goodshaw Lane, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Nov 2024 at 11:00.

Cadent Gas logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Rear 179 To 235 Railway Street

Cadent Gas are proposing to carry out Utility asset works on Rear 179 To 235 Railway Street, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 16:16.

Cadent Gas logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Rear 179 To 235 Railway Street

Cadent Gas are proposing to carry out Utility asset works on Rear 179 To 235 Railway Street, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:55.

Cadent Gas logo
Between
12 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Owen Street

Cadent Gas are proposing to carry out Utility asset works on Owen Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 10:01.

Cadent Gas logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Rear 179 To 235 Railway Street

Cadent Gas are proposing to carry out Utility asset works on Rear 179 To 235 Railway Street, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 14:17.

Electricity North West (NorWeb) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Wheatley Lane Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Wheatley Lane Road, Fence.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Oct 2024 at 09:20.

Cadent Gas logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Hapton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Nov 2024 at 09:51.

Cadent Gas logo
Between
19 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Marsden Hall Road

Cadent Gas are proposing to carry out Utility asset works on Marsden Hall Road, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 10:01.

United Utilities Water (formerly North West Water) logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Chapel Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Chapel Street, Brierfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Nov 2024 at 14:11.

Cadent Gas logo
LONG TERM
Between
19 Feb and 2 May 2025
Details
View Map
Share
Follow
Wheatley Lane Road

Cadent Gas are proposing to carry out Utility asset works on Wheatley Lane Road, Fence.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Oct 2024 at 12:00.

Cadent Gas logo
Between
19 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Marsden Hall Road

Cadent Gas are proposing to carry out Utility asset works on Marsden Hall Road, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 11:28.

Cadent Gas logo
LONG TERM
Between
19 Feb and 2 May 2025
Details
View Map
Share
Follow
Wheatley Lane Road

Cadent Gas are proposing to carry out Utility asset works on Wheatley Lane Road, Fence.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 14:38.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Hapton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 11:40.

Lancashire County Council logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Queens Park Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Queens Park Road, Burnley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 3 Dec 2024 at 10:53.

Lancashire County Council logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Ridge Avenue

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Ridge Avenue, Burnley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 3 Dec 2024 at 10:55.

Lancashire County Council logo
Between
26 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Lomeshaye Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Lomeshaye Road, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 26 Nov 2024 at 11:54.

Lancashire County Council logo
Between
28 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Abbey Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Abbey Street, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:10.

Lancashire County Council logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Brook Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Brook Street, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 11 Dec 2024 at 16:12.

Cadent Gas logo
LONG TERM
Between
5 Mar and 6 Jun 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 11:21.

Cadent Gas logo
LONG TERM
Between
5 Mar and 6 Jun 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:50.

Cadent Gas logo
LONG TERM
Between
5 Mar and 6 Jun 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Oct 2024 at 15:01.

Cadent Gas logo
Between
6 and 22 Mar 2025
Details
View Map
Share
Follow
Greenbank Drive

Cadent Gas are proposing to carry out Utility asset works on Greenbank Drive, Fence.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 12:40.

Lancashire County Council logo
LONG TERM
Between
17 Mar and 5 May 2025
Details
View Map
Share
Follow
Broadway

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Broadway, Nelson.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 20 Nov 2024 at 13:11.

Electricity North West (NorWeb) logo
Between
17 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Oxford Road

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Oxford Road, Nelson.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 1 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Dec 2024 at 13:17.

Cadent Gas logo
Between
19 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Albert Road

Cadent Gas are proposing to carry out Utility asset works on Albert Road, Rawtenstall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 14:28.


Roadworks Map near to Grisedale Drive, BURNLEY, BB12 8AR

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Dec 2024 00:10
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Grisedale Drive, BURNLEY, BB12 8AR (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
EMERGENCY
  
PADIHAM ROAD 
(0.2 miles)
Cadent Gas
Utility repair and maintenance works - Footpath - No carriageway incursion
Complete
18 Dec 2024 10:34 - 20 Dec 2024 11:55
0.2
Details
Share
2
Cadent Gas logo
EMERGENCY
  
LOWERHOUSE LANE 
(0.8 miles)
Cadent Gas
Utility repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 26 Dec 2024 19:24
(Scheduled: 26 Dec 2024 - 7 Jan 2025)
0.8
Details
Share
Follow
3
Cadent Gas logo
EMERGENCY
  
ACCRINGTON ROAD 
(0.8 miles)
Cadent Gas
Utility repair and maintenance works - Verge - Two-way signals
In Progress
Since: 2 Dec 2024 09:52
(Scheduled: 2 Dec 2024 - 10 Jan 2025)
0.8
Details
Share
Follow