ROADWORKS SUMMARY
Turner Fold, BURNLEY, BB12 7QZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Turner Fold, BB12 7QZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Turner Fold, BURNLEY, BB12 7QZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Turner Fold are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Lancashire County Council logo
LONG TERM
Between
5 Jul 2023 and 18 Jul 2025
Details
View Map
Share
Follow
York Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on York Street, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2023 and could run through until 18 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 27 Apr 2023 at 08:10.

Cadent Gas logo
LONG TERM
Until
10 Jan 2025
Details
View Map
Share
Follow
Accrington Road

Cadent Gas are carrying out Utility repair and maintenance works on Accrington Road, Burnley.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 09:52 and could run through until 10 January 2025. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 11:57.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Warwick Drive

Cadent Gas were proposing to carry out Utility asset works on Warwick Drive, Padiham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 09:23.

Cadent Gas logo
Between
9 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Abingdon Road

Cadent Gas were proposing to carry out Utility asset works on Abingdon Road, Padiham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 3 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 09:25.

Cadent Gas logo
Between
2 and 29 Jan 2025
Details
View Map
Share
Follow
Moor Lane

Cadent Gas are proposing to carry out Utility asset works on Moor Lane, Whalley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Sep 2024 at 13:57.

Cadent Gas logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Whalley Road

Cadent Gas are proposing to carry out Utility asset works on Whalley Road, Billington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 10:36.

Cadent Gas logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Cumberland Avenue

Cadent Gas are proposing to carry out Utility asset works on Cumberland Avenue, Burnley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 10:04.

Cadent Gas logo
Between
2 and 18 Jan 2025
Details
View Map
Share
Follow
Lower Rosegrove Lane

Cadent Gas are proposing to carry out Utility asset works on Lower Rosegrove Lane, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 09:58.

Cadent Gas logo
LONG TERM
Between
2 Jan and 15 Feb 2025
Details
View Map
Share
Follow
Wheatley Lane Road

Cadent Gas are proposing to carry out Utility asset works on Wheatley Lane Road, Fence.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 09:44.

Cadent Gas logo
Between
2 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Dorset Street

Cadent Gas are proposing to carry out Utility asset works on Dorset Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 08:58.

Cadent Gas logo
Between
6 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Cumberland Avenue

Cadent Gas are proposing to carry out Utility asset works on Cumberland Avenue, Burnley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 15:58.

Cadent Gas logo
Between
6 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Cumberland Avenue

Cadent Gas are proposing to carry out Utility asset works on Cumberland Avenue, Burnley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 10:30.

United Utilities Water (formerly North West Water) logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Rear 2 To 34 Albion Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Rear 2 To 34 Albion Street, Brierfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Oct 2024 at 09:08.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Rutland Avenue

Cadent Gas are proposing to carry out Utility asset works on Rutland Avenue, Burnley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 00:10.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Rutland Avenue

Cadent Gas are proposing to carry out Utility asset works on Rutland Avenue, Burnley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 10:03.

Cadent Gas logo
LONG TERM
Between
13 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Dorset Street

Cadent Gas are proposing to carry out Utility asset works on Dorset Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 14:15.

Lancashire County Council logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Fairfield Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Fairfield Street, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 18 Oct 2024 at 15:37.

Cadent Gas logo
Between
15 and 31 Jan 2025
Details
View Map
Share
Follow
Accrington Road

Cadent Gas are proposing to carry out Utility asset works on Accrington Road, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 09:54.

Cadent Gas logo
Between
15 and 31 Jan 2025
Details
View Map
Share
Follow
Hartley Street

Cadent Gas are proposing to carry out Utility asset works on Hartley Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 09:55.

Cadent Gas logo
Between
15 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Villiers Street

Cadent Gas are proposing to carry out Utility asset works on Villiers Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 09:58.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Queens Road

Cadent Gas are proposing to carry out Utility asset works on Queens Road, Clitheroe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 12:27.

Lancashire County Council logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Mitton Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Mitton Road, Whalley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 7 Nov 2024 at 11:15.

Lancashire County Council logo
Between
21 and 27 Jan 2025
Details
View Map
Share
Follow
Mitton Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Mitton Road, Great Mitton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 12 Nov 2024 at 09:57.

Cadent Gas logo
Between
22 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Brush Street

Cadent Gas are proposing to carry out Utility asset works on Brush Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 10:03.

Cadent Gas logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Abingdon Road

Cadent Gas were proposing to carry out Utility asset works on Abingdon Road, Padiham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 09:32.

Cadent Gas logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Littlemoor Road

Cadent Gas are proposing to carry out Utility asset works on Littlemoor Road, Clitheroe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 16:04.

Cadent Gas logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Warwick Drive

Cadent Gas are proposing to carry out Utility asset works on Warwick Drive, Padiham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 14:28.

Lancashire County Council logo
Between
4 and 10 Feb 2025
Details
View Map
Share
Follow
Mitton Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Mitton Road, Great Mitton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 8 Nov 2024 at 11:44.

Lancashire County Council logo
Between
4 and 10 Feb 2025
Details
View Map
Share
Follow
Mitton Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Mitton Road, Whalley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 6 Nov 2024 at 14:39.

Cadent Gas logo
Between
5 and 28 Feb 2025
Details
View Map
Share
Follow
Liverpool Road

Cadent Gas are proposing to carry out Utility asset works on Liverpool Road, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 09:59.

Lancashire County Council logo
Between
6 and 17 Feb 2025
Details
View Map
Share
Wellgate

Lancashire County Council were proposing to carry out Highway repair and maintenance works on Wellgate, Clitheroe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 February 2025 and run through until 17 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 9 Dec 2024 at 12:32.

Lancashire County Council logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Whitehalgh Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Whitehalgh Lane, Langho.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 10 Dec 2024 at 13:52.

Cadent Gas logo
Between
12 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Owen Street

Cadent Gas are proposing to carry out Utility asset works on Owen Street, Burnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 10:01.

Cadent Gas logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Hapton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Nov 2024 at 09:51.

Electricity North West (NorWeb) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Wheatley Lane Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Wheatley Lane Road, Fence.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Oct 2024 at 09:20.

Lancashire County Council logo
Between
18 and 25 Feb 2025
Details
View Map
Share
York Street

Lancashire County Council were proposing to carry out Highway repair and maintenance works on York Street, Clitheroe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 25 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 11 Dec 2024 at 09:24.

BT logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
York Lane

BT are proposing to carry out Utility asset works on York Lane, Langho.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Nov 2024 at 15:39.

Cadent Gas logo
LONG TERM
Between
19 Feb and 2 May 2025
Details
View Map
Share
Follow
Wheatley Lane Road

Cadent Gas are proposing to carry out Utility asset works on Wheatley Lane Road, Fence.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Oct 2024 at 12:00.

Cadent Gas logo
LONG TERM
Between
19 Feb and 2 May 2025
Details
View Map
Share
Follow
Wheatley Lane Road

Cadent Gas are proposing to carry out Utility asset works on Wheatley Lane Road, Fence.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 14:38.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Burnley Road

Cadent Gas are proposing to carry out Utility asset works on Burnley Road, Hapton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 11:40.

Cadent Gas logo
Between
25 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Riding Barn Street

Cadent Gas are proposing to carry out Utility asset works on Riding Barn Street, Church.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:36.

Cadent Gas logo
Between
25 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Riding Barn Street

Cadent Gas are proposing to carry out Utility asset works on Riding Barn Street, Church.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 09:00.

Lancashire County Council logo
Between
27 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Slaidburn Drive

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Slaidburn Drive, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 3 Dec 2024 at 11:18.

Lancashire County Council logo
Between
28 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Abbey Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Abbey Street, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:10.

Lancashire County Council logo
Between
3 and 12 Mar 2025
Details
View Map
Share
Follow
Slaidburn Drive

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Slaidburn Drive, Accrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 4 Dec 2024 at 15:33.

Lancashire County Council logo
LONG TERM
Between
3 Mar and 15 Apr 2025
Details
View Map
Share
Follow
Whitehalgh Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Whitehalgh Lane, Langho.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 10 Dec 2024 at 12:00.

Lancashire County Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Blackburn Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Blackburn Road, Great Harwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 3 Dec 2024 at 10:42.

Cadent Gas logo
Between
6 and 22 Mar 2025
Details
View Map
Share
Follow
Greenbank Drive

Cadent Gas are proposing to carry out Utility asset works on Greenbank Drive, Fence.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 12:40.

Network Rail logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Railway View Road To Chester Avenue

Network Rail are proposing to carry out Works for Rail Purposes on Railway View Road To Chester Avenue, Clitheroe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 22 Nov 2024 at 15:42.

Network Rail logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Railway View Road To Chester Avenue

Network Rail are proposing to carry out Works for Rail Purposes on Railway View Road To Chester Avenue, Clitheroe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Dec 2024 at 12:25.

Cadent Gas logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Green Drive

Cadent Gas are proposing to carry out Utility asset works on Green Drive, Clitheroe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 11:55.


Roadworks Map near to Turner Fold, BURNLEY, BB12 7QZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Dec 2024 00:10
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Turner Fold, BURNLEY, BB12 7QZ (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.