ROADWORKS SUMMARY
Rosegrove Lane, BURNLEY, BB12 6HB
Introduction

View current and future planned roadworks and road closures for Rosegrove Lane, BB12 6HB and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Rosegrove Lane, BURNLEY, BB12 6HB
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Rosegrove Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
26 Sep 2025
Lancashire County Council are carrying out Section 50 on Glen Way, Brierfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 09:30 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 2 Sep 2025 at 13:25.
Tomorrow
Lancashire County Council are proposing to carry out Section 50 on Carr Road, Nelson.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Lancashire County Council on 25 Apr 2025 at 11:36.
26 Sep 2025
Lancashire County Council are carrying out Section 50 on Carr Road, Nelson.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 June 2025 at 08:00 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Lancashire County Council on 15 Sep 2025 at 16:47.
21 Jul and 26 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Whalley Road, Clayton-le-moors.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Jun 2025 at 14:18.
13 Oct 2025
Lancashire County Council are carrying out Highway repair and maintenance works on Broadway, Nelson.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 July 2025 at 09:00 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 28 Jul 2025 at 09:02.
Tomorrow
Murphy Power Distribution are carrying out Utility asset works on Blackburn Road, Rising Bridge, Accrington.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 August 2025 at 08:00 and could run through until 19 September 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Murphy Power Distribution on 11 Aug 2025 at 08:26.
18 Aug and 28 Sep 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Burnley Road, Brierfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 1 Jul 2025 at 13:42.
28 Sep 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Burnley Road, Brierfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 August 2025 at 16:31 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 19 Aug 2025 at 07:36.
18 Aug and 28 Sep 2025
Electricity North West (NorWeb) are proposing to carry out roadworks on Massey Street, Brierfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 10 Jul 2025 at 12:07.
18 Aug and 28 Sep 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Massey Street, Brierfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Jul 2025 at 15:34.
18 Aug and 28 Sep 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Lord Street, Brierfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 28 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 10 Jul 2025 at 08:31.
18 Aug and 28 Sep 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Lord Street, Brierfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 28 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 10 Jul 2025 at 08:47.
18 Aug and 28 Sep 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Clegg Street, Brierfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 28 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 10 Jul 2025 at 08:33.
18 Aug and 28 Sep 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Clegg Street, Brierfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 28 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 10 Jul 2025 at 08:47.
1 Sep 2025 and 4 Feb 2026
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Scotland Road, Nelson.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 4 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 23 Apr 2025 at 17:41.
1 Sep 2025 and 4 Feb 2026
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Scotland Road, Nelson.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 4 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 28 Apr 2025 at 16:06.
2 Sep and 17 Nov 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Broadway, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 25 Apr 2025 at 11:54.
Tuesday
Cadent Gas are proposing to carry out Utility asset works on George Street, Clayton-le-moors.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Jul 2025 at 09:31.
Wednesday
Lancashire County Council are carrying out Section 50 on Heckenhurst Avenue, Worsthorne-with-hurstwood.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 13:30 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 15 Sep 2025 at 10:27.
Wednesday
Lancashire County Council are carrying out Section 50 on Heckenhurst Avenue, Worsthorne-with-hurstwood.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 13:30 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 15 Sep 2025 at 10:22.
Wednesday
Lancashire County Council are carrying out Section 50 on Heckenhurst Avenue, Worsthorne-with-hurstwood.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 13:30 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 15 Sep 2025 at 10:29.
8 Sep and 2 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Colne Road, Brierfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 1 Jul 2025 at 13:49.
2 Nov 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Colne Road, Brierfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 09:00 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 Sep 2025 at 10:22.
8 Sep and 2 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Hudson Street, Brierfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Jul 2025 at 14:18.
2 Nov 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Hudson Street, Brierfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 09:30 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 Sep 2025 at 10:32.
8 Sep and 2 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Bridge Street, Brierfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Jul 2025 at 15:46.
2 Nov 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Bridge Street, Brierfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 16:31 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2025 at 08:22.
8 Sep and 2 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Wesley Street, Brierfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Jul 2025 at 15:50.
2 Nov 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Wesley Street, Brierfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 16:31 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2025 at 08:23.
8 Sep and 2 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Chapel Street, Brierfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Jul 2025 at 15:56.
2 Nov 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Chapel Street, Brierfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 16:31 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2025 at 08:31.
8 Sep and 2 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on John Street, Brierfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 19 Jul 2025 at 09:06.
2 Nov 2025
Electricity North West (NorWeb) are carrying out Diversionary works on John Street, Brierfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 16:31 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2025 at 08:23.
8 Sep and 2 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Commercial Street, Brierfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 19 Jul 2025 at 09:10.
2 Nov 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Commercial Street, Brierfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 16:31 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2025 at 08:32.
8 Sep and 2 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Timber Street, Brierfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Jul 2025 at 15:18.
2 Nov 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Timber Street, Brierfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 16:31 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2025 at 08:32.
8 Sep and 2 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Every Street, Brierfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 19 Jul 2025 at 09:09.
2 Nov 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Every Street, Brierfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 16:31 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2025 at 08:32.
8 Sep and 2 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Bank Street, Brierfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 19 Jul 2025 at 09:08.
2 Nov 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Bank Street, Brierfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 16:31 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2025 at 08:33.
8 Sep and 2 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Glen Way, Brierfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 18 Jul 2025 at 14:09.
2 Nov 2025
Electricity North West (NorWeb) are carrying out Diversionary works on Glen Way, Brierfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 16:31 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2025 at 08:21.
8 and 26 Sep 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Holme Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 13 Aug 2025 at 08:47.
26 Sep 2025
Lancashire County Council are carrying out Highway repair and maintenance works on Holme Street, Nelson.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 08:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 9 Sep 2025 at 11:50.
8 Sep and 15 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Leeds Road, Nelson.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jul 2025 at 10:51.
15 Oct 2025
Cadent Gas are carrying out Utility asset works on Leeds Road, Nelson.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 09:00 and could run through until 15 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Sep 2025 at 09:19.
Tuesday
Lancashire County Council are proposing to carry out Highway improvement works on Burnley Road, Holme Chapel, Cliviger.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 23 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Lancashire County Council on 9 Sep 2025 at 10:00.
15 and 26 Sep 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Ladbrooke Grove, Burnley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 1 Jul 2025 at 16:13.
15 and 26 Sep 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Brunshaw Avenue, Burnley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 1 Jul 2025 at 16:11.
15 and 26 Sep 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Rimington Avenue, Burnley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 1 Jul 2025 at 16:12.
15 Sep and 3 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Vulcan Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jul 2025 at 11:00.
3 Oct 2025
Cadent Gas are carrying out Utility asset works on Vulcan Street, Nelson.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 08:25 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 08:26.
2 Oct 2025
Cadent Gas are carrying out Utility asset works on Accrington Road, Burnley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 09:00 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 09:15.
Wednesday
Electricity North West (NorWeb) are proposing to carry out Highway repair and maintenance works on Altham Lane, Altham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 31 Jul 2025 at 16:18.
22 Sep and 17 Oct 2025
Lancashire County Council are proposing to carry out Section 50 on South Drive, Padiham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Lancashire County Council on 16 Sep 2025 at 11:08.
22 Sep and 17 Oct 2025
Lancashire County Council are proposing to carry out Section 50 on South Drive, Padiham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Lancashire County Council on 16 Sep 2025 at 11:10.
22 Sep and 17 Oct 2025
Lancashire County Council are proposing to carry out Section 50 on South Drive, Padiham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Lancashire County Council on 16 Sep 2025 at 11:34.
22 Sep and 17 Oct 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Chapel Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 2 Jul 2025 at 12:53.
23 Sep and 7 Oct 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Rear 7 To 41 Derby Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 8 Jul 2025 at 14:28.
24 and 26 Sep 2025
BT were proposing to carry out Utility repair and maintenance works on Ightenhill Park Lane, Burnley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 3 Jul 2025 at 13:13.
29 Sep and 17 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Park Avenue, Barrowford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 12:33.
29 Sep and 17 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Carr Road, Nelson.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 12:32.
1 and 21 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Eastern Avenue, Burnley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 21 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 27 Aug 2025 at 13:56.
1 and 21 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Briercliffe Road, Burnley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 21 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 27 Aug 2025 at 13:55.
8 and 10 Oct 2025
Cadent Gas are proposing to carry out New service connection on Mill Street, Padiham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Aug 2025 at 14:29.
13 and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on George Street, Clayton-le-moors.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2025 at 09:02.
13 Oct and 5 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Rossendale Road, Burnley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:24.
13 Oct and 5 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Rossendale Road, Burnley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 13:04.
13 and 17 Oct 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Altham Lane, Altham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Jul 2025 at 11:12.
13 and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Lawrence Street, Padiham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 09:16.
13 and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Grove Lane, Padiham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 09:12.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Manchester Road, Nelson.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 1 Jul 2025 at 13:48.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Manchester Road, Nelson.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 19 Aug 2025 at 11:58.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Burlington Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 14 Sep 2025 at 10:09.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Burlington Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Sep 2025 at 09:15.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Summer Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 16 Sep 2025 at 08:52.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Summer Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Sep 2025 at 09:15.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Spring Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 12 Sep 2025 at 14:15.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Spring Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 12 Sep 2025 at 15:31.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Rupert Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 14 Sep 2025 at 10:00.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Rupert Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Sep 2025 at 09:11.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Farrer Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 14 Sep 2025 at 10:02.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Farrer Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Sep 2025 at 09:10.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Hargreaves Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 14 Sep 2025 at 10:08.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Hargreaves Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Sep 2025 at 09:14.
13 Oct and 5 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Wesley Street, Sabden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Jul 2025 at 11:05.
13 and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Stubbins Lane, Sabden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Jul 2025 at 11:03.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on St Marys Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 12 Sep 2025 at 15:31.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on St Marys Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 15 Sep 2025 at 12:03.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Victoria Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 14 Sep 2025 at 10:04.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Victoria Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Sep 2025 at 13:32.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Macleod Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 14 Sep 2025 at 10:00.
13 Oct and 7 Dec 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Macleod Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 17 Sep 2025 at 09:17.
13 and 26 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Mosley Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 14:00.
13 and 26 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Mosley Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2025 at 14:32.
13 Oct and 12 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Crowtrees Road, Sabden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 15:36.
14 and 16 Oct 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Rear 2 To 24 Cotton Street, Padiham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Jul 2025 at 15:50.
14 and 16 Oct 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Rear 2 To 24 Cotton Street, Padiham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Aug 2025 at 15:12.
15 and 29 Oct 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Hollins Lane, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 30 Jun 2025 at 13:40.
16 Oct and 12 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Every Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 14:09.
16 Oct and 12 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Every Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2025 at 14:31.
16 Oct and 12 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Stanley Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 14:10.
16 Oct and 12 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Stanley Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2025 at 14:39.
20 and 24 Oct 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Bolton Avenue, Accrington.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Aug 2025 at 13:23.
20 and 24 Oct 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Bolton Avenue, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Aug 2025 at 15:38.
20 and 22 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Highway repair and maintenance works on Altham Lane, Altham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 29 Jul 2025 at 08:55.
20 and 22 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Highway repair and maintenance works on Altham Lane, Altham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 31 Jul 2025 at 11:20.
20 and 27 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Cowley Crescent, Padiham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 23 Jul 2025 at 15:36.
20 and 27 Oct 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Cowley Crescent, Padiham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 20 Aug 2025 at 14:48.
20 Oct and 14 Nov 2025
Lancashire County Council are proposing to carry out Section 50 on South Drive, Padiham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Lancashire County Council on 18 Sep 2025 at 09:57.
21 and 23 Oct 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Towneley Avenue, Accrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Jul 2025 at 16:28.
22 Oct and 7 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Partridge Hill, Padiham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 09:15.
23 Oct and 26 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Every Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 14:12.
23 Oct and 26 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Every Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2025 at 14:40.
23 Oct and 26 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Market Square, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 14:14.
23 Oct and 26 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Market Square, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2025 at 14:35.
23 Oct and 26 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Albion Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 14:13.
23 Oct and 26 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Albion Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2025 at 14:41.
23 Oct and 26 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on New Brown Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 14:16.
23 Oct and 26 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on New Brown Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2025 at 14:33.
23 Oct and 26 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Pendle Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 14:17.
23 Oct and 26 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Pendle Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2025 at 14:40.
23 Oct and 26 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on North Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 14:18.
23 Oct and 26 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on North Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2025 at 14:37.
23 Oct and 26 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Calder Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 14:20.
23 Oct and 26 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Calder Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2025 at 14:30.
3 and 26 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Wyre Street, Padiham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 13:22.
3 and 21 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Lawrence Street, Padiham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 10:29.
3 and 21 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Grove Lane, Padiham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 10:28.
5 and 7 Nov 2025
Cadent Gas are proposing to carry out New service connection on Mill Street, Padiham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Aug 2025 at 14:14.
6 and 19 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Dalton Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 14:23.
6 and 19 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Dalton Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2025 at 14:32.
6 and 19 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Rear 94 To 152 Scotland Road, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 14:21.
6 and 19 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Rear 94 To 152 Scotland Road, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2025 at 14:38.
10 and 26 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Partridge Hill, Padiham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Jul 2025 at 10:28.
10 and 14 Nov 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Barden Lane, Burnley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 5 Sep 2025 at 08:57.
10 and 14 Nov 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Barden Lane, Burnley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Sep 2025 at 10:15.
10 and 23 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Fleet Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 14:23.
10 and 23 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Fleet Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2025 at 14:37.
10 and 23 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Elizabeth Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 14:24.
10 and 23 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Elizabeth Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2025 at 14:33.
10 and 23 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Rook Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 3 Sep 2025 at 14:25.
10 and 23 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Rook Street, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2025 at 14:36.
17 and 25 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Railway Street, Brierfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 7 Sep 2025 at 10:15.
17 and 25 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Railway Street, Brierfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2025 at 11:48.
18 Nov 2025 and 5 Mar 2026
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Broadway, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 5 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 25 Apr 2025 at 12:14.
18 Nov 2025 and 5 Mar 2026
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Broadway, Nelson.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 5 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 29 Apr 2025 at 08:58.
20 and 25 Nov 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Rear 8 To 62 Halifax Road, Brierfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Aug 2025 at 11:36.
24 and 28 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Commercial Street, Brierfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 1 Sep 2025 at 15:27.
24 and 28 Nov 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Commercial Street, Brierfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Sep 2025 at 13:54.
3 and 5 Dec 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on North Park Avenue, Barrowford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Sep 2025 at 08:11.
8 and 12 Dec 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Commercial Street, Rawtenstall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 10 Sep 2025 at 14:36.
8 and 24 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Hapton Road, Padiham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 24 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 10:30.
15 and 17 Dec 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Rear 1 To 87 Parkinson Street, Burnley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2025 at 14:44.
Roadworks Map near to Rosegrove Lane, BURNLEY, BB12 6HB (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Rosegrove Lane, BURNLEY, BB12 6HB (18 Events)
(Scheduled Dates)
(miles)
(Scheduled: 16 Sep 2025 - 2 Oct 2025)
(Scheduled: 17 Sep 2025 - 20 Sep 2025)
(Scheduled: 16 Sep 2025 - 19 Sep 2025)
(Scheduled: 16 Sep 2025 - 19 Sep 2025)
Contains public sector information licensed under the Open Government Licence v3.0.