ROADWORKS SUMMARY
King Alfred Way, BRADFORD-ON-AVON, BA15 2NQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for King Alfred Way, BA15 2NQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to King Alfred Way, BRADFORD-ON-AVON, BA15 2NQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for King Alfred Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wiltshire Council logo
LONG TERM
Between
21 Apr and 8 Dec 2024
Details
View Map
Share
Follow
Church Street

Wiltshire Council are proposing to carry out Highway improvement works on Church Street, Trowbridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wiltshire Council on 19 Apr 2024 at 06:37.

Wiltshire Council logo
LONG TERM
Until
8 Dec 2024
Details
View Map
Share
Follow
Church Street

Wiltshire Council are carrying out Highway repair and maintenance works on Church Street, Trowbridge.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:30 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 2 Sep 2024 at 10:13.

Wiltshire Council logo
LONG TERM
Until
8 Dec 2024
Details
View Map
Share
Follow
Conigre

Wiltshire Council are carrying out Highway repair and maintenance works on Conigre, Trowbridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:30 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 2 Sep 2024 at 10:14.

Wiltshire Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Manvers Street

Wiltshire Council are carrying out Highway repair and maintenance works on Manvers Street, Trowbridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 18 Nov 2024 at 10:49.

Wiltshire Council logo
LONG TERM
Between
30 Sep 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Lower Stoke

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Lower Stoke, Limpley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wiltshire Council on 4 Oct 2024 at 12:32.

Wiltshire Council logo
LONG TERM
Between
30 Sep 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Lower Stoke

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Lower Stoke, Limpley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wiltshire Council on 3 Oct 2024 at 12:54.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Glebe Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Glebe Road, Trowbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Oct 2024 at 16:59.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
28 Oct and 6 Dec 2024
Details
View Map
Share
Glebe Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Glebe Road, Trowbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Sep 2024 at 15:52.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
28 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Glebe Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Glebe Road, Trowbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Oct 2024 at 17:00.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Westfield Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Westfield Road, Trowbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Oct 2024 at 17:01.

Wiltshire Council logo
LONG TERM
Between
11 Nov and 22 Dec 2024
Details
View Map
Share
Hill Street

Wiltshire Council were proposing to carry out Highway improvement works on Hill Street, Trowbridge.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 8 Aug 2024 at 15:18.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Grosvenor Bridge Road

Wessex Water are proposing to carry out Utility asset works on Grosvenor Bridge Road, Lambridge, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 12 Sep 2024 at 13:59.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
27 Dec 2024
Details
View Map
Share
Follow
Glebe Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Glebe Road, Trowbridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 13:30 and could run through until 27 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Nov 2024 at 14:27.

Wiltshire Council logo
LONG TERM
Until
22 Dec 2024
Details
View Map
Share
Follow
Hill Street

Wiltshire Council are carrying out Highway improvement works on Hill Street, Trowbridge.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 18 Nov 2024 at 08:22.

Wiltshire Council logo
LONG TERM
Between
18 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Hill Street

Wiltshire Council are proposing to carry out Highway improvement works on Hill Street, Trowbridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 4 Sep 2024 at 09:52.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Lamberts Marsh

Wessex Water were proposing to carry out Utility repair and maintenance works on Lamberts Marsh, Southwick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 12 Sep 2024 at 13:37.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lamberts Marsh

Wessex Water are carrying out Utility repair and maintenance works on Lamberts Marsh, Southwick.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 12:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 22 Nov 2024 at 14:21.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lamberts Marsh

Wessex Water are proposing to carry out Utility repair and maintenance works on Lamberts Marsh, Southwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 18 Sep 2024 at 08:17.

Scottish Hydro Electric Power Dis logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Westfield Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Westfield Road, Trowbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 10:37.

Bath And North East Somerset Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Ferry Lane

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Ferry Lane, Claverton, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 11 Nov 2024 at 13:44.

Scottish Hydro Electric Power Dis logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Glebe Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Glebe Road, Trowbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Nov 2024 at 12:09.

Wessex Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Calton Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Calton Road, Lyncombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 20 Nov 2024 at 11:34.

Wessex Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Calton Road

Wessex Water are carrying out Utility repair and maintenance works on Calton Road, Lyncombe, Bath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 10:50 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 26 Nov 2024 at 10:57.

Wiltshire Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Holbutts Farm South East C183 To Middlehill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Holbutts Farm South East C183 To Middlehill, Middlehill, Box.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 21 Nov 2024 at 16:27.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Rivers Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Rivers Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 18 Nov 2024 at 14:25.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Rivers Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Rivers Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 19 Nov 2024 at 09:33.

Wiltshire Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Holbutts Farm South East C183 To Middlehill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Holbutts Farm South East C183 To Middlehill, Middlehill, Box.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 1 Nov 2024 at 16:10.

Wiltshire Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Wicker Hill

Wiltshire Council are proposing to carry out Highway improvement works on Wicker Hill, Trowbridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 27 Nov 2024 at 07:38.

Wiltshire Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Town Bridge

Wiltshire Council are proposing to carry out Highway improvement works on Town Bridge, Trowbridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 27 Nov 2024 at 07:41.

Western Power Distribution (South West) logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Pera Road

Western Power Distribution (South West) are proposing to carry out New service connection on Pera Road, Walcot, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 6 Sep 2024 at 08:38.

Western Power Distribution (South West) logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Pera Road

Western Power Distribution (South West) were proposing to carry out New service connection on Pera Road, Walcot, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 26 Sep 2024 at 10:59.

Western Power Distribution (South West) logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Pera Road

Western Power Distribution (South West) are proposing to carry out New service connection on Pera Road, Walcot, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 30 Sep 2024 at 12:46.

Wiltshire Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Shails Lane

Wiltshire Council are proposing to carry out Highway improvement works on Shails Lane, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 14 Oct 2024 at 16:43.

Wiltshire Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Turleigh

Wiltshire Council are proposing to carry out Section 50 on Turleigh, Turleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 13 Nov 2024 at 17:06.

Wiltshire Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Turleigh

Wiltshire Council are proposing to carry out Section 50 on Turleigh, Turleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 23 Oct 2024 at 17:01.

Nexfibre Networks Limited logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
The Batch

Nexfibre Networks Limited are proposing to carry out Utility asset works on The Batch, Batheaston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 29 Oct 2024 at 17:02.

Wiltshire Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Shails Lane

Wiltshire Council are proposing to carry out Highway improvement works on Shails Lane, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 9 Oct 2024 at 09:53.

Wiltshire Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Stallard Street

Wiltshire Council are proposing to carry out Highway improvement works on Stallard Street, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 20 Sep 2024 at 14:55.

Wiltshire Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Conigre

Wiltshire Council were proposing to carry out Highway improvement works on Conigre, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 20 Sep 2024 at 14:41.

Wiltshire Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Wicker Hill

Wiltshire Council are proposing to carry out Highway improvement works on Wicker Hill, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 8 Oct 2024 at 12:15.

Wiltshire Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Fore Street

Wiltshire Council are proposing to carry out Highway improvement works on Fore Street, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 9 Oct 2024 at 10:00.

Wiltshire Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hill Street

Wiltshire Council are proposing to carry out Highway improvement works on Hill Street, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 20 Sep 2024 at 15:06.

Wiltshire Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hill Street

Wiltshire Council are proposing to carry out Highway improvement works on Hill Street, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 20 Sep 2024 at 15:08.

Wiltshire Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Fore Street

Wiltshire Council are proposing to carry out Highway improvement works on Fore Street, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 8 Oct 2024 at 12:08.

Wiltshire Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Town Bridge

Wiltshire Council are proposing to carry out Highway improvement works on Town Bridge, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 20 Sep 2024 at 15:03.

Nexfibre Networks Limited logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
The Batch

Nexfibre Networks Limited are proposing to carry out Utility asset works on The Batch, Batheaston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 6 Nov 2024 at 09:27.

Wiltshire Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Manvers Street

Wiltshire Council were proposing to carry out Highway improvement works on Manvers Street, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 20 Sep 2024 at 14:41.

Wiltshire Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Wicker Hill

Wiltshire Council are proposing to carry out Highway improvement works on Wicker Hill, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 9 Oct 2024 at 10:01.

Wiltshire Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Church Street

Wiltshire Council were proposing to carry out Highway improvement works on Church Street, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 20 Sep 2024 at 14:42.

Wiltshire Council logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Silver Street Lane

Wiltshire Council were proposing to carry out Highway repair and maintenance works on Silver Street Lane, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 21 Oct 2024 at 13:46.

Wiltshire Council logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Silver Street Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Silver Street Lane, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 24 Oct 2024 at 13:24.

Wiltshire Council logo
Between
12 and 14 Dec 2024
Details
View Map
Share
Follow
Silver Street Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Silver Street Lane, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 5 Nov 2024 at 15:09.

Wessex Water logo
Between
13 and 23 Dec 2024
Details
View Map
Share
Follow
Church Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Church Lane, Monkton Combe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 16 Sep 2024 at 07:49.

Wiltshire Council logo
Between
14 and 16 Dec 2024
Details
View Map
Share
Follow
Junction With Bradford Road South West To Lynch Bottom

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Junction With Bradford Road South West To Lynch Bottom, Little Chalfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 25 Nov 2024 at 09:46.

Wiltshire Council logo
Between
14 and 16 Dec 2024
Details
View Map
Share
Follow
Wild Cross

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Wild Cross, South Wraxall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 25 Nov 2024 at 09:43.

Wessex Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Tyning Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Tyning Lane, Fairfield Park, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 12 Sep 2024 at 12:37.

Wessex Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Tyning Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Tyning Lane, Fairfield Park, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 26 Sep 2024 at 11:21.

Wessex Water logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Cheltenham Street

Wessex Water were proposing to carry out New service connection on Cheltenham Street, Westmoreland, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 25 Sep 2024 at 13:39.

Wessex Water logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Church Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Church Lane, Monkton Combe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 16 Sep 2024 at 07:49.

Western Power Distribution (South West) logo
Between
5 and 26 Jan 2025
Details
View Map
Share
Follow
Chapel Row

Western Power Distribution (South West) are proposing to carry out Utility asset works on Chapel Row, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 26 Nov 2024 at 15:21.

Western Power Distribution (South West) logo
Between
5 and 26 Jan 2025
Details
View Map
Share
Follow
St Paul's Place

Western Power Distribution (South West) are proposing to carry out Utility asset works on St Paul's Place, Kingsmead, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 26 Nov 2024 at 15:21.

Western Power Distribution (South West) logo
Between
5 and 26 Jan 2025
Details
View Map
Share
Follow
Queen Square

Western Power Distribution (South West) are proposing to carry out Utility asset works on Queen Square, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 26 Nov 2024 at 15:21.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Wiltshire Drive

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wiltshire Drive, Trowbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Nov 2024 at 14:27.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Ramsbury Walk

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Ramsbury Walk, Trowbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Nov 2024 at 14:24.

Wiltshire Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Road From 216 Blackberry Lane South To Junction At Winsley Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Road From 216 Blackberry Lane South To Junction At Winsley Hill, Conkwell, Limpley Stoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 5 Nov 2024 at 13:31.

Wiltshire Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Road From 216 Blackberry Lane South To Junction At Winsley Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Road From 216 Blackberry Lane South To Junction At Winsley Hill, Conkwell, Limpley Stoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 1 Nov 2024 at 16:22.

Wales And West Utilities logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Eastbourne Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Eastbourne Road, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 12 Sep 2024 at 11:47.

Wales And West Utilities logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Dursley Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Dursley Road, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 30 Oct 2024 at 07:15.

Wessex Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Princes Street

Wessex Water are proposing to carry out New service connection on Princes Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 21 Oct 2024 at 12:22.

Wessex Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Princes Street

Wessex Water are proposing to carry out New service connection on Princes Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 7 Oct 2024 at 12:15.

Gigaclear logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Winsley

Gigaclear are proposing to carry out Utility asset works on Winsley, Winsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gigaclear on 30 Oct 2024 at 16:56.

Wales And West Utilities logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Frome Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Frome Road, Southwick.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 2 Oct 2024 at 09:04.

Wessex Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Westmoreland Street

Wessex Water were proposing to carry out New service connection on Westmoreland Street, Westmoreland, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 15 Oct 2024 at 10:02.

Scottish Hydro Electric Power Dis logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Great Parks

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Great Parks, Holt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Nov 2024 at 11:37.

Scottish Hydro Electric Power Dis logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Great Parks

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Great Parks, Holt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 15:56.

Scottish Hydro Electric Power Dis logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Great Parks

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Great Parks, Holt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 28 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 09:37.

Scottish Hydro Electric Power Dis logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Great Parks

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Great Parks, Holt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 28 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 31 Oct 2024 at 14:41.

Network Rail logo
Between
25 Jan and 9 Feb 2025
Details
View Map
Share
Follow
A4 From J A363 Roundabout To J A46 W

Network Rail are proposing to carry out Works for Rail Purposes on A4 From J A363 Roundabout To J A46 W, Bath And North East Somerset.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Nov 2024 at 15:24.

Network Rail logo
Between
25 Jan and 9 Feb 2025
Details
View Map
Share
A4 From J A363 Roundabout To J A46 W

Network Rail were proposing to carry out Works for Rail Purposes on A4 From J A363 Roundabout To J A46 W, Bath And North East Somerset.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 January 2025 and run through until 9 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Nov 2024 at 13:45.

Western Power Distribution (South West) logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Rossiter Road

Western Power Distribution (South West) are proposing to carry out Disconnection or alteration of supply on Rossiter Road, Widcombe, Bath.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 25 Nov 2024 at 11:21.

Western Power Distribution (South West) logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Rossiter Road

Western Power Distribution (South West) are proposing to carry out Disconnection or alteration of supply on Rossiter Road, Widcombe, Bath.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 12 Nov 2024 at 14:53.

Wiltshire Council logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Belcombe Road

Wiltshire Council are proposing to carry out roadworks on Belcombe Road, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 7 Nov 2024 at 16:38.

Wales And West Utilities logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
New King Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on New King Street, Kingsmead, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 21 Nov 2024 at 10:25.

Western Power Distribution (South West) logo
Between
28 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Cul-de-sac At Rear Of 90 To 108 Frome Road

Western Power Distribution (South West) are proposing to carry out New service connection on Cul-de-sac At Rear Of 90 To 108 Frome Road, Odd Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 1 Nov 2024 at 14:59.

Western Power Distribution (South West) logo
Between
28 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Cul-de-sac At Rear Of 90 To 108 Frome Road

Western Power Distribution (South West) are proposing to carry out New service connection on Cul-de-sac At Rear Of 90 To 108 Frome Road, Odd Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 29 Oct 2024 at 08:25.

Wiltshire Council logo
LONG TERM
Between
3 Feb and 18 Mar 2025
Details
View Map
Share
The Halve

Wiltshire Council were proposing to carry out Section 58 on The Halve, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 18 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:28.

Wiltshire Council logo
LONG TERM
Between
3 Feb and 18 Mar 2025
Details
View Map
Share
Hilperton Road

Wiltshire Council were proposing to carry out Section 58 on Hilperton Road, Trowbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 18 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:36.

Wales And West Utilities logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Roundstone Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Roundstone Street, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 22 Nov 2024 at 17:22.

Wiltshire Council logo
LONG TERM
Between
10 Feb and 25 Mar 2025
Details
View Map
Share
Follow
The Halve

Wiltshire Council are proposing to carry out Section 58 on The Halve, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:58.

Wiltshire Council logo
LONG TERM
Between
10 Feb and 25 Mar 2025
Details
View Map
Share
Follow
Hilperton Road

Wiltshire Council are proposing to carry out Section 58 on Hilperton Road, Trowbridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:39.

Wales And West Utilities logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Morford Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Morford Street, Lansdown, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 19 Nov 2024 at 07:42.

Wales And West Utilities logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Morford Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Morford Street, Lansdown, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 25 Oct 2024 at 14:37.

Wales And West Utilities logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Gravel

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on The Gravel, Holt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 20 Nov 2024 at 14:59.

Wales And West Utilities logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Edward Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Edward Street, Bathwick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 23 Sep 2024 at 07:47.


Roadworks Map near to King Alfred Way, BRADFORD-ON-AVON, BA15 2NQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 08:25
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to King Alfred Way, BRADFORD-ON-AVON, BA15 2NQ (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Gigaclear logo
FIELDINS 
(0.3 miles)
Gigaclear
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 27 Nov 2024 - 28 Nov 2024
0.3
Details
Share
Follow
2
Wiltshire Council logo
TURLEIGH 
(0.7 miles)
Wiltshire Council
Highway repair and maintenance works - Carriageway, Verge - Two-way signals
In Progress
Since: 25 Nov 2024 08:34
(Scheduled: 25 Nov 2024 - 6 Dec 2024)
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.