ROADWORKS SUMMARY
The Dale, HENLEY-IN-ARDEN, B95 6AZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Dale, B95 6AZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Dale, HENLEY-IN-ARDEN, B95 6AZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Dale are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

BT logo
LONG TERM
Between
4 Nov 2024 and 17 Jan 2025
Details
View Map
Share
A46 From J A435 To J A422

BT were proposing to carry out Utility asset works on A46 From J A435 To J A422, Stratford-on-avon.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 17 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 19 Aug 2024 at 09:19.

BT logo
LONG TERM
Between
4 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
A46 From J A435 To J A422

BT are proposing to carry out Utility asset works on A46 From J A435 To J A422, Stratford-on-avon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 16 Sep 2024 at 16:30.

Energy Assets Networks (formerly Utility Distribution Networks) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Lye Green Road

Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out Utility asset works on Lye Green Road, Claverdon.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2024 and run through until 9 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 29 Aug 2024 at 15:18.

Energy Assets Networks (formerly Utility Distribution Networks) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
The Green

Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out Utility asset works on The Green, Claverdon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 29 Aug 2024 at 15:13.

Warwickshire County Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Birmingham Road

Warwickshire County Council are carrying out Highway improvement works on Birmingham Road, Stratford-upon-avon.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 November 2024 at 09:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 11 Nov 2024 at 07:39.

Energy Assets Networks (formerly Utility Distribution Networks) logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Lye Green Road

Energy Assets Networks (formerly Utility Distribution Networks) are carrying out Utility asset works on Lye Green Road, Claverdon.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:00 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 28 Nov 2024 at 09:13.

Warwickshire County Council logo
LONG TERM
Between
18 Nov 2024 and 12 Jan 2025
Details
View Map
Share
Follow
Birmingham Road

Warwickshire County Council are proposing to carry out Highway improvement works on Birmingham Road, Stratford-upon-avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 12 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 14 Aug 2024 at 15:10.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Lye Green Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Lye Green Road, Claverdon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 22 Oct 2024 at 13:59.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Lye Green Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Lye Green Road, Claverdon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 23 Oct 2024 at 12:03.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Lye Green Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Lye Green Road, Claverdon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 28 Oct 2024 at 12:04.

Warwickshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Norton Curlieu Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Norton Curlieu Lane, Budbrooke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 3 Sep 2024 at 11:04.

Warwickshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lapworth Street

Warwickshire County Council are proposing to carry out Highway improvement works on Lapworth Street, Lapworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 4 Sep 2024 at 13:01.

Cadent Gas logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Grange Road

Cadent Gas are proposing to carry out New service connection on Grange Road, Bearley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 11:51.

Severn Trent Water logo
Between
9 and 11 Jan 2025
Details
View Map
Share
Follow
Coughton Fields Lane

Severn Trent Water are proposing to carry out New service connection on Coughton Fields Lane, Coughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 11:37.

Severn Trent Water logo
Between
9 and 11 Jan 2025
Details
View Map
Share
Follow
Coughton Fields Lane

Severn Trent Water are proposing to carry out New service connection on Coughton Fields Lane, Coughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 2 Oct 2024 at 16:07.

Warwickshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Lapworth Street

Warwickshire County Council were proposing to carry out Highway improvement works on Lapworth Street, Lapworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 7 Nov 2024 at 11:21.

Western Power Distribution (West Midlands) logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Spernal Lane

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Spernal Lane, Spernall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Oct 2024 at 16:06.

Western Power Distribution (West Midlands) logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Spernal Lane

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Spernal Lane, Spernall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 13 Nov 2024 at 11:18.

Severn Trent Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Wawensmere Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Wawensmere Road, Wootton Wawen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 14:51.

Severn Trent Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Wawensmere Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Wawensmere Road, Wootton Wawen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 11:01.

Severn Trent Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
St Marys Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Marys Road, Alcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 10:21.

Severn Trent Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
St Marys Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Marys Road, Alcester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Oct 2024 at 15:31.

National Highways logo
LONG TERM
Between
3 Feb and 29 Mar 2025
Details
View Map
Share
Follow
Birmingham Road

National Highways are proposing to carry out Highway improvement works on Birmingham Road, Bishopton Hill, Pathlow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 8 Nov 2024 at 15:29.

National Highways logo
LONG TERM
Between
3 Feb and 29 Mar 2025
Details
View Map
Share
Birmingham Road

National Highways were proposing to carry out Highway improvement works on Birmingham Road, Bishopton Hill, Pathlow.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Oct 2024 at 08:29.

National Highways logo
LONG TERM
Between
3 Feb and 29 Mar 2025
Details
View Map
Share
Alcester Road

National Highways were proposing to carry out Highway improvement works on Alcester Road, Stratford-upon-avon.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Oct 2024 at 08:30.

National Highways logo
LONG TERM
Between
3 Feb and 29 Mar 2025
Details
View Map
Share
Follow
Alcester Road

National Highways are proposing to carry out Highway improvement works on Alcester Road, Stratford-upon-avon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 8 Nov 2024 at 15:29.

Warwickshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Lapworth Street

Warwickshire County Council are proposing to carry out Highway improvement works on Lapworth Street, Lapworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 21 Nov 2024 at 12:41.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Alcester Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Alcester Road, Aston Cantlow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:34.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Spernal Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Spernal Lane, Great Alne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 28 Nov 2024 at 10:09.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Spernal Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Spernal Lane, Great Alne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 14:42.

Warwickshire County Council logo
LONG TERM
Between
10 Feb and 26 Apr 2025
Details
View Map
Share
Follow
Birmingham Road

Warwickshire County Council are proposing to carry out Highway improvement works on Birmingham Road, Stratford-upon-avon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 8 Nov 2024 at 11:25.

Western Power Distribution (East Midlands) logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Ash Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Ash Lane, Bearley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 6 Nov 2024 at 14:15.

Severn Trent Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Lapworth Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lapworth Street, Lapworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 12:49.

Severn Trent Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Alcester Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Alcester Road, Aston Cantlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Nov 2024 at 13:18.

Warwickshire County Council logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Birmingham Road

Warwickshire County Council are proposing to carry out Highway improvement works on Birmingham Road, Henley-in-arden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 12 Nov 2024 at 10:14.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Spernal Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Spernal Lane, Great Alne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 11:28.

Warwickshire County Council logo
LONG TERM
Between
24 Feb and 9 Nov 2025
Details
View Map
Share
Follow
Birmingham Road

Warwickshire County Council are proposing to carry out Highway improvement works on Birmingham Road, Stratford-upon-avon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 9 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 18 Nov 2024 at 16:33.

Severn Trent Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Station Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Station Road, Shrewley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Nov 2024 at 19:22.


Roadworks Map near to The Dale, HENLEY-IN-ARDEN, B95 6AZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 5 Dec 2024 01:36
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Dale, HENLEY-IN-ARDEN, B95 6AZ (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Western Power Distribution (East Midlands) logo
URGENT
  
STRATFORD ROAD 
(0.7 miles)
Western Power Distribution (East Midlands)
Utility repair and maintenance works - Footway - Two-way signals
In Progress
Since: 2 Dec 2024 14:00
(Scheduled: 2 Dec 2024 - 6 Dec 2024)
0.7
Details
Share
Follow