ROADWORKS SUMMARY
Ullenhall, HENLEY-IN-ARDEN, B95 5FQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for B95 5FQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Ullenhall, HENLEY-IN-ARDEN, B95 5FQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Severn Trent Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Windmill Lane

Severn Trent Water are proposing to carry out New service connection on Windmill Lane, Solihull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 16:37.

Severn Trent Water logo
Finishing
Wednesday
Details
View Map
Share
Lilley Green Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Lilley Green Road, Alvechurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Severn Trent Water on 19 Dec 2024 at 15:56.

Severn Trent Water logo
Finishing
Wednesday
Details
View Map
Share
Church Lane

Severn Trent Water were proposing to carry out roadworks on Church Lane, Lapworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Oct 2024 at 15:13.

Severn Trent Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Windmill Lane

Severn Trent Water are proposing to carry out New service connection on Windmill Lane, Solihull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 15:29.

Severn Trent Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Lapworth Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lapworth Street, Lapworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 17 Dec 2024 at 12:12.

Warwickshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Lapworth Street

Warwickshire County Council were proposing to carry out Highway improvement works on Lapworth Street, Lapworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 7 Nov 2024 at 11:21.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Billesley Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Billesley Lane, Portway.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 09:55.

Western Power Distribution (West Midlands) logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Spernal Lane

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Spernal Lane, Spernall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Oct 2024 at 16:06.

Western Power Distribution (West Midlands) logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Spernal Lane

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Spernal Lane, Spernall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 13 Nov 2024 at 11:18.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Lapworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 12:59.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Lapworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 12:06.

Severn Trent Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Spring Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Spring Lane, Solihull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 09:37.

Severn Trent Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Spring Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Spring Lane, Solihull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 14:50.

Severn Trent Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Wawensmere Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Wawensmere Road, Wootton Wawen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 14:51.

Severn Trent Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Wawensmere Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Wawensmere Road, Wootton Wawen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 11:01.

Severn Trent Water logo
Between
7 and 11 Feb 2025
Details
View Map
Share
Follow
Alderhanger Lane Layby

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Alderhanger Lane Layby, Beoley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 15:03.

Severn Trent Water logo
Between
7 and 11 Feb 2025
Details
View Map
Share
Follow
Alderhanger Lane Layby

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Alderhanger Lane Layby, Beoley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 13:08.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Spernal Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Spernal Lane, Great Alne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 14:42.

Warwickshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Lapworth Street

Warwickshire County Council are proposing to carry out Highway improvement works on Lapworth Street, Lapworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 21 Nov 2024 at 12:41.

Warwickshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Lapworth Street

Warwickshire County Council are proposing to carry out Highway improvement works on Lapworth Street, Lapworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 3 Jan 2025 at 11:15.

Warwickshire County Council logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Broad Lane

Warwickshire County Council are proposing to carry out Highway improvement works on Broad Lane, Gilberts Green, Tanworth-in-arden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 7 Nov 2024 at 15:49.

Severn Trent Water logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Old Warwick Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Old Warwick Road, Lapworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 13 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 29 Nov 2024 at 15:52.

Worcestershire County Council logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Carpenters Hill

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Carpenters Hill, Beoley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 21 Nov 2024 at 15:45.

Worcestershire County Council logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Carpenters Hill

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Carpenters Hill, Beoley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 22 Nov 2024 at 14:16.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Spernal Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Spernal Lane, Great Alne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 28 Nov 2024 at 10:09.

Severn Trent Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Alcester Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Alcester Road, Aston Cantlow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 11:34.

Worcestershire County Council logo
Between
11 and 21 Feb 2025
Details
View Map
Share
Follow
Harport Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Harport Road, Redditch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 9 Dec 2024 at 14:27.

Severn Trent Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Lapworth Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lapworth Street, Lapworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 12:49.

Worcestershire County Council logo
Between
12 and 21 Feb 2025
Details
View Map
Share
Follow
Harport Road

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Harport Road, Redditch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 5 Nov 2024 at 10:24.

Warwickshire County Council logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Birmingham Road

Warwickshire County Council are proposing to carry out Highway improvement works on Birmingham Road, Henley-in-arden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 13 Dec 2024 at 11:01.

Warwickshire County Council logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Birmingham Road

Warwickshire County Council are proposing to carry out Highway improvement works on Birmingham Road, Henley-in-arden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Warwickshire County Council on 12 Nov 2024 at 10:14.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Spernal Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Spernal Lane, Great Alne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 11:28.

Severn Trent Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Alcester Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Alcester Road, Aston Cantlow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Dec 2024 at 15:26.

Severn Trent Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Lady Lane

Severn Trent Water are proposing to carry out New service connection on Lady Lane, Solihull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 23 Dec 2024 at 16:08.

Severn Trent Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Lady Lane

Severn Trent Water are proposing to carry out New service connection on Lady Lane, Solihull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 23 Dec 2024 at 15:04.

Severn Trent Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Billesley Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Billesley Lane, Portway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 26 Nov 2024 at 11:13.

Warwickshire County Council logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Saxon Close

Warwickshire County Council are proposing to carry out Highway improvement works on Saxon Close, Studley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 4 Dec 2024 at 10:58.

Warwickshire County Council logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Riverside

Warwickshire County Council are proposing to carry out Highway improvement works on Riverside, Studley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 4 Dec 2024 at 10:58.

Severn Trent Water logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Bear Lane

Severn Trent Water are proposing to carry out New service connection on Bear Lane, Henley-in-arden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 17 Dec 2024 at 13:21.

Severn Trent Water logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Bear Lane

Severn Trent Water are proposing to carry out New service connection on Bear Lane, Henley-in-arden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 3 Jan 2025 at 12:22.

Severn Trent Water logo
Between
17 and 20 Mar 2025
Details
View Map
Share
Old Warwick Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Old Warwick Road, Lapworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 20 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Dec 2024 at 09:04.

Severn Trent Water logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
Alcester Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Alcester Road, Aston Cantlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 3 Jan 2025 at 12:52.

Severn Trent Water logo
Between
24 and 27 Mar 2025
Details
View Map
Share
Follow
Alcester Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Alcester Road, Aston Cantlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Dec 2024 at 15:43.

Worcestershire County Council logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Icknield Street

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Icknield Street, Church Hill, Redditch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 24 Dec 2024 at 08:09.

Worcestershire County Council logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Icknield Street

Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Icknield Street, Church Hill, Redditch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Worcestershire County Council on 30 Dec 2024 at 08:27.


Roadworks Map near to Ullenhall, HENLEY-IN-ARDEN, B95 5FQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 6 Jan 2025 02:26
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Ullenhall, HENLEY-IN-ARDEN, B95 5FQ (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.