ROADWORKS SUMMARY
St. Georges Drive, SMETHWICK, B66 1DN
Introduction

View current and future planned roadworks and road closures for St. Georges Drive, B66 1DN and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to St. Georges Drive, SMETHWICK, B66 1DN
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for St. Georges Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
20 Jun 2025
Transport for West Midlands (TfWM) are carrying out roadworks on Castle Hill, Dudley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 January 2023 at 00:01 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 3 Apr 2025 at 11:27.
26 Sep 2025
Birmingham City Council are carrying out Highway improvement works on Park Circus, Birmingham.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2023 at 09:00 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Birmingham City Council on 31 Mar 2025 at 16:30.
20 Jun 2025
Transport for West Midlands (TfWM) are carrying out roadworks on Trindle Road, Dudley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 April 2023 at 16:30 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 3 Apr 2025 at 11:28.
2 May 2025
Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on Birmingham Street, Dudley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 October 2023 at 00:01 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 12 Nov 2024 at 11:03.
20 Jun 2025
Transport for West Midlands (TfWM) are carrying out roadworks on King Street, Dudley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 November 2023 at 07:00 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 3 Apr 2025 at 11:27.
2 May 2025
Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on King Street, Dudley.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 November 2023 at 07:00 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Nov 2024 at 12:23.
2 May 2025
Transport for West Midlands (TfWM) are carrying out roadworks on Birmingham Street, Dudley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2023 at 07:00 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 12 Nov 2024 at 11:03.
2 May 2025
Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on Station Drive, Dudley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 December 2023 at 07:00 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 12 Nov 2024 at 11:02.
26 Dec 2025
Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on New Meeting Street, Birmingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 February 2024 at 00:10 and could run through until 26 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 14 Apr 2025 at 09:28.
26 Dec 2025
Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on Masshouse Lane, Nechells, Birmingham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 08:30 and could run through until 26 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 14 Apr 2025 at 11:12.
26 Dec 2025
Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on Park Street, Nechells Digbeth, Birmingham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 08:30 and could run through until 26 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 17 Apr 2025 at 12:26.
26 Dec 2025
Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on Albert Street, Ladywood, Birmingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2024 at 00:30 and could run through until 26 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 14 Apr 2025 at 11:13.
24 Jul 2025
Dudley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Trindle Road, Dudley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 May 2024 at 08:00 and could run through until 24 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 Nov 2024 at 15:09.
8 Jun 2025
Dudley Metropolitan Borough Council are carrying out Highway repair and maintenance works on St Joseph Street, Dudley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 May 2024 at 11:00 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 May 2024 at 10:56.
26 Dec 2025
Transport for West Midlands (TfWM) are carrying out Highway improvement works on Dale End, Birmingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 May 2024 at 09:00 and could run through until 26 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 14 Apr 2025 at 11:12.
Saturday
Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Union Street, Wednesbury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 June 2024 at 08:15 and could run through until 19 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Dec 2024 at 07:39.
26 Dec 2025
Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on Bull Street, Ladywood, Birmingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 July 2024 at 08:30 and could run through until 26 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 14 Apr 2025 at 11:13.
26 Dec 2025
Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on Corporation Street, Ladywood, Birmingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 July 2024 at 00:01 and could run through until 26 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 14 Apr 2025 at 11:13.
1 Aug 2024 and 30 Sep 2025
Transport for West Midlands (TfWM) were proposing to carry out Highway improvement works on New Town Row, Birmingham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 August 2024 and run through until 30 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 17 Sep 2024 at 20:18.
1 Aug 2024 and 30 Sep 2025
Transport for West Midlands (TfWM) were proposing to carry out Highway improvement works on High Street, Aston, Birmingham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 August 2024 and run through until 30 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 17 Sep 2024 at 20:19.
1 Aug 2024 and 30 Sep 2025
Transport for West Midlands (TfWM) were proposing to carry out Highway improvement works on Birchfield Road, Birmingham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 August 2024 and run through until 30 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 17 Sep 2024 at 20:21.
1 Aug 2024 and 30 Sep 2025
Transport for West Midlands (TfWM) were proposing to carry out Highway improvement works on Walsall Road, Perry Barr, Birmingham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 August 2024 and run through until 30 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 18 Sep 2024 at 13:37.
11 Sep 2025
National Highways are carrying out Highway repair and maintenance works on Wolverhampton Road, Oldbury.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 6 August 2024 at 00:01 and could run through until 11 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 6 Aug 2024 at 09:57.
10 Aug 2024 and 21 May 2025
Birmingham City Council are proposing to carry out Highway improvement works on Senneleys Park Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 August 2024 and could run through until 21 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Birmingham City Council on 24 Jul 2024 at 10:55.
20 Jun 2025
Transport for West Midlands (TfWM) are carrying out Works for road purposes on The Broadway, Dudley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 September 2024 at 09:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 3 Apr 2025 at 11:27.
4 Sep 2024 and 19 Dec 2025
Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Birmingham Road, Walsall.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2024 and could run through until 19 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 27 Jun 2024 at 14:53.
19 Dec 2025
Transport for West Midlands (TfWM) are carrying out Highway repair and maintenance works on Moor Street Queensway, Birmingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 01:00 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 14 Apr 2025 at 09:28.
17 Oct 2024 and 25 Apr 2025
Birmingham City Council are proposing to carry out Highway improvement works on Dudley Road, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 October 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Birmingham City Council on 22 Aug 2024 at 13:46.
19 Sep 2025
Birmingham City Council are carrying out Highway improvement works on Dudley Road, Birmingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 October 2024 at 07:30 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Birmingham City Council on 13 Feb 2025 at 16:04.
19 Oct 2024 and 21 Oct 2025
Birmingham City Council were proposing to carry out Highway improvement works on Dartmouth Middleway, Birmingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 October 2024 and run through until 21 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Birmingham City Council on 8 Oct 2024 at 11:36.
24 Oct 2024 and 25 Oct 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Portland Road, Birmingham.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 October 2024 and run through until 25 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 18 Oct 2024 at 08:52.
28 Oct 2024 and 30 Jun 2025
Western Power Distribution (West Midlands) are proposing to carry out Diversionary works on Birchall Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 30 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 26 Jun 2024 at 14:33.
30 Sep 2025
Western Power Distribution (West Midlands) are carrying out Diversionary works on Birchall Street, Birmingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:16 and could run through until 30 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 18 Nov 2024 at 12:38.
28 Oct 2024 and 30 Jun 2025
Western Power Distribution (West Midlands) are proposing to carry out Diversionary works on Cheapside, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 30 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Jul 2024 at 15:30.
30 Sep 2025
Western Power Distribution (West Midlands) are carrying out Diversionary works on Cheapside, Birmingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:56 and could run through until 30 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 18 Nov 2024 at 12:36.
30 Oct 2024 and 30 Oct 2025
Birmingham City Council are proposing to carry out Highway improvement works on Conway Avenue, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 30 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Birmingham City Council on 13 Aug 2024 at 13:05.
9 Dec 2024 and 27 Jun 2025
Transport for West Midlands (TfWM) were proposing to carry out Works for road purposes on Railway Street, Tipton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 27 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 9 Dec 2024 at 11:38.
6 Jan and 30 Jun 2025
Transport for West Midlands (TfWM) are proposing to carry out Highway repair and maintenance works on Bradford Street, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 19 Dec 2024 at 16:27.
Cadent Gas carried out Utility asset works on Warstone Lane, Birmingham.
These works were categorised as Major.
Multi-way signals were in place for some or all of the period.
The works were originally planned between 6 Jan 2025 and 18 Apr 2025 and were actually completed between 6 Jan 2025 (08:00) and 17 Apr 2025 (11:30). The works impacted the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 11:31.
9 Jan and 1 Oct 2025
Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Trindle Road, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 15 Nov 2024 at 08:33.
3 Feb and 28 Nov 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Park Street West, Rowley Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Sep 2024 at 13:26.
3 Feb and 28 Nov 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Halesowen Street, Rowley Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Sep 2024 at 13:25.
3 Feb and 24 Nov 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Long Lane, Rowley Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 20 Jan 2025 at 13:36.
2 Sep 2025
Transport for West Midlands (TfWM) are carrying out Highway repair and maintenance works on Bradford Street, Birmingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 February 2025 at 09:00 and could run through until 2 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 5 Feb 2025 at 10:01.
3 Feb and 28 Nov 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on High Street, Rowley Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Sep 2024 at 13:26.
3 Feb and 28 Nov 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Birmingham Road, Rowley Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Sep 2024 at 13:26.
3 Feb and 28 Nov 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Oldbury Road, Rowley Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Sep 2024 at 13:26.
Tomorrow
Cadent Gas are proposing to carry out Utility asset works on Vyse Street, Ladywood, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 14:31.
5 May 2025
Western Power Distribution (West Midlands) are carrying out Utility asset works on Bagnall Street, Golds Hill, Tipton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 February 2025 at 17:30 and could run through until 5 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Feb 2025 at 09:05.
4 Feb and 5 May 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on New Street, Hill Top, West Bromwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 20 Nov 2024 at 11:03.
5 May 2025
Western Power Distribution (West Midlands) are carrying out Utility asset works on Harvills Hawthorn, West Bromwich.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 February 2025 at 17:20 and could run through until 5 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 19 Mar 2025 at 11:33.
2 May 2025
Cadent Gas are carrying out Utility asset works on Coronation Road, Great Barr, Birmingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 February 2025 at 10:00 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 14:47.
25 Apr 2025
Western Power Distribution (West Midlands) are carrying out Utility asset works on Hamilton Avenue, Halesowen.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 February 2025 at 12:00 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 7 Apr 2025 at 13:13.
10 Feb and 30 May 2025
Cadent Gas are proposing to carry out Utility asset works on Buckingham Road, Rowley Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 19 Jul 2024 at 12:34.
10 Feb and 31 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Europa Avenue, West Bromwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 11:04.
Monday
Sandwell Metropolitan Borough Council are carrying out Highway improvement works on Walsall Road, Walsall.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 February 2025 at 09:30 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 14 Apr 2025 at 12:54.
25 Apr 2025
Cadent Gas are carrying out Utility asset works on Chapel Lane, Great Barr.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 February 2025 at 10:00 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 08:22.
7 May 2025
Birmingham City Council are carrying out Highway improvement works on Gibbins Road, Birmingham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 11:02 and could run through until 7 May 2025. The works will impact the footway, verge and footpath.
This roadwork event was last updated by Birmingham City Council on 4 Apr 2025 at 12:05.
19 Feb and 24 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Old Walsall Road, Perry Barr, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 12:25.
19 Feb and 24 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Old Walsall Road, Birmingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 24 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 10:39.
30 May 2025
Cadent Gas are carrying out Utility asset works on Upper Sutton Street, Birmingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 February 2025 at 17:00 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 08:13.
24 Feb and 22 Aug 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Park Lane, Handsworth Wood, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 19 Feb 2025 at 14:50.
22 Aug 2025
Western Power Distribution (West Midlands) are carrying out Utility asset works on Park Lane, Handsworth Wood, Birmingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 February 2025 at 07:00 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Feb 2025 at 09:20.
24 Feb and 27 Jun 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Park Lane, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Dec 2024 at 10:39.
24 Feb and 22 Aug 2025
Western Power Distribution (West Midlands) were proposing to carry out Utility asset works on Park Lane, Birmingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 22 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 19 Feb 2025 at 09:22.
26 Feb and 6 May 2025
Cadent Gas are proposing to carry out Utility asset works on St Pauls Road, Smethwick.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 15:15.
28 Feb and 28 Apr 2025
Severn Trent Water are proposing to carry out Utility asset works on Elkington Street, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Severn Trent Water on 4 Oct 2024 at 11:51.
28 Feb and 28 Apr 2025
Severn Trent Water are proposing to carry out Utility asset works on Bracebridge Street, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Severn Trent Water on 4 Oct 2024 at 11:59.
28 Feb and 28 Apr 2025
Severn Trent Water are proposing to carry out Utility asset works on St Stephens Street, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Severn Trent Water on 4 Oct 2024 at 11:55.
25 Apr 2025
Transport for West Midlands (TfWM) are carrying out Highway repair and maintenance works on Allison Street, Birmingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 08:00 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 8 Apr 2025 at 10:06.
3 Mar and 7 May 2025
Cadent Gas were proposing to carry out Utility asset works on Old Walsall Road, Perry Barr, Birmingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 7 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 10:12.
Tuesday
Birmingham City Council are carrying out Highway improvement works on Bryony Road, Birmingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 March 2025 at 08:22 and could run through until 22 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Birmingham City Council on 14 Mar 2025 at 09:14.
12 May 2025
Birmingham City Council are carrying out Highway improvement works on Templefield Street, Birmingham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 09:51 and could run through until 12 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Birmingham City Council on 16 Apr 2025 at 09:25.
10 Mar and 16 May 2025
Birmingham City Council are proposing to carry out Highway improvement works on Summer Row, Birmingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Birmingham City Council on 12 Mar 2025 at 12:43.
16 May 2025
Cadent Gas are carrying out Utility asset works on St Pauls Road, Smethwick.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 March 2025 at 12:00 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 12:43.
10 Mar and 11 Jul 2025
Sandwell Metropolitan Borough Council were proposing to carry out Highway improvement works on New Birmingham Road, Tividale, Oldbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 20 Feb 2025 at 10:19.
12 Mar and 17 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Upper Sutton Street, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 13:29.
13 Mar and 12 May 2025
Severn Trent Water were proposing to carry out Utility asset works on Moorsom Street, Birmingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 March 2025 and run through until 12 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 23 Dec 2024 at 15:22.
14 Mar and 28 May 2025
Cadent Gas are proposing to carry out Utility asset works on Aldersea Drive, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 28 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 15:59.
14 Mar and 28 May 2025
Cadent Gas were proposing to carry out Utility asset works on Aldersea Drive, Birmingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 March 2025 and run through until 28 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 10:01.
17 Mar and 25 Apr 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Aberdeen Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Dec 2024 at 08:49.
Today
Cadent Gas are proposing to carry out Utility asset works on Barnes Hill, Birmingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 March 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 10:33.
24 Mar and 2 May 2025
Cadent Gas were proposing to carry out Utility asset works on Londonderry Lane, Smethwick.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 March 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 08:48.
9 May 2025
Western Power Distribution (West Midlands) are carrying out Utility asset works on Junction Road, Birmingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 March 2025 at 08:30 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Mar 2025 at 09:09.
31 Oct 2025
Sandwell Metropolitan Borough Council are carrying out Highway improvement works on Park Street West, Rowley Regis.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 31 March 2025 at 17:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Mar 2025 at 19:08.
31 Oct 2025
Sandwell Metropolitan Borough Council are carrying out Highway improvement works on Halesowen Street, Rowley Regis.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 March 2025 at 17:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Mar 2025 at 19:06.
31 Oct 2025
Sandwell Metropolitan Borough Council are carrying out Highway improvement works on Long Lane, Rowley Regis.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 March 2025 at 17:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Mar 2025 at 19:05.
31 Oct 2025
Sandwell Metropolitan Borough Council are carrying out Highway improvement works on High Street, Rowley Regis.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 March 2025 at 17:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Mar 2025 at 19:07.
31 Oct 2025
Sandwell Metropolitan Borough Council are carrying out Highway improvement works on Birmingham Road, Rowley Regis.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 March 2025 at 17:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Mar 2025 at 19:04.
31 Oct 2025
Sandwell Metropolitan Borough Council are carrying out Highway improvement works on Oldbury Road, Rowley Regis.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 March 2025 at 19:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Mar 2025 at 19:02.
18 Jun 2025
Cadent Gas are carrying out Utility asset works on Vyse Street, Ladywood, Birmingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 31 March 2025 at 09:13 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 31 Mar 2025 at 09:15.
31 Mar and 12 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Aldersea Drive, Birmingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 10:09.
Today
ESP Electricity are proposing to carry out Utility asset works on North Street, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 14 Mar 2025 at 10:09.
Today
ESP Electricity are carrying out Utility asset works on North Street, Dudley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 31 March 2025 at 09:30 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 31 Mar 2025 at 11:06.
Today
ES Pipelines were proposing to carry out Utility asset works on North Street, Dudley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by ES Pipelines on 14 Feb 2025 at 16:03.
25 Apr 2025
Cadent Gas are carrying out Utility asset works on Arthur Street, West Bromwich.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 31 March 2025 at 08:00 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Mar 2025 at 08:09.
31 Mar and 6 May 2025
Cadent Gas were proposing to carry out Utility asset works on Worlds End Road, Birmingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 6 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 17:09.
31 Mar and 6 May 2025
Cadent Gas are proposing to carry out Utility asset works on Worlds End Road, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 10:32.
Tomorrow
Cadent Gas were proposing to carry out Utility asset works on Fisher Street, Great Bridge, Tipton.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 09:37.
19 May 2025
Cadent Gas are carrying out Utility asset works on Coppice Street, Tipton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 31 March 2025 at 13:00 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Mar 2025 at 14:05.
28 Apr 2025
Electricity Network Company are carrying out Utility asset works on Bissell Street, Nechells, Birmingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 April 2025 at 08:00 and could run through until 28 April 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Electricity Network Company on 3 Apr 2025 at 09:01.
27 Apr 2025
Electricity Network Company are carrying out New service connection on Macdonald Street, Birmingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 April 2025 at 09:30 and could run through until 27 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 2 Apr 2025 at 11:28.
Monday
Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on High Street, Aston, Birmingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 26 Mar 2025 at 15:26.
Monday
Transport for West Midlands (TfWM) are carrying out Highway improvement works on High Street, Aston, Birmingham.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 April 2025 at 07:00 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 3 Apr 2025 at 08:31.
Today
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bayleys Lane, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Mar 2025 at 11:39.
Today
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bankfield Road, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Mar 2025 at 11:38.
Today
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Gilson Street, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Mar 2025 at 11:38.
Today
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Price Road, Wednesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Mar 2025 at 11:27.
Today
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on William Green Road, Wednesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Mar 2025 at 11:27.
Today
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Maple Avenue, Wednesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Mar 2025 at 10:05.
Today
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Rachael Gardens, Wednesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Mar 2025 at 10:06.
Today
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tame Avenue, Wednesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Mar 2025 at 10:05.
Today
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hazel Avenue, Wednesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 12 Mar 2025 at 11:28.
Monday
Transport for West Midlands (TfWM) were proposing to carry out Highway improvement works on High Street, Aston, Birmingham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 April 2025 and run through until 21 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 28 Feb 2025 at 10:57.
10 Jul 2025
Cadent Gas are carrying out Utility asset works on Cophall Street, Tipton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 April 2025 at 11:30 and could run through until 10 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 12:13.
28 Apr 2025
Cadent Gas are carrying out Utility asset works on Fenton Street, Smethwick.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 13:00 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Apr 2025 at 14:19.
7 Apr and 2 May 2025
Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Bourne Street, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 13 Mar 2025 at 09:29.
2 May 2025
Transport for West Midlands (TfWM) are carrying out Works for road purposes on Bourne Street, Dudley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 07:30 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 7 Apr 2025 at 08:58.
7 and 25 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Inverclyde Road, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 10:30.
7 Apr and 2 May 2025
Cadent Gas were proposing to carry out Utility asset works on Slater Street, Great Bridge, Tipton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 09:41.
Today
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Whittington Close, West Bromwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 26 Mar 2025 at 11:43.
25 Apr 2025
Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Whittington Close, West Bromwich.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 09:00 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Apr 2025 at 09:11.
7 and 25 Apr 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Hydes Road, West Bromwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 6 Mar 2025 at 15:23.
7 and 25 Apr 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Hydes Road, West Bromwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 5 Mar 2025 at 13:02.
7 and 25 Apr 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Hall Green Road, West Bromwich.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 5 Mar 2025 at 13:14.
7 and 25 Apr 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Hall Green Road, West Bromwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 5 Mar 2025 at 14:01.
7 and 30 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Farmer Way, Tipton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Jan 2025 at 13:54.
2 May 2025
Severn Trent Water are carrying out Utility repair and maintenance works on Moorcroft Drive, Wednesbury.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 07:34 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 15 Apr 2025 at 10:58.
8 Apr and 15 May 2025
Cadent Gas were proposing to carry out Utility asset works on Allcock Street, Birmingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 April 2025 and run through until 15 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 11:14.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on High Street, Rowley Regis.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2025 at 08:50 and could run through until 23 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 09:02.
8 Apr and 30 May 2025
Cadent Gas were proposing to carry out Utility asset works on Liverpool Street, Birmingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 April 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 11:28.
8 and 25 Apr 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cinder Bank, Netherton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 21 Jan 2025 at 10:06.
8 and 25 Apr 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on King Street, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 21 Jan 2025 at 10:06.
8 and 25 Apr 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Duncan Edwards Way, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 21 Jan 2025 at 10:05.
7 May 2025
Cadent Gas are carrying out Utility asset works on Thelma Road, Tipton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2025 at 14:00 and could run through until 7 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Apr 2025 at 14:13.
9 Apr and 30 May 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Winson Green Road, Birmingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Dec 2024 at 08:51.
Dudley Metropolitan Borough Council carried out Highway repair and maintenance works on Duncan Edwards Way, Dudley.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 9 Apr 2025 and 17 Apr 2025 and were actually completed between 9 Apr 2025 (19:00) and 17 Apr 2025 (07:00). The works impacted the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Apr 2025 at 07:44.
15 May 2025
Cadent Gas are carrying out Utility asset works on Worlds End Road, Birmingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 April 2025 at 14:00 and could run through until 15 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Apr 2025 at 15:08.
10 Apr and 23 May 2025
Cadent Gas are proposing to carry out Utility asset works on Church Lane, West Bromwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 14:38.
10 Apr and 23 May 2025
Cadent Gas are proposing to carry out Utility asset works on Brett Street, West Bromwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 14:40.
10 Apr and 23 May 2025
Cadent Gas are proposing to carry out Utility asset works on Byron Street, West Bromwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jan 2025 at 14:43.
12 May 2025
Birmingham City Council are carrying out Highway improvement works on Icknield Street, Soho, Birmingham.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 April 2025 at 09:00 and could run through until 12 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Birmingham City Council on 11 Apr 2025 at 13:05.
14 Apr and 16 May 2025
Cadent Gas were proposing to carry out Utility asset works on Holders Lane, Birmingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 14:32.
14 Apr and 16 May 2025
Cadent Gas are proposing to carry out Utility asset works on Holders Lane, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Dec 2024 at 09:13.
14 Apr and 21 May 2025
Cadent Gas were proposing to carry out Utility asset works on Allcock Street, Birmingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 21 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 11:33.
Today
South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Holly Road, Rowley Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Staffordshire Water on 17 Jan 2025 at 10:38.
14 Apr and 6 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Liverpool Street, Birmingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 11:32.
14 Apr and 23 May 2025
Transport for West Midlands (TfWM) are proposing to carry out Highway repair and maintenance works on Meriden Street, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 9 Apr 2025 at 10:24.
14 Apr and 23 May 2025
Transport for West Midlands (TfWM) were proposing to carry out Highway repair and maintenance works on Meriden Street, Birmingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 14 Apr 2025 at 14:58.
14 Apr and 9 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Moor Lane, Rowley Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 9 May 2025. The works will impact the footway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 2 Apr 2025 at 13:12.
14 and 25 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Great Francis Street, Birmingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 25 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 10:07.
14 and 25 Apr 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Londonderry Road, Oldbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 14 Mar 2025 at 10:27.
14 and 25 Apr 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Londonderry Road, Oldbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Mar 2025 at 08:52.
14 Apr and 2 May 2025
Cadent Gas are proposing to carry out Utility asset works on Manor Road, Smethwick.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 12:56.
14 Apr and 2 May 2025
Cadent Gas are proposing to carry out Utility asset works on Holly Lane, Smethwick.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 12:50.
14 Apr and 16 May 2025
Transport for West Midlands (TfWM) were proposing to carry out Highway improvement works on High Street, Aston, Birmingham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 25 Feb 2025 at 10:53.
14 Apr and 24 May 2025
Transport for West Midlands (TfWM) were proposing to carry out Highway improvement works on High Street, Aston, Birmingham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 24 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 16 Apr 2025 at 15:05.
14 Apr and 7 May 2025
Cadent Gas were proposing to carry out Utility asset works on Victoria Road, Aston, Birmingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 7 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 10:10.
14 Apr and 9 May 2025
Birmingham City Council are proposing to carry out Highway improvement works on Aston Hall Road, Perry Barr, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Birmingham City Council on 7 Mar 2025 at 14:54.
7 May 2025
Cadent Gas are carrying out Utility asset works on Inverclyde Road, Birmingham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 April 2025 at 08:00 and could run through until 7 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 08:19.
14 and 28 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Oak Road, Dudley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 14:48.
25 Apr 2025
Western Power Distribution (West Midlands) are carrying out Utility asset works on Tipton Road, Dudley.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 19:00 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Apr 2025 at 09:55.
14 Apr and 16 May 2025
Western Power Distribution (West Midlands) were proposing to carry out Utility asset works on Dudley Road, Tipton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Jan 2025 at 09:14.
14 Apr and 16 May 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Dudley Road, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 23 Jan 2025 at 13:55.
14 Apr and 16 May 2025
Cadent Gas were proposing to carry out Utility asset works on Church Lane, West Bromwich.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 12:15.
14 and 25 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Brett Street, West Bromwich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 25 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 12:13.
2 May 2025
Sandwell Metropolitan Borough Council are carrying out Highway improvement works on St Vincent Crescent, West Bromwich.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 09:00 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 16 Apr 2025 at 10:57.
14 Apr and 2 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Wolseley Road, West Bromwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 14 Apr 2025 at 15:56.
2 May 2025
Sandwell Metropolitan Borough Council are carrying out Highway improvement works on Wolseley Road, West Bromwich.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 08:30 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 16 Apr 2025 at 12:03.
14 and 25 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Upper Church Lane, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 15:20.
25 Apr 2025
Cadent Gas are carrying out Utility asset works on Upper Church Lane, Tipton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 09:01 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 09:56.
14 and 25 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Field Road, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 15:20.
25 Apr 2025
Cadent Gas are carrying out Utility asset works on Field Road, Tipton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 09:01 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 10:09.
Tuesday
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Hall Green Road, West Bromwich.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 6 Mar 2025 at 15:32.
15 and 29 Apr 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Manor Lane, Halesowen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Jan 2025 at 10:15.
15 and 29 Apr 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Manor Lane, Halesowen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 20 Jan 2025 at 10:20.
15 and 29 Apr 2025
Western Power Distribution (West Midlands) were proposing to carry out New service connection on Manor Lane, Halesowen.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 April 2025 and run through until 29 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Feb 2025 at 11:05.
15 and 29 Apr 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Manor Lane, Halesowen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Feb 2025 at 09:00.
29 Apr 2025
Western Power Distribution (West Midlands) are carrying out New service connection on Manor Lane, Halesowen.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2025 at 09:31 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 15 Apr 2025 at 10:06.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on Harborne Road, Birmingham.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2025 at 10:14 and could run through until 23 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 10:32.
Tuesday
South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Holly Road, Rowley Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Staffordshire Water on 11 Apr 2025 at 10:10.
24 Jun 2025
Cadent Gas are carrying out Utility asset works on Trinity Way, West Bromwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 16 April 2025 at 12:00 and could run through until 24 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 13:07.
Tuesday
Severn Trent Water are carrying out Utility repair and maintenance works on Dudley Port, Tipton.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 April 2025 at 16:51 and could run through until 22 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 17 Apr 2025 at 10:45.
21 May 2025
Cadent Gas are carrying out Utility asset works on Furnace Parade, Tipton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 April 2025 at 07:30 and could run through until 21 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 07:45.
21 Apr and 9 May 2025
Cadent Gas were proposing to carry out Utility asset works on Holders Gardens, Birmingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 April 2025 and run through until 9 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 14:35.
21 Apr and 9 May 2025
Cadent Gas are proposing to carry out Utility asset works on Holders Gardens, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Dec 2024 at 09:13.
21 Apr and 21 Jul 2025
Birmingham City Council are proposing to carry out Highway improvement works on Ladypool Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Birmingham City Council on 5 Feb 2025 at 10:47.
21 Apr and 28 May 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bishop Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 28 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 24 Jan 2025 at 09:27.
21 Apr and 28 May 2025
Cadent Gas are proposing to carry out Utility asset works on Allcock Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 28 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jan 2025 at 08:50.
21 Apr and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Liverpool Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jan 2025 at 08:50.
21 Apr and 18 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Moor Lane, Rowley Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 18 May 2025. The works will impact the footway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 15 Apr 2025 at 15:59.
21 Apr and 9 May 2025
Cadent Gas are proposing to carry out Utility asset works on Majestic Way, Rowley Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Jul 2024 at 12:18.
Wednesday
Severn Trent Water were proposing to carry out Remedial works on St Peters Road, Netherton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 April 2025 and run through until 23 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 4 Feb 2025 at 14:57.
21 Apr 2025 and 19 Apr 2026
Transport for West Midlands (TfWM) are proposing to carry out Works for Rail Purposes on Duncan Edwards Way, Dudley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 19 April 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 3 Dec 2024 at 12:49.
21 Apr 2025 and 19 Apr 2026
Transport for West Midlands (TfWM) were proposing to carry out Works for Rail Purposes on Duncan Edwards Way, Dudley.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 April 2025 and run through until 19 April 2026. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 15 Apr 2025 at 08:54.
21 Apr and 9 May 2025
Western Power Distribution (West Midlands) were proposing to carry out Utility asset works on Birmingham New Road, Dudley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 April 2025 and run through until 9 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Mar 2025 at 13:37.
21 Apr and 9 May 2025
Cadent Gas were proposing to carry out Utility asset works on Sheepwash Lane, Tipton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 April 2025 and run through until 9 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 09:42.
21 Apr and 16 May 2025
Cadent Gas were proposing to carry out Utility asset works on Byron Street, West Bromwich.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 April 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 12:14.
22 and 25 Apr 2025
BT are proposing to carry out Utility repair and maintenance works on Scotland Lane, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 7 Feb 2025 at 09:07.
22 and 25 Apr 2025
BT are proposing to carry out Utility repair and maintenance works on Scotland Lane, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 24 Feb 2025 at 11:19.
22 and 25 Apr 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on South Road, Smethwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 5 Mar 2025 at 14:25.
22 and 25 Apr 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on South Road, Smethwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 2 Apr 2025 at 11:12.
22 Apr and 9 May 2025
Transport for West Midlands (TfWM) were proposing to carry out Highway improvement works on High Street, Aston, Birmingham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 April 2025 and run through until 9 May 2025. The works were due to impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 16 Apr 2025 at 15:12.
22 Apr and 13 Jun 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Perrott Street, Birmingham.
These works are categorised as Major.
The works will start on or after 22 April 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 15 Apr 2025 at 09:49.
22 Apr and 25 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Trinity Way, West Bromwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 12:59.
22 and 26 Apr 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Walsall Road, Walsall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 26 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 20 Mar 2025 at 14:00.
23 and 29 Apr 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Thynne Street, West Bromwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 13:11.
24 and 29 Apr 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Park Street, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Mar 2025 at 15:15.
24 Apr and 9 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Brades Road, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 13 Mar 2025 at 13:43.
24 Apr and 9 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Brandon Way, West Bromwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 14 Mar 2025 at 13:00.
25 Apr and 1 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Peake Drive, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Jan 2025 at 11:29.
25 Apr and 1 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Edward Fisher Drive, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 3 Feb 2025 at 13:24.
25 Apr and 1 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Pepperbox Drive, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 3 Feb 2025 at 15:29.
25 Apr and 1 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mansion Drive, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Jan 2025 at 11:28.
25 Apr and 2 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cinquefoil Leasow, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Jan 2025 at 11:18.
25 Apr and 2 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Olga Drive, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Jan 2025 at 11:18.
25 Apr and 2 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Jackson Close, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Jan 2025 at 11:19.
25 Apr and 2 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stead Close, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Jan 2025 at 11:18.
25 Apr and 2 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Margaret Vale, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Jan 2025 at 11:19.
25 Apr and 2 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dawn Drive, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Jan 2025 at 10:59.
25 Apr and 2 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Weston Drive, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Jan 2025 at 10:58.
25 Apr and 2 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Sefton Grove, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Jan 2025 at 10:58.
25 Apr and 2 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ruth Close, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Jan 2025 at 10:59.
25 Apr and 2 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hopton Close, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 31 Jan 2025 at 11:01.
28 Apr and 23 May 2025
Cadent Gas are proposing to carry out Utility asset works on Carters Lane, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 10:39.
28 Apr and 23 May 2025
Cadent Gas were proposing to carry out Utility asset works on Carters Lane, Birmingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:35.
28 Apr and 6 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hereford Road, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 3 Feb 2025 at 13:29.
28 Apr and 6 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Radnor Road, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 3 Feb 2025 at 13:27.
28 Apr and 6 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Norfolk Road, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 3 Feb 2025 at 13:29.
28 Apr and 6 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Castle Close, Cradley Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 3 Feb 2025 at 13:31.
28 Apr and 30 May 2025
Transport for West Midlands (TfWM) are proposing to carry out Works for Rail Purposes on Meriden Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 16 Apr 2025 at 09:17.
28 Apr and 6 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Pryor Road, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 3 Feb 2025 at 13:26.
28 Apr and 6 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Capethorn Road, Smethwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 3 Feb 2025 at 13:34.
28 Apr and 15 Aug 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Basons Lane, Oldbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 15 Apr 2025 at 12:29.
28 Apr and 15 Aug 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Warley Road, Oldbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 15 Apr 2025 at 12:28.
28 Apr and 8 May 2025
Sandwell Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Holly Lane, Smethwick.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 8 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Feb 2025 at 15:00.
28 Apr and 30 May 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Wellington Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Dec 2024 at 08:49.
28 and 30 Apr 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Hill Street, Smethwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Mar 2025 at 15:42.
28 Apr and 2 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Rabone Lane, Smethwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 3 Feb 2025 at 13:34.
28 Apr and 23 May 2025
Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on High Street, Aston, Birmingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 16 Apr 2025 at 15:10.
28 Apr and 24 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Tat Bank Road, Oldbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 12:40.
28 Apr and 3 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Stone Street, Oldbury.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 13:40.
28 Apr and 16 May 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Crocketts Road, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Feb 2025 at 11:30.
28 Apr and 6 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Spencer Close, Tividale, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 3 Feb 2025 at 13:28.
28 Apr and 7 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Albion Street, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 7 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 3 Feb 2025 at 13:25.
28 Apr and 16 May 2025
Western Power Distribution (West Midlands) were proposing to carry out Utility asset works on Tipton Road, Dudley.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 15 Jan 2025 at 14:07.
28 Apr and 16 May 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Tipton Road, Dudley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Feb 2025 at 14:38.
28 Apr and 16 May 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Tipton Road, Dudley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Mar 2025 at 11:56.
28 Apr and 6 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Baker Street, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 3 Feb 2025 at 13:24.
28 Apr and 6 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Cophall Street, Tipton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 09:39.
28 Apr and 2 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Factory Road, Tipton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:24.
28 Apr and 2 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Walsall Road, Walsall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 10 Mar 2025 at 13:17.
28 Apr and 14 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Coronation Road, Great Barr, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 12:23.
28 Apr and 3 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Chapel Lane, Great Barr.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 15:17.
29 Apr and 20 May 2025
Cadent Gas are proposing to carry out Utility asset works on Regis Heath Road, Rowley Regis.
These works are categorised as Major.
The works will start on or after 29 April 2025 and could run through until 20 May 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 15:37.
30 Apr and 2 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Perry Park Road, Cradley Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Mar 2025 at 15:14.
30 Apr and 8 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on George Street, West Bromwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 8 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 5 Feb 2025 at 16:12.
30 Apr and 10 Jun 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Forge Lane, West Bromwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 13 Mar 2025 at 08:46.
30 Apr and 25 May 2025
Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hillingford Avenue, Great Barr.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 25 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Walsall Metropolitan Borough Council on 11 Apr 2025 at 12:28.
30 Apr and 23 May 2025
Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Beacon Road, Great Barr.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Walsall Metropolitan Borough Council on 10 Apr 2025 at 14:21.
2 and 14 May 2025
BT are proposing to carry out Utility repair and maintenance works on Icknield Port Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 May 2025 and could run through until 14 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 7 Mar 2025 at 09:32.
2 May and 16 Jun 2025
Transport for West Midlands (TfWM) were proposing to carry out Highway improvement works on High Street, Aston, Birmingham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 May 2025 and run through until 16 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 10 Apr 2025 at 13:24.
5 and 19 May 2025
Cadent Gas were proposing to carry out Utility asset works on Somery Road, Dudley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 May 2025 and run through until 19 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 16:11.
5 and 10 May 2025
Transport for West Midlands (TfWM) are proposing to carry out Works for Rail Purposes on Horseley Road, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 6 Mar 2025 at 12:46.
5 and 10 May 2025
Transport for West Midlands (TfWM) are proposing to carry out Works for Rail Purposes on Horseley Road, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Apr 2025 at 08:20.
5 and 9 May 2025
Transport for West Midlands (TfWM) are proposing to carry out Works for Rail Purposes on Railway Street, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 10 Apr 2025 at 09:22.
5 and 10 May 2025
Transport for West Midlands (TfWM) are proposing to carry out Works for Rail Purposes on Railway Street, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Apr 2025 at 08:20.
5 and 10 May 2025
Transport for West Midlands (TfWM) were proposing to carry out Works for road purposes on Railway Street, Tipton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 May 2025 and run through until 10 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 27 Feb 2025 at 13:32.
6 and 8 May 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Great Hampton Row, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 28 Jan 2025 at 14:39.
6 and 8 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hilton Road, Tividale, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 11 Feb 2025 at 10:02.
7 and 9 May 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on North Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 7 Feb 2025 at 12:03.
7 and 9 May 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on North Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 13 Feb 2025 at 13:54.
7 and 9 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Wheatley Road, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Mar 2025 at 15:17.
7 and 9 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lenwade Road, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Mar 2025 at 15:08.
7 and 9 May 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hurst Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 10 Feb 2025 at 15:44.
7 and 9 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Wilson Road, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Mar 2025 at 15:17.
10 and 18 May 2025
National Highways are proposing to carry out Highway repair and maintenance works on Wolverhampton Road, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 May 2025 and could run through until 18 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 17 Feb 2025 at 13:36.
10 and 18 May 2025
National Highways are proposing to carry out Highway repair and maintenance works on Wolverhampton Road, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 May 2025 and could run through until 18 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 25 Mar 2025 at 15:13.
11 and 13 May 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hurst Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 May 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 14 Feb 2025 at 08:27.
12 and 16 May 2025
BT are proposing to carry out Utility repair and maintenance works on Clover Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 25 Feb 2025 at 10:20.
12 and 16 May 2025
BT are proposing to carry out Utility repair and maintenance works on Clover Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 3 Mar 2025 at 13:16.
12 and 16 May 2025
BT are proposing to carry out Utility repair and maintenance works on Naunton Close, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 25 Feb 2025 at 10:15.
12 and 16 May 2025
BT are proposing to carry out Utility repair and maintenance works on Naunton Close, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 3 Mar 2025 at 13:13.
12 May and 6 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Woodgate Lane, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 10:41.
12 May and 6 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Woodgate Lane, Birmingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:46.
12 and 30 May 2025
Cadent Gas are proposing to carry out Utility asset works on Clapgate Lane, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 10:44.
12 and 30 May 2025
Cadent Gas were proposing to carry out Utility asset works on Clapgate Lane, Birmingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:45.
12 and 30 May 2025
Electricity Network Company are proposing to carry out Utility asset works on Adderley Street, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 3 Apr 2025 at 12:52.
12 and 30 May 2025
Electricity Network Company are proposing to carry out Utility asset works on Liverpool Street, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 3 Apr 2025 at 12:52.
12 and 16 May 2025
Cadent Gas were proposing to carry out Disconnection or alteration of supply on Edmund Street, Birmingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 16 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 13:02.
12 and 16 May 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Edmund Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 07:41.
12 and 16 May 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Edmund Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 08:42.
12 and 14 May 2025
South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Brisbane Road, Smethwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 17 Feb 2025 at 09:23.
12 and 14 May 2025
South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Brisbane Road, Smethwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 15 Apr 2025 at 12:26.
12 May and 13 Jun 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Booth Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Mar 2025 at 14:52.
12 May and 13 Jun 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Booth Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 26 Mar 2025 at 14:55.
12 May and 1 Jun 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Dartmouth Road, Smethwick.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 1 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Feb 2025 at 08:37.
12 May and 1 Jun 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Roebuck Lane, Smethwick.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 1 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 24 Feb 2025 at 08:37.
12 and 30 May 2025
Cadent Gas are proposing to carry out Utility asset works on Trinity Road North, West Bromwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 13:20.
12 and 30 May 2025
Cadent Gas were proposing to carry out Utility asset works on High Street, West Bromwich.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 10:05.
12 and 30 May 2025
Cadent Gas are proposing to carry out Utility asset works on Hamstead Hall Road, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 11:10.
12 May and 14 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Slater Street, Great Bridge, Tipton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 09:50.
13 and 15 May 2025
Severn Trent Water were proposing to carry out Remedial works on St Peters Road, Netherton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 May 2025 and run through until 15 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 20 Feb 2025 at 13:34.
14 and 16 May 2025
Cadent Gas are proposing to carry out Remedial works on Brewery Street, Aston, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 12:33.
16 and 23 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hanover Road, Rowley Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 5 Mar 2025 at 08:07.
18 May and 27 Jul 2025
Birmingham City Council are proposing to carry out Highway improvement works on Dudley Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 May 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Birmingham City Council on 4 Apr 2025 at 12:11.
19 and 23 May 2025
South Staffordshire Water are proposing to carry out Remedial works on Grange Road, Smethwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 19 Feb 2025 at 11:34.
19 May and 13 Jun 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Wellington Street, Smethwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 6 Dec 2024 at 14:10.
19 and 30 May 2025
Transport for West Midlands (TfWM) were proposing to carry out Highway improvement works on High Street, Aston, Birmingham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 30 May 2025. The works were due to impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 25 Feb 2025 at 10:57.
19 May and 20 Jun 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Booth Street, Smethwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 12 Feb 2025 at 07:43.
19 May and 23 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Parliament Street, West Bromwich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 23 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 09:52.
20 and 23 May 2025
South Staffordshire Water were proposing to carry out Remedial works on Station Road, Oldbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 20 Feb 2025 at 12:12.
20 and 22 May 2025
South Staffordshire Water were proposing to carry out Remedial works on Station Road, Oldbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 May 2025 and run through until 22 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 21 Feb 2025 at 08:05.
20 and 23 May 2025
South Staffordshire Water are proposing to carry out Remedial works on Station Road, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 24 Feb 2025 at 08:09.
21 and 23 May 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Freda Rise, Tividale, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 26 Feb 2025 at 15:57.
25 May and 18 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Hockley Street, Ladywood, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 10:59.
26 May and 13 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Lye Close Lane, Birmingham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 10:49.
26 May and 13 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Lye Close Lane, Birmingham.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:47.
26 May and 27 Jun 2025
Transport for West Midlands (TfWM) are proposing to carry out Works for Rail Purposes on New Canal Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 16 Apr 2025 at 09:32.
26 May and 20 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Balmoral Way, Rowley Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Jul 2024 at 12:19.
26 May and 6 Jun 2025
Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Brearley Street, Aston, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 26 Mar 2025 at 15:13.
26 and 29 May 2025
Severn Trent Water are proposing to carry out Remedial works on Lozells Road, Aston, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 26 Nov 2024 at 15:06.
26 May and 23 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Windermere Road, Handsworth Wood, Birmingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 23 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 12:07.
26 May and 30 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Friary Road, Birmingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 30 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 12:10.
26 May and 30 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on College Road, Handsworth Wood, Birmingham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 30 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 12:08.
27 May and 24 Jul 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Wilson Road, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 24 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Mar 2025 at 15:02.
27 May and 26 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Hall Street, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 15:05.
27 May and 26 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Hall Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 10:57.
27 and 29 May 2025
South Staffordshire Water are proposing to carry out Remedial works on High Street, Smethwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 25 Feb 2025 at 15:36.
27 May and 13 Jun 2025
Severn Trent Water are proposing to carry out Utility asset works on Phillips Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 19 Mar 2025 at 11:10.
27 May and 13 Jun 2025
Severn Trent Water are proposing to carry out Utility asset works on Thomas Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 19 Mar 2025 at 11:07.
27 May and 23 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Engine Street, Oldbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 13:40.
27 May and 17 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Park Road, Soho, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 15:47.
27 May and 22 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Fisher Street, Great Bridge, Tipton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 12:06.
27 and 29 May 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Parkside Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 6 Mar 2025 at 08:16.
27 and 29 May 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Parkside Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 21 Mar 2025 at 16:30.
28 May and 7 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Peartree Lane, Cradley Heath.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 May 2025 and run through until 7 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Mar 2025 at 08:26.
29 May and 2 Jun 2025
BT are proposing to carry out Utility repair and maintenance works on Rodney Close, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 4 Mar 2025 at 10:58.
30 May and 12 Jun 2025
Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hillingford Avenue, Great Barr.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Walsall Metropolitan Borough Council on 3 Apr 2025 at 12:26.
30 May and 12 Jun 2025
Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Beacon Road, Great Barr.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Walsall Metropolitan Borough Council on 3 Apr 2025 at 12:22.
2 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Ridgacre Road, Birmingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 16:00.
2 and 4 Jun 2025
South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Warwick Road, Netherton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 25 Mar 2025 at 16:26.
2 and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Station Road, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 08:34.
2 Jun and 2 Sep 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Spon Lane South, Smethwick.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 9 Apr 2025 at 11:00.
2 Jun and 2 Sep 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Spon Lane South, West Bromwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 9 Apr 2025 at 10:57.
2 Jun and 2 Sep 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Kelvin Way, West Bromwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 9 Apr 2025 at 10:51.
2 Jun and 2 Sep 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Spon Lane, West Bromwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 9 Apr 2025 at 14:15.
2 and 20 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, West Bromwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 11:01.
6 and 9 Jun 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on John Street, Rowley Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Mar 2025 at 15:50.
9 and 27 Jun 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Paddington Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Mar 2025 at 16:00.
9 and 27 Jun 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Paddington Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Mar 2025 at 15:42.
9 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Parliament Street, West Bromwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 10:55.
9 Jun and 6 Jul 2025
ESP Electricity are proposing to carry out Utility asset works on Birmingham Road, Dudley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by ESP Electricity on 7 Apr 2025 at 09:56.
9 and 20 Jun 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Park Lane, Handsworth Wood, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Dec 2024 at 14:38.
9 Jun and 11 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Park Lane, Handsworth Wood, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Mar 2025 at 14:54.
9 Jun and 8 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Thelma Road, Tipton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Mar 2025 at 14:21.
9 Jun and 29 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Coppice Street, Tipton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 29 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Mar 2025 at 14:26.
9 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Furnace Parade, Tipton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Mar 2025 at 14:24.
9 Jun and 14 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Factory Road, Tipton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Mar 2025 at 14:28.
10 and 12 Jun 2025
South Staffordshire Water are proposing to carry out New service connection on Nimmings Road, Halesowen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Staffordshire Water on 8 Apr 2025 at 14:19.
10 and 12 Jun 2025
South Staffordshire Water were proposing to carry out New service connection on Nimmings Road, Halesowen.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by South Staffordshire Water on 8 Apr 2025 at 14:32.
10 and 12 Jun 2025
South Staffordshire Water are proposing to carry out New service connection on Nimmings Road, Halesowen.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Staffordshire Water on 9 Apr 2025 at 14:59.
10 and 12 Jun 2025
Severn Trent Water are proposing to carry out Remedial works on St Peters Road, Netherton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 17 Mar 2025 at 11:00.
10 and 12 Jun 2025
Severn Trent Water are proposing to carry out Remedial works on St Peters Road, Netherton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 19 Mar 2025 at 12:04.
11 and 13 Jun 2025
Cadent Gas were proposing to carry out Remedial works on Sir Harrys Road, Birmingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 14:48.
11 and 13 Jun 2025
Cadent Gas were proposing to carry out Remedial works on Ampton Road, Birmingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 14:47.
11 Jun and 1 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Park Lane, West Bromwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 19 Mar 2025 at 13:49.
11 Jun and 1 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Park Lane, West Bromwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Apr 2025 at 09:53.
11 Jun and 1 Jul 2025
Western Power Distribution (West Midlands) were proposing to carry out Utility asset works on Park Lane, Handsworth Wood, Birmingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 June 2025 and run through until 1 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 19 Mar 2025 at 10:51.
13 Jun and 3 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Station Road, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 10:03.
16 and 18 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Trinity Street, Cradley Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 17 Mar 2025 at 14:03.
16 and 18 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sycamore Road, Smethwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 13 Mar 2025 at 12:48.
16 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Titford Road, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 15:33.
16 and 27 Jun 2025
Transport for West Midlands (TfWM) were proposing to carry out Highway improvement works on High Street, Aston, Birmingham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 27 June 2025. The works were due to impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 10 Apr 2025 at 13:30.
16 Jun and 18 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Holyhead Road, Birmingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 18 Feb 2025 at 10:11.
16 Jun and 18 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Holyhead Road, Birmingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 7 Mar 2025 at 14:33.
16 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Arthur Street, West Bromwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 12:54.
16 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Elizabeth Road, West Bromwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 10:04.
16 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Philip Road, Tipton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 10:27.
16 Jun and 16 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Cophall Street, Tipton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 16 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 09:45.
16 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Sheepwash Lane, Tipton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 10:19.
16 Jun and 18 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Owen Street, Tipton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:26.
16 Jun and 18 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Slater Street, Great Bridge, Tipton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 10:36.
16 and 27 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Coppice Street, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:29.
16 Jun and 1 Aug 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Forge Lane, West Bromwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Dec 2024 at 14:24.
17 and 20 Jun 2025
Cadent Gas are proposing to carry out New service connection on Hurst Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 14:00.
17 and 19 Jun 2025
South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Bell Road, Walsall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 8 Apr 2025 at 12:14.
18 and 20 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Rabone Lane, Smethwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 19 Mar 2025 at 16:00.
18 and 20 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Myvod Road, Wednesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 19 Mar 2025 at 09:10.
19 Jun and 9 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Hamstead Hall Road, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 09:28.
20 and 23 Jun 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Hydes Road, Wednesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 5 Mar 2025 at 08:00.
22 Jun and 15 Aug 2025
Birmingham City Council are proposing to carry out Highway improvement works on Dudley Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 June 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Birmingham City Council on 1 Apr 2025 at 12:03.
23 and 25 Jun 2025
Cadent Gas are proposing to carry out Remedial works on Farquhar Road, Edgbaston, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 10:02.
23 and 25 Jun 2025
Cadent Gas are proposing to carry out Remedial works on Farquhar Road, Edgbaston, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 12:07.
23 Jun and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Ridgacre Road, Birmingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 14:30.
23 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Worlds End Lane, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 14:27.
23 and 25 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on North Road, Harborne, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 16 Apr 2025 at 09:49.
23 and 25 Jun 2025
Cadent Gas are proposing to carry out Remedial works on Newhall Road, Rowley Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 31 Mar 2025 at 12:11.
23 and 25 Jun 2025
Cadent Gas are proposing to carry out Remedial works on Newhall Road, Rowley Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 31 Mar 2025 at 13:53.
23 Jun and 22 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Caroline Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 15:03.
23 Jun and 14 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Park Road, Soho, Birmingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 11:57.
23 and 25 Jun 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Wattville Road, Smethwick.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 25 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 11 Apr 2025 at 11:58.
23 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Tipton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 11:00.
23 Jun and 25 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Owen Street, Tipton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 14:22.
23 Jun and 13 Jul 2025
Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Railway Street, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 17 Apr 2025 at 08:53.
23 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Factory Road, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:28.
23 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Coppice Street, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 14:15.
23 and 27 Jun 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bagnall Street, Harvills Hawthorn, West Bromwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 6 Nov 2024 at 14:07.
23 Jun and 25 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Dangerfield Lane, Darlaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 12:30.
23 Jun and 12 Sep 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Chapel Lane, Great Barr.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 20 Nov 2024 at 11:45.
24 and 27 Jun 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Pikehelve Street, West Bromwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 6 Nov 2024 at 14:07.
25 and 27 Jun 2025
Severn Trent Water are proposing to carry out Remedial works on Moseley Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 20 Mar 2025 at 09:50.
25 and 27 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Plume Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 26 Mar 2025 at 15:47.
25 and 27 Jun 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lambert End, West Bromwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 17 Mar 2025 at 14:24.
29 Jun and 20 Jul 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Sir Harrys Road, Birmingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 June 2025 and run through until 20 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 9 Apr 2025 at 14:28.
29 Jun and 1 Jul 2025
Severn Trent Water are proposing to carry out Remedial works on Moseley Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 2 Apr 2025 at 12:50.
30 Jun and 18 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Bristol Road, Selly Oak, Birmingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 28 Jan 2025 at 10:44.
30 Jun and 14 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Barker Street, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 11:58.
30 Jun and 11 Jul 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Paddington Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 27 Dec 2024 at 14:54.
30 Jun and 3 Jul 2025
Cadent Gas are proposing to carry out New service connection on Barnfield Road, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Mar 2025 at 09:27.
1 and 3 Jul 2025
Cadent Gas are proposing to carry out Remedial works on Sir Harrys Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 10:41.
1 and 3 Jul 2025
Cadent Gas are proposing to carry out Remedial works on Ampton Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 10:36.
1 and 3 Jul 2025
Cadent Gas are proposing to carry out Remedial works on Ampton Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 09:54.
1 and 3 Jul 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Barston Road, Oldbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Mar 2025 at 15:14.
1 and 3 Jul 2025
Severn Trent Water are proposing to carry out New service connection on Princip Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Severn Trent Water on 4 Apr 2025 at 10:18.
1 Jul and 19 Dec 2025
Birmingham City Council are proposing to carry out Highway improvement works on Holford Drive, Birmingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Birmingham City Council on 28 Feb 2025 at 13:01.
2 and 4 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Calthorpe Road, Edgbaston, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 19 Mar 2025 at 15:57.
2 and 15 Jul 2025
ESP Electricity are proposing to carry out Utility asset works on Castlegate Drive, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2025 and could run through until 15 July 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by ESP Electricity on 4 Apr 2025 at 11:27.
6 and 18 Jul 2025
Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Queslett Road, Great Barr.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Walsall Metropolitan Borough Council on 3 Apr 2025 at 14:53.
6 and 18 Jul 2025
Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Queslett Road, Great Barr.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Walsall Metropolitan Borough Council on 3 Apr 2025 at 14:55.
7 Jul and 5 Sep 2025
Birmingham City Council are proposing to carry out Highway improvement works on Bristol Road, Edgbaston, Birmingham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Birmingham City Council on 3 Apr 2025 at 10:42.
7 and 15 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Alum Rock Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 15 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 4 Apr 2025 at 14:38.
7 Jul and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Engine Street, Oldbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 11:22.
7 Jul and 1 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Tat Bank Road, Oldbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 09:59.
7 Jul and 8 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Stone Street, Oldbury.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 11:17.
7 and 25 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Tipton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Mar 2025 at 14:15.
7 and 25 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Factory Road, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 14:20.
7 and 10 Jul 2025
South Staffordshire Water are proposing to carry out New service connection on Arlen Drive, Great Barr, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Staffordshire Water on 4 Apr 2025 at 13:15.
7 and 28 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Farmer Way, Tipton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 10:19.
7 Jul and 5 Sep 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Chapel Lane, Great Barr, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 23 Oct 2024 at 11:08.
7 Jul and 12 Sep 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Collingwood Drive, Great Barr.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 20 Nov 2024 at 11:48.
8 and 10 Jul 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Westbourne Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 7 Apr 2025 at 08:06.
9 and 11 Jul 2025
Cadent Gas are proposing to carry out Remedial works on Hockley Street, Ladywood, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 14:07.
14 and 18 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on Highgate Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 8 Apr 2025 at 14:06.
14 and 16 Jul 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on North Road, Birmingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 16 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 16 Apr 2025 at 15:42.
14 Jul and 12 Sep 2025
Birmingham City Council are proposing to carry out Highway improvement works on Constitution Hill, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Birmingham City Council on 6 Mar 2025 at 11:09.
14 Jul and 12 Sep 2025
Birmingham City Council are proposing to carry out Highway improvement works on Great Hampton Street, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Birmingham City Council on 6 Mar 2025 at 11:09.
14 Jul and 12 Sep 2025
Birmingham City Council are proposing to carry out Highway improvement works on Hockley Hill, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Birmingham City Council on 6 Mar 2025 at 11:09.
14 Jul and 15 Aug 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Anne Road, Smethwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 7 Feb 2025 at 14:42.
14 and 25 Jul 2025
ESP Electricity are proposing to carry out Utility asset works on Castlegate Drive, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the footway and cycleway.
This roadwork event was last updated by ESP Electricity on 8 Apr 2025 at 14:21.
14 Jul and 8 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Fisher Street, Great Bridge, Tipton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Mar 2025 at 10:33.
15 and 18 Jul 2025
BT are proposing to carry out Utility repair and maintenance works on Harborne Park Road, Birmingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 16 Apr 2025 at 12:19.
15 and 17 Jul 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Pargeter Road, Smethwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 5 Mar 2025 at 14:28.
15 and 18 Jul 2025
Cadent Gas are proposing to carry out Remedial works on Bescot Crescent, Walsall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 15:57.
Roadworks Map near to St. Georges Drive, SMETHWICK, B66 1DN (30 Events)

















- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to St. Georges Drive, SMETHWICK, B66 1DN (30 Events)
(Scheduled Dates)
(miles)
(Scheduled: 7 Apr 2025 - 28 Apr 2025)
(Scheduled: 16 Apr 2025 - 24 Apr 2025)
(Scheduled: 10 Mar 2025 - 16 May 2025)
(Scheduled: 11 Apr 2025 - 25 Apr 2025)
(Scheduled: 4 Apr 2025 - 16 May 2025)
(Scheduled: 24 Mar 2025 - 9 May 2025)
(Scheduled: 14 Apr 2025 - 17 Apr 2025)
Contains public sector information licensed under the Open Government Licence v3.0.