ROADWORKS SUMMARY
Langston Way, ALCESTER, B50 4FZ
Introduction
View current and future planned roadworks and road closures for Langston Way, B50 4FZ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Langston Way, ALCESTER, B50 4FZ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Langston Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
20 Dec 2024
Warwickshire County Council are carrying out Highway improvement works on Honeybourne Road, Bidford-on-avon.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 August 2024 at 08:14 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 14 Nov 2024 at 13:10.
20 Dec 2024
Warwickshire County Council are carrying out Highway improvement works on Binton Road, Welford-on-avon.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 10:55 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Warwickshire County Council on 14 Nov 2024 at 13:10.
4 Nov 2024 and 31 Jan 2025
BT are proposing to carry out Utility asset works on A46 From J A435 To J A422, Stratford-on-avon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 16 Sep 2024 at 16:30.
4 Nov 2024 and 17 Jan 2025
BT were proposing to carry out Utility asset works on A46 From J A435 To J A422, Stratford-on-avon.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 17 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 19 Aug 2024 at 09:19.
6 Dec 2024 and 3 Jan 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Barton Road, Welford-on-avon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 3 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Sep 2024 at 11:14.
16 and 24 Dec 2024
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Tower Hill, Bidford-on-avon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 24 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 11 Sep 2024 at 09:04.
18 and 20 Dec 2024
Severn Trent Water are proposing to carry out New service connection on Stratford Road, Pebworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 10 Sep 2024 at 11:13.
18 and 20 Dec 2024
Severn Trent Water are proposing to carry out New service connection on Stratford Road, Pebworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 16 Sep 2024 at 07:50.
2 and 4 Jan 2025
Severn Trent Water are proposing to carry out New service connection on Barton Road, Welford-on-avon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 4 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 13:50.
6 and 8 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Broom Lane, Dunnington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 12:09.
9 and 11 Jan 2025
Severn Trent Water are proposing to carry out New service connection on Coughton Fields Lane, Coughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 11:37.
9 and 11 Jan 2025
Severn Trent Water are proposing to carry out New service connection on Coughton Fields Lane, Coughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 2 Oct 2024 at 16:07.
13 and 15 Jan 2025
Western Power Distribution (West Midlands) are proposing to carry out Remedial works on Atch Lench Road, Worcestershire County Council, Church Lench.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Nov 2024 at 11:50.
20 and 22 Jan 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Sherwell Drive, Alcester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nexfibre Networks Limited on 24 Oct 2024 at 11:46.
20 and 22 Jan 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Sherwell Drive, Alcester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Oct 2024 at 10:33.
22 and 24 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Grange Road, Bidford-on-avon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 15:51.
22 and 24 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Grange Road, Bidford-on-avon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 10:41.
28 and 30 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Marys Road, Alcester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 10:21.
28 and 30 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Marys Road, Alcester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 18 Oct 2024 at 15:31.
3 and 21 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Long Marston Road, Long Marston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 10 Oct 2024 at 15:50.
3 Feb and 29 Mar 2025
National Highways were proposing to carry out Highway improvement works on Alcester Bypass, Arrow.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 11 Oct 2024 at 08:34.
3 Feb and 29 Mar 2025
National Highways are proposing to carry out Highway improvement works on Alcester Bypass, Arrow.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 29 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 8 Nov 2024 at 15:29.
3 Feb and 29 Mar 2025
National Highways are proposing to carry out Highway improvement works on Alcester Road, Stratford-upon-avon.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 29 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 8 Nov 2024 at 15:29.
3 Feb and 29 Mar 2025
National Highways were proposing to carry out Highway improvement works on Alcester Road, Stratford-upon-avon.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 11 Oct 2024 at 08:30.
3 and 21 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Long Marston Road, Long Marston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 27 Nov 2024 at 12:03.
4 and 6 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Meeting Lane, Alcester.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 February 2025 and run through until 6 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 16:07.
10 and 14 Feb 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Long Hyde Road, South Littleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 6 Nov 2024 at 14:30.
10 and 12 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Spernal Lane, Great Alne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 14:42.
10 and 12 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Spernal Lane, Great Alne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 28 Nov 2024 at 10:09.
10 and 14 Feb 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Long Hyde Road, South Littleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 7 Nov 2024 at 14:04.
10 and 14 Feb 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Bennetts Hill, Offenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 6 Nov 2024 at 14:24.
10 and 14 Feb 2025
Worcestershire County Council are proposing to carry out Highway repair and maintenance works on Bennetts Hill, Offenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 7 Nov 2024 at 14:03.
17 and 19 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stratford Road, Alcester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 10:34.
17 and 28 Feb 2025
Worcestershire County Council are proposing to carry out Remedial works on Shinehill Lane, South Littleton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Worcestershire County Council on 25 Nov 2024 at 16:18.
17 and 19 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Spernal Lane, Great Alne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 11:28.
17 Feb and 8 Mar 2025
Warwickshire County Council are proposing to carry out roadworks on Barton Road, Welford-on-avon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Warwickshire County Council on 4 Dec 2024 at 14:38.
18 and 20 Feb 2025
Worcestershire County Council are proposing to carry out Remedial works on Station Road, Harvington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 6 Nov 2024 at 07:51.
18 and 24 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Atch Lench Road, Church Lench.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 19 Nov 2024 at 14:23.
18 and 24 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Atch Lench Road, Church Lench.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 21 Nov 2024 at 09:11.
24 and 26 Feb 2025
Severn Trent Water are proposing to carry out New service connection on Ryknild Street, Wixford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 26 Nov 2024 at 14:49.
24 and 26 Feb 2025
Severn Trent Water are proposing to carry out New service connection on Ryknild Street, Wixford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 13:25.
24 Feb and 11 Apr 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Salford Road, Marriage Hill, Bidford-on-avon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 11 Nov 2024 at 11:58.
25 and 27 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Broom Lane, Dunnington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 February 2025 and run through until 27 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 15:56.
Roadworks Map near to Langston Way, ALCESTER, B50 4FZ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Langston Way, ALCESTER, B50 4FZ (7 Events)
(Scheduled Dates)
(miles)
(Scheduled: 3 Dec 2024 - 9 Dec 2024)
(Scheduled: 2 Dec 2024 - 3 Jan 2025)
(Scheduled: 10 Aug 2024 - 20 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.