ROADWORKS SUMMARY
Lambeth Road, BIRMINGHAM, B44 9PN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Lambeth Road, B44 9PN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Lambeth Road, BIRMINGHAM, B44 9PN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lambeth Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Birmingham City Council logo
LONG TERM
Until
4 Dec 2026
Details
View Map
Share
Follow
Park Circus

Birmingham City Council are carrying out Highway improvement works on Park Circus, Birmingham.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2023 at 09:00 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Birmingham City Council on 1 Sep 2026 at 15:59.

Severn Trent Water logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Keir Road

Severn Trent Water are carrying out Utility repair and maintenance works on Keir Road, Wednesbury.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2026 at 15:30 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Aug 2026 at 10:12.

Cadent Gas logo
LONG TERM
Until
6 Oct 2026
Details
View Map
Share
Follow
Reddicap Heath Road

Cadent Gas are carrying out Utility asset works on Reddicap Heath Road, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 12:00 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 16:32.

Western Power Distribution (West Midlands) logo
LONG TERM
Until
6 Nov 2026
Details
View Map
Share
Follow
Dudley Road

Western Power Distribution (West Midlands) are carrying out Utility asset works on Dudley Road, Birmingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2026 at 15:00 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Aug 2026 at 15:05.

Cadent Gas logo
LONG TERM
Until
12 Oct 2026
Details
View Map
Share
Follow
Wood End Lane

Cadent Gas are carrying out Utility asset works on Wood End Lane, Birmingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2026 at 08:00 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Aug 2026 at 08:14.

Birmingham City Council logo
LONG TERM
Between
17 Aug and 2 Oct 2026
Details
View Map
Share
Follow
Chester Road

Birmingham City Council are proposing to carry out Highway improvement works on Chester Road, Tyburn, Birmingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 August 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Birmingham City Council on 4 Jun 2026 at 11:57.

Birmingham City Council logo
LONG TERM
Between
17 Aug and 2 Oct 2026
Details
View Map
Share
Follow
Chester Road

Birmingham City Council are proposing to carry out Highway improvement works on Chester Road, Tyburn, Birmingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 August 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Birmingham City Council on 16 Jul 2026 at 15:38.

Birmingham City Council logo
LONG TERM
Between
17 Aug and 2 Oct 2026
Details
View Map
Share
Follow
Chester Road

Birmingham City Council are proposing to carry out Highway improvement works on Chester Road, Tyburn, Birmingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 August 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Birmingham City Council on 14 Aug 2026 at 09:07.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Stoney Lane

Cadent Gas are proposing to carry out Utility asset works on Stoney Lane, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 August 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 10 Jun 2026 at 14:32.

Cadent Gas logo
LONG TERM
Until
23 Nov 2026
Details
View Map
Share
Follow
Myvod Road

Cadent Gas are carrying out Utility asset works on Myvod Road, Wednesbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 08:00 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Aug 2026 at 09:56.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Taylors Lane

Cadent Gas are proposing to carry out Utility asset works on Taylors Lane, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jun 2026 at 14:29.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are carrying out Utility asset works on Mill Lane, Walsall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2026 at 08:00 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Aug 2026 at 09:57.

Cadent Gas logo
LONG TERM
Until
11 Oct 2026
Details
View Map
Share
Follow
Coalpool Lane

Cadent Gas are carrying out Utility asset works on Coalpool Lane, Walsall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2026 at 08:05 and could run through until 11 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2026 at 10:19.

Birmingham City Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Lichfield Road

Birmingham City Council are carrying out Highway improvement works on Lichfield Road, Nechells, Birmingham.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2026 at 07:55 and could run through until 27 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Birmingham City Council on 27 Aug 2026 at 08:56.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
28 Aug and 23 Oct 2026
Details
View Map
Share
Follow
James Watt Queensway

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on James Watt Queensway, Birmingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 6 Jul 2026 at 13:12.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
28 Aug and 23 Oct 2026
Details
View Map
Share
Follow
Lancaster Street

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Lancaster Street, Birmingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 3 Jul 2026 at 11:57.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
28 Aug and 23 Oct 2026
Details
View Map
Share
Follow
Lancaster Circus Underpass

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Lancaster Circus Underpass, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 3 Jul 2026 at 12:22.

Birmingham City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Haddon Road

Birmingham City Council are carrying out Highway improvement works on Haddon Road, Birmingham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 August 2026 at 08:45 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Birmingham City Council on 28 Aug 2026 at 10:04.

Birmingham City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Chester Road

Birmingham City Council are carrying out Highway improvement works on Chester Road, Erdington, Birmingham.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 August 2026 at 08:28 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Birmingham City Council on 28 Aug 2026 at 09:50.

Birmingham City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Kingstanding Road

Birmingham City Council are carrying out Highway improvement works on Kingstanding Road, Birmingham.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2026 at 08:50 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Birmingham City Council on 17 Sep 2026 at 08:02.

Cadent Gas logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
College Road

Cadent Gas are carrying out Utility asset works on College Road, Handsworth Wood, Birmingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 12:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 12:57.

Cadent Gas logo
LONG TERM
Between
31 Aug and 12 Oct 2026
Details
View Map
Share
Follow
Stoney Lane

Cadent Gas are proposing to carry out Utility asset works on Stoney Lane, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2026 at 10:23.

Cadent Gas logo
LONG TERM
Between
31 Aug and 5 Oct 2026
Details
View Map
Share
Follow
Summer Street

Cadent Gas are proposing to carry out Utility asset works on Summer Street, West Bromwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2026 at 10:24.

Cadent Gas logo
LONG TERM
Until
7 Dec 2026
Details
View Map
Share
Follow
All Saints Way

Cadent Gas are carrying out Utility asset works on All Saints Way, West Bromwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 31 August 2026 at 09:00 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 08:05.

South Staffordshire Water logo
LONG TERM
Until
27 Nov 2026
Details
View Map
Share
Follow
Dower Road

South Staffordshire Water are carrying out Utility repair and maintenance works on Dower Road, Sutton Coldfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 07:35 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 1 Sep 2026 at 07:49.

Birmingham City Council logo
LONG TERM
Until
1 Oct 2026
Details
View Map
Share
Follow
Oxhill Road

Birmingham City Council are carrying out Highway improvement works on Oxhill Road, Birmingham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 07:57 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Birmingham City Council on 1 Sep 2026 at 13:17.

Cadent Gas logo
Tomorrow
Details
View Map
Share
Chester Road

Cadent Gas carried out Utility asset works on Chester Road, Tyburn, Birmingham.

These works were categorised as Major.

A lane was closed for some or all of the period.

The works were originally planned between 1 Sep 2026 and 25 Sep 2026 and were actually completed between 1 Sep 2026 (08:43) and 24 Sep 2026 (15:54). The works impacted the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2026 at 16:19.

Cadent Gas logo
Tomorrow
Details
View Map
Share
Chester Road

Cadent Gas carried out Utility asset works on Chester Road, Tyburn, Birmingham.

These works were categorised as Major.

A lane was closed for some or all of the period.

The works were originally planned between 1 Sep 2026 and 25 Sep 2026 and were actually completed between 1 Sep 2026 (08:43) and 24 Sep 2026 (15:54). The works impacted the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2026 at 16:18.

Birmingham City Council logo
LONG TERM
Until
1 Oct 2026
Details
View Map
Share
Follow
Chester Road

Birmingham City Council are carrying out Highway improvement works on Chester Road, Tyburn, Birmingham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 07:17 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Birmingham City Council on 1 Sep 2026 at 08:55.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Hallam Street

Cadent Gas are carrying out Utility asset works on Hallam Street, West Bromwich.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 08:27.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lewisham Street

Cadent Gas are carrying out Utility asset works on Lewisham Street, West Bromwich.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 29 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 08:28.

Birmingham City Council logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Heartlands Parkway

Birmingham City Council are carrying out Highway improvement works on Heartlands Parkway, Nechells, Birmingham.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 12:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Birmingham City Council on 2 Sep 2026 at 13:00.

Birmingham City Council logo
LONG TERM
Between
7 Sep and 25 Oct 2026
Details
View Map
Share
Follow
Witton Lane

Birmingham City Council are proposing to carry out Highway improvement works on Witton Lane, Birmingham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Birmingham City Council on 17 Aug 2026 at 16:04.

Cadent Gas logo
LONG TERM
Between
7 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Taylors Lane

Cadent Gas are proposing to carry out Utility asset works on Taylors Lane, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 11:34.

Cadent Gas logo
LONG TERM
Between
7 Sep and 12 Oct 2026
Details
View Map
Share
Follow
St Clements Lane

Cadent Gas are proposing to carry out Utility asset works on St Clements Lane, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 11:34.

Sandwell Metropolitan Borough Council logo
Until
1 Oct 2026
Details
View Map
Share
Follow
Hill Top

Sandwell Metropolitan Borough Council are carrying out Highway improvement works on Hill Top, West Bromwich.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 09:30 and could run through until 1 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 7 Sep 2026 at 09:31.

Cadent Gas logo
LONG TERM
Between
7 Sep and 2 Nov 2026
Details
View Map
Share
Follow
Coleman Road

Cadent Gas are proposing to carry out Utility asset works on Coleman Road, Wednesbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2026 at 11:26.

Cadent Gas logo
Until
5 Oct 2026
Details
View Map
Share
Follow
Heneage Street West

Cadent Gas are carrying out Utility repair and maintenance works on Heneage Street West, Birmingham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2026 at 13:05 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2026 at 08:06.

Western Power Distribution (West Midlands) logo
LONG TERM
Until
9 Oct 2026
Details
View Map
Share
Follow
Brookhus Farm Road

Western Power Distribution (West Midlands) are carrying out Utility asset works on Brookhus Farm Road, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 September 2026 at 07:48 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Sep 2026 at 08:11.

Severn Trent Water logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Park Road

Severn Trent Water are carrying out Utility repair and maintenance works on Park Road, Birmingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:22 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Sep 2026 at 10:12.

Severn Trent Water logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Church Street

Severn Trent Water are carrying out Utility repair and maintenance works on Church Street, Birmingham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 13:00 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Sep 2026 at 12:16.

Cadent Gas logo
LONG TERM
Between
14 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Friary Road

Cadent Gas are proposing to carry out Utility asset works on Friary Road, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jul 2026 at 09:31.

Cadent Gas logo
LONG TERM
Until
16 Oct 2026
Details
View Map
Share
Follow
Friary Road

Cadent Gas are carrying out Utility asset works on Friary Road, Birmingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:00 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2026 at 11:47.

Sandwell Metropolitan Borough Council logo
Between
14 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Brunswick Park Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Brunswick Park Road, Wednesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 12 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 11 Sep 2026 at 13:02.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
14 Sep and 21 Oct 2026
Details
View Map
Share
Follow
Birmingham Road

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Birmingham Road, Walsall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 7 Jul 2026 at 15:16.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
14 Sep and 21 Oct 2026
Details
View Map
Share
Follow
Lichfield Street

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Lichfield Street, Walsall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 7 Jul 2026 at 15:12.

Cadent Gas logo
Between
15 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Oakfield Road

Cadent Gas are proposing to carry out Utility asset works on Oakfield Road, Stockland Green, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2026 at 09:38.

Cadent Gas logo
Until
5 Oct 2026
Details
View Map
Share
Follow
Oakfield Road

Cadent Gas are carrying out Utility asset works on Oakfield Road, Stockland Green, Birmingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2026 at 10:00 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 11:25.

Cadent Gas logo
Until
6 Oct 2026
Details
View Map
Share
Follow
Springfield Road

Cadent Gas are carrying out Utility asset works on Springfield Road, Sutton New Hall, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 September 2026 at 11:00 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2026 at 11:45.

Cadent Gas logo
Until
12 Oct 2026
Details
View Map
Share
Follow
Stephens Road

Cadent Gas are carrying out Utility asset works on Stephens Road, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 September 2026 at 10:35 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Sep 2026 at 12:21.

Severn Trent Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Wilton Road

Severn Trent Water are carrying out Utility repair and maintenance works on Wilton Road, Birmingham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2026 at 08:54 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Sep 2026 at 12:53.

Cadent Gas logo
Between
21 Sep and 19 Oct 2026
Details
View Map
Share
Follow
Hallam Street

Cadent Gas are proposing to carry out Utility asset works on Hallam Street, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jun 2026 at 15:07.

Cadent Gas logo
LONG TERM
Between
21 Sep and 13 Nov 2026
Details
View Map
Share
Follow
Somerset Road

Cadent Gas are proposing to carry out Utility asset works on Somerset Road, Erdington, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jul 2026 at 07:24.

Cadent Gas logo
LONG TERM
Until
13 Nov 2026
Details
View Map
Share
Follow
Somerset Road

Cadent Gas are carrying out Utility asset works on Somerset Road, Erdington, Birmingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2026 at 09:00 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Sep 2026 at 09:42.

Cadent Gas logo
Until
12 Oct 2026
Details
View Map
Share
Follow
Houliston Close

Cadent Gas are carrying out Utility asset works on Houliston Close, Wednesbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2026 at 08:00 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Sep 2026 at 09:32.

Cadent Gas logo
Until
5 Oct 2026
Details
View Map
Share
Follow
Barlow Road

Cadent Gas are carrying out Utility asset works on Barlow Road, Wednesbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2026 at 08:00 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Sep 2026 at 09:31.

South Staffordshire Water logo
LONG TERM
Until
6 Dec 2026
Details
View Map
Share
Follow
Whetstone Lane

South Staffordshire Water are carrying out Utility asset works on Whetstone Lane, Aldridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2026 at 09:30 and could run through until 6 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 21 Sep 2026 at 09:38.

Walsall Metropolitan Borough Council logo
Today
Details
View Map
Share
Lichfield Road

Walsall Metropolitan Borough Council carried out Highway repair and maintenance works on Lichfield Road, Rushall.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 21 Sep 2026 and 24 Sep 2026 and were actually completed between 21 Sep 2026 (19:00) and 24 Sep 2026 (05:00). The works impacted the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 24 Sep 2026 at 08:13.

Cadent Gas logo
Tomorrow
Details
View Map
Share
Walsall Wood Road

Cadent Gas carried out Utility repair and maintenance works on Walsall Wood Road, Aldridge.

Two-way signals were in place for some or all of the period.

The works were originally planned between 21 Sep 2026 and 25 Sep 2026 and were actually completed between 21 Sep 2026 (17:08) and 24 Sep 2026 (11:20). The works impacted the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cadent Gas on 24 Sep 2026 at 11:21.

Walsall Metropolitan Borough Council logo
Today
Details
View Map
Share
Walsall Road

Walsall Metropolitan Borough Council carried out Highway repair and maintenance works on Walsall Road, Walsall Wood.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 21 Sep 2026 and 24 Sep 2026 and were actually completed between 21 Sep 2026 (19:00) and 24 Sep 2026 (05:00). The works impacted the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 24 Sep 2026 at 08:13.

Walsall Metropolitan Borough Council logo
Today
Details
View Map
Share
Lichfield Road

Walsall Metropolitan Borough Council carried out Highway repair and maintenance works on Lichfield Road, Shelfield.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 21 Sep 2026 and 24 Sep 2026 and were actually completed between 21 Sep 2026 (19:00) and 24 Sep 2026 (05:00). The works impacted the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 24 Sep 2026 at 08:14.

Walsall Metropolitan Borough Council logo
Today
Details
View Map
Share
High Street

Walsall Metropolitan Borough Council carried out Highway repair and maintenance works on High Street, Walsall Wood.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 21 Sep 2026 and 24 Sep 2026 and were actually completed between 21 Sep 2026 (19:00) and 24 Sep 2026 (05:00). The works impacted the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 24 Sep 2026 at 08:13.

Birmingham City Council logo
LONG TERM
Until
22 Oct 2026
Details
View Map
Share
Follow
Saltley Road

Birmingham City Council are carrying out Highway improvement works on Saltley Road, Birmingham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 September 2026 at 13:55 and could run through until 22 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Birmingham City Council on 23 Sep 2026 at 11:21.

Severn Trent Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Walmley Road

Severn Trent Water are carrying out Remedial works on Walmley Road, Sutton New Hall, Sutton Coldfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2026 at 10:05 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Sep 2026 at 12:09.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Hill Hook Road

Cadent Gas are carrying out Utility repair and maintenance works on Hill Hook Road, Sutton Coldfield.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2026 at 14:13 and could run through until 29 September 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cadent Gas on 24 Sep 2026 at 08:57.

Walsall Metropolitan Borough Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Mill Road

Walsall Metropolitan Borough Council are carrying out Highway repair and maintenance works on Mill Road, Walsall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2026 at 19:00 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 24 Sep 2026 at 08:11.

Birmingham City Council logo
LONG TERM
Until
24 Oct 2026
Details
View Map
Share
Follow
Whitehead Road

Birmingham City Council are carrying out Highway improvement works on Whitehead Road, Birmingham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 September 2026 at 08:45 and could run through until 24 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Birmingham City Council on 24 Sep 2026 at 11:57.

Sandwell Metropolitan Borough Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Park Lane

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Park Lane, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 22 Sep 2026 at 09:00.

Sandwell Metropolitan Borough Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Forge Lane

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Forge Lane, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 22 Sep 2026 at 09:00.

Severn Trent Water logo
Finishing
Monday
Details
View Map
Share
Follow
Hill Village Road

Severn Trent Water are proposing to carry out Remedial works on Hill Village Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Jul 2026 at 13:57.

Severn Trent Water logo
Finishing
Monday
Details
View Map
Share
Follow
Hundred Acre Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hundred Acre Road, Streetly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2026 at 14:29.

Cadent Gas logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Windermere Road

Cadent Gas are proposing to carry out Utility asset works on Windermere Road, Handsworth Wood, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jul 2026 at 07:34.

Cadent Gas logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Windermere Road

Cadent Gas are proposing to carry out Utility asset works on Windermere Road, Handsworth Wood, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 12:29.

ESP Electricity logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Mere Road

ESP Electricity are proposing to carry out Utility asset works on Mere Road, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 9 Sep 2026 at 11:10.

ESP Electricity logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Mere Road

ESP Electricity are proposing to carry out Utility asset works on Mere Road, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 15 Sep 2026 at 17:39.

ESP Electricity logo
Between
28 Sep and 23 Oct 2026
Details
View Map
Share
Follow
Mere Road

ESP Electricity are proposing to carry out Utility asset works on Mere Road, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 22 Sep 2026 at 11:40.

Cadent Gas logo
Between
28 Sep and 26 Oct 2026
Details
View Map
Share
Follow
Hallam Street

Cadent Gas are proposing to carry out Utility asset works on Hallam Street, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2026 at 10:30.

Cadent Gas logo
Between
28 Sep and 26 Oct 2026
Details
View Map
Share
Follow
Seagar Street

Cadent Gas are proposing to carry out Utility asset works on Seagar Street, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2026 at 10:28.

Cadent Gas logo
Between
28 Sep and 16 Oct 2026
Details
View Map
Share
Streetly Road

Cadent Gas were proposing to carry out Utility asset works on Streetly Road, Stockland Green, Birmingham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2026 and run through until 16 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2026 at 14:35.

Cadent Gas logo
Between
28 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Marsh Lane

Cadent Gas are proposing to carry out Utility asset works on Marsh Lane, Birmingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Aug 2026 at 10:56.

Cadent Gas logo
Between
28 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Lambourn Road

Cadent Gas are proposing to carry out Utility asset works on Lambourn Road, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 12:57.

Cadent Gas logo
Between
28 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Lambourn Road

Cadent Gas are proposing to carry out Utility asset works on Lambourn Road, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 15:00.

Cadent Gas logo
Between
28 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Lambourn Road

Cadent Gas are proposing to carry out Utility asset works on Lambourn Road, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2026 at 10:53.

Cadent Gas logo
Between
28 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Barlow Road

Cadent Gas are proposing to carry out Utility asset works on Barlow Road, Wednesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2026 at 15:50.

Cadent Gas logo
Between
28 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Holden Crescent

Cadent Gas are proposing to carry out Utility asset works on Holden Crescent, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 12:52.

Western Power Distribution (West Midlands) logo
Between
30 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Brockhurst Crescent

Western Power Distribution (West Midlands) are proposing to carry out Remedial works on Brockhurst Crescent, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 28 Aug 2026 at 16:27.

Cadent Gas logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Marsh Lane

Cadent Gas were proposing to carry out Utility asset works on Marsh Lane, Birmingham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2026 and run through until 23 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2026 at 14:36.

Severn Trent Water logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
George Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on George Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Aug 2026 at 10:08.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
5 Oct 2026 and 29 Jan 2027
Details
View Map
Share
Follow
Darwall Street

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Darwall Street, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 29 January 2027. The works will impact the footway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 21 Sep 2026 at 16:01.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
5 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Lichfield Street

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Lichfield Street, Walsall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 18 Sep 2026 at 11:52.

Cadent Gas logo
Between
7 and 23 Oct 2026
Details
View Map
Share
Follow
Oxhill Road

Cadent Gas are proposing to carry out Utility asset works on Oxhill Road, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jul 2026 at 07:28.

Cadent Gas logo
Between
7 and 23 Oct 2026
Details
View Map
Share
Follow
Oxhill Road

Cadent Gas are proposing to carry out Utility asset works on Oxhill Road, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Sep 2026 at 00:10.

Cadent Gas logo
LONG TERM
Between
8 Oct and 3 Dec 2026
Details
View Map
Share
Follow
Reservoir Road

Cadent Gas are proposing to carry out Utility asset works on Reservoir Road, Stockland Green, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 3 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2026 at 15:55.

Cadent Gas logo
LONG TERM
Between
8 Oct and 3 Dec 2026
Details
View Map
Share
Follow
Reservoir Road

Cadent Gas are proposing to carry out Utility asset works on Reservoir Road, Stockland Green, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2026 and could run through until 3 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 13:52.

Telefonica UK logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Great King Street North

Telefonica UK are proposing to carry out Utility asset works on Great King Street North, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Telefonica UK on 10 Aug 2026 at 13:19.

Telefonica UK logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Great King Street North

Telefonica UK are proposing to carry out Utility asset works on Great King Street North, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Telefonica UK on 17 Sep 2026 at 09:31.

Cadent Gas logo
Between
12 and 26 Oct 2026
Details
View Map
Share
Follow
Bishop Road

Cadent Gas are proposing to carry out Utility asset works on Bishop Road, Wednesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2026 at 09:53.

Cadent Gas logo
Between
12 and 26 Oct 2026
Details
View Map
Share
Follow
Booth Road

Cadent Gas are proposing to carry out Utility asset works on Booth Road, Wednesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 09:01.

Cadent Gas logo
Between
12 and 26 Oct 2026
Details
View Map
Share
Follow
Booth Road

Cadent Gas are proposing to carry out Utility asset works on Booth Road, Wednesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2026 at 09:06.

Cadent Gas logo
Between
12 and 31 Oct 2026
Details
View Map
Share
Follow
Walmley Road

Cadent Gas are proposing to carry out Utility asset works on Walmley Road, Sutton New Hall, Sutton Coldfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Jul 2026 at 15:27.

National Highways logo
Between
12 Oct and 7 Nov 2026
Details
View Map
Share
Follow
Wood Green Road

National Highways are proposing to carry out roadworks on Wood Green Road, Wednesbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Jun 2026 at 11:06.

Transport for West Midlands (TfWM) logo
Between
12 Oct and 5 Nov 2026
Details
View Map
Share
Follow
Birmingham Road

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Birmingham Road, Walsall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 5 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 7 Jul 2026 at 15:17.

National Highways logo
Between
12 Oct and 7 Nov 2026
Details
View Map
Share
Follow
Bescot Road

National Highways are proposing to carry out Highway repair and maintenance works on Bescot Road, Walsall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 7 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 1 Jul 2026 at 14:35.

South Staffordshire Water logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Thornhill Park

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Thornhill Park, Streetly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 1 Jul 2026 at 15:32.

Severn Trent Water logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Westminster Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Westminster Road, Rushall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2026 and run through until 16 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 31 Aug 2026 at 15:14.

Walsall Metropolitan Borough Council logo
Between
17 Oct and 5 Nov 2026
Details
View Map
Share
Follow
Pelsall Lane

Walsall Metropolitan Borough Council are proposing to carry out Highway improvement works on Pelsall Lane, Rushall.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2026 and could run through until 5 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 13 Aug 2026 at 14:50.

Cadent Gas logo
Between
19 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Crew Road

Cadent Gas are proposing to carry out Utility asset works on Crew Road, Wednesbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2026 at 11:25.

Cadent Gas logo
Between
19 Oct and 16 Nov 2026
Details
View Map
Share
Follow
Prince George Road

Cadent Gas are proposing to carry out Utility asset works on Prince George Road, Wednesbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 16 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2026 at 11:25.

Severn Trent Water logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Westgate

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Westgate, Aldridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 30 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 27 Aug 2026 at 13:58.

Western Power Distribution (West Midlands) logo
Between
19 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Barns Lane

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Barns Lane, Rushall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Aug 2026 at 08:02.

Western Power Distribution (West Midlands) logo
Between
19 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Barns Lane

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Barns Lane, Rushall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Sep 2026 at 11:01.

Sandwell Metropolitan Borough Council logo
Between
21 and 27 Oct 2026
Details
View Map
Share
Follow
Lechlade Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lechlade Road, Great Barr, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2026 and could run through until 27 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 24 Aug 2026 at 13:24.

Sandwell Metropolitan Borough Council logo
Between
22 and 26 Oct 2026
Details
View Map
Share
Follow
Millfields Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Millfields Road, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2026 and could run through until 26 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 1 Jul 2026 at 15:15.

Severn Trent Water logo
Between
24 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Heathfield Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Heathfield Road, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Sep 2026 at 11:27.

Cadent Gas logo
LONG TERM
Between
26 Oct and 30 Nov 2026
Details
View Map
Share
Follow
Nansen Road

Cadent Gas are proposing to carry out Utility asset works on Nansen Road, Washwood Heath, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 10:02.

Severn Trent Water logo
Between
26 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Bromford Lane

Severn Trent Water are proposing to carry out Utility asset works on Bromford Lane, Hodge Hill, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 24 Sep 2026 at 11:57.

Severn Trent Water logo
Between
26 Oct and 6 Nov 2026
Details
View Map
Share
Heathfield Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Heathfield Road, Birmingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2026 and run through until 6 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 31 Aug 2026 at 13:29.

Severn Trent Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Yew Tree Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Yew Tree Road, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Aug 2026 at 09:08.

Cadent Gas logo
Between
26 Oct and 16 Nov 2026
Details
View Map
Share
Follow
Highcroft Road

Cadent Gas are proposing to carry out Utility asset works on Highcroft Road, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 16 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2026 at 13:05.

Sandwell Metropolitan Borough Council logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Baker House Grove

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Baker House Grove, Great Barr, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 24 Aug 2026 at 13:24.

Sandwell Metropolitan Borough Council logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Stanton Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Stanton Road, Great Barr, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 24 Aug 2026 at 13:24.

Cadent Gas logo
Between
26 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Bishop Road

Cadent Gas are proposing to carry out Utility asset works on Bishop Road, Wednesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Jul 2026 at 15:25.

Cadent Gas logo
Between
26 Oct and 16 Nov 2026
Details
View Map
Share
Follow
Prince George Road

Cadent Gas are proposing to carry out Utility asset works on Prince George Road, Wednesbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 16 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2026 at 11:26.

Transport for West Midlands (TfWM) logo
Between
27 Oct and 23 Nov 2026
Details
View Map
Share
Follow
Birmingham Road

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Birmingham Road, Great Barr, Birmingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 30 Jun 2026 at 13:16.

Telefonica UK logo
Between
28 and 30 Oct 2026
Details
View Map
Share
Follow
Great King Street North

Telefonica UK are proposing to carry out Utility asset works on Great King Street North, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Telefonica UK on 12 Aug 2026 at 15:44.

Telefonica UK logo
Between
28 and 30 Oct 2026
Details
View Map
Share
Follow
Great King Street North

Telefonica UK are proposing to carry out Utility asset works on Great King Street North, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Telefonica UK on 17 Sep 2026 at 09:31.

Severn Trent Water logo
Between
28 and 30 Oct 2026
Details
View Map
Share
Follow
Aston Lane

Severn Trent Water are proposing to carry out New service connection on Aston Lane, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 27 Aug 2026 at 09:56.

Birmingham City Council logo
LONG TERM
Between
2 Nov and 2 Dec 2026
Details
View Map
Share
Follow
Bromford Drive

Birmingham City Council are proposing to carry out Remedial works on Bromford Drive, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Birmingham City Council on 12 Aug 2026 at 12:16.

Severn Trent Water logo
Between
2 and 10 Nov 2026
Details
View Map
Share
Hunton Hill

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Hunton Hill, Birmingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 November 2026 and run through until 10 November 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Sep 2026 at 12:49.

Transport for West Midlands (TfWM) logo
Between
2 and 27 Nov 2026
Details
View Map
Share
Follow
Birmingham Road

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Birmingham Road, Great Barr, Birmingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 7 Jul 2026 at 13:27.

Transport for West Midlands (TfWM) logo
Between
4 and 23 Nov 2026
Details
View Map
Share
Follow
Birmingham Road

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Birmingham Road, Great Barr, Birmingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 30 Jun 2026 at 13:17.

Severn Trent Water logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Frances Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Frances Road, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2026 at 13:56.

Severn Trent Water logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Frances Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Frances Road, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Sep 2026 at 14:31.

Sandwell Metropolitan Borough Council logo
Between
9 and 27 Nov 2026
Details
View Map
Share
Follow
Halfords Lane

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Halfords Lane, West Bromwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 13 Aug 2026 at 09:40.

Sandwell Metropolitan Borough Council logo
Between
9 and 27 Nov 2026
Details
View Map
Share
Follow
Birmingham Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway improvement works on Birmingham Road, West Bromwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 13 Aug 2026 at 09:40.

Severn Trent Water logo
Between
9 and 11 Nov 2026
Details
View Map
Share
Follow
Goscote Place

Severn Trent Water are proposing to carry out Remedial works on Goscote Place, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 11 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Sep 2026 at 09:26.

Cadent Gas logo
LONG TERM
Between
9 Nov and 21 Dec 2026
Details
View Map
Share
Follow
Barns Lane

Cadent Gas are proposing to carry out Utility asset works on Barns Lane, Rushall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 13:50.

Severn Trent Water logo
Between
11 and 13 Nov 2026
Details
View Map
Share
Follow
College Road

Severn Trent Water are proposing to carry out Remedial works on College Road, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Aug 2026 at 14:56.

Cadent Gas logo
Between
16 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Lodge Road

Cadent Gas are proposing to carry out Utility asset works on Lodge Road, Soho Hockley, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Sep 2026 at 16:14.

Cadent Gas logo
Between
16 and 18 Nov 2026
Details
View Map
Share
Follow
Manby Road

Cadent Gas are proposing to carry out Remedial works on Manby Road, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 18 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 12:26.

National Highways logo
Between
16 Nov and 5 Dec 2026
Details
View Map
Share
Follow
Birmingham Road

National Highways are proposing to carry out roadworks on Birmingham Road, Great Barr, Birmingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 16 Sep 2026 at 11:19.

National Highways logo
Between
16 Nov and 5 Dec 2026
Details
View Map
Share
Follow
Birmingham Road

National Highways are proposing to carry out roadworks on Birmingham Road, Great Barr, Birmingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 5 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 16 Sep 2026 at 11:15.

South Staffordshire Water logo
LONG TERM
Between
16 Nov and 21 Dec 2026
Details
View Map
Share
Follow
Ley Hill Road

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Ley Hill Road, Sutton Coldfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 13 Aug 2026 at 12:54.

Telefonica UK logo
Between
16 and 18 Nov 2026
Details
View Map
Share
Follow
Buchanan Avenue

Telefonica UK are proposing to carry out Utility asset works on Buchanan Avenue, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 18 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Telefonica UK on 27 Aug 2026 at 10:16.

Walsall Metropolitan Borough Council logo
Between
20 and 26 Nov 2026
Details
View Map
Share
Follow
Birmingham Road

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Birmingham Road, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 26 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 28 Aug 2026 at 10:12.

Cadent Gas logo
Between
23 and 25 Nov 2026
Details
View Map
Share
Follow
Clarence Road

Cadent Gas are proposing to carry out Remedial works on Clarence Road, Soho, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 25 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 14 Sep 2026 at 14:39.

Cadent Gas logo
Between
23 and 25 Nov 2026
Details
View Map
Share
Follow
Clarence Road

Cadent Gas are proposing to carry out Remedial works on Clarence Road, Soho, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 25 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Sep 2026 at 11:10.

Severn Trent Water logo
Between
23 and 25 Nov 2026
Details
View Map
Share
Follow
Uplands Road

Severn Trent Water are proposing to carry out New service connection on Uplands Road, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 25 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 14 Sep 2026 at 10:31.

Severn Trent Water logo
Between
23 and 25 Nov 2026
Details
View Map
Share
Follow
Uplands Road

Severn Trent Water are proposing to carry out New service connection on Uplands Road, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 25 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 24 Sep 2026 at 10:43.

Cadent Gas logo
Between
23 Nov and 14 Dec 2026
Details
View Map
Share
Follow
Banners Grove

Cadent Gas are proposing to carry out Utility asset works on Banners Grove, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Sep 2026 at 09:00.

Cadent Gas logo
Between
23 Nov and 7 Dec 2026
Details
View Map
Share
Follow
Stanway Road

Cadent Gas are proposing to carry out Utility asset works on Stanway Road, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 11:27.

Cadent Gas logo
Between
23 Nov and 14 Dec 2026
Details
View Map
Share
Follow
Rowden Drive

Cadent Gas are proposing to carry out Utility asset works on Rowden Drive, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Sep 2026 at 09:00.

Between
23 Nov and 7 Dec 2026
Details
View Map
Share
Follow
Bath Street

Advanced Electricty Networks Ltd are proposing to carry out New service connection on Bath Street, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Advanced Electricty Networks Ltd on 24 Sep 2026 at 15:05.

Birmingham City Council logo
Between
24 Nov and 8 Dec 2026
Details
View Map
Share
Follow
Lichfield Road

Birmingham City Council are proposing to carry out Remedial works on Lichfield Road, Nechells, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 8 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Birmingham City Council on 31 Aug 2026 at 16:32.

Severn Trent Water logo
Between
24 and 27 Nov 2026
Details
View Map
Share
Aston Lane

Severn Trent Water were proposing to carry out New service connection on Aston Lane, Birmingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2026 and run through until 27 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 26 Aug 2026 at 14:31.

Cadent Gas logo
Between
25 and 27 Nov 2026
Details
View Map
Share
Follow
Duttons Lane

Cadent Gas are proposing to carry out Remedial works on Duttons Lane, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 12:45.

Cellnex OT UK logo
Between
27 and 29 Nov 2026
Details
View Map
Share
Follow
Rabone Lane

Cellnex OT UK are proposing to carry out Utility asset works on Rabone Lane, Smethwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2026 and could run through until 29 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cellnex OT UK on 16 Sep 2026 at 09:07.

T-Mobile (UK) logo
Between
30 Nov and 2 Dec 2026
Details
View Map
Share
Follow
Henrietta Street

T-Mobile (UK) are proposing to carry out Utility asset works on Henrietta Street, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 24 Sep 2026 at 11:45.

Birmingham City Council logo
Between
30 Nov and 16 Dec 2026
Details
View Map
Share
Follow
Lichfield Road

Birmingham City Council are proposing to carry out Highway improvement works on Lichfield Road, Nechells, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 16 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Birmingham City Council on 23 Sep 2026 at 11:47.

Severn Trent Water logo
Between
30 Nov and 9 Dec 2026
Details
View Map
Share
Follow
Westgate

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Westgate, Aldridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 9 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Sep 2026 at 12:53.

Walsall Metropolitan Borough Council logo
Between
1 and 3 Dec 2026
Details
View Map
Share
Follow
Barr Lakes Lane

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Barr Lakes Lane, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 3 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 9 Sep 2026 at 11:40.

Cadent Gas logo
Between
2 and 4 Dec 2026
Details
View Map
Share
Follow
Hillwood Road

Cadent Gas are proposing to carry out Remedial works on Hillwood Road, Sutton Four Oaks, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Sep 2026 at 11:03.

Birmingham City Council logo
Between
4 and 18 Dec 2026
Details
View Map
Share
Follow
Bromford Lane

Birmingham City Council are proposing to carry out Remedial works on Bromford Lane, Hodge Hill, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Birmingham City Council on 1 Sep 2026 at 16:31.

Walsall Metropolitan Borough Council logo
Between
7 and 11 Dec 2026
Details
View Map
Share
Follow
Waverley Avenue

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Waverley Avenue, Great Barr.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 14 Sep 2026 at 15:09.

Cadent Gas logo
Between
7 and 21 Dec 2026
Details
View Map
Share
Follow
Kings Road

Cadent Gas are proposing to carry out Utility asset works on Kings Road, Rushall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 21 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2026 at 13:50.

Sandwell Metropolitan Borough Council logo
Between
14 and 16 Dec 2026
Details
View Map
Share
Follow
Andrew Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Andrew Road, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 16 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 24 Aug 2026 at 13:16.

Sandwell Metropolitan Borough Council logo
Between
14 and 16 Dec 2026
Details
View Map
Share
Follow
Bustleholme Lane

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bustleholme Lane, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 16 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 24 Aug 2026 at 13:16.

Staffordshire County Council logo
Between
14 and 18 Dec 2026
Details
View Map
Share
Follow
Camp Road

Staffordshire County Council are proposing to carry out Highway improvement works on Camp Road, Little Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2026 at 14:57.


Roadworks Map near to Lambeth Road, BIRMINGHAM, B44 9PN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Sep 2026 19:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Lambeth Road, BIRMINGHAM, B44 9PN (11 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
KINGS ROAD, OSCOTT 
(0.1 miles)
BT
New service connection - Footway - Some carriageway incursion
Cancelled
(Scheduled: 23 Sep 2026 - 25 Sep 2026)
0.1
Details
Share
2
Virgin Media logo
KINGSLAND ROAD 
(0.3 miles)
Virgin Media
Utility repair and maintenance works - Footway, Verge - No carriageway incursion
In Progress
Since: 24 Sep 2026 14:09
(Scheduled: 24 Sep 2026 - 25 Sep 2026)
0.3
Details
Share
Follow
3
Virgin Media logo
KINGS ROAD, OSCOTT 
(0.3 miles)
Virgin Media
Utility repair and maintenance works - Footway, Verge - No carriageway incursion
Planned
Scheduled: 24 Sep 2026 - 25 Sep 2026
0.3
Details
Share
Follow
4
Birmingham City Council logo
EMERGENCY
  
KINGSTANDING ROAD 
(0.6 miles)
Birmingham City Council
Highway improvement works - Carriageway - Lane closure
In Progress
Since: 28 Aug 2026 08:50
(Scheduled: 28 Aug 2026 - 28 Sep 2026)
0.6
Details
Share
Follow
5
Western Power Distribution (West Midlands) logo
URGENT
  
BEACON ROAD 
(0.6 miles)
Western Power Distribution (West Midlands)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 23 Sep 2026 10:15
(Scheduled: 23 Sep 2026 - 6 Oct 2026)
0.6
Details
Share
Follow
6
Virgin Media logo
KINGS ROAD, KINGSTANDING 
(0.7 miles)
Virgin Media
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 25 Sep 2026
0.7
Details
Share
Follow
7
Virgin Media logo
PARK FARM ROAD 
(0.8 miles)
Virgin Media
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 25 Sep 2026
0.8
Details
Share
Follow
8
Virgin Media logo
URGENT
  
BINSTEAD ROAD 
(0.8 miles)
Virgin Media
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
23 Sep 2026 11:58 - 12:37
0.8
Details
Share
9
Severn Trent Water logo
URGENT
  
LONGMOOR ROAD 
(0.9 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
23 Sep 2026 08:51 - 13:21
0.9
Details
Share
10
Birmingham City Council logo
CRANBOURNE ROAD 
(0.9 miles)
Birmingham City Council
Highway improvement works - Footway, Carriageway - Road closure
Planned
Scheduled: 25 Sep 2026
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.