ROADWORKS SUMMARY
Sebright Road, ST. ALBANS, AL3 8RT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Sebright Road, AL3 8RT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Sebright Road, ST. ALBANS, AL3 8RT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Sebright Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Between
28 Apr and 20 Jun 2025
Details
View Map
Share
Follow
Manton Drive

Cadent Gas are proposing to carry out Utility asset works on Manton Drive, Luton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 23 Mar 2025 at 10:19.

Luton Borough Council logo
LONG TERM
Between
28 Apr and 21 Jun 2025
Details
View Map
Share
Follow
Marsh Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Marsh Road, Luton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 21 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Luton Borough Council on 16 Feb 2025 at 10:22.

Luton Borough Council logo
LONG TERM
Until
28 Jun 2025
Details
View Map
Share
Follow
Marsh Road

Luton Borough Council are carrying out Highway repair and maintenance works on Marsh Road, Luton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 May 2025 at 08:00 and could run through until 28 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Luton Borough Council on 6 May 2025 at 08:49.

Cadent Gas logo
LONG TERM
Between
6 May and 4 Jul 2025
Details
View Map
Share
Follow
Eldon Road

Cadent Gas are proposing to carry out Utility asset works on Eldon Road, Luton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Apr 2025 at 14:00.

Cadent Gas logo
LONG TERM
Until
9 Jul 2025
Details
View Map
Share
Follow
Eldon Road

Cadent Gas are carrying out Utility asset works on Eldon Road, Luton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 May 2025 at 11:32 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 May 2025 at 11:37.

Cadent Gas logo
LONG TERM
Between
12 May and 4 Jul 2025
Details
View Map
Share
Manton Drive

Cadent Gas were proposing to carry out Utility asset works on Manton Drive, Luton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 4 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 14:27.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Priory Gardens

Cadent Gas were proposing to carry out Utility asset works on Priory Gardens, Luton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Apr 2025 at 14:29.

Luton Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Union Street

Luton Borough Council are carrying out Highway repair and maintenance works on Union Street, Luton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 May 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Luton Borough Council on 1 Jun 2025 at 08:00.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Annables Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Annables Lane, Kinsbourne Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Feb 2025 at 16:13.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Annables Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Annables Lane, Kinsbourne Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2025 at 10:35.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Annables Lane

UK Power Networks Eastern & London are carrying out New service connection on Annables Lane, Kinsbourne Green.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 May 2025 at 08:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 08:01.

Cadent Gas logo
LONG TERM
Between
26 May and 4 Jul 2025
Details
View Map
Share
Lewsey Road

Cadent Gas were proposing to carry out Utility asset works on Lewsey Road, Luton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 10:16.

Cadent Gas logo
LONG TERM
Between
26 May and 4 Jul 2025
Details
View Map
Share
Lewsey Road

Cadent Gas were proposing to carry out Utility asset works on Lewsey Road, Luton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 10:16.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
West Common

Affinity Water were proposing to carry out Utility repair and maintenance works on West Common, Harpenden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 11 Mar 2025 at 14:54.

Central Bedfordshire Council logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Farrs Lane

Central Bedfordshire Council are proposing to carry out Section 50 on Farrs Lane, Hyde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 24 Apr 2025 at 14:23.

Central Bedfordshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Woodside Road

Central Bedfordshire Council are carrying out Highway repair and maintenance works on Woodside Road, Woodside.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:08 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 2 Jun 2025 at 09:10.

Luton Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Stanley Street

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Stanley Street, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 2 Apr 2025 at 15:20.

Luton Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Stanley Street

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Stanley Street, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 29 May 2025 at 15:12.

Luton Borough Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Stanley Street

Luton Borough Council are carrying out Highway repair and maintenance works on Stanley Street, Luton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:30 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 2 Jun 2025 at 09:31.

Luton Borough Council logo
Finishing
Friday
Details
View Map
Share
Durham Road

Luton Borough Council were proposing to carry out Highway repair and maintenance works on Durham Road, Luton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 4 Mar 2025 at 19:22.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Arden Grove

Affinity Water are proposing to carry out Utility repair and maintenance works on Arden Grove, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 13 Feb 2025 at 16:31.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Arden Grove

Affinity Water are carrying out Utility repair and maintenance works on Arden Grove, Harpenden.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 10:31 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Jun 2025 at 10:37.

Hertfordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Chad Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chad Lane, Flamstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 11 Apr 2025 at 14:12.

Hertfordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Chad Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chad Lane, Flamstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 9 May 2025 at 11:02.

Hertfordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Between Chad Lane And Windmill Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Between Chad Lane And Windmill Road, Flamstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 11 Apr 2025 at 14:12.

Hertfordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Between Chad Lane And Windmill Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Between Chad Lane And Windmill Road, Flamstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 9 May 2025 at 11:03.

Luton Borough Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Ashburnham Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Ashburnham Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 3 Jun 2025 at 09:15.

BT logo
Finishing
Thursday
Details
View Map
Share
Follow
New Bedford Road

BT are carrying out Utility repair and maintenance works on New Bedford Road, Luton.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 08:00 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 3 Jun 2025 at 09:52.

Luton Borough Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Bancroft Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Bancroft Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 28 Apr 2025 at 11:39.

Luton Borough Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Bancroft Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Bancroft Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 27 May 2025 at 13:19.

Hertfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Ganymede Place

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ganymede Place, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 16 May 2025 at 10:55.

Luton Borough Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Ashburnham Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Ashburnham Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 21 May 2025 at 08:51.

Luton Borough Council logo
Finishing
Monday
Details
View Map
Share
Follow
Dunstable Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Dunstable Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 25 Mar 2025 at 08:49.

Luton Borough Council logo
Between
4 and 10 Jun 2025
Details
View Map
Share
Follow
Dunstable Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Dunstable Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 1 Jun 2025 at 06:56.

Hertfordshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Potten End Hill

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Potten End Hill, Great Gaddesden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Nov 2024 at 08:38.

Hertfordshire County Council logo
Finishing
Monday
Details
View Map
Share
Potten End Hill

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Potten End Hill, Great Gaddesden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 June 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 13:56.

Hertfordshire County Council logo
Finishing
Monday
Details
View Map
Share
Leighton Buzzard Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Leighton Buzzard Road, Water End.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 June 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 25 Nov 2024 at 13:51.

Hertfordshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Hollybush Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hollybush Lane, Flamstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 11 Apr 2025 at 14:13.

Hertfordshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Hollybush Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hollybush Lane, Flamstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 9 May 2025 at 11:09.

Hertfordshire County Council logo
Between
6 and 10 Jun 2025
Details
View Map
Share
Follow
Water End Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Water End Road, Potten End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Nov 2024 at 08:37.

Hertfordshire County Council logo
Between
6 and 10 Jun 2025
Details
View Map
Share
Follow
Water End Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Water End Road, Potten End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 27 Feb 2025 at 09:19.

Hertfordshire County Council logo
Between
6 and 10 Jun 2025
Details
View Map
Share
Follow
Clements End Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clements End Road, Great Gaddesden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 Nov 2024 at 08:33.

Hertfordshire County Council logo
Between
6 and 10 Jun 2025
Details
View Map
Share
Follow
Clements End Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clements End Road, Great Gaddesden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 11 Dec 2024 at 11:06.

Luton Borough Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Grange Avenue

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Grange Avenue, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 29 May 2025 at 15:17.

Luton Borough Council logo
Finishing
Sunday
Details
View Map
Share
Grange Avenue

Luton Borough Council were proposing to carry out Highway repair and maintenance works on Grange Avenue, Luton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 June 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 30 May 2025 at 10:08.

Luton Borough Council logo
Between
7 and 10 Jun 2025
Details
View Map
Share
Follow
Pastures Way

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Pastures Way, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 2 Jun 2025 at 08:32.

Luton Borough Council logo
Between
8 and 10 Jun 2025
Details
View Map
Share
Follow
Wheatfield Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Wheatfield Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 2 Jun 2025 at 08:32.

Hertfordshire County Council logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Crown Street

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Crown Street, Redbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 13:08.

Luton Borough Council logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Arthur Street

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Arthur Street, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 8 Apr 2025 at 09:13.

Affinity Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Union Street

Affinity Water are proposing to carry out Utility asset works on Union Street, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Apr 2025 at 12:07.

Affinity Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Union Street

Affinity Water are proposing to carry out Utility asset works on Union Street, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 14 May 2025 at 16:00.

Luton Borough Council logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Guildford Street

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Guildford Street, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 3 Apr 2025 at 12:32.

Luton Borough Council logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Wadhurst Avenue

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Wadhurst Avenue, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 7 Apr 2025 at 12:31.

Luton Borough Council logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Wadhurst Avenue

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Wadhurst Avenue, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 1 Jun 2025 at 07:57.

Hertfordshire County Council logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Callisto Court

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Callisto Court, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 16 May 2025 at 10:56.

Luton Borough Council logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Guildford Street

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Guildford Street, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 2 Jun 2025 at 13:46.

Luton Borough Council logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Wychwood Avenue

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Wychwood Avenue, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 8 Apr 2025 at 10:00.

Luton Borough Council logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Wychwood Avenue

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Wychwood Avenue, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 3 Jun 2025 at 10:40.

Hertfordshire County Council logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Luton Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Luton Lane, Redbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 1 Apr 2025 at 09:58.

Hertfordshire County Council logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Kinsbourne Green Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kinsbourne Green Lane, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 1 Apr 2025 at 10:02.

Hertfordshire County Council logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Ridge Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ridge Avenue, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 May 2025 at 12:10.

Hertfordshire County Council logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Ridge Avenue

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ridge Avenue, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 13:02.

Luton Borough Council logo
Between
11 and 14 Jun 2025
Details
View Map
Share
Follow
Acworth Crescent

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Acworth Crescent, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 9 Apr 2025 at 15:07.

Luton Borough Council logo
Between
11 and 14 Jun 2025
Details
View Map
Share
Follow
Pirton Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Pirton Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 9 Apr 2025 at 15:28.

Luton Borough Council logo
Between
12 and 17 Jun 2025
Details
View Map
Share
Hockwell Ring

Luton Borough Council were proposing to carry out Highway repair and maintenance works on Hockwell Ring, Luton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 June 2025 and run through until 17 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 13 Mar 2025 at 11:32.

Luton Borough Council logo
Between
12 and 17 Jun 2025
Details
View Map
Share
Follow
Hockwell Ring

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Hockwell Ring, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 9 Apr 2025 at 15:36.

Luton Borough Council logo
Between
12 and 17 Jun 2025
Details
View Map
Share
Follow
Hockwell Ring

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Hockwell Ring, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 29 May 2025 at 08:43.

Luton Borough Council logo
Between
13 and 18 Jun 2025
Details
View Map
Share
Follow
Brunel Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Brunel Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 9 Apr 2025 at 15:48.

Luton Borough Council logo
Between
13 and 18 Jun 2025
Details
View Map
Share
Follow
Brunel Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Brunel Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 30 May 2025 at 08:50.

Hertfordshire County Council logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Peterlee Court

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Peterlee Court, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 09:19.

Hertfordshire County Council logo
Between
16 and 27 Jun 2025
Details
View Map
Share
Follow
Three Cherry Trees Lane

Hertfordshire County Council are proposing to carry out Highway improvement works on Three Cherry Trees Lane, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 May 2025 at 13:44.

Hertfordshire County Council logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Half Moon Meadow

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Half Moon Meadow, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 09:15.

Hertfordshire County Council logo
Between
16 and 27 Jun 2025
Details
View Map
Share
Cherry Tree Lane

Hertfordshire County Council were proposing to carry out Highway improvement works on Cherry Tree Lane, Redbourn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 14 May 2025 at 16:06.

Hertfordshire County Council logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Cleves Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cleves Road, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 08:57.

Hertfordshire County Council logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Southdown Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Southdown Road, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 14:11.

Central Bedfordshire Council logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Farrs Lane

Central Bedfordshire Council are proposing to carry out Section 50 on Farrs Lane, Hyde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 14 May 2025 at 12:27.

Affinity Water logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Baker Street

Affinity Water were proposing to carry out Utility repair and maintenance works on Baker Street, Luton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 19 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Jan 2025 at 15:23.

Affinity Water logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Baker Street

Affinity Water are proposing to carry out Utility repair and maintenance works on Baker Street, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 Feb 2025 at 12:00.

Affinity Water logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Baker Street

Affinity Water are proposing to carry out Utility repair and maintenance works on Baker Street, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 13 Feb 2025 at 13:58.

Thames Water logo
Between
16 and 23 Jun 2025
Details
View Map
Share
Follow
High Town Road

Thames Water are proposing to carry out Utility repair and maintenance works on High Town Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 13:58.

Thames Water logo
Between
16 and 23 Jun 2025
Details
View Map
Share
Follow
High Town Road

Thames Water are proposing to carry out Utility repair and maintenance works on High Town Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 08:50.

Affinity Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Dunstable Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Dunstable Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 7 Apr 2025 at 11:37.

Affinity Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Dunstable Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Dunstable Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Apr 2025 at 10:12.

Luton Borough Council logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Elmwood Crescent

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Elmwood Crescent, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 2 Jun 2025 at 08:55.

Luton Borough Council logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Acworth Crescent

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Acworth Crescent, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 2 Jun 2025 at 08:55.

Luton Borough Council logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Pirton Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Pirton Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 2 Jun 2025 at 08:55.

Hertfordshire County Council logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
Aragon Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Aragon Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 09:00.

Hertfordshire County Council logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
Catherine Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Catherine Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 09:05.

Luton Borough Council logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
High Wood Close

Luton Borough Council are proposing to carry out Highway repair and maintenance works on High Wood Close, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 9 Apr 2025 at 15:57.

Luton Borough Council logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
High Wood Close

Luton Borough Council are proposing to carry out Highway repair and maintenance works on High Wood Close, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 3 Jun 2025 at 08:47.

Hertfordshire County Council logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Parr Crescent

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Parr Crescent, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 09:04.

Hertfordshire County Council logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Northaw Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Northaw Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 09:07.

Affinity Water logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Frithsden Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Frithsden Lane, Potten End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 25 Mar 2025 at 09:48.

Affinity Water logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Frithsden Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Frithsden Lane, Potten End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 9 May 2025 at 10:57.

Hertfordshire County Council logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Jane Close

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Jane Close, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 09:09.

Hertfordshire County Council logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Connaught Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Connaught Road, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 8 May 2025 at 12:50.

Hertfordshire County Council logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Elliswick Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Elliswick Road, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 8 May 2025 at 12:02.

Central Bedfordshire Council logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
The Green

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on The Green, Whipsnade.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 19 Mar 2025 at 14:17.

Luton Borough Council logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Longcroft Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Longcroft Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 9 Apr 2025 at 16:09.

Hertfordshire County Council logo
Between
19 and 23 Jun 2025
Details
View Map
Share
Follow
Cowper Rise

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cowper Rise, Markyate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 09:28.

Hertfordshire County Council logo
Between
19 and 23 Jun 2025
Details
View Map
Share
Follow
Cowper Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cowper Road, Markyate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 13 May 2025 at 09:28.

Hertfordshire County Council logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Ledgemore Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ledgemore Lane, Great Gaddesden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Apr 2025 at 10:02.

Hertfordshire County Council logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Ledgemore Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ledgemore Lane, Great Gaddesden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 19 May 2025 at 09:13.

Hertfordshire County Council logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Leighton Buzzard Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Leighton Buzzard Road, Water End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 12 Dec 2024 at 09:13.

Hertfordshire County Council logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Leighton Buzzard Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Leighton Buzzard Road, Water End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Mar 2025 at 11:43.

Hertfordshire County Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Luton Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Luton Lane, Redbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 20 Nov 2024 at 11:27.

Hertfordshire County Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Kinsbourne Green Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kinsbourne Green Lane, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 20 Nov 2024 at 11:24.

Hertfordshire County Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Kinsbourne Green Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kinsbourne Green Lane, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 27 Nov 2024 at 10:17.

Hertfordshire County Council logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Kinsbourne Green Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kinsbourne Green Lane, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 20 Mar 2025 at 08:39.

Cadent Gas logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Tavistock Crescent

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Tavistock Crescent, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 14:00.

Affinity Water logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Russell Rise

Affinity Water are proposing to carry out Utility repair and maintenance works on Russell Rise, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Apr 2025 at 09:50.

Affinity Water logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Biscot Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Biscot Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Mar 2025 at 11:19.

Luton Borough Council logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Black Swan Lane

Luton Borough Council were proposing to carry out Highway repair and maintenance works on Black Swan Lane, Luton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 22 Apr 2025 at 06:13.

Luton Borough Council logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Black Swan Lane

Luton Borough Council were proposing to carry out Highway repair and maintenance works on Black Swan Lane, Luton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 26 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 13 May 2025 at 11:44.

Central Bedfordshire Council logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
The Green

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on The Green, Whipsnade.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 25 Mar 2025 at 14:54.

Central Bedfordshire Council logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
The Green

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on The Green, Whipsnade.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 2 Apr 2025 at 12:54.

Hertfordshire County Council logo
Between
26 and 30 Jun 2025
Details
View Map
Share
Potten End Hill

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Potten End Hill, Great Gaddesden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 27 May 2025 at 15:25.

Hertfordshire County Council logo
Between
27 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Water End Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Water End Road, Potten End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 6 May 2025 at 10:29.

Hertfordshire County Council logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Clements End Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clements End Road, Great Gaddesden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 6 May 2025 at 10:30.

Central Bedfordshire Council logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Pipers Lane

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Pipers Lane, Aley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 20 May 2025 at 14:55.

Affinity Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Dunstable Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Dunstable Road, Luton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 2 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Apr 2025 at 11:58.

Central Bedfordshire Council logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
High Street South

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on High Street South, Dunstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 22 May 2025 at 11:42.

Central Bedfordshire Council logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
High Street South

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on High Street South, Dunstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 28 May 2025 at 11:19.

Central Bedfordshire Council logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
High Street North

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on High Street North, Dunstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 22 May 2025 at 11:41.

Central Bedfordshire Council logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
High Street North

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on High Street North, Dunstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 28 May 2025 at 11:20.

Central Bedfordshire Council logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
High Street North

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on High Street North, Dunstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 19 May 2025 at 07:06.

Cadent Gas logo
LONG TERM
Between
30 Jun and 26 Sep 2025
Details
View Map
Share
Follow
Stratford Road

Cadent Gas are proposing to carry out Utility asset works on Stratford Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 07:14.

Luton Borough Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
St Martins Avenue

Luton Borough Council are proposing to carry out Highway repair and maintenance works on St Martins Avenue, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 28 Apr 2025 at 10:28.

Hertfordshire County Council logo
Between
2 and 4 Jul 2025
Details
View Map
Share
Follow
The Nokes

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Nokes, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 09:49.

Hertfordshire County Council logo
Between
2 and 4 Jul 2025
Details
View Map
Share
Follow
The Nokes

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Nokes, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 2 Jun 2025 at 11:39.

Affinity Water logo
Between
2 and 4 Jul 2025
Details
View Map
Share
Follow
Trowley Hill Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Trowley Hill Road, Flamstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 15 Apr 2025 at 10:00.

Affinity Water logo
Between
5 and 8 Jul 2025
Details
View Map
Share
Follow
Liverpool Road

Affinity Water are proposing to carry out Remedial works on Liverpool Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 Apr 2025 at 13:58.

Affinity Water logo
Between
5 and 7 Jul 2025
Details
View Map
Share
Follow
New Bedford Road

Affinity Water are proposing to carry out Utility repair and maintenance works on New Bedford Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 28 Apr 2025 at 12:37.

Hertfordshire County Council logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Potten End Hill

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Potten End Hill, Great Gaddesden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Apr 2025 at 15:17.

Central Bedfordshire Council logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Dunstable Road

Central Bedfordshire Council were proposing to carry out Highway improvement works on Dunstable Road, Whipsnade.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the verge only.

This roadwork event was last updated by Central Bedfordshire Council on 16 Apr 2025 at 08:56.

Affinity Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Kimpton Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Kimpton Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Apr 2025 at 11:03.

Affinity Water logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Kimpton Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Kimpton Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Apr 2025 at 10:50.

Luton Borough Council logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Milton Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Milton Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Luton Borough Council on 3 May 2025 at 10:22.

Central Bedfordshire Council logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Tring Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Tring Road, Dunstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 14 Apr 2025 at 15:47.

Luton Borough Council logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Roman Road

Luton Borough Council were proposing to carry out Highway repair and maintenance works on Roman Road, Luton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 10 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 11 Apr 2025 at 09:27.

Hertfordshire County Council logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Water End Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Water End Road, Potten End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Apr 2025 at 15:16.

Hertfordshire County Council logo
Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Clements End Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clements End Road, Great Gaddesden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Apr 2025 at 15:10.

Central Bedfordshire Council logo
Between
10 and 14 Jul 2025
Details
View Map
Share
Follow
Tring Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Tring Road, Dunstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 15 Apr 2025 at 10:11.

Central Bedfordshire Council logo
Between
10 and 14 Jul 2025
Details
View Map
Share
Follow
Tring Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Tring Road, Dunstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 17 Apr 2025 at 10:11.

Hertfordshire County Council logo
Between
12 and 14 Jul 2025
Details
View Map
Share
Follow
Luton Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Luton Lane, Redbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 28 May 2025 at 18:36.

Hertfordshire County Council logo
Between
12 and 14 Jul 2025
Details
View Map
Share
Follow
Kinsbourne Green Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kinsbourne Green Lane, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 28 May 2025 at 19:55.

UK Power Networks Eastern & London logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Trowley Bottom

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Trowley Bottom, Flamstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 10:21.

Affinity Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
High Street

Affinity Water were proposing to carry out Remedial works on High Street, Harpenden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 16 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 28 May 2025 at 10:46.

Central Bedfordshire Council logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Buckwood Lane

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Buckwood Lane, Studham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 15 Apr 2025 at 07:15.

Central Bedfordshire Council logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Buckwood Lane

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Buckwood Lane, Studham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 24 Apr 2025 at 20:33.

Cadent Gas logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Leagrave Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Leagrave Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 May 2025 at 11:34.

Luton Borough Council logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Humberstone Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Humberstone Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 5 May 2025 at 08:13.

Hertfordshire County Council logo
Between
18 and 22 Jul 2025
Details
View Map
Share
Follow
Dodds Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dodds Lane, Great Gaddesden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 26 Mar 2025 at 10:50.

Hertfordshire County Council logo
Between
21 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Three Cherry Trees Lane

Hertfordshire County Council are proposing to carry out Highway improvement works on Three Cherry Trees Lane, Hemel Hempstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 23 May 2025 at 09:30.

Central Bedfordshire Council logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Buckwood Lane

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Buckwood Lane, Studham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 28 Apr 2025 at 13:15.

Central Bedfordshire Council logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Dunstable Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Dunstable Road, Whipsnade.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Central Bedfordshire Council on 16 Apr 2025 at 10:12.

Central Bedfordshire Council logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Dunstable Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Dunstable Road, Whipsnade.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Central Bedfordshire Council on 24 Apr 2025 at 20:32.

Affinity Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Russell Rise

Affinity Water are proposing to carry out Utility repair and maintenance works on Russell Rise, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 May 2025 at 07:19.

Central Bedfordshire Council logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Priory Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Priory Road, Dunstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 15 Apr 2025 at 08:34.

Central Bedfordshire Council logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Priory Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Priory Road, Dunstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 17 Apr 2025 at 12:13.

Cadent Gas logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Leagrave Road

Cadent Gas are proposing to carry out Utility asset works on Leagrave Road, Luton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 16:12.

Cadent Gas logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Dunstable Road

Cadent Gas are proposing to carry out Utility asset works on Dunstable Road, Luton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 10:30.

Cadent Gas logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Hitchin Road

Cadent Gas are proposing to carry out Utility asset works on Hitchin Road, Luton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 16:38.

Cadent Gas logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Lewsey Road

Cadent Gas were proposing to carry out Utility asset works on Lewsey Road, Luton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 08:19.

Cadent Gas logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Wilbury Drive

Cadent Gas are proposing to carry out Utility asset works on Wilbury Drive, Dunstable.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 15:04.

Cadent Gas logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Poynters Road

Cadent Gas are proposing to carry out Utility asset works on Poynters Road, Dunstable.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 15:05.

Cadent Gas logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Poynters Road

Cadent Gas are proposing to carry out Utility asset works on Poynters Road, Dunstable.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 14:29.

Cadent Gas logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Brunel Road

Cadent Gas are proposing to carry out Utility asset works on Brunel Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Apr 2025 at 13:38.

Cadent Gas logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Poynters Road

Cadent Gas are proposing to carry out Utility asset works on Poynters Road, Luton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 16:30.

Cadent Gas logo
LONG TERM
Between
23 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Leagrave Road

Cadent Gas are proposing to carry out Utility asset works on Leagrave Road, Luton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Dec 2024 at 15:56.

Cadent Gas logo
LONG TERM
Between
23 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Leagrave Road

Cadent Gas are proposing to carry out Utility asset works on Leagrave Road, Luton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Jan 2025 at 12:12.

Cadent Gas logo
Between
23 Jul and 8 Aug 2025
Details
View Map
Share
Hitchin Road

Cadent Gas were proposing to carry out Utility asset works on Hitchin Road, Luton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 13:04.

Hertfordshire County Council logo
Between
25 and 27 Jul 2025
Details
View Map
Share
Follow
Nettleden Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Nettleden Road, Frithsden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 1 Apr 2025 at 14:18.

Hertfordshire County Council logo
Between
25 and 27 Jul 2025
Details
View Map
Share
Follow
Nettleden Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Nettleden Road, Frithsden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 10 Apr 2025 at 09:46.

Hertfordshire County Council logo
Between
25 and 27 Jul 2025
Details
View Map
Share
Follow
Frithsden Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Frithsden Lane, Potten End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 1 Apr 2025 at 14:18.

Hertfordshire County Council logo
Between
25 and 27 Jul 2025
Details
View Map
Share
Follow
Frithsden Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Frithsden Lane, Potten End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 4 Apr 2025 at 15:04.

Hertfordshire County Council logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Luton Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Luton Lane, Redbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 08:59.

Hertfordshire County Council logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Luton Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Luton Lane, Redbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 3 Jun 2025 at 11:14.

Hertfordshire County Council logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Kinsbourne Green Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kinsbourne Green Lane, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 08:58.

Hertfordshire County Council logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Kinsbourne Green Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kinsbourne Green Lane, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 08:57.

Central Bedfordshire Council logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Clayhall Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Clayhall Road, Kensworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 29 Apr 2025 at 12:24.

Central Bedfordshire Council logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Clayhall Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Clayhall Road, Kensworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 12 May 2025 at 07:41.

Central Bedfordshire Council logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Dunstable Road

Central Bedfordshire Council are proposing to carry out Highway improvement works on Dunstable Road, Caddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 1 May 2025 at 13:49.

Hertfordshire County Council logo
Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
Dodds Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Dodds Lane, Great Gaddesden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 29 May 2025 at 12:43.

Central Bedfordshire Council logo
Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
Westfield Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Westfield Road, Dunstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 29 Apr 2025 at 12:07.

Central Bedfordshire Council logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Buckwood Lane

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Buckwood Lane, Studham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 29 Apr 2025 at 10:20.

Central Bedfordshire Council logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Buckwood Lane

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Buckwood Lane, Studham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 29 Apr 2025 at 12:52.

Central Bedfordshire Council logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Buckwood Lane

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Buckwood Lane, Studham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 12 May 2025 at 07:42.

BT logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Harling Road

BT are proposing to carry out Utility asset works on Harling Road, Eaton Bray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 12 May 2025 at 07:41.

Affinity Water logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Russell Rise

Affinity Water are proposing to carry out Utility repair and maintenance works on Russell Rise, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 28 May 2025 at 09:23.

Affinity Water logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Russell Rise

Affinity Water are proposing to carry out Utility repair and maintenance works on Russell Rise, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 28 May 2025 at 14:34.

Affinity Water logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Chiltern Rise

Affinity Water are proposing to carry out Utility repair and maintenance works on Chiltern Rise, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 29 May 2025 at 11:21.

Affinity Water logo
Between
3 and 5 Aug 2025
Details
View Map
Share
Follow
Biscot Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Biscot Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 31 Mar 2025 at 09:45.

Cadent Gas logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Stanton Road

Cadent Gas are proposing to carry out Utility asset works on Stanton Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 15:00.

Cadent Gas logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Humphrys Road

Cadent Gas were proposing to carry out New service connection on Humphrys Road, Dunstable.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 May 2025 at 17:02.

Cadent Gas logo
Between
5 and 29 Aug 2025
Details
View Map
Share
Follow
Westfield Road

Cadent Gas are proposing to carry out Utility asset works on Westfield Road, Harpenden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:39.

Cadent Gas logo
Between
5 and 29 Aug 2025
Details
View Map
Share
Follow
Westfield Road

Cadent Gas are proposing to carry out Utility asset works on Westfield Road, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Apr 2025 at 15:01.

Cadent Gas logo
Between
5 and 29 Aug 2025
Details
View Map
Share
Follow
Lower Luton Road

Cadent Gas are proposing to carry out Utility asset works on Lower Luton Road, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:37.

Cadent Gas logo
Between
5 and 29 Aug 2025
Details
View Map
Share
Follow
Lower Luton Road

Cadent Gas are proposing to carry out Utility asset works on Lower Luton Road, Harpenden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Apr 2025 at 15:06.

Luton Borough Council logo
Between
8 and 11 Aug 2025
Details
View Map
Share
Follow
Cosgrove Way

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Cosgrove Way, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 28 May 2025 at 10:12.

Central Bedfordshire Council logo
Between
11 and 29 Aug 2025
Details
View Map
Share
Follow
Meadway

Central Bedfordshire Council are proposing to carry out Highway improvement works on Meadway, Dunstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 28 Apr 2025 at 12:34.

Luton Borough Council logo
LONG TERM
Between
11 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Cavendish Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Cavendish Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 4 May 2025 at 11:19.

Cadent Gas logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Humphrys Road

Cadent Gas are proposing to carry out New service connection on Humphrys Road, Dunstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 12:03.

Affinity Water logo
Between
12 and 14 Aug 2025
Details
View Map
Share
John Street

Affinity Water were proposing to carry out Utility repair and maintenance works on John Street, Luton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2025 and run through until 14 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 12 May 2025 at 13:34.

Luton Borough Council logo
Between
12 and 15 Aug 2025
Details
View Map
Share
Follow
Hatters Way

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Hatters Way, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 28 May 2025 at 12:12.

Central Bedfordshire Council logo
Between
12 and 29 Aug 2025
Details
View Map
Share
Follow
Borough Road

Central Bedfordshire Council are proposing to carry out Highway improvement works on Borough Road, Dunstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 28 Apr 2025 at 13:13.

Central Bedfordshire Council logo
Between
12 and 29 Aug 2025
Details
View Map
Share
Follow
Friars Walk

Central Bedfordshire Council are proposing to carry out Highway improvement works on Friars Walk, Dunstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 28 Apr 2025 at 12:18.

Affinity Water logo
Between
12 and 14 Aug 2025
Details
View Map
Share
New Bedford Road

Affinity Water were proposing to carry out Utility repair and maintenance works on New Bedford Road, Luton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2025 and run through until 14 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 May 2025 at 10:08.

Luton Borough Council logo
Between
12 and 14 Aug 2025
Details
View Map
Share
Follow
Clydesdale Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Clydesdale Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 24 Apr 2025 at 11:34.

Central Bedfordshire Council logo
Between
13 and 29 Aug 2025
Details
View Map
Share
Luton Road

Central Bedfordshire Council were proposing to carry out Highway improvement works on Luton Road, Markyate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 8 May 2025 at 09:40.

Central Bedfordshire Council logo
Between
13 and 29 Aug 2025
Details
View Map
Share
Follow
Luton Road

Central Bedfordshire Council are proposing to carry out Highway improvement works on Luton Road, Markyate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 8 May 2025 at 12:53.

Central Bedfordshire Council logo
Between
13 and 29 Aug 2025
Details
View Map
Share
Follow
Markyate Road

Central Bedfordshire Council are proposing to carry out Highway improvement works on Markyate Road, Slip End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 30 Apr 2025 at 09:16.

Affinity Water logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
John Street

Affinity Water are proposing to carry out Utility repair and maintenance works on John Street, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 12 May 2025 at 09:37.

Luton Borough Council logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Follow
Sundon Park Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Sundon Park Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 24 Apr 2025 at 12:02.

Luton Borough Council logo
Between
15 and 18 Aug 2025
Details
View Map
Share
Follow
Cosgrove Way

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Cosgrove Way, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 28 May 2025 at 10:24.

Luton Borough Council logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
Carisbrooke Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Carisbrooke Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 25 Apr 2025 at 13:32.

Luton Borough Council logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
Wingate Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Wingate Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 25 Apr 2025 at 11:56.

Luton Borough Council logo
Between
17 and 19 Aug 2025
Details
View Map
Share
Follow
Pastures Way

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Pastures Way, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 25 Apr 2025 at 13:52.

Luton Borough Council logo
Between
17 and 19 Aug 2025
Details
View Map
Share
Follow
Kestrel Way

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Kestrel Way, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 25 Apr 2025 at 13:44.

Affinity Water logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Roundwood Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Roundwood Lane, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 28 Apr 2025 at 14:22.

Hertfordshire County Council logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Kinsbourne Green Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kinsbourne Green Lane, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 25 Apr 2025 at 16:06.

Hertfordshire County Council logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Kinsbourne Green Lane

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kinsbourne Green Lane, Harpenden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 25 Apr 2025 at 10:23.

Luton Borough Council logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Montrose Avenue

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Montrose Avenue, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 25 Apr 2025 at 14:07.

Central Bedfordshire Council logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Sandringham Drive

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Sandringham Drive, Houghton Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 15 May 2025 at 12:55.

Central Bedfordshire Council logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Sandringham Drive

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Sandringham Drive, Houghton Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 3 Jun 2025 at 10:31.

Central Bedfordshire Council logo
Between
19 and 21 Aug 2025
Details
View Map
Share
Follow
West Hyde Road

Central Bedfordshire Council are proposing to carry out Highway improvement works on West Hyde Road, Hyde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 13 May 2025 at 12:15.

Central Bedfordshire Council logo
Between
19 and 21 Aug 2025
Details
View Map
Share
Follow
West Hyde Road

Central Bedfordshire Council are proposing to carry out Highway improvement works on West Hyde Road, Hyde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 30 May 2025 at 12:17.

Luton Borough Council logo
Between
19 and 21 Aug 2025
Details
View Map
Share
Follow
Cheapside

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Cheapside, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 25 Apr 2025 at 14:40.

Luton Borough Council logo
Between
19 and 21 Aug 2025
Details
View Map
Share
Follow
Silver Street

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Silver Street, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 25 Apr 2025 at 14:29.

Luton Borough Council logo
Between
19 and 21 Aug 2025
Details
View Map
Share
Follow
Guildford Street

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Guildford Street, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 25 Apr 2025 at 14:44.

Luton Borough Council logo
Between
19 and 21 Aug 2025
Details
View Map
Share
Follow
Studley Road

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Studley Road, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 12 May 2025 at 13:30.

Hertfordshire County Council logo
Between
20 and 23 Aug 2025
Details
View Map
Share
Follow
Leighton Buzzard Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Leighton Buzzard Road, Water End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 28 Apr 2025 at 09:18.

Luton Borough Council logo
Between
26 and 29 Aug 2025
Details
View Map
Share
Follow
Whitehill Avenue

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Whitehill Avenue, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 23 May 2025 at 17:43.

Luton Borough Council logo
Between
29 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Cosgrove Way

Luton Borough Council are proposing to carry out Highway repair and maintenance works on Cosgrove Way, Luton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Luton Borough Council on 28 May 2025 at 10:26.


Roadworks Map near to Sebright Road, ST. ALBANS, AL3 8RT (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 11:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Sebright Road, ST. ALBANS, AL3 8RT (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.