ROADWORKS SUMMARY
Roe End Lane, ST. ALBANS, AL3 8AH
Introduction
View current and future planned roadworks and road closures for Roe End Lane, AL3 8AH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Roe End Lane, ST. ALBANS, AL3 8AH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Roe End Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Mar 2025
Hertfordshire County Council are carrying out Highway repair and maintenance works on Hempstead Lane, Potten End.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 May 2024 at 15:00 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 17 Sep 2024 at 08:42.
20 Dec 2024
Central Bedfordshire Council are carrying out Highway improvement works on Newlands Road, Hyde.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 June 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Central Bedfordshire Council on 13 Nov 2024 at 13:33.
Monday
Cadent Gas are carrying out Utility asset works on Harpenden Lane, Redbourn.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 October 2024 at 09:44 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 09:52.
Monday
Murphy Power Distribution are carrying out Utility asset works on Great Road, Hemel Hempstead.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:30 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 1 Nov 2024 at 09:06.
Tomorrow
Cadent Gas are carrying out Utility asset works on Crown Street, Redbourn.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 16:36 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 15:09.
Tomorrow
Murphy Power Distribution were proposing to carry out New service connection on Piccotts End Lane, Hemel Hempstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 13 Sep 2024 at 15:48.
11 Nov and 13 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Crown Street, Redbourn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:28.
Saturday
Buckinghamshire Council are carrying out Highway improvement works on Studham Lane, Dagnall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:30 and could run through until 23 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 20 Nov 2024 at 10:09.
18 and 29 Nov 2024
Central Bedfordshire Council are proposing to carry out Section 58 on Meadway, Dunstable.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 27 Aug 2024 at 11:21.
2 Dec 2024
Central Bedfordshire Council are carrying out Section 58 on Meadway, Dunstable.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 08:30 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 21 Nov 2024 at 08:31.
25 and 29 Nov 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on The Common, Potten End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 Oct 2024 at 09:28.
25 and 29 Nov 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on The Common, Potten End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 10:18.
25 Nov and 20 Dec 2024
Affinity Water were proposing to carry out Utility asset works on Dodds Lane, Great Gaddesden.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 7 Nov 2024 at 13:06.
25 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Crown Street, Redbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:48.
25 and 28 Nov 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Cowper Street, Luton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 23 Jun 2024 at 09:37.
25 Nov and 6 Dec 2024
Central Bedfordshire Council are proposing to carry out Section 58 on Friars Walk, Dunstable.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 28 Aug 2024 at 07:36.
25 Nov and 2 Dec 2024
Central Bedfordshire Council are proposing to carry out Section 58 on Friars Walk, Dunstable.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 4 Nov 2024 at 17:25.
26 and 29 Nov 2024
Luton Borough Council are proposing to carry out Highway repair and maintenance works on Castle Street, Luton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Luton Borough Council on 28 Aug 2024 at 12:20.
2 and 14 Dec 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on Cherry Tree Lane, Redbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 13:42.
2 and 14 Dec 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on Cherry Tree Lane, Redbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 Nov 2024 at 11:12.
2 and 4 Dec 2024
Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Lower Harpenden Road, Hyde.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 16 Jul 2024 at 09:09.
2 and 4 Dec 2024
BT are proposing to carry out Utility asset works on Harling Road, Eaton Bray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the verge only.
This roadwork event was last updated by BT on 9 Sep 2024 at 11:42.
2 and 4 Dec 2024
BT are proposing to carry out Utility asset works on Harling Road, Eaton Bray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the verge only.
This roadwork event was last updated by BT on 12 Nov 2024 at 12:23.
2 and 13 Dec 2024
Central Bedfordshire Council are proposing to carry out Section 58 on Borough Road, Dunstable.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 27 Aug 2024 at 11:21.
2 and 9 Dec 2024
Central Bedfordshire Council are proposing to carry out Section 58 on Borough Road, Dunstable.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 4 Nov 2024 at 17:20.
2 and 6 Dec 2024
Luton Borough Council were proposing to carry out Highway repair and maintenance works on Malvern Road, Luton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Luton Borough Council on 18 Sep 2024 at 11:09.
2 and 6 Dec 2024
Vodafone were proposing to carry out Utility asset works on Back Street, Luton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Vodafone on 30 Oct 2024 at 10:05.
3 and 5 Dec 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Hastings Street, Luton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 25 Sep 2024 at 13:02.
3 and 5 Dec 2024
Affinity Water were proposing to carry out Utility repair and maintenance works on Hastings Street, Luton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 11 Oct 2024 at 10:00.
9 and 13 Dec 2024
Central Bedfordshire Council are proposing to carry out Highway improvement works on Clements End Road, Studham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Central Bedfordshire Council on 23 Oct 2024 at 10:23.
9 and 13 Dec 2024
Central Bedfordshire Council are proposing to carry out Highway improvement works on Clements End Road, Studham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Central Bedfordshire Council on 23 Oct 2024 at 12:12.
16 Dec 2024 and 3 Jan 2025
Murphy Power Distribution were proposing to carry out Utility asset works on Queensway, Hemel Hempstead.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 3 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 16 Sep 2024 at 14:33.
16 and 20 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Common Road, Kensworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 7 Oct 2024 at 14:56.
6 and 31 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Dodds Lane, Great Gaddesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 15:51.
6 and 9 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Tavistock Crescent, Luton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 23 Jun 2024 at 09:30.
6 and 10 Jan 2025
Luton Borough Council are proposing to carry out Highway repair and maintenance works on Wellington Street, Luton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Luton Borough Council on 2 Oct 2024 at 13:48.
9 and 13 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Luton Lane, Redbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 18 Oct 2024 at 12:11.
9 and 13 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Kinsbourne Green Lane, Harpenden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 18 Oct 2024 at 12:09.
13 and 17 Jan 2025
Luton Borough Council are proposing to carry out Highway repair and maintenance works on Strathmore Avenue, Luton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Luton Borough Council on 14 Oct 2024 at 10:13.
13 and 16 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Baker Street, Luton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 23 Jun 2024 at 09:14.
13 and 24 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on High Street North, Dunstable.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 7 Oct 2024 at 13:58.
20 and 22 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Willow Way, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 09:07.
20 and 22 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Willow Way, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 09:11.
20 and 22 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Nokes, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 09:06.
20 and 22 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Nokes, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 09:09.
20 and 22 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Half Moon Meadow, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 14:56.
20 and 22 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Half Moon Meadow, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 08:55.
20 and 22 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Puddephats Lane, Markyate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 Oct 2024 at 09:33.
20 and 23 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on May Street, Luton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 23 Jun 2024 at 09:27.
22 and 24 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Nettleden Road, Frithsden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 Oct 2024 at 09:37.
22 and 24 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Nettleden Road, Frithsden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 4 Nov 2024 at 08:44.
23 and 27 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Callisto Court, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 17 Oct 2024 at 08:59.
23 and 27 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Callisto Court, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 09:26.
24 and 28 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Austins Place, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 14:34.
24 and 28 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Austins Place, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 12:27.
27 and 31 Jan 2025
Luton Borough Council are proposing to carry out Highway repair and maintenance works on Strathmore Avenue, Luton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Luton Borough Council on 4 Nov 2024 at 09:51.
30 Jan and 3 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Harepark Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 16:19.
30 Jan and 3 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Harepark Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 11:37.
30 Jan and 3 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Robbs Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 16:22.
30 Jan and 3 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Robbs Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 11:37.
31 Jan and 4 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Peterlee Court, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 16:04.
31 Jan and 4 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Peterlee Court, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 11:36.
31 Jan and 4 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cleves Road, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 11:03.
31 Jan and 4 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Potten End Hill, Great Gaddesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:25.
31 Jan and 4 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Potten End Hill, Great Gaddesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 11 Nov 2024 at 11:14.
3 and 5 Feb 2025
Affinity Water were proposing to carry out Remedial works on Highfield Lane, Hemel Hempstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 7 Nov 2024 at 08:08.
3 and 5 Feb 2025
Affinity Water are proposing to carry out Remedial works on Highfield Lane, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 11:05.
3 and 5 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Parr Crescent, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 16:07.
3 and 5 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Parr Crescent, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 11:35.
3 and 5 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chad Lane, Flamstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:13.
3 and 5 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Chad Lane, Flamstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 08:55.
3 and 5 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Between Chad Lane And Windmill Road, Flamstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:12.
3 and 5 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Between Chad Lane And Windmill Road, Flamstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 08:54.
3 and 5 Feb 2025
Central Bedfordshire Council were proposing to carry out Highway repair and maintenance works on Brive Road, Dunstable.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 3 Oct 2024 at 13:08.
3 and 5 Feb 2025
Luton Borough Council are proposing to carry out Highway repair and maintenance works on Brantwood Road, Luton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Luton Borough Council on 4 Nov 2024 at 13:44.
3 and 28 Feb 2025
Central Bedfordshire Council were proposing to carry out Highway repair and maintenance works on High Street South, Dunstable.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 18 Nov 2024 at 14:28.
3 and 28 Feb 2025
Central Bedfordshire Council are proposing to carry out Highway improvement works on High Street South, Dunstable.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 13 Nov 2024 at 13:26.
3 and 28 Feb 2025
Central Bedfordshire Council were proposing to carry out Highway improvement works on High Street South, Dunstable.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 18 Nov 2024 at 14:22.
3 and 28 Feb 2025
Central Bedfordshire Council were proposing to carry out Highway repair and maintenance works on Ashton Square, Dunstable.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 18 Nov 2024 at 14:12.
3 and 12 Feb 2025
Central Bedfordshire Council were proposing to carry out Highway repair and maintenance works on Friars Walk, Dunstable.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 5 Nov 2024 at 09:31.
3 and 28 Feb 2025
Central Bedfordshire Council were proposing to carry out Highway repair and maintenance works on Friars Walk, Dunstable.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 6 Nov 2024 at 10:15.
3 and 28 Feb 2025
Central Bedfordshire Council were proposing to carry out Highway improvement works on High Street South, Dunstable.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 18 Nov 2024 at 14:19.
3 and 28 Feb 2025
Central Bedfordshire Council were proposing to carry out Highway improvement works on West Street, Dunstable.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 18 Nov 2024 at 14:06.
3 and 11 Feb 2025
Central Bedfordshire Council were proposing to carry out Highway improvement works on West Street, Dunstable.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 11 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 20 Nov 2024 at 11:17.
3 and 11 Feb 2025
Central Bedfordshire Council are proposing to carry out Highway improvement works on West Street, Dunstable.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 21 Nov 2024 at 12:08.
3 and 11 Feb 2025
Central Bedfordshire Council are proposing to carry out Highway improvement works on West Street, Dunstable.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 21 Nov 2024 at 14:28.
4 and 6 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Aragon Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:55.
4 and 6 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Catherine Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 16:01.
4 and 6 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Northaw Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:52.
4 and 6 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Jane Close, Hemel Hempstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Oct 2024 at 15:49.
4 and 28 Feb 2025
Central Bedfordshire Council were proposing to carry out Highway improvement works on High Street South, Dunstable.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 20 Nov 2024 at 12:09.
10 and 12 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Water End Road, Potten End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 09:02.
10 and 12 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Water End Road, Potten End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 08:48.
10 and 12 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Leighton Buzzard Road, Water End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 10:16.
10 and 13 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Byslips Road, Studham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 12 Nov 2024 at 14:38.
10 and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Dunstable Road, Studham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 09:44.
10 and 12 Feb 2025
Luton Borough Council are proposing to carry out Highway repair and maintenance works on St Peters Road, Luton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Luton Borough Council on 4 Nov 2024 at 13:49.
10 and 13 Feb 2025
Central Bedfordshire Council were proposing to carry out Highway repair and maintenance works on Ashton Square, Dunstable.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 13 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 20 Nov 2024 at 14:38.
11 and 25 Feb 2025
Central Bedfordshire Council were proposing to carry out Highway improvement works on High Street South, Dunstable.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 February 2025 and run through until 25 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 20 Nov 2024 at 12:50.
11 and 25 Feb 2025
Central Bedfordshire Council were proposing to carry out Highway improvement works on High Street South, Dunstable.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 February 2025 and run through until 25 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 20 Nov 2024 at 14:45.
11 and 28 Feb 2025
Central Bedfordshire Council are proposing to carry out Highway improvement works on High Street South, Dunstable.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 21 Nov 2024 at 12:07.
11 and 28 Feb 2025
Central Bedfordshire Council are proposing to carry out Highway improvement works on High Street South, Dunstable.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 21 Nov 2024 at 14:34.
11 and 28 Feb 2025
Central Bedfordshire Council were proposing to carry out Highway improvement works on High Street South, Dunstable.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Central Bedfordshire Council on 21 Nov 2024 at 10:28.
13 and 17 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clements End Road, Great Gaddesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 09:42.
14 and 18 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cowper Rise, Markyate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Oct 2024 at 13:52.
14 and 18 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Cowper Road, Markyate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Oct 2024 at 13:53.
17 and 19 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clements End Road, Great Gaddesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 18 Nov 2024 at 09:36.
17 and 21 Feb 2025
Central Bedfordshire Council are proposing to carry out Highway improvement works on Dunstable Road, Caddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 15 May 2024 at 10:53.
17 and 19 Feb 2025
Central Bedfordshire Council were proposing to carry out Highway repair and maintenance works on High Street South, Dunstable.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 21 Nov 2024 at 10:26.
17 and 19 Feb 2025
Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on High Street South, Dunstable.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 21 Nov 2024 at 12:09.
17 and 19 Feb 2025
Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on High Street South, Dunstable.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Central Bedfordshire Council on 21 Nov 2024 at 14:33.
17 and 19 Feb 2025
Luton Borough Council are proposing to carry out Highway repair and maintenance works on Ferndale Road, Luton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Luton Borough Council on 4 Nov 2024 at 13:58.
17 Feb and 28 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Stratford Road, Luton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 11:37.
18 and 20 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Leighton Buzzard Road, Water End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 Nov 2024 at 08:28.
18 and 21 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Leighton Buzzard Road, Water End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 Nov 2024 at 14:51.
Roadworks Map near to Roe End Lane, ST. ALBANS, AL3 8AH
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.