ROADWORKS SUMMARY
Acton Lane, LONDON, W3 8PE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Acton Lane, W3 8PE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Acton Lane, LONDON, W3 8PE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Acton Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Tideway Tunnel logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Chelsea Embankment

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Chelsea Embankment, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2020 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 15 Feb 2024 at 15:50.

LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Hartington Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Hartington Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2020 at 07:00 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:39.

LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Winchester Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Winchester Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2020 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:53.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Lion Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Lion Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:39.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Copthall Gardens

London Borough Of Richmond Upon Thames are carrying out roadworks on Copthall Gardens, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:26.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Staten Gardens

London Borough Of Richmond Upon Thames are carrying out roadworks on Staten Gardens, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:40.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Station Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:52.

LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Egerton Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Egerton Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:27.

LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Carrington Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Carrington Road, Richmond.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:54.

LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Meadlands Drive

London Borough Of Richmond Upon Thames are carrying out roadworks on Meadlands Drive, Petersham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:40.

LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Amyand Park Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Amyand Park Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:25.

Thames Tideway Tunnel logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Trinity Road

Thames Tideway Tunnel are carrying out Utility asset works on Trinity Road, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 March 2021 at 14:50 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 1 Jul 2024 at 10:28.

London Borough Of Ealing logo
LONG TERM
Until
18 May 2025
Details
View Map
Share
Follow
Friary Road

London Borough Of Ealing are carrying out Highway improvement works on Friary Road, Acton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2021 at 00:00 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 08:28.

London Borough Of Wandsworth logo
LONG TERM
Until
24 Feb 2026
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2021 at 08:00 and could run through until 24 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Feb 2024 at 12:14.

Transport for London (TfL) logo
LONG TERM
Between
19 Dec 2022 and 18 Dec 2024
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out roadworks on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2022 and could run through until 18 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2024 at 09:36.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Sloane Street

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 January 2023 at 08:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 9 Jan 2023 at 09:41.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Sloane Terrace

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Terrace, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:04.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Ellis Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Ellis Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 15:53.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Pont Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Pont Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:15.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Cadogan Place

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Cadogan Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:15.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Harriet Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Harriet Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:04.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Cadogan Gardens

Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Cadogan Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 May 2023 at 07:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 15 May 2023 at 07:01.

Thames Tideway Tunnel logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
York Road

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on York Road, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 May 2023 at 08:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 2 Jul 2024 at 08:06.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
9 Feb 2025
Details
View Map
Share
Follow
Hammersmith Bridge Road

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Bridge Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 August 2023 at 23:01 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 20 May 2024 at 11:32.

Transport for London (TfL) logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Manor Road

Transport for London (TfL) are carrying out Highway improvement works on Manor Road, Richmond.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 September 2023 at 08:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 14:19.

HS2 logo
LONG TERM
Until
18 Nov 2024
Details
View Map
Share
Follow
Bennetts Avenue

HS2 are carrying out Utility asset works on Bennetts Avenue, Greenford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2023 at 09:00 and could run through until 18 November 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 31 Oct 2024 at 13:52.

Transport for London (TfL) logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Pembroke Road

Transport for London (TfL) are carrying out Highway improvement works on Pembroke Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2023 at 08:00 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2023 at 08:59.

Thames Water logo
LONG TERM
Between
9 Dec 2023 and 10 Dec 2024
Details
View Map
Share
Follow
Du Cane Road

Thames Water are proposing to carry out Utility repair and maintenance works on Du Cane Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2023 and could run through until 10 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Nov 2023 at 14:09.

City Of Westminster logo
LONG TERM
Until
23 Nov 2024
Details
View Map
Share
Follow
Fernhead Road

City Of Westminster are carrying out Highway repair and maintenance works on Fernhead Road, Harrow Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 12:30 and could run through until 23 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 18 Oct 2024 at 11:53.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
9 Feb 2025
Details
View Map
Share
Follow
Hammersmith Bridge

London Borough Of Hammersmith & Fulham are carrying out Highway improvement works on Hammersmith Bridge, Barnes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 March 2024 at 00:00 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Mar 2024 at 07:34.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
1 Mar 2024 and 9 Feb 2025
Details
View Map
Share
Follow
Hammersmith Bridge

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Hammersmith Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Mar 2024 at 11:02.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
1 Mar 2024 and 9 Feb 2025
Details
View Map
Share
Follow
Hammersmith Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Hammersmith Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Mar 2024 at 10:58.

HS2 logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
Ruskin Gardens

HS2 are carrying out Utility asset works on Ruskin Gardens, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 11 November 2024. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 23 Oct 2024 at 11:50.

HS2 logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
Brentham Way

HS2 are carrying out Utility asset works on Brentham Way, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 11 November 2024. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 8 Oct 2024 at 13:07.

HS2 logo
LONG TERM
Until
12 Nov 2024
Details
View Map
Share
Follow
Brunswick Road

HS2 are carrying out Utility asset works on Brunswick Road, Ealing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 12 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 4 Nov 2024 at 10:34.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 22:00 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:39.

UK Power Networks Eastern & London logo
LONG TERM
Until
7 Dec 2024
Details
View Map
Share
Follow
Greencroft Gardens

UK Power Networks Eastern & London are carrying out Utility asset works on Greencroft Gardens, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 April 2024 at 09:00 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 Oct 2024 at 07:08.

Thames Water logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
College Road

Thames Water are carrying out Utility asset works on College Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 April 2024 at 09:10 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 18:12.

LONG TERM
Between
5 May and 1 Dec 2024
Details
View Map
Share
Follow
Station Approach

London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Station Approach, Kew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 17 Apr 2024 at 10:20.

HS2 logo
LONG TERM
Until
18 Nov 2024
Details
View Map
Share
Follow
Oxford Road

HS2 are carrying out Section 50 on Oxford Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2024 at 19:00 and could run through until 18 November 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 10 Oct 2024 at 11:30.

HS2 logo
LONG TERM
Until
18 Nov 2024
Details
View Map
Share
Follow
Oxford Road

HS2 are carrying out Section 50 on Oxford Road, Maida Vale, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2024 at 19:00 and could run through until 18 November 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 10 Oct 2024 at 11:30.

HS2 logo
LONG TERM
Until
18 Nov 2024
Details
View Map
Share
Follow
Greville Road

HS2 are carrying out Section 50 on Greville Road, Kilburn, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2024 at 11:00 and could run through until 18 November 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 10 Oct 2024 at 11:31.

Thames Water logo
LONG TERM
Until
24 Nov 2024
Details
View Map
Share
Follow
Acton Lane

Thames Water are carrying out Utility asset works on Acton Lane, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 08:00 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:50.

UK Power Networks Eastern & London logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Winchester Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Winchester Road, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 June 2024 at 11:40 and could run through until 15 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 08:06.

Thames Tideway Tunnel logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Riverwalk F - Carnwath Road To Petrofina Wharf

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Riverwalk F - Carnwath Road To Petrofina Wharf, London.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 24 June 2024 at 08:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 10 Sep 2024 at 11:17.

London Borough Of Wandsworth logo
LONG TERM
Between
24 Jun 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Randall Close

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Randall Close, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 1 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 4 Jul 2024 at 14:24.

Transport for London (TfL) logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are carrying out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 07:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2024 at 17:53.

Transport for London (TfL) logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
South Africa Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 07:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2024 at 17:54.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
8 Jul 2025
Details
View Map
Share
Follow
Lower Sloane Street

Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Lower Sloane Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 08:00 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 8 Jul 2024 at 07:51.

HS2 logo
LONG TERM
Until
14 Nov 2024
Details
View Map
Share
Follow
Lynwood Road

HS2 are carrying out Utility asset works on Lynwood Road, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 07:00 and could run through until 14 November 2024. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 8 Oct 2024 at 13:07.

Thames Water logo
LONG TERM
Until
24 Nov 2024
Details
View Map
Share
Follow
Greenhill Park

Thames Water are carrying out Utility asset works on Greenhill Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 14:35 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:52.

UK Power Networks Eastern & London logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
St John's Wood Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on St John's Wood Park, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 July 2024 at 09:49 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 14:19.

Thames Water logo
LONG TERM
Between
29 Jul and 28 Nov 2024
Details
View Map
Share
Follow
Keevil Drive

Thames Water are proposing to carry out Disconnection or alteration of supply on Keevil Drive, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 28 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 11 Dec 2023 at 09:03.

Thames Water logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Greenford Road

Thames Water are carrying out Utility asset works on Greenford Road, Greenford.

These works are categorised as Major.

The works started on 19 August 2024 at 08:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 09:38.

Transport for London (TfL) logo
LONG TERM
Between
27 Aug 2024 and 14 Jul 2025
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 12:28.

Transport for London (TfL) logo
LONG TERM
Between
27 Aug 2024 and 14 Jul 2025
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are proposing to carry out Highway improvement works on London Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 12:30.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
7 Mar 2025
Details
View Map
Share
Follow
Draycott Avenue

Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Draycott Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 2 Sep 2024 at 09:00.

HS2 logo
LONG TERM
Until
18 Nov 2024
Details
View Map
Share
Follow
Kilburn High Road

HS2 are carrying out Section 50 on Kilburn High Road, Maida Vale, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 00:01 and could run through until 18 November 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 10 Oct 2024 at 11:44.

HS2 logo
LONG TERM
Until
18 Nov 2024
Details
View Map
Share
Follow
Kilburn High Road

HS2 are carrying out Section 50 on Kilburn High Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 00:01 and could run through until 18 November 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 10 Oct 2024 at 11:45.

HS2 logo
LONG TERM
Until
18 Nov 2024
Details
View Map
Share
Follow
Kilburn High Road

HS2 are carrying out Section 50 on Kilburn High Road, Kilburn, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 00:01 and could run through until 18 November 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 10 Oct 2024 at 11:37.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep and 29 Nov 2024
Details
View Map
Share
Follow
Shepherd's Bush Green

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep and 29 Nov 2024
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:09.

Transport for London (TfL) logo
LONG TERM
Until
26 Jun 2025
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are carrying out Highway improvement works on London Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 08:06.

Thames Water logo
LONG TERM
Wednesday
Details
View Map
Share
Earl's Court Road

Thames Water carried out Utility repair and maintenance works on Earl's Court Road, London.

These works were categorised as Major.

A lane was closed for some or all of the period.

The works were originally planned between 16 Sep 2024 and 6 Nov 2024 and were actually completed between 16 Sep 2024 (08:00) and 4 Nov 2024 (08:30). The works impacted the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 10:05.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 May 2024 at 10:42.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 30 May 2025
Details
View Map
Share
Follow
Battersea Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 30 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 May 2024 at 10:41.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Cheyne Walk

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheyne Walk, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2024 at 08:41.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2024 at 08:42.

London Borough Of Wandsworth logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Putney High Street

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Putney High Street, Putney, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 1 Oct 2024 at 13:25.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
St Mark's Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Section 50 on St Mark's Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 20 Sep 2024 at 15:11.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Today
Details
View Map
Share
St Mark's Road

Royal Borough Of Kensington And Chelsea carried out Utility asset works on St Mark's Road, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 23 Sep 2024 and 4 Nov 2024 and were actually completed between 23 Sep 2024 (00:00) and 4 Nov 2024 (09:38). The works impacted the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Nov 2024 at 09:47.

G2 Energy IDNO logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Old Oak Lane

G2 Energy IDNO are carrying out Utility asset works on Old Oak Lane, Park Royal.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 September 2024 at 08:30 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 29 Oct 2024 at 11:50.

UK Power Networks Eastern & London logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Adamson Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Adamson Road, Belsize, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 September 2024 at 09:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 07:12.

London Borough Of Hounslow logo
LONG TERM
Between
27 Sep and 13 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hounslow on 1 Oct 2024 at 14:55.

UK Power Networks Eastern & London logo
LONG TERM
Today
Details
View Map
Share
Canfield Gardens

UK Power Networks Eastern & London carried out Utility asset works on Canfield Gardens, Swiss Cottage, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 27 Sep 2024 and 4 Nov 2024 and were actually completed between 27 Sep 2024 (08:58) and 4 Nov 2024 (12:38). The works impacted the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 12:51.

London Borough Of Wandsworth logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 08:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 23 Oct 2024 at 09:06.

Transport for London (TfL) logo
LONG TERM
Between
30 Sep 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2024 at 12:20.

Transport for London (TfL) logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
Elizabeth Street

Transport for London (TfL) are carrying out Highway improvement works on Elizabeth Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 20:00 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2024 at 09:16.

Transport for London (TfL) logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
Eaton Square

Transport for London (TfL) are carrying out Highway improvement works on Eaton Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 20:00 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2024 at 09:15.

Transport for London (TfL) logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
Lyall Street

Transport for London (TfL) are carrying out Highway improvement works on Lyall Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 20:00 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2024 at 09:15.

Thames Water logo
LONG TERM
Until
17 Nov 2024
Details
View Map
Share
Follow
Mount Road

Thames Water are carrying out Utility repair and maintenance works on Mount Road, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 13:40 and could run through until 17 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 09:51.

G2 Energy IDNO logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Victoria Road

G2 Energy IDNO are carrying out Utility asset works on Victoria Road, Park Royal.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 October 2024 at 08:00 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 29 Oct 2024 at 11:50.

Cadent Gas logo
LONG TERM
Between
7 Oct and 19 Nov 2024
Details
View Map
Share
Boscombe Road

Cadent Gas were proposing to carry out Utility asset works on Boscombe Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 19 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 10:45.

G2 Energy IDNO logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Wales Farm Road

G2 Energy IDNO are carrying out Utility asset works on Wales Farm Road, Acton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 7 Oct 2024 at 08:31.

City Of Westminster logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Luxborough Street

City Of Westminster are carrying out Highway improvement works on Luxborough Street, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 10:00 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 1 Nov 2024 at 13:35.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Harrow Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Harrow Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2024 at 08:57.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Harrow Road

UK Power Networks Eastern & London are carrying out New service connection on Harrow Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 08:21.

Scottish Hydro Electric Power Dis logo
Finishing
Wednesday
Details
View Map
Share
Follow
Burwell Avenue

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Burwell Avenue, Greenford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 October 2024 at 08:00 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Nov 2024 at 13:58.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 11:50.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are carrying out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 October 2024 at 22:00 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 08:37.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 11:51.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are carrying out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 October 2024 at 22:00 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 08:37.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 11:09.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2024 at 12:37.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are carrying out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 October 2024 at 22:00 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 08:38.

Cadent Gas logo
LONG TERM
Between
14 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Worton Road

Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 07:26.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
The Little Boltons

Thames Water are carrying out Utility repair and maintenance works on The Little Boltons, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 09:50 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 16:16.

City Of Westminster logo
LONG TERM
Between
14 Oct 2024 and 31 May 2025
Details
View Map
Share
Knightsbridge

City Of Westminster were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 31 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Aug 2024 at 16:45.

City Of Westminster logo
LONG TERM
Between
14 Oct 2024 and 31 May 2025
Details
View Map
Share
Piccadilly

City Of Westminster were proposing to carry out Highway improvement works on Piccadilly, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 31 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Aug 2024 at 16:50.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Leopold Road

Cadent Gas are carrying out Utility asset works on Leopold Road, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 October 2024 at 09:44 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:15.

G2 Energy IDNO logo
Finishing
Thursday
Details
View Map
Share
Follow
Leamington Park

G2 Energy IDNO are carrying out Utility asset works on Leamington Park, Acton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 14 Oct 2024 at 09:06.

Thames Water logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Bristol Gardens

Thames Water are proposing to carry out Utility asset works on Bristol Gardens, Little Venice, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jul 2024 at 10:35.

Thames Water logo
LONG TERM
Until
24 Nov 2024
Details
View Map
Share
Follow
Connaught Road

Thames Water are carrying out Utility asset works on Connaught Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 10:00 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:51.

London Borough Of Camden logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Hermit Place

London Borough Of Camden are carrying out Highway repair and maintenance works on Hermit Place, Kilburn, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 09:42.

Cadent Gas logo
Between
14 Oct and 11 Nov 2024
Details
View Map
Share
Bridgewater Road

Cadent Gas were proposing to carry out Utility asset works on Bridgewater Road, Wembley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 11 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 10:04.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Lancaster Grove

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Lancaster Grove, Belsize, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Oct 2024 at 10:43.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Buckland Crescent

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Buckland Crescent, Belsize, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Oct 2024 at 10:44.

Cadent Gas logo
LONG TERM
Until
25 Nov 2024
Details
View Map
Share
Follow
Mitchell Way

Cadent Gas are carrying out Utility asset works on Mitchell Way, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 09:20 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 21:30.

Cadent Gas logo
Until
12 Nov 2024
Details
View Map
Share
Follow
Douglas Road

Cadent Gas are carrying out Utility repair and maintenance works on Douglas Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 October 2024 at 13:53 and could run through until 12 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 15:29.

Cadent Gas logo
Until
12 Nov 2024
Details
View Map
Share
Follow
Willesden Lane

Cadent Gas are carrying out Utility repair and maintenance works on Willesden Lane, Kilburn, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 October 2024 at 13:59 and could run through until 12 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 15:29.

UK Power Networks Eastern & London logo
LONG TERM
Between
16 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Hall Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 16:06.

ESP Electricity logo
Until
15 Nov 2024
Details
View Map
Share
Follow
St Thomas's Road

ESP Electricity are carrying out Utility repair and maintenance works on St Thomas's Road, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 October 2024 at 14:18 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 4 Nov 2024 at 12:56.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Sutton Lane

Cadent Gas are carrying out Utility repair and maintenance works on Sutton Lane, Hounslow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 October 2024 at 23:29 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 12:53.

Thames Water logo
LONG TERM
Until
19 Nov 2024
Details
View Map
Share
Follow
Eccleston Street

Thames Water are carrying out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 10:20 and could run through until 19 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 10:46.

UK Power Networks Eastern & London logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Hall Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 October 2024 at 15:30 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 16:12.

Network Rail logo
LONG TERM
Between
19 Oct and 21 Dec 2024
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Oct 2024 at 16:26.

Network Rail logo
LONG TERM
Until
21 Dec 2024
Details
View Map
Share
Follow
Acton Lane

Network Rail are carrying out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 October 2024 at 22:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 Oct 2024 at 09:21.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 13:00.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 16:46.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:42.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 16:45.

Transport for London (TfL) logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are carrying out Highway improvement works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 08:08.

Transport for London (TfL) logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are carrying out Highway improvement works on London Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 08:09.

Transport for London (TfL) logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Cole Park Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Cole Park Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 10:09.

Transport for London (TfL) logo
LONG TERM
Between
21 Oct 2024 and 25 Jul 2025
Details
View Map
Share
Follow
Cole Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cole Park Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Oct 2024 at 16:21.

Transport for London (TfL) logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Cole Park Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Cole Park Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 06:00 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 06:47.

Between
21 Oct and 13 Nov 2024
Details
View Map
Share
Follow
East Sheen Avenue

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on East Sheen Avenue, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 29 Jul 2024 at 15:20.

Between
21 Oct and 13 Nov 2024
Details
View Map
Share
East Sheen Avenue

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on East Sheen Avenue, East Sheen.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 13 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 2 Aug 2024 at 15:42.

Between
21 Oct and 13 Nov 2024
Details
View Map
Share
Follow
East Sheen Avenue

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on East Sheen Avenue, East Sheen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 16 Aug 2024 at 11:34.

Cadent Gas logo
LONG TERM
Between
21 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Worton Road

Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 08:20.

LONG TERM
Between
21 Oct and 11 Dec 2024
Details
View Map
Share
Follow
London Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on London Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 26 Sep 2024 at 07:27.

LONG TERM
Until
11 Dec 2024
Details
View Map
Share
Follow
London Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on London Road, Brentford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Oct 2024 at 09:15.

London Borough Of Hounslow logo
Finishing
Today
Details
View Map
Share
Follow
Augustus Close

London Borough Of Hounslow are proposing to carry out Highway improvement works on Augustus Close, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 15 Oct 2024 at 15:52.

London Borough Of Hounslow logo
Finishing
Today
Details
View Map
Share
Follow
Augustus Close

London Borough Of Hounslow are carrying out Highway improvement works on Augustus Close, Brentford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 28 Oct 2024 at 11:28.

UK Power Networks Eastern & London logo
LONG TERM
Between
21 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Pelham Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Pelham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2024 at 11:38.

Transport for London (TfL) logo
LONG TERM
Between
21 Oct and 23 Nov 2024
Details
View Map
Share
Knightsbridge

Transport for London (TfL) were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 23 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:37.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Knightsbridge

Transport for London (TfL) were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 4 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 14:55.

Cadent Gas logo
LONG TERM
Between
21 Oct and 6 Dec 2024
Details
View Map
Share
Windmill Avenue

Cadent Gas were proposing to carry out Utility asset works on Windmill Avenue, Southall.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 13:30.

Cadent Gas logo
LONG TERM
Between
21 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Windmill Lane

Cadent Gas are proposing to carry out Utility asset works on Windmill Lane, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 14:16.

Cadent Gas logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Windmill Lane

Cadent Gas are carrying out Utility asset works on Windmill Lane, Southall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:24 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:42.

UK Power Networks Eastern & London logo
Until
11 Nov 2024
Details
View Map
Share
Follow
North Audley Street

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on North Audley Street, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 10:19 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 Oct 2024 at 09:58.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Gordon Road

Thames Water are carrying out Utility repair and maintenance works on Gordon Road, Ealing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 10:00 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 11:09.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
21 Oct 2024 and 3 Jun 2025
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Sep 2024 at 11:22.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
21 Oct 2024 and 3 Jun 2025
Details
View Map
Share
Kensington Park Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Kensington Park Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 16 Oct 2024 at 09:06.

Scottish Hydro Electric Power Dis logo
Finishing
Sunday
Details
View Map
Share
Follow
Fleming Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fleming Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Oct 2024 at 11:10.

Scottish Hydro Electric Power Dis logo
Finishing
Sunday
Details
View Map
Share
Follow
Fleming Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Fleming Road, Southall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:30 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Oct 2024 at 09:53.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
St Stephens Road

Cadent Gas are carrying out Utility asset works on St Stephens Road, West Ealing.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:23 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 15:09.

London Borough Of Brent logo
LONG TERM
Between
21 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Kilburn Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Kilburn Lane, Kilburn, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 18 Oct 2024 at 22:19.

London Borough Of Brent logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Kilburn Lane

London Borough Of Brent are carrying out Highway repair and maintenance works on Kilburn Lane, Kilburn, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 22 Oct 2024 at 08:55.

Thames Water logo
Between
21 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility repair and maintenance works on Avenue Road, Swiss Cottage, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 11:24.

Thames Water logo
Until
15 Nov 2024
Details
View Map
Share
Follow
Avenue Road

Thames Water are carrying out Utility repair and maintenance works on Avenue Road, Swiss Cottage, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 11:00 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 12:44.

UK Power Networks Eastern & London logo
Between
21 Oct and 18 Nov 2024
Details
View Map
Share
Crossfield Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Crossfield Road, Belsize, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 18 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 10:06.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
High Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on High Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:54.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
High Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on High Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 10 Oct 2024 at 11:41.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Harrow Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Wembley Hill Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ladbroke Grove

Cadent Gas are carrying out Utility repair and maintenance works on Ladbroke Grove, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 11:43 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 16:43.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Wandsworth High Street

Thames Water are carrying out Utility repair and maintenance works on Wandsworth High Street, Wandsworth, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 15:00 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 08:59.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Motcomb Street

Cadent Gas are carrying out Utility repair and maintenance works on Motcomb Street, Knightsbridge & Belgravia, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 16:00 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 13:19.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Charecroft Way

Thames Water are carrying out roadworks on Charecroft Way, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 08:00 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 08:06.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 16:16.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Claremont Road

Thames Water are carrying out Statutory Infrastructure Works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 October 2024 at 09:30 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 10:33.

Cadent Gas logo
Thursday
Details
View Map
Share
Vanston Place

Cadent Gas carried out Utility repair and maintenance works on Vanston Place, London.

The road was closed for some or all of the period.

The works were originally planned between 27 Oct 2024 and 7 Nov 2024 and were actually completed between 27 Oct 2024 (10:44) and 4 Nov 2024 (09:46). The works impacted the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 16:30.

UK Power Networks South Eastern logo
Between
28 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Pagoda Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Pagoda Avenue, Richmond.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Oct 2024 at 10:52.

UK Power Networks South Eastern logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Pagoda Avenue

UK Power Networks South Eastern are carrying out Utility asset works on Pagoda Avenue, Richmond.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 08:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 29 Oct 2024 at 08:37.

London Borough Of Hounslow logo
Between
28 Oct and 15 Nov 2024
Details
View Map
Share
Follow
North Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on North Street, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 8 Oct 2024 at 16:45.

Thames Water logo
Today
Details
View Map
Share
Dawes Road

Thames Water carried out New service connection on Dawes Road, London.

These works were categorised as Major.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 28 Oct 2024 and 4 Nov 2024 and were actually completed between 28 Oct 2024 (15:00) and 4 Nov 2024 (07:00). The works impacted the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 07:56.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Lordship Place

Thames Water are proposing to carry out New service connection on Lordship Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Jul 2024 at 14:33.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Lordship Place

Thames Water are carrying out New service connection on Lordship Place, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 08:06.

Royal Borough Of Kensington And Chelsea logo
Between
28 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Gilston Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Gilston Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 9 Oct 2024 at 15:36.

Royal Borough Of Kensington And Chelsea logo
Until
22 Nov 2024
Details
View Map
Share
Follow
Gilston Road

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Gilston Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 28 Oct 2024 at 08:31.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
28 Oct 2024 and 23 May 2025
Details
View Map
Share
Follow
Hogarth Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Hogarth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 18 Sep 2024 at 16:21.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
Hogarth Road

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Hogarth Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 28 Oct 2024 at 08:31.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Oct and 30 Nov 2024
Details
View Map
Share
Follow
Pelham Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Pelham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Sep 2024 at 15:25.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Norwood Green Road

Cadent Gas are proposing to carry out Utility asset works on Norwood Green Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 16:24.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Norwood Green Road

Cadent Gas are proposing to carry out Utility asset works on Norwood Green Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 11:13.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Norwood Green Road

Cadent Gas are carrying out Utility asset works on Norwood Green Road, Southall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 10:01 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:41.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Norwood Road

Cadent Gas are proposing to carry out Utility asset works on Norwood Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 15:55.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Norwood Road

Cadent Gas are proposing to carry out Utility asset works on Norwood Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 11:13.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Norwood Road

Cadent Gas are carrying out Utility asset works on Norwood Road, Southall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 10:00 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 16:32.

Thames Water logo
Finishing
Today
Details
View Map
Share
Enfield Road

Thames Water were proposing to carry out New service connection on Enfield Road, Acton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 4 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 15:26.

Transport for London (TfL) logo
LONG TERM
Until
20 Mar 2026
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Uxbridge Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 07:30 and could run through until 20 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 08:34.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Leopold Road

Cadent Gas were proposing to carry out Utility asset works on Leopold Road, Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 10:12.

Cadent Gas logo
Between
28 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Leopold Road

Cadent Gas are proposing to carry out Utility asset works on Leopold Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 11:33.

UK Power Networks Eastern & London logo
Between
28 Oct and 18 Nov 2024
Details
View Map
Share
Old Oak Common Lane

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 18 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 10:09.

UK Power Networks Eastern & London logo
Between
28 Oct and 18 Nov 2024
Details
View Map
Share
Old Oak Common Lane

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 18 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 12:16.

UK Power Networks Eastern & London logo
Between
28 Oct and 18 Nov 2024
Details
View Map
Share
Braybrook Street

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Braybrook Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 18 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 11:05.

UK Power Networks Eastern & London logo
Between
28 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Braybrook Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Braybrook Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 17:42.

UK Power Networks Eastern & London logo
Between
28 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Braybrook Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Braybrook Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 10:29.

UK Power Networks Eastern & London logo
Between
28 Oct and 18 Nov 2024
Details
View Map
Share
Braybrook Street

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Braybrook Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 18 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 08:09.

UK Power Networks Eastern & London logo
Between
28 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Old Oak Common Lane

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Oct 2024 at 09:18.

UK Power Networks Eastern & London logo
Between
28 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Old Oak Common Lane

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 09:15.

UK Power Networks Eastern & London logo
Until
18 Nov 2024
Details
View Map
Share
Follow
Old Oak Common Lane

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Old Oak Common Lane, Acton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 14:30 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 16:16.

Finishing
Friday
Details
View Map
Share
Follow
Rootes Drive

Last Mile Gas are proposing to carry out Utility repair and maintenance works on Rootes Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 13 Sep 2024 at 15:56.

Finishing
Friday
Details
View Map
Share
Follow
Rootes Drive

Last Mile Gas are carrying out Utility repair and maintenance works on Rootes Drive, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 28 Oct 2024 at 09:36.

City Of Westminster logo
Between
28 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Elgin Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Elgin Avenue, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 13 Aug 2024 at 16:17.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Leighton Gardens

Thames Water are carrying out Utility asset works on Leighton Gardens, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 07:33.

Thames Water logo
Finishing
Today
Details
View Map
Share
Hans Crescent

Thames Water were proposing to carry out Utility repair and maintenance works on Hans Crescent, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2024 and run through until 4 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 14:48.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Pavilion Road

Thames Water are carrying out Utility repair and maintenance works on Pavilion Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 10:51 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 15:26.

UK Power Networks Eastern & London logo
Between
29 Oct and 12 Nov 2024
Details
View Map
Share
Follow
Hall Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 12 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 09:16.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Hall Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2024 and run through until 4 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 13:26.

UK Power Networks Eastern & London logo
Between
29 Oct and 12 Nov 2024
Details
View Map
Share
Follow
Maida Vale

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Maida Vale, Maida Vale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 12 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 09:30.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Maida Vale

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Maida Vale, Maida Vale, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2024 and run through until 4 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 13:27.

Cadent Gas logo
LONG TERM
Until
3 Dec 2024
Details
View Map
Share
Follow
Worton Road

Cadent Gas are carrying out Utility asset works on Worton Road, Isleworth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 12:24 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 12:56.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Penfold Street

Thames Water are carrying out Utility repair and maintenance works on Penfold Street, Church Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 08:31 and could run through until 5 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 08:44.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Crawford Place

Thames Water are carrying out Utility repair and maintenance works on Crawford Place, Bryanston & Dorset Square, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 09:11 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 12:17.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Gloucester Place

Thames Water are carrying out Utility repair and maintenance works on Gloucester Place, Bryanston & Dorset Square, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 20:14 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 10:26.

UK Power Networks Eastern & London logo
Finishing
Thursday
Details
View Map
Share
Follow
Broadhurst Gardens

UK Power Networks Eastern & London are carrying out Utility asset works on Broadhurst Gardens, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 08:00 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 14:14.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Sedlescombe Road

Thames Water were proposing to carry out New service connection on Sedlescombe Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 6 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 11:01.

Cadent Gas logo
Until
11 Nov 2024
Details
View Map
Share
Follow
Lovett Way

Cadent Gas are carrying out Utility repair and maintenance works on Lovett Way, London.

The works started on 1 November 2024 at 12:10 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 12:12.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Gunnersbury Avenue (North Circular Road)

Thames Water are carrying out Utility repair and maintenance works on Gunnersbury Avenue (North Circular Road), London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 November 2024 at 20:00 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:24.

UK Power Networks Eastern & London logo
Between
3 and 24 Nov 2024
Details
View Map
Share
Follow
Jameson Street

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Jameson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Oct 2024 at 09:59.

UK Power Networks Eastern & London logo
Until
24 Nov 2024
Details
View Map
Share
Follow
Jameson Street

UK Power Networks Eastern & London are carrying out Disconnection or alteration of supply on Jameson Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 November 2024 at 08:00 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 09:19.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Shaftesbury Road

Thames Water are proposing to carry out New service connection on Shaftesbury Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 09:37.

Southern Gas Networks logo
Until
11 Nov 2024
Details
View Map
Share
Follow
Lower Richmond Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Lower Richmond Road, Putney, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 12:30 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 14:11.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Byam Street

Thames Water are proposing to carry out New service connection on Byam Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 11:00.

Network Rail logo
Finishing
Saturday
Details
View Map
Share
Follow
Battersea High Street

Network Rail are proposing to carry out Works for Rail Purposes on Battersea High Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 9 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Sep 2024 at 09:32.

Network Rail logo
Finishing
Saturday
Details
View Map
Share
Follow
Battersea High Street

Network Rail are proposing to carry out Works for Rail Purposes on Battersea High Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 9 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 7 Oct 2024 at 08:40.

Transport for London (TfL) logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 09:36.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Randall Close

Thames Water are proposing to carry out New service connection on Randall Close, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 08:29.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Randall Close

Thames Water are carrying out New service connection on Randall Close, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:24 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 09:43.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Randall Close

Thames Water were proposing to carry out New service connection on Randall Close, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 08:13.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Flood Street

Thames Water are proposing to carry out New service connection on Flood Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 12:10.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Flood Street

Thames Water are carrying out New service connection on Flood Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:37 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 09:05.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Carville Crescent

Thames Water are proposing to carry out New service connection on Carville Crescent, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 14:14.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Carville Crescent

Thames Water are carrying out New service connection on Carville Crescent, Brentford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:03 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:35.

Virgin Media logo
Finishing
Wednesday
Details
View Map
Share
Holland Road

Virgin Media were proposing to carry out Utility asset works on Holland Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 6 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 4 Oct 2024 at 07:44.

Transport for London (TfL) logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Knightsbridge

Transport for London (TfL) were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 14:52.

Transport for London (TfL) logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Knightsbridge

Transport for London (TfL) were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 14:58.

Transport for London (TfL) logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Knightsbridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 14:50.

Transport for London (TfL) logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Knightsbridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 18:03.

Cadent Gas logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Northfield Avenue

Cadent Gas are proposing to carry out Utility asset works on Northfield Avenue, West Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 11:33.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Green Man Lane

Thames Water were proposing to carry out Disconnection or alteration of supply on Green Man Lane, West Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 15:50.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Green Man Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Green Man Lane, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 08:59.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Green Man Lane

Thames Water are carrying out Disconnection or alteration of supply on Green Man Lane, West Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 07:55 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 07:56.

Thames Water logo
Until
24 Nov 2024
Details
View Map
Share
Follow
Pembridge Crescent

Thames Water are carrying out Utility repair and maintenance works on Pembridge Crescent, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 13:30 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 16:35.

City Of Westminster logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Upper Berkeley Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Oct 2024 at 10:47.

City Of Westminster logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Upper Berkeley Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Oct 2024 at 09:36.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Chiltern Street

Thames Water are proposing to carry out New service connection on Chiltern Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 17:01.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Chiltern Street

Thames Water are carrying out New service connection on Chiltern Street, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:56 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 09:06.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Harrow Road

Thames Water are proposing to carry out Utility asset works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 09:51.

Transport for London (TfL) logo
Between
4 and 16 Nov 2024
Details
View Map
Share
Follow
Boscobel Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Boscobel Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Oct 2024 at 08:51.

UK Power Networks Eastern & London logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Foscote Mews

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Foscote Mews, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 15:23.

Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Rootes Drive

Last Mile Gas are proposing to carry out Utility repair and maintenance works on Rootes Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Gas on 16 Aug 2024 at 10:52.

Transport for London (TfL) logo
Between
4 and 16 Nov 2024
Details
View Map
Share
Follow
Frampton Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Frampton Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Oct 2024 at 08:53.

Transport for London (TfL) logo
Between
4 and 16 Nov 2024
Details
View Map
Share
Follow
Orchardson Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Orchardson Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Oct 2024 at 14:12.

Transport for London (TfL) logo
Between
4 and 16 Nov 2024
Details
View Map
Share
Follow
Edgware Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Edgware Road, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2024 at 14:53.

Virgin Media logo
Finishing
Friday
Details
View Map
Share
Standard Road

Virgin Media were proposing to carry out Utility asset works on Standard Road, Park Royal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 29 Jul 2024 at 15:32.

Virgin Media logo
Finishing
Friday
Details
View Map
Share
Standard Road

Virgin Media were proposing to carry out Utility asset works on Standard Road, Park Royal.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 23 Oct 2024 at 11:14.

UK Power Networks Eastern & London logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Hall Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 09:43.

UK Power Networks Eastern & London logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Hall Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 10:46.

Electricity Network Company logo
Until
26 Nov 2024
Details
View Map
Share
Follow
Fernhead Road

Electricity Network Company are carrying out Utility asset works on Fernhead Road, Harrow Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 11:00 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 4 Nov 2024 at 11:48.

UK Power Networks Eastern & London logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
High Street

UK Power Networks Eastern & London are proposing to carry out New service connection on High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 16:02.

UK Power Networks Eastern & London logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
High Street

UK Power Networks Eastern & London are proposing to carry out New service connection on High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 Oct 2024 at 10:24.

London Borough Of Camden logo
LONG TERM
Between
4 Nov and 5 Dec 2024
Details
View Map
Share
Kilburn High Road

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Kilburn High Road, Kilburn, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 5 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 22 Oct 2024 at 12:36.

Thames Water logo
LONG TERM
Between
4 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Lydford Road

Thames Water are proposing to carry out Utility asset works on Lydford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.

London Borough Of Barnet logo
Between
4 and 18 Nov 2024
Details
View Map
Share
Follow
Pennine Drive

London Borough Of Barnet are proposing to carry out Highway improvement works on Pennine Drive, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Oct 2024 at 13:15.

London Borough Of Barnet logo
Between
4 and 18 Nov 2024
Details
View Map
Share
Follow
Pennine Drive

London Borough Of Barnet are proposing to carry out Highway improvement works on Pennine Drive, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Oct 2024 at 09:03.

London Borough Of Barnet logo
Between
4 and 18 Nov 2024
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 1 Nov 2024 at 13:14.

London Borough Of Barnet logo
Between
4 and 18 Nov 2024
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 1 Nov 2024 at 15:07.

Finishing
Thursday
Details
View Map
Share
Follow
Sandy Lane

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Sandy Lane, Petersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 2 Aug 2024 at 16:21.

Finishing
Thursday
Details
View Map
Share
Follow
Sandy Lane

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Sandy Lane, Petersham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 5 Aug 2024 at 16:22.

BT logo
Finishing
Thursday
Details
View Map
Share
Follow
Old Palace Lane

BT are proposing to carry out Utility asset works on Old Palace Lane, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 26 Sep 2024 at 16:32.

Royal Borough Of Kensington And Chelsea logo
Between
5 and 20 Nov 2024
Details
View Map
Share
Follow
Ashburn Place

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Ashburn Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 18 Oct 2024 at 15:15.

Vorboss logo
Finishing
Thursday
Details
View Map
Share
Follow
Edgware Road

Vorboss are proposing to carry out Utility asset works on Edgware Road, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vorboss on 15 Aug 2024 at 11:29.

Vorboss logo
Finishing
Thursday
Details
View Map
Share
Follow
Edgware Road

Vorboss are proposing to carry out Utility asset works on Edgware Road, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vorboss on 28 Aug 2024 at 11:17.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Belsize Road

Thames Water were proposing to carry out Utility repair and maintenance works on Belsize Road, Kilburn, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2024 and run through until 7 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 14:23.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Beaufort Road

Thames Water were proposing to carry out Utility asset works on Beaufort Road, Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 07:47.

London Borough Of Camden logo
Between
6 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Kilburn High Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Kilburn High Road, Kilburn, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 31 Oct 2024 at 08:58.

Finishing
Friday
Details
View Map
Share
Follow
Sudbury Hill

London Borough Of Harrow are proposing to carry out Highway improvement works on Sudbury Hill, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 12:21.

Thames Water logo
Between
7 and 12 Nov 2024
Details
View Map
Share
Sedlescombe Road

Thames Water were proposing to carry out New service connection on Sedlescombe Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 November 2024 and run through until 12 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2024 at 15:34.

Thames Water logo
Between
7 and 12 Nov 2024
Details
View Map
Share
Albion Place

Thames Water were proposing to carry out New service connection on Albion Place, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 November 2024 and run through until 12 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 11:25.

UK Power Networks Eastern & London logo
Between
7 and 14 Nov 2024
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 16:07.

Finishing
Sunday
Details
View Map
Share
Follow
Sudbury Hill

London Borough Of Harrow are proposing to carry out Highway improvement works on Sudbury Hill, Sudbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Oct 2024 at 13:11.

London Borough Of Barnet logo
LONG TERM
Between
7 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Jul 2024 at 10:56.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Redcliffe Gardens

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Redcliffe Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Aug 2024 at 15:02.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 28 Jan 2025
Details
View Map
Share
Follow
Redcliffe Gardens

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Redcliffe Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 28 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 15:23.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 28 Jan 2025
Details
View Map
Share
Follow
Redcliffe Gardens

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Redcliffe Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 28 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 16:01.

Thames Water logo
Between
8 and 13 Nov 2024
Details
View Map
Share
Follow
Sedlescombe Road

Thames Water are proposing to carry out New service connection on Sedlescombe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 09:03.

Transport for London (TfL) logo
Between
8 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Fawcett Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Fawcett Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2024 at 10:40.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 28 Jan 2025
Details
View Map
Share
Follow
Fawcett Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Fawcett Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 16:42.

Thames Water logo
Between
8 and 14 Nov 2024
Details
View Map
Share
Follow
Ifield Road

Thames Water are proposing to carry out New service connection on Ifield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 14:08.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Tregunter Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tregunter Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2024 at 10:41.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Tregunter Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tregunter Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 16:44.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 28 Jan 2025
Details
View Map
Share
Follow
Redcliffe Square

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Redcliffe Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 17:04.

Transport for London (TfL) logo
Between
8 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Redcliffe Square

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Redcliffe Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Aug 2024 at 16:05.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Jul 2024 at 13:18.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:12.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:38.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Feb 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Jul 2024 at 11:07.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:09.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:38.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:11.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:35.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:09.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:37.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 11:05.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:14.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:35.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2024 at 13:03.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 10:51.

Thames Water logo
Between
9 and 14 Nov 2024
Details
View Map
Share
Follow
Sedlescombe Road

Thames Water are proposing to carry out New service connection on Sedlescombe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 10:01.

Thames Water logo
LONG TERM
Until
25 Mar 2025
Details
View Map
Share
Follow
Bristol Gardens

Thames Water are carrying out Utility asset works on Bristol Gardens, Little Venice, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 10:55.

Virgin Media logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Friars Lane

Virgin Media are proposing to carry out Utility asset works on Friars Lane, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 6 Aug 2024 at 09:37.

Cadent Gas logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Dawes Avenue

Cadent Gas are proposing to carry out New service connection on Dawes Avenue, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 16:25.

Cadent Gas logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Dawes Avenue

Cadent Gas are proposing to carry out New service connection on Dawes Avenue, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 09:00.

Cadent Gas logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Dawes Avenue

Cadent Gas are proposing to carry out New service connection on Dawes Avenue, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 00:10.

UK Power Networks Eastern & London logo
LONG TERM
Between
11 Nov 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Wye Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Wye Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:54.

Transport for London (TfL) logo
LONG TERM
Between
11 Nov 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Prince Of Wales Drive

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prince Of Wales Drive, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2024 at 09:54.

Transport for London (TfL) logo
LONG TERM
Between
11 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Prince Of Wales Drive

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prince Of Wales Drive, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 08:53.

Thames Water logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Waterford Road

Thames Water are proposing to carry out New service connection on Waterford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 11:00.

Thames Water logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Waterford Road

Thames Water are proposing to carry out New service connection on Waterford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 08:20.

Cadent Gas logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
St Christophers Close

Cadent Gas were proposing to carry out Utility asset works on St Christophers Close, Isleworth.

These works were categorised as Major.

The works were originally planned to start 11 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 08:51.

Cadent Gas logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Footpath From London Road To Brent Lea

Cadent Gas are proposing to carry out Utility asset works on Footpath From London Road To Brent Lea, Brentford.

These works are categorised as Major.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 15:32.

Thames Water logo
Between
11 and 14 Nov 2024
Details
View Map
Share
Follow
Shorrolds Road

Thames Water are proposing to carry out New service connection on Shorrolds Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2024 at 08:28.

Thames Water logo
Between
11 and 14 Nov 2024
Details
View Map
Share
Haldane Road

Thames Water were proposing to carry out New service connection on Haldane Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 14 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2024 at 11:35.

Thames Water logo
Between
11 and 14 Nov 2024
Details
View Map
Share
Follow
Haldane Road

Thames Water are proposing to carry out New service connection on Haldane Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 08:48.

Thames Water logo
Between
11 and 14 Nov 2024
Details
View Map
Share
Follow
Carlyle Square

Thames Water are proposing to carry out New service connection on Carlyle Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 12:13.

Cadent Gas logo
LONG TERM
Between
11 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Ealing Road

Cadent Gas are proposing to carry out Utility asset works on Ealing Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 15:43.

Thames Water logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Aubrey Walk

Thames Water are proposing to carry out Utility repair and maintenance works on Aubrey Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:37.

Thames Water logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Bloemfontein Road

Thames Water are proposing to carry out New service connection on Bloemfontein Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 10:44.

Thames Water logo
Between
11 and 14 Nov 2024
Details
View Map
Share
Follow
Kildare Gardens

Thames Water are proposing to carry out New service connection on Kildare Gardens, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2024 at 10:02.

Thames Water logo
Between
11 and 14 Nov 2024
Details
View Map
Share
Follow
Kildare Gardens

Thames Water are proposing to carry out New service connection on Kildare Gardens, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 16:10.

Thames Water logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Blandford Street

Thames Water are proposing to carry out New service connection on Blandford Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 17:01.

Thames Water logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Blandford Street

Thames Water are proposing to carry out New service connection on Blandford Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 09:34.

Thames Water logo
LONG TERM
Between
11 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Baker Street

Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 09:54.

Thames Water logo
Between
11 and 16 Nov 2024
Details
View Map
Share
Follow
Croxley Road

Thames Water are proposing to carry out New service connection on Croxley Road, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 16 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 18:21.

Thames Water logo
Between
11 and 16 Nov 2024
Details
View Map
Share
Follow
Croxley Road

Thames Water are proposing to carry out New service connection on Croxley Road, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 16 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 11:34.

UK Power Networks Eastern & London logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Follow
High Street

UK Power Networks Eastern & London are proposing to carry out New service connection on High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2024 at 09:26.

London Borough Of Ealing logo
LONG TERM
Between
11 Nov 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 18 Oct 2024 at 10:14.

London Borough Of Brent logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Park Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Park Lane, Wembley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 31 Oct 2024 at 23:12.

Cadent Gas logo
Between
12 and 14 Nov 2024
Details
View Map
Share
Follow
Worton Gardens

Cadent Gas are proposing to carry out New service connection on Worton Gardens, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 10:30.

Cadent Gas logo
Between
12 and 14 Nov 2024
Details
View Map
Share
Follow
Worton Gardens

Cadent Gas are proposing to carry out New service connection on Worton Gardens, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 00:10.

Thames Water logo
LONG TERM
Between
12 Nov 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Earl's Court Road

Thames Water are proposing to carry out Utility repair and maintenance works on Earl's Court Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 7 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 17:12.

Thames Water logo
Between
12 and 15 Nov 2024
Details
View Map
Share
Follow
Enfield Road

Thames Water are proposing to carry out New service connection on Enfield Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 14:06.

Thames Water logo
Between
12 and 15 Nov 2024
Details
View Map
Share
Follow
Enfield Road

Thames Water are proposing to carry out New service connection on Enfield Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:30.

Thames Water logo
Between
12 and 14 Nov 2024
Details
View Map
Share
Follow
Quex Road

Thames Water are proposing to carry out Utility repair and maintenance works on Quex Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 13:20.

Thames Water logo
Between
13 and 15 Nov 2024
Details
View Map
Share
Follow
Penzance Place

Thames Water are proposing to carry out Utility repair and maintenance works on Penzance Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 15:48.

Thames Water logo
Between
13 and 15 Nov 2024
Details
View Map
Share
Follow
Penzance Place

Thames Water are proposing to carry out Utility repair and maintenance works on Penzance Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 12:20.

Transport for London (TfL) logo
Between
15 and 30 Nov 2024
Details
View Map
Share
Knightsbridge

Transport for London (TfL) were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 November 2024 and run through until 30 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 10:09.

Transport for London (TfL) logo
Between
15 and 21 Nov 2024
Details
View Map
Share
Follow
Shepherd's Bush Green

Transport for London (TfL) are proposing to carry out Highway improvement works on Shepherd's Bush Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Oct 2024 at 11:06.

Transport for London (TfL) logo
Between
15 and 21 Nov 2024
Details
View Map
Share
Follow
Shepherd's Bush Green

Transport for London (TfL) are proposing to carry out Highway improvement works on Shepherd's Bush Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 15:49.

Transport for London (TfL) logo
Between
15 and 21 Nov 2024
Details
View Map
Share
Follow
Shepherd's Bush Green

Transport for London (TfL) are proposing to carry out Highway improvement works on Shepherd's Bush Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:24.

UK Power Networks Eastern & London logo
Between
15 and 29 Nov 2024
Details
View Map
Share
Follow
Hall Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 09:38.

UK Power Networks South Eastern logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Dynevor Road

UK Power Networks South Eastern are proposing to carry out New service connection on Dynevor Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Aug 2024 at 14:26.

UK Power Networks South Eastern logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Dynevor Road

UK Power Networks South Eastern are proposing to carry out New service connection on Dynevor Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Nov 2024 at 08:52.

Thames Water logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Station Approach Road

Thames Water are proposing to carry out New service connection on Station Approach Road, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 14:48.

Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Syon Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Syon Lane, Isleworth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Nov 2024 at 15:24.

Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Great West Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 1 Nov 2024 at 15:12.

Transport for London (TfL) logo
Between
18 and 30 Nov 2024
Details
View Map
Share
Follow
Butterwick

Transport for London (TfL) are proposing to carry out Highway improvement works on Butterwick, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 16:45.

Transport for London (TfL) logo
Between
18 and 30 Nov 2024
Details
View Map
Share
Follow
Hammersmith Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Hammersmith Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 16:01.

UK Power Networks Eastern & London logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Lexham Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Lexham Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2024 at 16:18.

Transport for London (TfL) logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Knightsbridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 15:03.

Cadent Gas logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Northfield Avenue

Cadent Gas are proposing to carry out Utility asset works on Northfield Avenue, West Ealing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 10:57.

UK Power Networks Eastern & London logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Old Oak Common Lane

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 11:04.

UK Power Networks Eastern & London logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Old Oak Common Lane

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 10:11.

Thames Water logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Adpar Street

Thames Water are proposing to carry out New service connection on Adpar Street, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:17.

City Of Westminster logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Formosa Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Formosa Street, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Oct 2024 at 17:28.

Thames Water logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Coronation Road

Thames Water are proposing to carry out New service connection on Coronation Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 13:01.

Murphy Power Distribution logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Central Way

Murphy Power Distribution are proposing to carry out New service connection on Central Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 21 Aug 2024 at 16:25.

Murphy Power Distribution logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Central Way

Murphy Power Distribution are proposing to carry out New service connection on Central Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 29 Aug 2024 at 15:22.

Thames Water logo
Between
18 and 28 Nov 2024
Details
View Map
Share
Follow
Andover Place

Thames Water are proposing to carry out New service connection on Andover Place, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 17:01.

Thames Water logo
Between
18 and 28 Nov 2024
Details
View Map
Share
Follow
Andover Place

Thames Water are proposing to carry out New service connection on Andover Place, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 09:56.

UK Power Networks Eastern & London logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Monks Park

UK Power Networks Eastern & London are proposing to carry out New service connection on Monks Park, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2024 at 20:26.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Lydford Road

Thames Water are proposing to carry out Utility asset works on Lydford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 14:44.

Thames Water logo
Between
19 and 21 Nov 2024
Details
View Map
Share
Follow
Red Lion Street

Thames Water are proposing to carry out Remedial works on Red Lion Street, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 10:28.

Thames Water logo
Between
19 and 25 Nov 2024
Details
View Map
Share
Follow
Sedlescombe Road

Thames Water are proposing to carry out New service connection on Sedlescombe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 09:17.

BT logo
Between
20 and 22 Nov 2024
Details
View Map
Share
Follow
Mullins Path

BT are proposing to carry out Utility asset works on Mullins Path, Mortlake.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 31 Oct 2024 at 15:16.

Thames Water logo
Between
20 and 25 Nov 2024
Details
View Map
Share
Smith Street

Thames Water were proposing to carry out New service connection on Smith Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 25 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 13:48.

Thames Water logo
Between
20 and 25 Nov 2024
Details
View Map
Share
Follow
Smith Street

Thames Water are proposing to carry out New service connection on Smith Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 13:10.

Virgin Media logo
Between
20 Nov and 4 Dec 2024
Details
View Map
Share
Stanhope Gate

Virgin Media were proposing to carry out Utility asset works on Stanhope Gate, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Aug 2024 at 15:19.

City Of Westminster logo
Between
20 and 22 Nov 2024
Details
View Map
Share
Follow
Gloucester Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Gloucester Terrace, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Aug 2024 at 17:46.

BT logo
Between
21 and 25 Nov 2024
Details
View Map
Share
Follow
Woodheyes Road

BT are proposing to carry out Utility asset works on Woodheyes Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Aug 2024 at 11:55.

UK Power Networks Eastern & London logo
Between
22 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Hamilton Terrace

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 09:31.

UK Power Networks Eastern & London logo
Between
22 Nov and 17 Dec 2024
Details
View Map
Share
High Street

UK Power Networks Eastern & London were proposing to carry out New service connection on High Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 17 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Aug 2024 at 17:23.

Thames Water logo
Between
23 and 29 Nov 2024
Details
View Map
Share
Follow
Chiswick High Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Chiswick High Road, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 12:21.

Transport for London (TfL) logo
Between
24 and 26 Nov 2024
Details
View Map
Share
Follow
Lower Richmond Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:39.

Transport for London (TfL) logo
Between
24 and 26 Nov 2024
Details
View Map
Share
Follow
Lower Richmond Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:41.

Transport for London (TfL) logo
Between
24 and 26 Nov 2024
Details
View Map
Share
Follow
Clifford Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:40.

Transport for London (TfL) logo
Between
24 and 26 Nov 2024
Details
View Map
Share
Follow
Clifford Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:34.

Southern Gas Networks logo
Between
25 Nov and 3 Dec 2024
Details
View Map
Share
Jephtha Road

Southern Gas Networks were proposing to carry out New service connection on Jephtha Road, Wandsworth, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 3 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 12:27.

Transport for London (TfL) logo
Between
25 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Upper Richmond Road West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Richmond Road West, East Sheen.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 14:59.

Transport for London (TfL) logo
Between
25 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Upper Richmond Road West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Richmond Road West, East Sheen.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 14:58.

Transport for London (TfL) logo
Between
25 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Upper Richmond Road West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Richmond Road West, East Sheen.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 15:01.

Transport for London (TfL) logo
Between
25 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Upper Richmond Road West

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Richmond Road West, East Sheen.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 15:02.

Thames Water logo
Between
25 and 30 Nov 2024
Details
View Map
Share
Follow
Taunton Avenue

Thames Water are proposing to carry out New service connection on Taunton Avenue, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 13:44.

Thames Water logo
Between
25 and 30 Nov 2024
Details
View Map
Share
Follow
Taunton Avenue

Thames Water are proposing to carry out New service connection on Taunton Avenue, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 11:00.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Epworth Road

Thames Water were proposing to carry out New service connection on Epworth Road, Isleworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:56.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Hollywood Road

Thames Water are proposing to carry out New service connection on Hollywood Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 17:00.

Transport for London (TfL) logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Knightsbridge

Transport for London (TfL) were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 14:29.

Thames Water logo
Between
25 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Enfield Road

Thames Water are proposing to carry out New service connection on Enfield Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 10:04.

Thames Water logo
Between
25 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Enfield Road

Thames Water are proposing to carry out New service connection on Enfield Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 09:16.

Thames Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Hatfield Road

Thames Water are proposing to carry out New service connection on Hatfield Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 12:58.

Thames Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Hatfield Road

Thames Water are proposing to carry out New service connection on Hatfield Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 15:18.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
South Audley Street

Thames Water were proposing to carry out New service connection on South Audley Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 14:39.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Reeves Mews

Thames Water were proposing to carry out New service connection on Reeves Mews, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 08:16.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Talbot Road

Thames Water were proposing to carry out New service connection on Talbot Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 09:47.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Talbot Road

Thames Water are proposing to carry out New service connection on Talbot Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 11:39.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Oxford Gardens

Thames Water are proposing to carry out New service connection on Oxford Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 14:48.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Oxford Gardens

Thames Water are proposing to carry out New service connection on Oxford Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 11:22.

Thames Water logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Marylebone Road

Thames Water are proposing to carry out Utility asset works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 17:05.

London Borough Of Ealing logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Copley Close

London Borough Of Ealing are proposing to carry out Highway improvement works on Copley Close, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 24 Oct 2024 at 09:49.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Hamilton Terrace

Thames Water are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:21.

Thames Water logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Quex Road

Thames Water are proposing to carry out Utility repair and maintenance works on Quex Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 15:00.

Thames Water logo
Between
26 Nov and 2 Dec 2024
Details
View Map
Share
Kingsdown Avenue

Thames Water were proposing to carry out New service connection on Kingsdown Avenue, West Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 09:55.

Thames Water logo
Between
26 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Kingsdown Avenue

Thames Water are proposing to carry out New service connection on Kingsdown Avenue, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 09:07.

Thames Water logo
Between
26 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Kingsdown Avenue

Thames Water are proposing to carry out New service connection on Kingsdown Avenue, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 11:39.

BT logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Biggs Row

BT were proposing to carry out Utility asset works on Biggs Row, Putney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 30 Aug 2024 at 09:53.

City Of Westminster logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Westbourne Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Terrace, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 30 Sep 2024 at 15:05.

City Of Westminster logo
Between
27 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Senior Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Senior Street, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Sep 2024 at 12:36.

City Of Westminster logo
Between
27 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Lord Hills Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Lord Hills Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Sep 2024 at 12:41.

City Of Westminster logo
Between
28 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Lisson Grove

City Of Westminster are proposing to carry out Highway repair and maintenance works on Lisson Grove, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 4 Nov 2024 at 12:08.

Thames Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Bettridge Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bettridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 12:52.

Thames Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Bettridge Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bettridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 10:52.

Thames Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Pavilion Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Pavilion Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 15:51.

Transport for London (TfL) logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Knightsbridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 15:06.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Shepherd's Bush Green

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Bulwer Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bulwer Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Thames Water logo
Between
2 and 9 Dec 2024
Details
View Map
Share
Follow
Boston Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Boston Road, Hanwell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 14:14.

Transport for London (TfL) logo
LONG TERM
Between
2 Dec 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Thames Water logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Aubrey Walk

Thames Water are proposing to carry out Utility repair and maintenance works on Aubrey Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 08:27.

Transport for London (TfL) logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
West Cross Route (A3220)

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 09:59.

Transport for London (TfL) logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 10:01.

Transport for London (TfL) logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 09:57.

Transport for London (TfL) logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 09:54.

Transport for London (TfL) logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 09:50.

UK Power Networks Eastern & London logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
Braybrook Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Braybrook Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Oct 2024 at 18:14.

UK Power Networks Eastern & London logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Braybrook Street

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Braybrook Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 08:10.

UK Power Networks Eastern & London logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Old Oak Common Lane

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 10:09.

UK Power Networks Eastern & London logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
Old Oak Common Lane

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Oct 2024 at 11:31.

UK Power Networks Eastern & London logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
Old Oak Common Lane

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 15:09.

Electricity Network Company logo
Between
2 and 25 Dec 2024
Details
View Map
Share
Follow
Fernhead Road

Electricity Network Company are proposing to carry out Utility asset works on Fernhead Road, Harrow Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 25 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 27 Sep 2024 at 16:01.

Affinity Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Manor Farm Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Sep 2024 at 06:16.

Affinity Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Manor Farm Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 15 Oct 2024 at 09:59.

UK Power Networks Eastern & London logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Monks Park

UK Power Networks Eastern & London are proposing to carry out New service connection on Monks Park, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2024 at 14:32.

Thames Water logo
Between
2 and 22 Dec 2024
Details
View Map
Share
Follow
Buxton Road

Thames Water are proposing to carry out Utility asset works on Buxton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.

Thames Water logo
Between
2 and 22 Dec 2024
Details
View Map
Share
Follow
Buxton Road

Thames Water are proposing to carry out Utility asset works on Buxton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 08:16.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 25 May 2025
Details
View Map
Share
Follow
Chapter Road

Thames Water are proposing to carry out Utility asset works on Chapter Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 25 May 2025
Details
View Map
Share
Follow
Chapter Road

Thames Water are proposing to carry out Utility asset works on Chapter Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 08:16.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Dec 2024
Details
View Map
Share
Southam Street

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Southam Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:36.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Dec 2024
Details
View Map
Share
Adair Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Adair Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:39.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Dec 2024
Details
View Map
Share
Golborne Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Golborne Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:33.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Dec 2024
Details
View Map
Share
Kensal Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Kensal Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:32.

Royal Borough Of Kensington And Chelsea logo
Between
4 and 14 Dec 2024
Details
View Map
Share
Follow
Sloane Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 10 Oct 2024 at 14:57.

City Of Westminster logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Cheval Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Cheval Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Oct 2024 at 11:18.

City Of Westminster logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Rutland Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Rutland Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Oct 2024 at 11:19.

City Of Westminster logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Fairholt Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Fairholt Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Oct 2024 at 11:20.

City Of Westminster logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Jun 2024 at 13:27.

Thames Water logo
Between
5 and 12 Dec 2024
Details
View Map
Share
Follow
Rosebank Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Rosebank Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 15:51.

Thames Water logo
Between
5 and 12 Dec 2024
Details
View Map
Share
Follow
Boston Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Boston Road, Hanwell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:39.

City Of Westminster logo
Between
6 and 9 Dec 2024
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 Sep 2024 at 15:58.

Between
6 and 15 Dec 2024
Details
View Map
Share
Follow
Downing Drive

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Downing Drive, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Oct 2024 at 15:31.

Between
6 and 15 Dec 2024
Details
View Map
Share
Follow
Downing Drive

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Downing Drive, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Oct 2024 at 11:18.

Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
Downing Drive

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Downing Drive, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Nov 2024 at 15:28.

Between
6 and 15 Dec 2024
Details
View Map
Share
Follow
Ingram Way

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Ingram Way, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Oct 2024 at 10:15.

Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
Ingram Way

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Ingram Way, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Nov 2024 at 15:30.

Thames Water logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Utility asset works on London Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 10:44.

Thames Water logo
Between
9 and 17 Dec 2024
Details
View Map
Share
Follow
Mexfield Road

Thames Water are proposing to carry out New service connection on Mexfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 10:07.

Thames Water logo
Between
9 and 17 Dec 2024
Details
View Map
Share
Follow
Mexfield Road

Thames Water are proposing to carry out New service connection on Mexfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 14:37.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
The Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:14.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
The Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:45.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Twickenham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:21.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Twickenham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:39.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Kew Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kew Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:17.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Kew Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kew Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:48.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Lower Mortlake Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Mortlake Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:19.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Lower Mortlake Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Mortlake Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:40.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Lower Richmond Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:15.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Lower Richmond Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:46.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Clifford Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:20.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Clifford Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:50.

Virgin Media logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Hans Place

Virgin Media are proposing to carry out Utility asset works on Hans Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 6 Sep 2024 at 14:06.

Transport for London (TfL) logo
LONG TERM
Between
9 Dec 2024 and 2 May 2025
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

City Of Westminster logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Bernhardt Crescent

City Of Westminster are proposing to carry out Highway repair and maintenance works on Bernhardt Crescent, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Oct 2024 at 11:45.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Coronation Road

Thames Water are proposing to carry out New service connection on Coronation Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 09:08.

Thames Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Parthenia Road

Thames Water are proposing to carry out Utility repair and maintenance works on Parthenia Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 11:18.

London Borough Of Camden logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Fortune Green Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Fortune Green Road, Fortune Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:08.

Cadent Gas logo
LONG TERM
Between
11 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Worton Road

Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:46.

Cadent Gas logo
Between
11 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Worton Road

Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:47.

Royal Borough Of Kensington And Chelsea logo
Between
11 and 21 Dec 2024
Details
View Map
Share
Follow
Sloane Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 10 Oct 2024 at 15:57.

Royal Borough Of Kensington And Chelsea logo
Between
11 and 21 Dec 2024
Details
View Map
Share
Follow
Sloane Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 16 Oct 2024 at 16:05.

City Of Westminster logo
Between
11 and 17 Dec 2024
Details
View Map
Share
Follow
Delamere Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Delamere Terrace, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Sep 2024 at 15:24.

City Of Westminster logo
Between
11 and 17 Dec 2024
Details
View Map
Share
Follow
Delamere Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Delamere Terrace, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Oct 2024 at 17:07.

Transport for London (TfL) logo
LONG TERM
Between
12 Dec 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.

Affinity Water logo
Between
12 and 16 Dec 2024
Details
View Map
Share
Follow
Manor Farm Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 28 Aug 2024 at 11:48.

Between
13 and 15 Dec 2024
Details
View Map
Share
Follow
Alperton Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Alperton Lane, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 23 Oct 2024 at 12:01.

Between
13 and 15 Dec 2024
Details
View Map
Share
Follow
Alperton Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Alperton Lane, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Oct 2024 at 11:18.

Thames Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Hanbury Road

Thames Water are proposing to carry out New service connection on Hanbury Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 09:16.

Thames Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Hanbury Road

Thames Water are proposing to carry out New service connection on Hanbury Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:39.

Thames Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Beaufort Road

Thames Water are proposing to carry out Utility asset works on Beaufort Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 15:28.

Thames Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Bristol Gardens

Thames Water were proposing to carry out New service connection on Bristol Gardens, Little Venice, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 13:58.

Thames Water logo
Between
17 and 22 Dec 2024
Details
View Map
Share
Taunton Avenue

Thames Water were proposing to carry out New service connection on Taunton Avenue, Hounslow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:41.

Royal Borough Of Kensington And Chelsea logo
Between
17 and 21 Dec 2024
Details
View Map
Share
Follow
Sloane Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 25 Sep 2024 at 14:35.

UK Power Networks Eastern & London logo
LONG TERM
Between
18 Dec 2024 and 19 Feb 2025
Details
View Map
Share
Follow
Ingrave Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Ingrave Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:52.

Transport for London (TfL) logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Surrey Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Surrey Lane, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 15:50.

Thames Water logo
Between
19 and 22 Dec 2024
Details
View Map
Share
Wood Lane

Thames Water were proposing to carry out New service connection on Wood Lane, Isleworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:55.

Thames Water logo
Between
23 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Carnwath Road

Thames Water were proposing to carry out New service connection on Carnwath Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 2 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2024 at 15:40.

Thames Water logo
Between
23 and 30 Dec 2024
Details
View Map
Share
Carlyle Square

Thames Water were proposing to carry out New service connection on Carlyle Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 30 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 13:12.

Thames Water logo
Between
23 and 30 Dec 2024
Details
View Map
Share
Follow
Carlyle Square

Thames Water are proposing to carry out New service connection on Carlyle Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 15:56.

BT logo
Between
27 and 31 Dec 2024
Details
View Map
Share
Cromwell Place

BT were proposing to carry out Utility asset works on Cromwell Place, Mortlake.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 December 2024 and run through until 31 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Oct 2024 at 12:03.

Thames Water logo
Between
28 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Rosebank Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Rosebank Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 14:14.

Network Rail logo
LONG TERM
Between
28 Dec 2024 and 29 Mar 2025
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Oct 2024 at 17:58.

Network Rail logo
LONG TERM
Between
28 Dec 2024 and 29 Mar 2025
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Oct 2024 at 13:42.

Transport for London (TfL) logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:46.

Transport for London (TfL) logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:46.

Transport for London (TfL) logo
Between
2 and 8 Jan 2025
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:47.

Transport for London (TfL) logo
Between
2 and 8 Jan 2025
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:48.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Richmond Road

Thames Water are proposing to carry out Utility asset works on Richmond Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 14:45.

UK Power Networks South Eastern logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Pagoda Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Pagoda Avenue, Richmond.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Sep 2024 at 13:11.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Worton Gardens

Cadent Gas are proposing to carry out New service connection on Worton Gardens, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:53.

Cadent Gas logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Worton Gardens

Cadent Gas are proposing to carry out New service connection on Worton Gardens, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 16:27.

Thames Water logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Petley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Petley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 14:26.

Thames Water logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Petley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Petley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 09:43.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Alexander Place

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Alexander Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 14:05.

Scottish Hydro Electric Power Dis logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Hunt Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Hunt Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Oct 2024 at 12:48.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
South Street

Thames Water were proposing to carry out Disconnection or alteration of supply on South Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 11:42.

Thames Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hillgate Street

Thames Water are proposing to carry out Utility repair and maintenance works on Hillgate Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 09:48.

Thames Water logo
Between
6 and 9 Jan 2025
Details
View Map
Share
South Audley Street

Thames Water were proposing to carry out New service connection on South Audley Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 16:05.

UK Power Networks Eastern & London logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Chapel Side

UK Power Networks Eastern & London were proposing to carry out New service connection on Chapel Side, Lancaster Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 15 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Oct 2024 at 10:02.

UK Power Networks Eastern & London logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Chapel Side

UK Power Networks Eastern & London are proposing to carry out New service connection on Chapel Side, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 10:09.

Cadent Gas logo
LONG TERM
Between
6 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Bomore Road

Cadent Gas are proposing to carry out Utility asset works on Bomore Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 10:31.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
North Audley Street

Thames Water are proposing to carry out New service connection on North Audley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 08:38.

Thames Water logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Upper Berkeley Street

Thames Water are proposing to carry out Utility repair and maintenance works on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 16:24.

Thames Water logo
LONG TERM
Between
6 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Paddington Street

Thames Water are proposing to carry out Utility asset works on Paddington Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 17:02.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Broadley Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Broadley Street, Church Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:07.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 10:47.

Thames Water logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Marylebone Road

Thames Water are proposing to carry out Utility asset works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 10:04.

Thames Water logo
LONG TERM
Between
6 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Baker Street

Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 17:35.

Thames Water logo
LONG TERM
Between
6 Jan and 25 Mar 2025
Details
View Map
Share
Follow
Bristol Gardens

Thames Water are proposing to carry out Utility asset works on Bristol Gardens, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:19.

Thames Water logo
Between
6 and 11 Jan 2025
Details
View Map
Share
Follow
Maida Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Maida Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 17:20.

Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Randolph Avenue

G. Network Communications are proposing to carry out Remedial works on Randolph Avenue, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 9 Oct 2024 at 09:07.

City Of Westminster logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Tolhurst Drive

City Of Westminster are proposing to carry out Highway repair and maintenance works on Tolhurst Drive, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Oct 2024 at 17:09.

Thames Water logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Circus Road

Thames Water are proposing to carry out Utility asset works on Circus Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:06.

Thames Water logo
LONG TERM
Between
6 Jan and 13 Apr 2025
Details
View Map
Share
Follow
Wellington Road

Thames Water are proposing to carry out Utility asset works on Wellington Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 12:25.

Thames Water logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Twyford Abbey Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 11:30.

Thames Water logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Twyford Abbey Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 11:39.

Thames Water logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Waverley Place

Thames Water are proposing to carry out Utility repair and maintenance works on Waverley Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:05.

Thames Water logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Finchley Place

Thames Water are proposing to carry out Utility asset works on Finchley Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:05.

T-Mobile (UK) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
The Avenue

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on The Avenue, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 18 Oct 2024 at 13:15.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 09:07.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 Sep 2024 at 09:27.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Oct 2024 at 16:42.

BT logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Mullins Path

BT are proposing to carry out Utility asset works on Mullins Path, Mortlake.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 8 Oct 2024 at 10:07.

Virgin Media logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Kensington Church Street

Virgin Media are proposing to carry out Utility asset works on Kensington Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 13 Sep 2024 at 15:45.

Thames Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Beaufort Road

Thames Water are proposing to carry out Utility asset works on Beaufort Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:26.

London Borough Of Barnet logo
LONG TERM
Between
7 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 29 Oct 2024 at 08:45.

Transport for London (TfL) logo
LONG TERM
Between
9 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Parkgate Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkgate Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 10:42.

Transport for London (TfL) logo
LONG TERM
Between
9 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Westbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westbridge Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2024 at 14:36.

Thames Water logo
LONG TERM
Between
9 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Chiltern Street

Thames Water are proposing to carry out Utility asset works on Chiltern Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:05.

T-Mobile (UK) logo
Between
11 and 18 Jan 2025
Details
View Map
Share
Follow
Corringham Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Corringham Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 18 January 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 22 Oct 2024 at 14:25.

T-Mobile (UK) logo
Between
11 and 18 Jan 2025
Details
View Map
Share
Follow
Corringham Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Corringham Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 18 January 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 23 Oct 2024 at 15:48.

Cadent Gas logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Smith Terrace

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Smith Terrace, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 10:23.

Cadent Gas logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Wellington Square

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Wellington Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 14:00.

Hyperoptic logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Gerald Road

Hyperoptic are proposing to carry out Utility asset works on Gerald Road, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 24 Oct 2024 at 14:49.

City Of Westminster logo
LONG TERM
Between
13 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 Oct 2024 at 09:28.

City Of Westminster logo
LONG TERM
Between
13 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Oct 2024 at 11:54.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
South Street

Thames Water are proposing to carry out Disconnection or alteration of supply on South Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 11:20.

Cadent Gas logo
Between
13 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Grenfell Road

Cadent Gas are proposing to carry out Utility asset works on Grenfell Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:29.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
North Audley Street

Thames Water are proposing to carry out New service connection on North Audley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 10:32.

Cadent Gas logo
Between
13 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Walmer Road

Cadent Gas are proposing to carry out Utility asset works on Walmer Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:29.

Thames Water logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Great Cumberland Place

Thames Water were proposing to carry out Works for road purposes on Great Cumberland Place, Bryanston & Dorset Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 11:37.

Thames Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Frampton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Frampton Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 15:35.

Thames Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Lisson Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Lisson Grove, Church Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 12:07.

Thames Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Hamilton Terrace

Thames Water are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 14:34.

City Of Westminster logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Elgin Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Elgin Avenue, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 21 Oct 2024 at 15:27.

Thames Water logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Thames Water are proposing to carry out New service connection on Dudden Hill Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 13:36.

London Borough Of Brent logo
LONG TERM
Between
13 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Harrow Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 4 Oct 2024 at 10:43.

London Borough Of Brent logo
LONG TERM
Between
13 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Wembley Hill Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 4 Oct 2024 at 10:54.

Scottish Hydro Electric Power Dis logo
Between
14 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Swift Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Swift Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Oct 2024 at 11:43.

Thames Water logo
Between
16 and 22 Jan 2025
Details
View Map
Share
Follow
Rootes Drive

Thames Water are proposing to carry out Disconnection or alteration of supply on Rootes Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:37.

City Of Westminster logo
Between
17 and 20 Jan 2025
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Jun 2024 at 13:27.

UK Power Networks Eastern & London logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Peterborough Mews

UK Power Networks Eastern & London were proposing to carry out New service connection on Peterborough Mews, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 11:31.

UK Power Networks Eastern & London logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Peterborough Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Peterborough Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 11:33.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 12 Mar 2025
Details
View Map
Share
Follow
Parkgate Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkgate Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 13:59.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Westbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westbridge Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 15:43.

Thames Water logo
Between
20 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Fletcher Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fletcher Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 14:07.

Thames Water logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
South Audley Street

Thames Water are proposing to carry out New service connection on South Audley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 09:25.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Cherington Road

Thames Water are proposing to carry out New service connection on Cherington Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 15:29.

Cadent Gas logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Leinster Terrace

Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 09:17.

Cadent Gas logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Leinster Terrace

Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 12:28.

Thames Water logo
Between
20 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Creffield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Creffield Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 10:23.

Thames Water logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Longfield Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Longfield Avenue, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 16:25.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Upper Berkeley Street

Thames Water were proposing to carry out New service connection on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 09:23.

Thames Water logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Luxborough Street

Thames Water are proposing to carry out New service connection on Luxborough Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 07:58.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Llanover Road

Thames Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the cycleway only.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 07:51.

Thames Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Holbein Mews

Thames Water are proposing to carry out Utility asset works on Holbein Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 10:40.

Thames Water logo
Between
22 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Baker Street

Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:06.

Cadent Gas logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Albert Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Albert Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 14:21.

UK Power Networks Eastern & London logo
Between
27 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Old York Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Oct 2024 at 14:32.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Eastbourne Terrace

Thames Water are proposing to carry out New service connection on Eastbourne Terrace, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 11:03.

Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Gloucester Place

G. Network Communications are proposing to carry out Utility asset works on Gloucester Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by G. Network Communications on 25 Oct 2024 at 17:31.

Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Gloucester Place

G. Network Communications are proposing to carry out Utility asset works on Gloucester Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by G. Network Communications on 4 Nov 2024 at 09:40.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Coles Green Road

Thames Water are proposing to carry out New service connection on Coles Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 08:46.

Transport for London (TfL) logo
LONG TERM
Between
28 Jan and 30 May 2025
Details
View Map
Share
Follow
Beaufort Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beaufort Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 13:50.

London Borough Of Barnet logo
Between
29 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 20 Sep 2024 at 13:49.


Roadworks Map near to Acton Lane, LONDON, W3 8PE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 4 Nov 2024 19:23
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Acton Lane, LONDON, W3 8PE (75 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Thames Water logo
WINCHESTER STREET 
(0.1 miles)
Thames Water
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 4 Nov 2024 - 6 Nov 2024
0.1
Details
Share
Follow
2
London Borough Of Ealing logo
URGENT
  
WINCHESTER STREET 
(0.1 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - No carriageway incursion
Complete
14 Oct 2024 00:00 - 15 Oct 2024 23:59
0.1
Details
Share
3
London Borough Of Ealing logo
MAJOR
  
ACTON LANE 
(0.1 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - No carriageway incursion
Planned
Scheduled: 4 Sep 2024 - 4 Nov 2024
0.1
Details
Share
Follow
4
London Borough Of Ealing logo
MAJOR
  
ACTON LANE 
(0.1 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - No carriageway incursion
In Progress
Since: 4 Sep 2024 00:00
(Scheduled: 4 Sep 2024 - 4 Nov 2024)
0.1
Details
Share
Follow
5
London Borough Of Ealing logo
MAJOR
  
HIGH STREET 
(0.1 miles)
London Borough Of Ealing
Highway improvement works - Footway, Footpath - No carriageway incursion
In Progress
Since: 25 Oct 2024 00:00
(Scheduled: 25 Oct 2024 - 25 Nov 2024)
0.1
Details
Share
Follow
6
London Borough Of Ealing logo
MAJOR
  
HIGH STREET 
(0.1 miles)
London Borough Of Ealing
Highway improvement works - Footway, Footpath - No carriageway incursion
Planned
Scheduled: 25 Oct 2024 - 25 Nov 2024
0.1
Details
Share
Follow
7
London Borough Of Ealing logo
URGENT
  
ACTON LANE 
(0.1 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - Some carriageway incursion
Complete
14 Oct 2024 00:00 - 16 Oct 2024 23:59
0.1
Details
Share
8
London Borough Of Ealing logo
AVENUE ROAD 
(0.1 miles)
London Borough Of Ealing
Highway repair and maintenance works - Footway - No carriageway incursion
Cancelled
(Scheduled: 5 Nov 2024 - 7 Nov 2024)
0.1
Details
Share
9
London Borough Of Ealing logo
URGENT
  
HIGH STREET 
(0.2 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - No carriageway incursion
In Progress
Since: 4 Nov 2024 00:00
(Scheduled: 4 Nov 2024 - 4 Dec 2024)
0.2
Details
Share
Follow
10
London Borough Of Ealing logo
URGENT
  
HIGH STREET 
(0.2 miles)
London Borough Of Ealing
Highway improvement works - Carriageway - No carriageway incursion
In Progress
Since: 4 Nov 2024 00:00
(Scheduled: 4 Nov 2024 - 4 Dec 2024)
0.2
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data