Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Carroll Crescent, SL5 9EJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Carroll Crescent, ASCOT, SL5 9EJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Carroll Crescent are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
LONG TERM
Between
15 Feb and 9 May 2024
Details
View Map
Share
Follow
St Judes Road

Cadent Gas are proposing to carry out Utility asset works on St Judes Road, Englefield Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 31 Jan 2024 at 00:10.

Cadent Gas logo
LONG TERM
Until
7 Jun 2024
Details
View Map
Share
Follow
Sunning Avenue

Cadent Gas are carrying out Utility asset works on Sunning Avenue, Sunningdale, Ascot.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 09:27 and could run through until 7 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Feb 2024 at 09:30.

Bracknell Forest Council logo
LONG TERM
Until
19 Jul 2024
Details
View Map
Share
Follow
Warfield Street

Bracknell Forest Council are carrying out Highway repair and maintenance works on Warfield Street, Warfield, Bracknell.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 11:30 and could run through until 19 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 4 Mar 2024 at 13:20.

Cadent Gas logo
LONG TERM
Between
18 Mar and 13 May 2024
Details
View Map
Share
Follow
North Street

Cadent Gas are proposing to carry out Utility asset works on North Street, Winkfield, Windsor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 29 Jan 2024 at 13:00.

Cadent Gas logo
LONG TERM
Between
18 Mar and 10 Jun 2024
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Binfield, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2024 and could run through until 10 June 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 31 Jan 2024 at 15:00.

Cadent Gas logo
LONG TERM
Until
7 Jun 2024
Details
View Map
Share
Follow
Silwood Road

Cadent Gas are carrying out Utility asset works on Silwood Road, Sunninghill, Ascot.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 08:18 and could run through until 7 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2024 at 08:20.

Cadent Gas logo
LONG TERM
Until
16 Jul 2024
Details
View Map
Share
Follow
Bagshot Road

Cadent Gas are carrying out Utility asset works on Bagshot Road, Ascot.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 April 2024 at 06:30 and could run through until 16 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2024 at 06:55.

Cadent Gas logo
LONG TERM
Between
15 Apr and 8 Jul 2024
Details
View Map
Share
Follow
Crouch Lane

Cadent Gas are proposing to carry out Utility asset works on Crouch Lane, Winkfield, Windsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 8 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Feb 2024 at 10:30.

Cadent Gas logo
LONG TERM
Between
15 Apr and 15 Jul 2024
Details
View Map
Share
Follow
Hatchet Lane

Cadent Gas are proposing to carry out Utility asset works on Hatchet Lane, Winkfield, Windsor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 15 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Feb 2024 at 15:00.

Cadent Gas logo
LONG TERM
Until
22 May 2024
Details
View Map
Share
Follow
Freemantle Road Footpath

Cadent Gas are carrying out Utility asset works on Freemantle Road Footpath, Bagshot.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 26 April 2024 at 10:23 and could run through until 22 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 10:39.

Cadent Gas logo
LONG TERM
Between
21 Apr and 14 Jul 2024
Details
View Map
Share
Follow
Bagshot Road

Cadent Gas are proposing to carry out Utility asset works on Bagshot Road, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 14 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2023 at 12:43.

Surrey County Council logo
Until
3 May 2024
Details
View Map
Share
Follow
London Road

Surrey County Council are carrying out Highway improvement works on London Road, Virginia Water.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 18:00 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 22 Apr 2024 at 21:04.

Surrey County Council logo
Between
22 Apr and 5 May 2024
Details
View Map
Share
Follow
London Road

Surrey County Council are proposing to carry out Highway improvement works on London Road, Virginia Water.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 5 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 11 Dec 2023 at 11:16.

Surrey County Council logo
Between
22 Apr and 5 May 2024
Details
View Map
Share
Follow
Blacknest Road

Surrey County Council are proposing to carry out Highway improvement works on Blacknest Road, Virginia Water.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 5 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 11 Dec 2023 at 11:27.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Sunninghill Road

Cadent Gas are carrying out Utility repair and maintenance works on Sunninghill Road, Sunninghill, Ascot.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 April 2024 at 09:38 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 11:57.

Cadent Gas logo
LONG TERM
Between
28 Apr and 27 Jun 2024
Details
View Map
Share
Follow
Larch Avenue

Cadent Gas are proposing to carry out Utility asset works on Larch Avenue, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 10:14.

Cadent Gas logo
LONG TERM
Between
28 Apr and 27 Jun 2024
Details
View Map
Share
Follow
Larch Avenue

Cadent Gas are proposing to carry out Utility asset works on Larch Avenue, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Apr 2024 at 10:55.

Bracknell Forest Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Church Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Church Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 9 Apr 2024 at 09:04.

Bracknell Forest Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Station Roundabout

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Station Roundabout, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 9 Apr 2024 at 08:45.

Affinity Water logo
Between
6 and 10 May 2024
Details
View Map
Share
Follow
Kings Ride

Affinity Water are proposing to carry out Utility repair and maintenance works on Kings Ride, Ascot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 10 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 22 Apr 2024 at 09:40.

Scottish Hydro Electric Power Dis logo
Between
7 and 13 May 2024
Details
View Map
Share
Follow
Forest Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Forest Road, Winkfield Row, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Feb 2024 at 16:24.

Scottish Hydro Electric Power Dis logo
Between
13 and 31 May 2024
Details
View Map
Share
Follow
Skimped Hill Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Skimped Hill Lane, Bracknell.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 31 May 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Apr 2024 at 08:45.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 18 May 2024
Details
View Map
Share
Follow
Harmans Water Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Harmans Water Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2024 and could run through until 18 May 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 13 Mar 2024 at 08:30.

Surrey County Council logo
Between
17 and 21 May 2024
Details
View Map
Share
Follow
The Maultway

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Maultway, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Apr 2024 at 07:00.

Cadent Gas logo
Between
19 May and 13 Jun 2024
Details
View Map
Share
Follow
Devenish Road

Cadent Gas are proposing to carry out Utility asset works on Devenish Road, Sunningdale, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 07:57.

Cadent Gas logo
Between
19 May and 16 Jun 2024
Details
View Map
Share
Follow
Bagshot Road

Cadent Gas are proposing to carry out Utility asset works on Bagshot Road, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 16 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 07:57.

Nexfibre Networks Limited logo
Between
20 May and 3 Jun 2024
Details
View Map
Share
Follow
Chavey Down Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Chavey Down Road, Winkfield Row, Bracknell.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 19 Apr 2024 at 09:28.

South East Water logo
Between
21 and 24 May 2024
Details
View Map
Share
Follow
Broad Lane

South East Water are proposing to carry out Utility repair and maintenance works on Broad Lane, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 16 Feb 2024 at 15:48.

Cadent Gas logo
LONG TERM
Between
22 May and 21 Jul 2024
Details
View Map
Share
Follow
Crouch Lane

Cadent Gas are proposing to carry out Utility asset works on Crouch Lane, Winkfield, Windsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2024 and could run through until 21 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2024 at 11:25.

Surrey County Council logo
Between
22 and 30 May 2024
Details
View Map
Share
Follow
Portsmouth Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Portsmouth Road, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Mar 2024 at 08:07.

Cadent Gas logo
LONG TERM
Between
22 May and 21 Jul 2024
Details
View Map
Share
Follow
North Street

Cadent Gas are proposing to carry out Utility asset works on North Street, Winkfield, Windsor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2024 and could run through until 21 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2024 at 11:33.

Nexfibre Networks Limited logo
Between
27 May and 14 Jun 2024
Details
View Map
Share
Follow
Chavey Down Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Chavey Down Road, Winkfield Row, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 14 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 18 Apr 2024 at 09:22.

Bracknell Forest Council logo
Between
27 and 30 May 2024
Details
View Map
Share
Follow
Forest Road

Bracknell Forest Council are proposing to carry out Highway improvement works on Forest Road, Binfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 26 Apr 2024 at 08:30.

Cadent Gas logo
Between
27 and 30 May 2024
Details
View Map
Share
Follow
Crimp Hill

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Crimp Hill, Old Windsor, Windsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 30 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 19 Dec 2023 at 15:07.

Cadent Gas logo
LONG TERM
Between
27 May and 11 Jul 2024
Details
View Map
Share
Follow
Charters Road

Cadent Gas are proposing to carry out Utility asset works on Charters Road, Sunningdale, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 11 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 09:31.

Cadent Gas logo
Between
27 May and 24 Jun 2024
Details
View Map
Share
Follow
South Road

Cadent Gas are proposing to carry out Utility asset works on South Road, Bracknell.

These works are categorised as Major.

The works will start on or after 27 May 2024 and could run through until 24 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Feb 2024 at 17:00.

Hutchinson 3G logo
Between
28 and 30 May 2024
Details
View Map
Share
Follow
Bull Lane

Hutchinson 3G are proposing to carry out Utility repair and maintenance works on Bull Lane, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the verge only.

This roadwork event was last updated by Hutchinson 3G on 4 Mar 2024 at 16:15.

Bracknell Forest Council logo
Between
29 May and 1 Jun 2024
Details
View Map
Share
Follow
Binfield Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Binfield Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 26 Apr 2024 at 08:45.

Cornerstone Telecommunications Infrastructure logo
Between
30 May and 2 Jun 2024
Details
View Map
Share
Follow
Harmans Water Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Harmans Water Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2024 and could run through until 2 June 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 13 Mar 2024 at 08:32.

Surrey County Council logo
Between
3 and 20 Jun 2024
Details
View Map
Share
Follow
Trumps Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Trumps Green Road, Virginia Water.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 08:28.

Surrey County Council logo
Between
3 and 20 Jun 2024
Details
View Map
Share
Follow
Chobham Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chobham Lane, Longcross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 08:27.

Surrey County Council logo
Between
3 and 20 Jun 2024
Details
View Map
Share
Follow
Kitsmead Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kitsmead Lane, Longcross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 08:27.

Affinity Water logo
Between
4 and 7 Jun 2024
Details
View Map
Share
Follow
Bracknell Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Bracknell Road, Warfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2024 and could run through until 7 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 12 Mar 2024 at 15:12.

Surrey County Council logo
Between
7 and 18 Jun 2024
Details
View Map
Share
Follow
Staple Hill Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Staple Hill Road, Chobham, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Apr 2024 at 08:53.

Bracknell Forest Council logo
Between
21 and 24 Jun 2024
Details
View Map
Share
Follow
Mill Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 June 2024 and could run through until 24 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 26 Apr 2024 at 08:56.

Bracknell Forest Council logo
Between
23 and 25 Jun 2024
Details
View Map
Share
Follow
Forest Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Forest Road, Binfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 25 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 25 Apr 2024 at 12:22.

Bracknell Forest Council logo
Between
24 and 29 Jun 2024
Details
View Map
Share
Follow
Mill Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 29 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 26 Apr 2024 at 08:58.

Bracknell Forest Council logo
Between
24 Jun and 3 Jul 2024
Details
View Map
Share
Follow
Forest Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Forest Road, Binfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 3 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 26 Apr 2024 at 09:00.

Bracknell Forest Council logo
Between
26 Jun and 4 Jul 2024
Details
View Map
Share
Follow
Binfield Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Binfield Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 4 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 26 Apr 2024 at 09:02.

Bracknell Forest Council logo
Between
26 and 30 Jun 2024
Details
View Map
Share
Follow
Binfield Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Binfield Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 25 Apr 2024 at 12:22.

Bracknell Forest Council logo
Between
28 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Bagshot Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bagshot Road, Winkfield, Windsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 25 Apr 2024 at 12:23.

Bracknell Forest Council logo
Between
28 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Mill Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 25 Apr 2024 at 12:23.

Bracknell Forest Council logo
Between
1 and 4 Jul 2024
Details
View Map
Share
Follow
Mill Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 4 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 25 Apr 2024 at 12:23.

Bracknell Forest Council logo
Between
12 and 15 Jul 2024
Details
View Map
Share
Follow
Bagshot Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bagshot Road, Winkfield, Windsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2024 and could run through until 15 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 25 Apr 2024 at 12:24.

Surrey County Council logo
Between
14 and 18 Jul 2024
Details
View Map
Share
Follow
Crimp Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Crimp Hill, Englefield Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 18 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Apr 2024 at 07:24.

Cornerstone Telecommunications Infrastructure logo
Between
14 and 17 Jul 2024
Details
View Map
Share
Follow
Birch Hill Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Birch Hill Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 17 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 24 Apr 2024 at 12:23.

Cadent Gas logo
LONG TERM
Between
18 Jul and 10 Oct 2024
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Binfield, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2024 and could run through until 10 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Apr 2024 at 10:11.

Bracknell Forest Council logo
Between
19 and 22 Jul 2024
Details
View Map
Share
Follow
Bagshot Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bagshot Road, Winkfield, Windsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2024 and could run through until 22 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 25 Apr 2024 at 12:24.

Cadent Gas logo
LONG TERM
Between
22 Jul and 14 Oct 2024
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Binfield, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 14 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Feb 2024 at 12:00.

Cadent Gas logo
LONG TERM
Between
22 Jul and 30 Aug 2024
Details
View Map
Share
Follow
Devenish Road

Cadent Gas are proposing to carry out Utility asset works on Devenish Road, Sunningdale, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 30 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 09:59.

Cadent Gas logo
LONG TERM
Between
22 Jul and 27 Sep 2024
Details
View Map
Share
Follow
St Judes Road

Cadent Gas are proposing to carry out Utility asset works on St Judes Road, Englefield Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Apr 2024 at 14:26.

Cadent Gas logo
LONG TERM
Between
22 Jul and 10 Oct 2024
Details
View Map
Share
Follow
St Judes Road

Cadent Gas are proposing to carry out Utility asset works on St Judes Road, Englefield Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 10 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Mar 2024 at 13:37.


Roadworks Map near to Carroll Crescent, ASCOT, SL5 9EJ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 26 Apr 2024 15:14
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Carroll Crescent, ASCOT, SL5 9EJ (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Thames Water logo
EMERGENCY
  
PRINCE ANDREW WAY 
(1.0 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Give and take
In Progress
Since: 3 Apr 2024 14:00
(Scheduled: 3 Apr 2024 - 10 May 2024)
1.0
Details
Share
Follow
2
Thames Water logo
URGENT
  
DARWALL DRIVE 
(1.0 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Give and take
In Progress
Since: 18 Apr 2024 15:00
(Scheduled: 18 Apr 2024 - 10 May 2024)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.