1
Council Housing - Chestnut Grove
Immediately after the Second World War prefabricated concrete bungalows were offered to local authorities in an attempt to meet a housing shortage. This small estate was built in Wednesfield. These Tarran bungalows had an expected life of ten years.
Image: © John M
Taken: 21 Nov 2010
0.02 miles
2
Hazel Grove, Wood End
One of three footpaths lined with prefabricated bungalows between Bellamy Lane (immediately behind the photographer) and Orchard Road.
Image: © Richard Vince
Taken: 28 Dec 2016
0.03 miles
3
Council Housing - Chestnut Grove
Immediately after the Second World War prefabricated concrete bungalows were offered to local authorities in an attempt to meet a housing shortage. This small estate was built in Wednesfield.The prpoerties had a design life of ten years.
Image: © John M
Taken: 21 Nov 2010
0.03 miles
4
Open space, Orchard Road, Wood End
Image: © Richard Vince
Taken: 28 Dec 2016
0.07 miles
5
Polling Station - Wolverhampton North East
The hall at Wood End Primary School plays host to a polling station for the 2010 General Election. The school is in an area of predominantly private housing pre and post war. The demographic is a mix of working and middle class.
Image: © John M
Taken: 6 May 2010
0.10 miles
6
Wood End Primary School
The new school buildings opened last year.
A polling station for the EU Referendum.
Image: © John M
Taken: 23 Jun 2016
0.12 miles
7
Robin Grove, Wood End
A residential cul de sac off Bellamy Lane.
Image: © Richard Vince
Taken: 28 Dec 2016
0.12 miles
8
Boys Entrance - Wood End Primary School
The two-storey 1960 block was demolished at the start of the year. Now is the turn of the original 1938 school. A new £2.5M school has been constructed on the playing field. My brother and I were pupils at the school in the 1960s.
The front entrances were not used by pupils in the 1960s with access made from the courtyard to the rear. There was a classroom on the left with headmaster Mr Shannon and school secretary's offices on the right.
Image: © John M
Taken: 13 Dec 2015
0.12 miles
9
Demolition of Wood End Primary School
The two-storey 1960 block was demolished at the start of the year. Now is the turn of the original 1938 school. A new £2.5M school has been constructed on the playing field. My brother and I were pupils at the school in the 1960s.
Image: © John M
Taken: 13 Dec 2015
0.12 miles
10
Demolition of Wood End Primary School
The two-storey 1960 block was demolished at the start of the year. Now is the turn of the original 1938 school. A new £2.5M school has been constructed on the playing field. My brother and I were pupils at the school in the 1960s.
Image: © John M
Taken: 13 Dec 2015
0.12 miles