1
Fire engine at Oriel High School
It seemed to me a genuine call-out, but evidently of no large consequence.
Image: © Robin Webster
Taken: 7 Jul 2013
0.05 miles
2
Fire engine at Oriel High School
It seemed to me a genuine call-out, but evidently of no large consequence.
Image: © Robin Webster
Taken: 7 Jul 2013
0.05 miles
3
Entrance to Oriel High School
Image: © Shazz
Taken: 30 Apr 2016
0.07 miles
4
Railway bridge VTB3 129
Work on the extension of the bridge on the far side is in hand with a new concrete span in place, and now the widened embankment needs forming, hence the restricted width of the bridleway. The work is to accommodate additional sidings for stabling of stock for longer trains on the Thameslink service.
Image: © Robin Webster
Taken: 7 Jul 2013
0.09 miles
5
Path heads towards way under rail bridge
A view the other way from 2012 is at http://www.geograph.org.uk/photo/3179173.
Image: © Shazz
Taken: 30 Apr 2016
0.09 miles
6
Embankment widening south of Three Bridges
Extra sidings for twelve car Thameslink trains are being installed, which requires the embankment to be widened.
Image: © Robin Webster
Taken: 7 Jul 2013
0.09 miles
7
Railway bridge VTB3 129
A skew crossing of Maidenbower Lane, here only a bridleway, for four tracks. Network Rail has under construction facilities for servicing Thameslink trains in 12-car formations, which involve adding a further track across the lane on this side, with the new span abutting the existing bridge. The span will be of flat concrete beam construction, obscuring the existing arch profile beyond. It will be a generous 7 m wide transverse to the railway, so adding somewhat more to the lane cover. There will be lighting.
Image: © Robin Webster
Taken: 14 Oct 2012
0.10 miles
8
Sculpture on roundabout
It must depict some sort of insect.
Image: © Shazz
Taken: 30 Apr 2016
0.10 miles
9
Railway bridge VTB3 129
The south side extension of the bridge is complete, but the widened embankment to each side needs further work. This is in order to accommodate additional sidings for stabling of stock for longer trains on the Thameslink service.
Image: © Robin Webster
Taken: 8 Mar 2014
0.11 miles
10
Railway bridge VTB3 129
Work on the south side extension of the bridge is in hand with a new concrete span in place, and now the widened embankment to each side needs forming. This is in order to accommodate additional sidings for stabling of stock for longer trains on the Thameslink service.
Image: © Robin Webster
Taken: 7 Jul 2013
0.11 miles