1
New housing, Forge Wood
Part of the large development here. The part west of the Gatwick Stream is still under construction, but the northern end is largely complete.
Image: © Robin Webster
Taken: 28 Aug 2017
0.00 miles
2
Flats, Somerley Drive, Forge Wood, Crawley
Image: © Robin Webster
Taken: 28 Feb 2021
0.02 miles
3
New housing, Forge Wood
There is a large development here. Looking from the raw part west of the Gatwick Stream towards the more established parts.
Image: © Robin Webster
Taken: 28 Aug 2017
0.04 miles
4
New road bridge over Gatwick Stream
Part of the Forge Wood housing development.
Image: © Robin Webster
Taken: 28 Aug 2017
0.04 miles
5
New housing, Forge Wood
On the largely complete part of this large development east of the Gatwick Stream.
Image: © Robin Webster
Taken: 28 Aug 2017
0.04 miles
6
Renovated bridge over Gatwick Stream
The old bridge's concrete span appears to have been overlaid with a new span with railings, reaching well beyond the old abutments which are in crumbling brick, and remain as was. Carried out as part of the Forge Wood housing development, and viewed from a new bridge for one of the new roads.
Image: © Robin Webster
Taken: 28 Aug 2017
0.05 miles
7
Bridge over Gatwick Stream, Forge Wood, Crawley
An old bridge, its concrete span appears to have been overlaid with a new span with railings, reaching well beyond the old abutments which are in crumbling brick, and remain as was. Carried out as part of the Forge Wood housing development, and viewed from a new bridge for one of the new roads. When seen in 2017 it was not blocked off by the plastic barriers -
Image
Image: © Robin Webster
Taken: 28 Feb 2021
0.05 miles
8
Path, Forge Wood, Crawley
A large area in the flood zone from the Gatwick Stream has been left undeveloped apart from a network of paths.
Image: © Robin Webster
Taken: 29 May 2023
0.05 miles
9
Forge Wood Community Centre, Crawley
On Somerley Drive.
Image: © Robin Webster
Taken: 13 Aug 2023
0.07 miles
10
Forge Wood Primary School
The school has been operating from nearby temporary accommodation for a year, but plans to start the 2017/8 academic year in this proper new building. There is still a lot of finishing off and tidying up to do, at least externally. With only ten days to go until pupils turn up, will they make it?
Image: © Robin Webster
Taken: 28 Aug 2017
0.07 miles