1
Training tram on Southchurch Drive
Between Rivergreen and Dovenby Road.
Image: © Alan Murray-Rust
Taken: 21 May 2015
0.08 miles
2
Southchurch Drive above Dovenby Road
Overhead wires are now up although not fixed in place.
Image: © Alan Murray-Rust
Taken: 13 Nov 2014
0.08 miles
3
Looking like a real tramway at last
The northern section of Southchurch Drive. The overhead is still to be constructed of course. One outcome of the tramway is that the road humps have had to disappear.
Image: © Alan Murray-Rust
Taken: 7 Mar 2014
0.09 miles
4
Southchurch drive near Rivergreen
This should have been reopened to traffic two weeks before the view was taken, but completion has been delayed.
Image: © Alan Murray-Rust
Taken: 13 Feb 2014
0.09 miles
5
On Southchurch Drive
The section of track between Rivergreen and Farnborough Road is the longest section of street track to be laid so far. This section only needs the top surface to be laid. When done, it will be the turn of the other side of the road to be worked on.
Image: © Alan Murray-Rust
Taken: 2 Aug 2013
0.09 miles
6
Southchurch Drive
This is the main spine road of Clifton Estate. This view is looking north from Rivergreen with the tower of Southchurch Court in the background. The proposed extension of Nottingham's tram to Clifton will run along here.
Image: © Alan Murray-Rust
Taken: 21 May 2009
0.09 miles
7
Southchurch Drive
This is the main spine road of Clifton Estate. This view is looking south from Rivergreen. The proposed extension of Nottingham's tram to Clifton will run along here, with a stop where the trees are.
Image: © Alan Murray-Rust
Taken: 21 May 2009
0.09 miles
8
Southchurch Drive, April 2013 - 2
The northern section is closed to all but residents as trackbed work for the tramway progresses.
Image: © Alan Murray-Rust
Taken: 12 Apr 2013
0.09 miles
9
Green link
A small open space provides a pedestrian link between Southchurch Drive and Colley Moor Leys Lane.
Image: © Alan Murray-Rust
Taken: 21 May 2009
0.10 miles
10
Southchurch Drive, April 2013 - 3
The northern section is closed to all but residents as trackbed work for the tramway progresses. This is the southern end of this section of works at Rivergreen.
Image: © Alan Murray-Rust
Taken: 12 Apr 2013
0.10 miles