IMAGES TAKEN NEAR TO
Syston Road, LEICESTER, LE7 4UZ

Introduction

This page details the photographs taken nearby to Syston Road, LE7 4UZ by members of the Geograph project.

The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.

There are currently over 7.5m images from over14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Image Map


Images are licensed for reuse under creativecommons.org/licenses/by-sa/2.0
Notes
  • Clicking on the map will re-center to the selected point.
  • The higher the marker number, the further away the image location is from the centre of the postcode.

Image Listing (27 Images Found)

Images are licensed for reuse under creativecommons.org/licenses/by-sa/2.0
  • ...
Image
Details
Distance
1
Chestnut Farm driveway
Image: © Andrew Tatlow Taken: 2 Feb 2017
0.06 miles
2
Signs at end of Chestnut Farm driveway
Image: © Andrew Tatlow Taken: 2 Feb 2017
0.11 miles
3
Syston Road/Chestnut Farm driveway junction
Bridge SPC5/43 on Syston Road was being rebuilt and had been closed since 16 September 2016. According to the signs the closure was expected to last "approximately 26 weeks".
Image: © Andrew Tatlow Taken: 2 Feb 2017
0.11 miles
4
Syston Road eastwards over the Midland Main Line
Bridge SPC5/43 on Syston Road was being rebuilt and had been closed since 16 September 2016. According to the signs the closure was expected to last "approximately 26 weeks".
Image: © Andrew Tatlow Taken: 2 Feb 2017
0.11 miles
5
Sign at Syston Road closure for bridge re-building 001
Bridge SPC5/43 on Syston Road was being rebuilt and had been closed since 16 September 2016. According to the signs the closure was expected to last "approximately 26 weeks".
Image: © Andrew Tatlow Taken: 2 Feb 2017
0.11 miles
6
Sign at Syston Road closure for bridge re-building 002
Bridge SPC5/43 on Syston Road was being rebuilt and had been closed since 16 September 2016. According to the signs the closure was expected to last "approximately 26 weeks".
Image: © Andrew Tatlow Taken: 2 Feb 2017
0.11 miles
7
Sign at Syston Road closure for bridge re-building 003
Bridge SPC5/43 on Syston Road was being rebuilt and had been closed since 16 September 2016. According to the signs the closure was expected to last "approximately 26 weeks".
Image: © Andrew Tatlow Taken: 2 Feb 2017
0.11 miles
8
Sign at Syston Road closure for bridge re-building 004
Bridge SPC5/43 on Syston Road was being rebuilt and had been closed since 16 September 2016. According to the signs the closure was expected to last "approximately 26 weeks".
Image: © Andrew Tatlow Taken: 2 Feb 2017
0.11 miles
9
Sign at Syston Road closure for bridge re-building 005
Bridge SPC5/43 on Syston Road was being rebuilt and had been closed since 16 September 2016. According to the signs the closure was expected to last "approximately 26 weeks".
Image: © Andrew Tatlow Taken: 2 Feb 2017
0.11 miles
10
Syston Road towards Rothley
Image: © Andrew Tatlow Taken: 7 May 2011
0.12 miles
  • ...