1
Timber Yard, off Taff Trail
Image: © David Smith
Taken: 22 Sep 2022
0.06 miles
2
Ordnance Survey Cut Mark
This OS cut mark can be found on the NW parapet of the bridge on Cemetery Road. It marks a point 49.976m above mean sea level.
Image: © Adrian Dust
Taken: 17 Aug 2019
0.10 miles
3
Ordnance Survey Cut Mark
This OS cut mark can be found on the abutment of the Railway Bridge. It marks a point 38.949m above mean sea level.
Image: © Adrian Dust
Taken: 17 Aug 2019
0.11 miles
4
Bridge over temporary section of Taff Trail
At the time of the picture, the Taff Trail had been diverted for construction of a light railway, so the real trail is on the bridge above
Image: © David Smith
Taken: 22 Sep 2022
0.12 miles
5
Llwybr Ffynnon Taf / Taffs Well path
Llwybr yn gadeal Llwybr Taf yn Ffynnon Taf.
A path branching away off the Taff Trail at Taffs Well.
Image: © Alan Richards
Taken: 23 Mar 2014
0.13 miles
6
Two bridges in Taff's Well
These bridges over the A470 link Taff's Well with Glan-y-llyn; the first is a pedestrian bridge and the second carries a cycle path, part of the Taff Trail
Image: © David Smith
Taken: 7 Jul 2011
0.13 miles
7
The A470 near Taffs Well
Note the low-flying helicopter.
Image: © Gareth James
Taken: 20 Jan 2016
0.15 miles
8
Construction of the new Metro depot at Taffs Well
View of progress at the northern end of the depot. Stabled, left to right, are class 398 tram-trains Nos. 398012, 009, 014, 013 and 008.
Image: © Gareth James
Taken: 3 Mar 2024
0.15 miles
9
Construction of the new Metro depot at Taffs Well
The ground is clear and construction work on the new Taffs Well Metro depot for Transport for Wales is underway; this building has been erected at the northern end of the site.
Image: © Gareth James
Taken: 13 Mar 2022
0.16 miles
10
Construction of the new Metro depot at Taffs Well
Class 398 tram-train No. 398008, with 398006 behind, is seen outside the shed at the northern end of the depot.
Image: © Gareth James
Taken: 3 Mar 2024
0.16 miles