1
Towards Bromford
The view SW from Erdington Oval. Somewhere down there there's the A38, the M6, the A47 and the River Tame.
Image: © Adrian Bailey
Taken: 27 Feb 2005
0.10 miles
2
Birmingham and Fazeley Canal near Gravelly Hill in Birmingham
Looking east-north-east towards Fazeley.
Image: © Roger Kidd
Taken: 20 Aug 2012
0.11 miles
3
Birmingham and Fazeley Canal near Gravelly Hill, Birmingham
Approaching Troutpool Bridge, out of sight past the bend.
The Birmingham and Fazeley Canal was completed in 1789 having been engineered and supervised by John Smeaton. It linked Birmingham (Farmer's Bridge Junction) with the Coventry Canal at Fazeley Junction, fifteen miles in length, with 38 locks. An extension along part of the Coventry Canal route to Whittington was added later.
Image: © Roger D Kidd
Taken: 29 Aug 2012
0.11 miles
4
Birmingham and Fazeley Canal near Gravelly Hill in Birmingham
Looking east-north-east towards Fazeley.
Image: © Roger Kidd
Taken: 20 Aug 2012
0.11 miles
5
Canal towpath with heron near Gravelly Hill, Birmingham
Approaching Troutpool Bridge, out of sight past the bend.
The Birmingham and Fazeley Canal was completed in 1789 having been engineered and supervised by John Smeaton. It linked Birmingham (Farmer's Bridge Junction) with the Coventry Canal at Fazeley Junction, fifteen miles in length, with 38 locks. An extension along part of the Coventry Canal route to Whittington was added later.
Image: © Roger D Kidd
Taken: 29 Aug 2012
0.11 miles
6
Tyburn Road to the M6
Image: © Steve Daniels
Taken: 30 Jun 2014
0.11 miles
7
Birmingham and Fazeley Canal near Gravelly Hill in Birmingham
Looking east-north-east towards Fazeley, between the two Troutpool Bridges.
Image: © Roger Kidd
Taken: 20 Aug 2012
0.11 miles
8
Troutpool Bridge, Birmingham & Fazeley Canal
Image: © Tim Glover
Taken: 10 Jan 2003
0.13 miles
9
Troutpool Bridge near Gravelly Hill, Birmingham
Here the Birmingham and Fazeley Canal passes under this concrete bridge (which carries Jarvis Way into Gravelly Industrial Park), then continues under a factory for more than two hundred metres, emerging by Erdington Hall Bridge.
Image]
Image: © Roger D Kidd
Taken: 9 Sep 2008
0.13 miles
10
Troutpool Bridge south of Gravelly Hill, Birmingham
The Birmingham and Fazeley Canal was completed in 1789 having been engineered and supervised by John Smeaton. It linked Birmingham (Farmer's Bridge Junction) with the Coventry Canal at Fazeley Junction, fifteen miles in length, with 38 locks. An extension along part of the Coventry Canal route to Whittington was added later.
Image: © Roger D Kidd
Taken: 29 Aug 2012
0.13 miles